This solicitation document requests offers for the construction of water treatment injection and backflow prevention facilities for the Arkansas Valley Conduit Boone Reach Pipeline project. Offerors are asked to provide sealed offers by November 30th, 2023 for the construction of a backflow preventer site, chemical injection site, and related site improvements including piping, a chemical building, access roads, fencing, utilities and testing of installed fiber optic cable. Offerors must be able to begin performance within 10 calendar days of award and complete the work within 1300 calendar days. The solicitation was issued by the Bureau of Reclamation Great Plains Region on behalf of the Department of the Interior for the specified work located in Pueblo County, Colorado.

View the file

Other files

File Type Posted
Question_30_-_Amendment_0007_0007.pdf PDF
Sol_140R6023R0013_Amd_0007.pdf PDF
AMD0006_-_Specifications_0006.pdf PDF
Sol_140R6023R0013_Amd_0006.pdf PDF
140R6023R0013__RFP_Amendment0006_0006.pdf PDF
Questions_22-29_Amendment_0006_0006.pdf PDF
Questions_11-21_0005.pdf PDF
Sol_140R6023R0013_Amd_0005.pdf PDF
Sol_140R6023R0013_Amd_0004.pdf PDF
Questions_9-10_amendment0004_0004.pdf PDF
01_33_00_-_Submittals_AMD0003_0003.pdf PDF
Questions_4-8_amendment0003_0003.pdf PDF
140R6023R0013__RFP_Amendment0003_0003.pdf PDF
Sol_140R6023R0013_Amd_0003.pdf PDF
140R6023R0013_Pre-bid_Site_Visit__(10-25-2023)_0002.pdf PDF
Sol_140R6023R0013_Amd_0002.pdf PDF
Injection_Site_Sign_in_0002.JPG JPG image
140R6023R0013__RFP_Amendment0002_0002.pdf PDF
Questions_1-3_0001.pdf PDF
Sol_140R6023R0013_Amd_0001.pdf PDF
Attachment_5_Project_Experience_Form.docx DOCX document
Geology.pdf PDF
Attachment_7_Wage_Determination.pdf PDF
AVC_Injection_Site_Drawings.pdf PDF
Attachment_6__Subcontracting_Plan_Template.docx DOCX document
140R6023R0013__RFP_Final.pdf PDF
Attachment_4_Past_Performance_Questionnaire.pdf PDF
AVC_Injection_Site_-_Specifications.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Bureau of Reclamation

Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Jessica Busman 0000000000

1x 09/21/2023

140R6023R0013

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Work is located along the south side of U.S. Route 50 / Colorado State Highway 96

(SH96) between Devine, Colorado and North Avondale, Colorado in Pueblo County. Work consists primarily of the construction of a water treatment injection facility and backflow prevention facility for the Arkansas Valley Conduit Boone Reach Pipeline.

A. Contractor is responsible for staging areas, including space for construction trailers, material storage, and construction staff parking.

B. Contractor is responsible for investigations before beginning any construction, including exploratory excavations and contacting utility owners to determine locations and type of existing utilities.

C. Install:

1. Backflow Preventer Site improvements, including piping, a valve enclosure, power, and controls.

2. Chemical Injection Site improvements, including:

a. Chemical building, including chemical storage and feed systems, power, SCADA system, security system, and supporting infrastructure.

b. Access road, perimeter fencing, and stormwater detention pond.

c. Yard piping, vaults, and valves.

d. Engine generator.

3. Fiber conduit, cable, and associated improvements, including testing the fiber

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 711 calendar days and complete it within ________________ ________________ calendar days after receiving

11/30/2023

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Dwane D. Esplin

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 81

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R6023R0013 optic cable on delivery to the staging area, prior to installation, following installation in the fiber conduit but prior to splicing, and after splicing.

D. Relocate utilities as needed.

E. Flush, test, and disinfect installed piping, including furnishing and disposal of water.

F. Disinfect approximately 11.4 miles of 30-inch transmission piping, including furnishing and disposal of water.

G. Disinfect approximately 1.5 miles of 6-inch delivery line piping connected to the transmission piping, including furnishing and disposal of water.

00001 AVC Injection and Backflow 1 AU

Product/Service Code: Y1NE

Product/Service Description: CONSTRUCTION OF

WATER SUPPLY FACILITIES

Price Schedule 1

See Following Continuation Page(s).

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .