Questions___Answers_-_Round_3_0004.pdf

PDF 96 KB Posted

Attached to
NGWSP BLOCK 2-3 HDD
Solicitation number
140R4026R0002
Issued by

About this file

This is a Questions and Answers (Q&A) document related to a federal contract opportunity for horizontal directional drilling (HDD) work on a pipeline project.

The document addresses three primary technical concerns raised by bidders regarding Specification 33 05 22 and contract drawings. The first question requests the addition of a bid line item to accommodate either a 2,000 linear foot metallic Shumway HDD option or a 1,100 linear foot plastic Shumway HDD option, noting that the current bid form presents both options at 2,000 linear feet. The Contracting Officer's Representative (BOR) response directs bidders to indicate plastic pipe usage and modify quantities accordingly. The second question challenges the 6-inch reaming step size limitation specified for the Nenahnezad Bluff HDD, arguing that industry standards typically call for larger step increments (12 inches) to maintain operational efficiency and prevent equipment failure. The questioner contends that the 6-inch requirement could necessitate nine additional passes and increase project costs and timeline risks. The BOR rejected this challenge with no change to the specification. The third question concerns steel pipe wall thickness requirements under paragraph 2.05.B.1.c, arguing that HDD installation stresses exceed operating stresses and require thicker walls than the internal-pressure-based Barlow formula calculation provides. The question also recommends a minimum DR11 rating for HDPE Shumway HDD pipe rather than the specified maximum DR13.5. The BOR again declined to make modifications to the specification requirements.

View the file

Other files

File Type Posted
140R4026R0002_Attachment_1_3_33_05_22_-_Horizontal_Directional_Drilling_(HDD)_0005.pdf PDF
Sol_140R4026R0002_Amd_0005.pdf PDF
Sol_140R4026R0002_Amd_0004.pdf PDF
Sol_140R4026R0002_Amd_0003.pdf PDF
Questions___Answers_-_Round_2_0003.pdf PDF
140R4026R0002_Attachment_2_2_00_00_02_Drawings_01162026_0003.pdf PDF
140R4026R0002_Attachment_1_2_00_00_01_Specifications_01162026_0003.pdf PDF
140R4026R0002_Attachment_2_1_00_00_02_-_Drawings_12102025_0002.PDF PDF
140R4026R0002_Attachment_1_1_00_00_01_-_Specifications_12102025_0002.pdf PDF
Sol_140R4026R0002_Amd_0002.pdf PDF
Questions___Answers_-_Round_1_0002.pdf PDF
Sol_140R4026R0002_Amd_0001.pdf PDF
Site_Tour_Sign-in_Sheet_0001.pdf PDF
NGWSP_-_Block_2-3_HDD_Site_Tour_-_2_DECEMBER_2025_0001.pdf PDF
Sol_140R4026R0002.pdf PDF
140R4026R0002_Attachment_9_-_Construction_Contract_Administration.pdf PDF
140R4026R0002_Attachment_2_-_00_00_02_Dwgs-B_NGWSP-Block2-3HDD_11x17_20251027.pdf PDF
140R4026R0002_Attachment_4_-_WD_NM20250040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4026R0002_Attachment_1_-_00_00_01_NGWSP-BLK2-3-HDD_Specifications_10272025.pdf PDF
140R4026R0002_NGWSP_Block_2-3_HDD_17NOV25.pdf PDF
140R4026R0002_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4026R0002_Attachment_3_-_00_00_02A_GeologyDwgsAndLogs_NGWSP-BLK2-3-HDD_11x17_20251027.pdf PDF
140R4026R0002_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM.pdf PDF
140R4026R0002_Attachment_8_-_Key_Personnel_Form.docx DOCX document
140R4026R0002_Attachment_7_-_Experience_Form.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question / Comment BOR Response Shumway Pilot Bore & HDD: CLINs 1-8 & 1-9 both are shown as 2,000 linear feet. This is the distance of the metallic Shumway HDD option shown on drawing 1695-D-62450. Specification 33 05 22 and drawing 1695-D-61852 give the contractor and option to perform an 1,100 plastic Shumway HDD. There is no way to present the plastic 1,100 linear foot option on the current bid form. This could potentially cause an unfair evaluation of a proposal. Can a line item be added to the bid form that allows the contractor to chose either the 2,000 LF Metallic or the 1,100 Plastic option for the Shumway HDD?

Please indicate that plastic pipe is being used and modify quantities accordingly.

SPEC 33 05 22; Paragraph 3.04.L.4.a.1 - Amendment 0003; For Nenahnezad Bluff HDD, reaming step sizes shall not be greated than 6-inches in diameter per pass. The amendment No. 3 HDD specification allows reaming step sizes for all crossings except for the Nenahnezad Bluff HDD to be 12-inches in diameter per pass. The Nenahnezad Bluff HDD specs state that it shall not be greater than 6-inches in diameter per pass. We understand that the intent is successful preparation of the bore hole, however we have concerns that this approach will increase the risk and cost as compared to conventional methods for reaming. The selection of the various reamer/hole opener sizes is very much a preference (means and methods) and highly dependent on the HDD drill rig (torque and pull/thrust capabilities), mud pump’s flow rate and pressure, as well as the design of the hole openers. The configuration, cone/cutter size, IADC code, jet sizes, and other factors all work together as a system to efficiently perform bore hole reaming. Limiting the step size to 6-inches would require Nenahnezad Bluff to be completed in up to 9 passes including the pilot hole. This would dramatically increase project cost and time, potentially pushing the completion of the project outside the period of performance.

Additionally, this does not allow the hole opener to operate as it designed. A hole opener is made to use the full face of the cone, this allows for the weight used to fracture the rock to be distributed evenly across the entire cone. This alleviates side and front loading which can cause premature wear on the bearings which could lead to failure and the loss of the cone. (One would see this in the 18”-30” passes as the segments would be made from a 9 7/8” to 12 ¼ bit segments due to the size of the reamer.) The specification limitation of 6-inch step size increments does not follow industry standards. The industry has realized that reaming should be done in as few passes as possible while maintaining mud cleaning efficiency and cuttings removal. We are concerned that this requirement will likely lead to a failure and loss of a cone, which may or may not be able to be extracted. Our recommendation is to require that the pilot hole be reamed to a minimum of 12-inches greater than the OD of the pipe but eliminate the 6-inch step Nenahnezad and 12-inch step for the other crossings.

No change will be made.

SPEC 33 05 22; Paragraph 2.05.B.1.c.; HDD Steel Pipe Wall Thickness; After reviewing the contract documents regarding the steel pipe wall thickness, the noted requirements are all based on internal pressure. This is certainly appropriate for the safe operation of the pipeline, however the stresses that are necessary for pipe installation by horizontal directional drilling are typically much larger than operating stresses and therefore require a much thicker pipe wall. The wall thickness design for HDD installation is a much more rigorous procedure than using the Barlow formula and may not be fully evaluated prior to awarding the project and result in one or more of the bidders selecting a wall thickness that does not meet the installation stress requirements. A similar concern exists in specification 33 05 22 2.05.B.2.a.2.a where it states the HDPE pipe will have a Maximum DR: DR13.5. We believe that for the HDPE Shumway HDD a minimum of DR11 should be considered.

No change will be made.