140R4026R0002_Attachment_1_1_00_00_01_-_Specifications_12102025_0002.pdf
PDF 531 KB Posted
- Attached to
- NGWSP BLOCK 2-3 HDD
- Solicitation number
- 140R4026R0002
About this file
These documents are solicitation files for the Navajo-Gallup Water Supply Project, specifically for the San Juan Lateral – Block 2-3 Horizontal Directional Drilling (HDD) project. The amendment includes multiple technical specification sections covering project requirements for use of site, work restrictions, submittals, protected species, temporary safety fence, pesticides, and gravel surfacing. Key project constraints include work restrictions around sensitive environmental areas, with specific limitations for work near the Shumway Arroyo, San Juan River, and Chaco River during certain months of the year.
The project involves horizontal directional drilling with extensive environmental protection measures, particularly for protected species like Mesa Verde Cactus, migratory birds, raptors, ferruginous hawks, burrowing owls, kit foxes, and prairie dogs. Contractors must submit detailed plans for site use, safety, environmental monitoring, and construction methods, with multiple required submittals to the Bureau of Reclamation. The work includes preparing access roads, installing temporary safety fencing, managing potential wildlife interactions, and ensuring minimal environmental disturbance during construction activities. The project requires strict adherence to federal, state, and tribal environmental regulations, with comprehensive documentation and reporting requirements throughout the construction process.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo-Gallup Water Supply Project Amendment No. 002 San Juan Lateral – Block 2-3 Horizontal Directional Drilling Solicitation No.
Revised Use of Site
01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost: Include in prices offered in the Price Schedules for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (Reclamation)
1. Cleaning Manual Inspection and Cleaning Manual for
Equipment and Vehicles to Prevent the Spread of Invasive Species, available at:
https://www.usbr.gov/mussels/prevention/do cs/EquipmentInspectionandCleaningManual 2021.pdf
1.03 SUBMITTALS
A. Submit in accordance with Section 01 33 00 – Submittals.
B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:
1. Use site on Right-of-Way (ROW) or easements:
a. Show use location and extent of impact. Uses include but are not limited to the following:
1) Buildings and service areas including onsite offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.
2) Parking areas, temporary roads, and haul routes.
3) Utilities including gas, air, power, and water lines; fire hydrants;
and compressor station.
4) First-aid and medical facilities.
5) Areas for processing, storing, and disposing of waste materials from construction operations.
6) Temporary fences.
b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work https://www.usbr.gov/mussels/prevention/docs/EquipmentInspectionandCleaningManual2021.pdf https://www.usbr.gov/mussels/prevention/docs/EquipmentInspectionandCleaningManual2021.pdf https://www.usbr.gov/mussels/prevention/docs/EquipmentInspectionandCleaningManual2021.pdf
01 14 10 - 2 required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.
c. Describe methods to reseed disturbed pipe laydown areas.
d. Describe methods to preserve, protect, identified cultural resources adjacent to jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect sensitive areas, and prevent erosion.
e. Describe methods to protect and repair, existing improvements and utilities at or near jobsite.
f. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.
g. Describe methods for cleaning construction equipment.
C. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.
D. RSN 01 14 10-2, Optional Onsite Security Plan:
1. Schedule for single individual to live on job site to provide full-time inhabitance including estimated of fixed dates.
2. Residence facilities, indicating:
a. If existing job trailer will be used of if a new trailer will be placed onsite.
b. Utilities for residence facility to be used and if modifications are required:
1) Electric.
2) Water.
3) Waste management.
c. Any changes required to existing site security lighting
3. Map showing residence facility in relation to overall site, including plant, construction trailer, etc.
4. Other items not listed pertinent to additional site use.
1.04 PROJECT CONDITIONS
A. Government land, ROW, and Easements as shown on drawings may be used for required construction facilities:
1. Refer to Contractor Use Areas as shown on drawings.
B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land:
01 14 10 - 3
1. Prior to using land outside of ROW, obtain cultural and environmental approvals in accordance with Section 01 31 19 – Project Management and Coordination and Section 01 57 90 – Preservation of Historical and Archeological Data.
C. Location, construction, operation, maintenance, and removal of construction facilities on ROW or Easements will be subject to approval of COR.
D. Do not interfere with work of other contractors, Navajo Nation or Government in vicinity, or with reservations made by Government for use of such land.
E. Government may backcharge Contractor for costs incurred by the Government from contractors failing to cooperate with Government or other Contractors.
F. Blasting is not allowed.
G. See 01 51 00 – Temporary Utilities.
H. Natural Conditions, Contractor to verify (https://wrcc.dri.edu/cgi-bin/cliMAIN.pl?nm3340):
1. Ambient Temperature Range: Averages 16 to 93 degrees F with extremes of minus 21 to 110 degrees F possible.
2. Annual Average Precipitation: 7 to 8 inches.
3. Altitude: 5,000 to 5,350 feet.
4. Wind:
a. Maximum sustained: 9.5 mph.
b. Maximum gust: 64 mph.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 CLEANING
A. Construction Equipment:
1. Before bringing on site, clean construction equipment, to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species. If in Mesa Verde Cactus habitat, follow cleaning protocols outlined in the Mesa Verde Cactus Construction Plan referenced in Section 01 57 60 – Protected Species.
2. Contractor cleaning procedures shall result in equipment and vehicles being cleaned as well or better than procedures described in Cleaning Manual.
https://wrcc.dri.edu/cgi-bin/cliMAIN.pl?nm3340 https://wrcc.dri.edu/cgi-bin/cliMAIN.pl?nm3340
01 14 10 - 4
3. OGR will inspect construction equipment following procedures described in Cleaning Manual before allowing equipment onsite.
3.02 MAINTENANCE
A. Clean and service portable toilets weekly or more frequently as directed by COR.
B. Keep approach walks free of mud, water, ice, and snow.
3.03 RESTORATION
A. Restore Contactor Use Areas to preconstruction condition.
B. Restore temporary construction roads to original contours and make impassable to vehicular traffic when no longer required.
C. After completion of work, regrade and scarify Government land, easements, and ROWs used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that facilitates revegetation, provides drainage, and prevents erosion.
END OF SECTION
Revised Work Restrictions and Limitations
01 14 12 - 1
SECTION 01 14 12
WORK RESTRICTIONS AND LIMITATIONS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost: Include in prices offered in the Price Schedules for other items of work.
1.02 WORK RESTRICTIONS AND LIMITATIONS
A. Allowable Work Hours: Sunrise to sunset, Monday through Saturday, unless otherwise authorized by COR.
B. Comply with noise and light restrictions listed in Section 01 57 20 – Environmental Controls and 01 35 20 – Safety and Health.
C. Perform work in roadways in accordance with Section 01 55 20 – Traffic Control.
D. Contractor will not have access to north and west sides of Road 6800 unless authorized by COR.
1. If authorized, Contractor may not cross Road 6800 until temporary safety fence is installed in accordance with Section 01 56 32 - Temporary Safety Fence.
E. Shumway Arroyo HDD:
1. Allowable Work Period: November 1 to February 28 of any given year.
1. No drilling activities allowed between March 1st to October 31st of any given year.
2. No vehicles or construction equipment will be permitted to drive across the
Shumway Arroyo.
3. No ground disturbing activities between entry and exit points.
F. San Juan River HDD:
1. No vehicles or construction equipment will be permitted to drive across the San
Juan River.
2. No ground disturbing activities between entry and exit points.
G. Chaco River HDD:
1. Chaco River monsoon season: July 1st though October 15th.
2. No construction activities allowed between March 1st to July 31st of any given year on the Northeast side of the Chaco River.
Revised Work Restrictions and Limitations
01 14 12 - 2
3. No vehicles or construction equipment will be permitted to drive across the Chaco River.
4. No ground disturbing activities between entry and exit points.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Revised Submittals
01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost: Include in prices offered in the Price Schedules for other items of work.
1.02 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME)
1. ASME Y14.1-2020 Decimal Inch Drawing Sheet Size and
Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-2014 United States National CAD Standards, Version 6
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittal Types, as listed in Table 01 33 00A – List of Submittals:
1. A – Action:
a. Government will respond as to adequacy of submittal.
b. Action submittals: Considered to be “shop drawings” within terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.
2. I – Informational:
a. Government will acknowledge receipt of Informational submittals.
b. Government may reject an Informational submittal when submittal does not comply with contract. Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.
c. Informational submittals: Considered to be “shop drawings” within terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction, except that approval by Government is not required.
01 33 00 - 2
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number, title, and RSN.
3. Measurement units: US Customary Units.
4. Provide unique transmittal number for each submittal.
C. Drawings:
1. Minimum identification in title block:
a. Contract number and title.
b. Contractor’s or supplier’s title and drawing number.
c. Date.
2. Reserve 3- by 3-inch space next to title block for review stamps.
3. Print Size: D size (22- by 34-inches) as defined by ASME Y14.1.
4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified:
a. Computer drafted drawings:
1) In accordance with NIBS NCS.
2) Electronic file format: Compatible with AutoCAD, Version 2018 or newer.
3) Compile using “eTransmit” utility in AutoCAD.
b. Drawing prepared with drafting equipment, when allowed: Lettering shall be neat.
5. Drawings designated as “Government Format” in specifications:
a. Computer drafted.
b. Government will provide electronic AutoCAD format template.
c. Title block and sheet format:
1) As shown on Standard Drawing 40-D-7102.
2) Government will provide template.
3) Government will provide specific title block information to be used.
01 33 00 - 3
6. Final Drawings:
a. Computer drafted.
b. Government will provide electronic AutoCAD format template.
c. Show as-built changes, including revision dates, made during installation.
Indicate changes by clouding.
d. Electronic Files: On Reclamation issued USB Drive.
D. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets:
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
E. Certifications:
1. Certifications by a registered professional: Signed and sealed by registered professional:
a. Not required for non-design work.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
F. Manuals:
1. Copies:
a. Printed copies: Bound and indexed.
b. Electronic copies: Searchable Adobe .pdf on Reclamation issued USB
Drive:
1) Bookmark longer files to assist in navigating file.
2) Electronic files may be submitted as separate parts of a manual.
After each separate electronic file is approved, compile each approved electronic file to assemble an entire manual which shall be consistent with final manual submittal.
2. Contents:
a. Parts identification lists, lists of special tools, and accessories.
b. Schematics and wiring diagrams.
c. Detailed instructions for installing, operating, lubricating, and maintaining equipment.
01 33 00 - 4
d. As-built drawings, photographs, and test records or reports if required by specifications.
G. Photographs:
1. Digital files: In .jpeg or similar format.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A – List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A – List of Submittals:
1. Submittals identified with “CDMS” in “Sets to be sent” column shall be submitted electronically in accordance with Section 01 31 30 – Contract Document Management System.
2. Submittals identified with “CDMS” in the top row of the “Sets to be sent” column require approval (Action) or acknowledgement (Informational) before sending required sets of hardcopy submittals.
3. Submittals identified with “CDMS” in the bottom row of the “Sets to be sent” column require submittal of hardcopy submittals before finalizing submittal in
CDMS.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 28 days after receiving the comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
01 33 00 - 5
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through digital signature date stamp and upload date in CDMS.
B. Time in Excess of Specified:
1. CO may extend contract completion date to allow additional time for completing work affected by excess review time:
a. Time extension will be to extent that excess review time caused delay to contract completion date.
b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending contract completion date.
2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to extent that:
a. Approval was required under contract, and
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR
52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Return of Submittals:
1. Return of submittals will be by CDMS response or hard copy, as applicable.
2. Action Submittals: One set of submittals required for action will be returned either approved, partially approved, approved subject to identified changes and resubmit, or not approved:
a. Submittals that are not approved shall be revised and resubmitted.
b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.
c. Exception: Schedules will be either accepted, partially accepted or not accepted.
01 33 00 - 6
3. Informational Submittals: Government will acknowledge Informational submittals:
a. Informational submittals will not be returned when they comply with specifications.
b. Informational submittals that do not comply with specifications may be returned for resubmittal or additional information may be requested.
1.07 HARD COPY OF TRANSMITTALS
A. Addresses for codes listed in Table 01 33 00A – List of Submittals:
1. Contracting Officer, Bureau of Reclamation, Attn: UC-840, 125 South State St., Room 6107, Salt Lake City, UT 84138-1147.
2. Construction Engineer, Bureau of Reclamation, 1235 La Plata Hwy, Farmington, New Mexico, 87401.
3. Technical Service Center, Bureau of Reclamation, Attn: 86-68160, PO Box
25007, Denver CO 80225-0007; Express Mail: Sixth and Kipling, Building 67, Room 152.
4. Navajo Tribal Utility Authority (NTUA), Attn: Operations Manager, PO Box 1749, Shiprock, NM 87420.
B. Send original transmittal letter with appropriate number of sets to office listed in “Responsible Code” column in Table 01 33 00A – List of Submittals:
1. Responsible codes starting with “86-6” are located in the Technical Service
Center. Send these submittals to the TSC address shown above.
C. Send copy of transmittal letter with appropriate number of sets to offices that are not the responsible code but show “No. of sets to be sent to” in Table 01 33 00A – List of Submittals.
D. Provide copy of transmittal letter on CDMS.
E. When “No. of sets to be sent to” is 0, send a copy of transmittal letter to that office.
F. Submittals required by the specifications, but not listed in Table 01 33 00A – List of Submittals:
1. Submit in accordance with this section.
2. Submit to CE, unless otherwise specified.
PART 2 PRODUCTS
01 33 00 - 7
PART 3 EXECUTION
01 33 00 - 8
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, TSC indicates Technical Service Center, and NTUA indicates the City of Gallup New Mexico.
RSN Clause or Section Title
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan
At least 63 days before use of
ROW
A CE CDMS
01 14 10-2 Use of Site Optional Onsite Security Plan
At least 60 days before use of site
A CE CDMS
01 31 19-1 Project Management and Coordination
Written Summary Monthly once onsite construction begins
A CE CDMS
01 31 19-2 Project Management and Coordination
Off ROW Land Use Coordination
At least 6 months before use of OFF ROW land
I CE CDMS
01 31 19-3 Project Management and Coordination
Key Personnel Within 7 days after receipt of Notice of Award
A CE CDMS
01 31 19-4 Project Management and Coordination
Replacement of Key Personnel
A minimum of 2 business days prior to work being performed by new personnel
A CE CDMS
01 31 30-1 Contract Document Management System
Approval Data Within 21 days of Award
A CE 0 1 0 0
CDMS
01 31 30-2 Contract Document Management System
Final Data Within 14 days of completion of work
A CE 0 2 2 0
CDMS
01 32 10-1 Construction Program
Representative Information
Within 7 days after receipt of Notice of Award
I CE CDMS
01 32 10-2 Construction Program
Baseline Schedule Within 21 days after receipt of initial Notice to Proceed
A CE CDMS
01 32 10-3 Construction Program
Updated Schedule Reports
Monthly or with Progress Payments
A CE CDMS
01 33 00 - 9
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
01 32 10-4 Construction Program
Time Impact Analysis
Within 28 days after CO directs a contract change, with any proposal for a future modification, with any value engineering proposal, or with any request or claim for an equitable adjustment to the contract.
A CE CDMS
01 35 10-1 Safety Data Sheets Complete LHM and SDS
At least 14 days before jobsite delivery of hazardous material
I CE CDMS
01 35 10-2 Safety Data Sheets Updated LHM and
SDS
At least 14 days before jobsite delivery of hazardous material not previously listed
I CE CDMS
01 35 20-1 Safety and Health
(WBR 1452.223-81)
Safety Program Submitted and accepted before commencing onsite work.
Submit at least 45 days before beginning onsite work. See Section 3 of RSHS
A CE CDMS
01 35 20-2 Safety and Health Job Hazard Analyses
At least 14 days before commencing onsite activities for each phase of work
A CE CDMS
01 35 20-3 Safety and Health General Lift Plan for HDDs
Within 7 days after each pilot bore is completed
01 33 00 - 10
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
01 35 20-4 Safety and Health General Safety Plan for HDDs
At least 72-days prior to first HDD pilot bore
A CE CDMS
01 35 20-5 Safety and Health Monthly Accident Summary Report
First day of each month. See paragraph 3.8 of
RSHS
A CE CDMS
01 35 30-1 Contractor’s Onsite Safety Personnel
Resumes At least 45 days before beginning onsite construction;
resubmit upon personnel change
A CE CDMS
01 35 30-2 Contractor’s Onsite Safety Personnel
Safety Inspection Reports
At least once each week
I CE CDMS
01 46 00-1 Quality Procedures Contractor Quality Control (QC) Plan
At least 45 days before beginning onsite work
A CE CDMS
01 46 00-2 Quality Procedures Contractor’s Daily Report
Weekly I CE CDMS
01 46 00-3 Quality Procedures Quality Control Supervisor (QCS) Resume
At least 45 days before beginning onsite work.
Resubmit upon personnel change.
A CE CDMS
01 46 00-4 Quality Procedures Contractor’s Quality Testing Plan
At least 45 days before beginning onsite work
A CE CDMS
01 46 00-5 Quality Procedures Summary of Monthly Test Results
Monthly, on or before 5th day of each month
A CE CDMS
01 46 20-1 Testing Agency Services
Testing Agencies Services Plan
At least 45 days before testing is required
A CE CDMS
01 55 00-1 Vehicular Access and Parking
Preconstruction Digital Recording
At least 21 days before beginning onsite work
A CE 0 1 0 0
01 55 00-2 Vehicular Access and Parking
Right of Way (ROW) Access Plan
At least 21 days before beginning onsite work.
A CE CDMS
01 55 00-3 Vehicular Access and Parking
Post-Construction and Post-Repair Digital Recording
At least 21 days before leaving site.
A CE 0 1 0 0
01 33 00 - 11
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
01 55 20-1 Traffic Control Information of Traffic Control Plan
At least 70 days before affecting public traffic.
A CE CDMS
01 55 20-2 Traffic Control Approved NMDOT Permit(s)
At least 45 days before affecting public traffic.
A CE CDMS
01 56 10-1 Protection of Existing Installations
Plan for Protecting Existing Installations
At least 45 days before start of onsite construction work
A CE CDMS
01 56 15-1 Protection of Existing Utilities
Utility Owner Acknowledgement
At least 45 days prior to submitting RSN 33 05 22-2
A CE CDMS
01 56 15-2 Protection of Existing Utilities
Utility Crossing Investigation
At least 45 days prior to submitting RSN 33 05 22-2 and at least 45 days prior to pilot bore
A CE CDMS
01 56 15-3 Protection of Existing Utilities
Work Plan within Utility Easements
With RSN 33 05 22-2 and at least 45 days prior to pilot bore
A CE CDMS
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit
At least 14 days before beginning onsite work
I CE CDMS
01 57 30-1 Water Pollution Control
Stormwater Pollution Prevention Plan
(SWPPP)
At least 28 days before start of onsite construction work
A CE CDMS
01 57 30-2 Water Pollution Control
Spill Prevention, Control, and Countermeasure (SPCC) Plan
At least 28 days before delivery or storage of oil
A CE CDMS
01 57 40-1 Pesticides Qualifications At least 45 days before beginning onsite work
A CE CDMS
01 57 40-2 Pesticides Pesticide Use Plan At least 45 days before application of first pesticide
A CE CDMS
01 57 50-1 Tree and Plant Protection
Protection Plan At least 45 days before beginning onsite work
01 33 00 - 12
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
01 57 90-1 Preservation of Historical and Archeological Data
Alternate Use Area At least 45 days before beginning offsite work, if commercial site;
if non-commercial site then at least 6-months prior to use of land
A CE CDMS
01 61 10-1 Buy American Buy American Certificates
Prior to project closeout
I CE CDMS
01 71 20-1 Surveying Surveying Plan Within 45 days after Notice to Proceed, and approved before beginning survey work
A CE CDMS
01 71 20-2 Surveying Resume(s) At least 45 days before beginning survey work;
resubmit upon personnel change
I CE CDMS
01 71 20-3 Surveying Accuracy Check Results
At least 45 days before beginning survey work
I CE CDMS
01 74 00-1 Cleaning and Waste Management
Waste Production and Disposal Plan
At least 45 days before beginning onsite work
I CE CDMS
01 74 00-2 Cleaning and Waste Management
Waste Production and Disposal Records
Within 7 days of hazardous waste disposal
I CE CDMS
01 74 00-3 Cleaning and Waste Management
Environmental Consultant Resume
At least 45 days before beginning environmental assessment
I CE CDMS
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment
Within 14 days of completion of work
I CE CDMS
01 33 00 - 13
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
01 78 30-1 Project Record Documents
Electronic Media Release Form
With request for Electronic Drawings
A CE CDMS
01 78 30-2 Project Record Documents
Progress As-Built Drawings
Monthly once onsite construction begins.
A CE CDMS
01 78 30-3 Project Record Documents
Final As-Built Drawings
Within 28 days of Government issued substantial completion of work
A CE CDMS
01 78 30-4 Project Record Documents
Final Drawings Within 14 days of approval of
RSN 01 78 30-3
A CE 0 2 0 2
CDMS
CDMS
09 96 20-1 Coatings Approval Data At least 28-days before beginning coating work
A TSC 86-
68540
CDMS
09 96 20-2 Coatings Final Approval Data
At least 28-days before beginning coating work
A TSC 86-
68540
CDMS
09 96 20-4 Coatings Qualifications At least 28-days before beginning coating work
A TSC 86-
68540
CDMS
09 96 20-5 Coatings Quality Control Plan
At least 28-days before beginning coating work
A TSC 86-
68540
CDMS
09 96 20-6 Coatings Contractor Quality Testing Report
At least 14-days after completion of test
A TSC 86-
68540
CDMS
31 02 10-1 Water for Dust Abatement
Meter Calibration At least 42-days before beginning onsite work
01 33 00 - 14
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
31 02 30-1 Dust Palliative Proposed Application Areas for Dust Palliative
At least 42-days before beginning onsite work
A CE CDMS
32 15 10-1 Gravel Surfacing Gravel Certification
At least 35-days before placing surfacing
A CE CDMS
32 15 10-2 Gravel Surfacing Geotextile Installation
At least 28-days before placing surfacing
A CE CDMS
32 15 10-3 Gravel Surfacing Geotextile Certification
At least 28-days before placing surfacing
A CE CDMS
33 05 22-1 Horizontal Directional Drilling
(HDD)
Key Personnel Resumes
At least 7-days prior to pre-construction meeting
A 86-6814X CDMS
33 05 22-2 Horizontal Directional Drilling
(HDD)
General Work Plan for all HDD Crossings
At least 72-days prior to first HDD pilot bore
A 86-6814X & 86- 6831X
CDMS
33 05 22-3 Horizontal Directional Drilling
(HDD)
General Contingency Plans
At least 42-days prior to first HDD pilot bore
A 86-6814X CDMS
33 05 22-4 Horizontal Directional Drilling
(HDD)
Drilling Plan for Shumway Arroyo
HDD
Submit concurrently with
RSN 33 05 22-5
at least 42-days before manufacture of pipe
A 86-6814X & 86- 6831X
CDMS
01 33 00 - 15
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
33 05 22-5 Horizontal Directional Drilling
(HDD)
Calculations for Shumway Arroyo
HDD
Submit concurrently with
RSN 33 05 22-4
at least 42-days before manufacture of pipe
A 86-6814X & 86- 6831X
CDMS
33 05 22-6 Horizontal Directional Drilling
(HDD)
Drilling Plan for San Juan River
HDD
Submit concurrently with
RSN 33 05 22-7
at least 42-days before manufacture of pipe
A 86-6814X & 86- 6831X
CDMS
33 05 22-7 Horizontal Directional Drilling
(HDD)
Calculations for San Juan River
HDD
Submit concurrently with
RSN 33 05 22-6
at least 42-days before manufacture of pipe
A 86-6814X & 86- 6831X
CDMS
33 05 22-8 Horizontal Directional Drilling
(HDD)
Drilling Plan for Nenahnezad Bluff
HDD
Submit concurrently with
RSN 33 05 22-9
at least 42-days before manufacture of pipe
A 86-6814X & 86- 6831X
CDMS
33 05 22-9 Horizontal Directional Drilling
(HDD)
Calculations for Nenahnezad Bluff
HDD
Submit concurrently with
RSN 33 05 22-8
at least 42-days before manufacture of pipe
A 86-6814X & 86- 6831X
CDMS
33 05 22-10 Horizontal Directional Drilling
(HDD)
Drilling Plan for Chaco River HDD
Submit concurrently with
RSN 33 05 22-11
at least 42-days before manufacture of pipe
A 86-6814X & 86- 6831X
CDMS
01 33 00 - 16
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
33 05 22-11 Horizontal Directional Drilling
(HDD)
Calculations for Chaco River HDD
Submit concurrently with
RSN 33 05 22-10
at least 42-days before manufacture of pipe
A 86-6814X & 86- 6831X
CDMS
33 05 22-12 Horizontal Directional Drilling
(HDD)
Photo Documentation
At least 42-days prior to work
A CE CDMS
33 05 22-13 Horizontal Directional Drilling
(HDD)
General HDD Pipe Retention Plan
At least 42-days prior to first HDD pilot bore
A CE CDMS
33 05 22-14 Horizontal Directional Drilling
(HDD)
Daily Reports Daily A CE CDMS
33 05 22-15 Horizontal Directional Drilling
(HDD)
Drilling Fluid Daily Report
Daily A CE CDMS
33 05 22-16 Horizontal Directional Drilling
(HDD)
General Drill Fluid and Cuttings Management and Disposal Plan
At least 42-days prior to first HDD pilot bore
A CE CDMS
33 05 22-17 Horizontal Directional Drilling
(HDD)
Disposal Report At least 42-days after completion of work
A CE CDMS
33 05 22-18 Horizontal Directional Drilling
(HDD)
Annulus Backfill Plan
At least 42-day prior to first HDD pilot bore
A 86-6831X CDMS
01 33 00 - 17
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTU
A
33 05 22-19 Horizontal Directional Drilling
(HDD)
Fluid Release Contingency Containment Report
Within 48-hours of drilling fluid release being detected
A CE CDMS
33 05 22-20 Horizontal Directional Drilling
(HDD)
Final Report At least 42-days after completion of work
A CE CDMS
33 05 22-21 Horizontal Directional Drilling
(HDD)
HDPE Heat Fusion Joint Operator Qualifications
At least 42-days prior to pipe fabrication
A 86-6814x CDMS
33 05 22-22 Horizontal Directional Drilling
(HDD)
HDPE Fusion Procedures
At least 42-days prior to pipe fabrication
A 86-6814X CDMS
33 05 22-23 Horizontal Directional Drilling
(HDD)
PVC Fused Pipe Information
At least 42-days prior to pipe fabrication
A 86-6814X CDMS
33 05 22-24 Horizontal Directional Drilling
(HDD)
Ductile Iron Commercial Products
At least 42-days prior to pipe fabrication
A 86-6814X CDMS
01 33 00 - 18
This page intentionally left blank.
Revised Temporary Safety Fence
01 56 32 - 1
SECTION 01 56 32
TEMPORARY SAFETY FENCE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost: Include in prices offered in the Price Schedules for other items of work.
PART 2 PRODUCTS
2.01 SAFETY FENCE
A. Fence:
1. High-density polyethylene grid.
2. Minimum height: 48 inches.
3. Color: Safety orange.
4. Recovered Material Content:
a. 90 to 100 percent.
5. Postconsumer Content:
a. 60 to 100 percent.
B. Posts: Steel fence posts.
2.02 WIRE SAFETY FENCE
A. Install wire safety fence at locations listed in Section 01 57 60 - Protected Species.
B. Steel fence posts with smooth wires as shown in Figure 1 below.
Figure 1 3-Strand Smooth Wire Fence
Revised Temporary Safety Fence
01 56 32 - 2
C. Metal t-posts with metal grid.
PART 3 EXECUTION
3.01 INSTALLATION
A. Erect fence around work areas at location approved by COR.
1. Install safety fence as directed by OGR.
2. Fence along Contractor use areas.
3. Install wire safety fence along Road 6800, if authorized by COR, in accordance with Section 01 14 12 – Work Restrictions and Limitations and Section 01 57 60
– Protected Species.
B. Space posts 10 feet, maximum, on center.
C. Secure grid fencing to posts.
3.02 MAINTENANCE AND REMOVAL
A. Maintain fence until work in area is complete and accepted by OGR.
B. Remove fence when no longer required, except:
1. Along Road 6800 in accordance with Section 01 57 60 – Protected Species.
Revised Pesticides
01 57 40 - 1
SECTION 01 57 40
PESTICIDES
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedules for other items of work.
2. Contractor is responsible for damages resulting from use of pesticides under these specifications in accordance with the clause at FAR 52.236-7, Permits and Responsibilities.
1.02 DEFINITIONS
A. Pesticides: Includes herbicides, insecticides, fungicides, rodenticides, piscicides, avicides, surface disinfectants, animal repellants, and insect repellants.
1.03 REFERENCE STANDARDS
A. Code of Federal Regulations (CFR)
1. 40 CFR Subchapter E Pesticide Programs
2. 40 CFR 156.10 Labeling Requirements for Pesticides and
Devices
1.04 SUBMITTALS
A. Submit in accordance with Section 01 33 00 – Submittals.
B. RSN 01 57 90-1, Qualifications
1. Certifications
2. Resubmit within 10 days of personnel change.
3. Applicators may be required to undergo Reclamation’s Mesa Verde Cactus
Education and Awareness training and adhere to Mesa Verde Construction Plan.
Training must be completed before applying herbicides in Mesa Verde suitable habitat.
C. RSN 01 57 40-1, Pesticide Use Plan:
1. Not required for insect repellant to be applied directly to clothing, or for small quantities of aerosol insecticide, such as fly and spider sprays, to be applied within or directly to offices or shop buildings.
2. For each pesticide:
01 57 40 - 2
a. Provide a SDS.
b. Complete label as defined by 40 CFR 156.10, containing the following:
1) Name, brand, or trademark product sold under.
2) Name and address of the producer or registrant.
3) Net contents.
4) Producing establishment’s number.
5) Ingredient statement.
6) Warning or precautionary statements.
7) Directions for use.
8) Use classification.
1.05 QUALIFICATIONS
A. Certified to apply appropriate weed and vegetation control measures in the project area.
Possess, at a minimum, a commercial applicator’s license for the State of New Mexico to dispense herbicides in industrial-right-of-ways, rangeland settings, and in wetland areas for weed control work involving herbicide application.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Comply with labeling and Safety Data Sheet (SDS) requirements when dealing with pesticides.
B. Keep records of pesticide types and amounts purchased, delivered, stored, mixed, and actually used, and disposal means of excess. Make records available for review by COR upon request.
PART 2 PRODUCTS
2.01 PESTICIDES
A. Apply herbicide after gravel surfacing has been placed.
A. Allowed pesticides:
1. Appropriate for site-specific conditions where applied
2. Refer to pesticides in Section 51 00 80 – BLM Herbicides
3. Not prohibited by State, Navajo Nation, or local agencies.
01 57 40 - 3
PART 3 EXECUTION
3.01 APPLICATION
A. Apply pesticides only as allowed by labeling.
B. Apply pesticides in accordance with the Mesa Verde Cactus Construction Plan, once plan has been approved by the U.S. Fish and Wildlife Service and Navajo Nation Department of Fish and Wildlife.
C. In accordance with and only after approval of Pesticide Use Plan.
01 57 40 - 4
Revised Protected Species
01 57 60 - 1
SECTION 01 57 60
PROTECTED SPECIES
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost: Include in prices offered in the Price Schedules for other items of work.
1.02 PROJECT CONDITIONS
A. Certain native plant and animal species in the State of New Mexico are protected under Federal, State and Tribal laws. Government has ascertained that protected species and/or their habitats may exist in the areas to be disturbed by construction activities. These species include, but may not be limited to, the following:
1. Migratory Birds.
2. Burrowing Owl.
3. Ferruginous Hawk.
4. Prairie Dog.
5. Kit Fox.
6. Mesa Verde Cactus.
7. Raptors.
B. Federal legislation provides for protection of Threatened and Endangered Species, which might otherwise be lost due to alteration of terrain as a result of any Federal construction projects.
C. Project is designed to comply with Environment Commitments of Navajo-Gallup Water Supply Project Final Environmental Impact Statement, Realignment of the Northern Portion of the San Juan Lateral Environmental Assessment, and Final Biological Opinion for the Navajo-Gallup Water Supply Project reissued by U.S. Fish and Wildlife Service on September 20, 2022.
D. Insert this section in subcontracts.
E. In accordance with Federal, State, and Tribal Law, Government may arrange for removal of protected species.
1. Cooperate with those performing such removal.
2. If these species are not removed, cooperate with and abide by protection plans developed by appropriate Federal, State, and Tribal entities to avoid damage to or disturbance of protected species.
01 57 60 - 2
F. Persons who, without permission contribute to the take of threatened and endangered species are subject to arrest and penalty of United States, Navajo Nation, and New Mexico laws.
1. Take: to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture or collect, or to attempt to engage in any such conduct.
2. Harm: includes significant habitat modification or degradation that results in death or injury to listed species by significantly impairing essential behavioral patterns, including breeding, feeding, or sheltering.
3. Harass: intentional or negligent actions that create the likelihood of injury to listed species to such an extent as to significantly disrupt normal behavior patterns which include, but are not limited to, breeding, feeding or sheltering.
4. Incidental take: take that is incidental to, and not the purpose of, the carrying out of an otherwise lawful activity.
5. Offenders will be subject to United States, Navajo Nation, and New Mexico environmental protection laws and civil penalties.
G. Immediately notify COR if protected species listed above are disturbed. Include written account, map, extend of disturbance, number of impacted species, and circumstances.
COR will coordinate notifications to USFWS and Navajo Nation.
1.03 SPECIAL REQUIREMENTS
A. Migratory Birds
1. Nesting may occur in area between March 15th and August 15th:
2. Government will survey for nesting birds in vegetated areas to be disturbed.
Evaluation shall be performed no more than 5 days prior to area disturbance.
3. Notify COR 10 days before disturbing an area.
4. Do not disturb a nesting pair of birds with eggs.
5. Avoid birds and modify construction activities as directed by COR.
B. Mesa Verde Cactus
1. Mesa Verde Cactus is found directly adjacent to construction areas.
a. Government will monitor work in these areas.
b. Coordinate work with COR.
c. Government will conduct preconstruction surveys for Mesa Verde Cactus.
Evaluation shall be performed in blooming season in the year prior to construction.
1) Blooming may occur from April to May.
01 57 60 - 3
d. Notify COR before a minimum of 14 days prior to disturbing an area to complete spring surveys
1) Do not disturb potential Mesa Verde Cactus habitat prior to preconstruction surveys.
2) Modify construction activities as directed by COR.
e. Onsite Contractor personnel shall complete Mesa Verde Cactus awareness training prior to working in project area.
1) Government will provide training to inform onsite personnel of environmental requirements and expectations.
2) Training session will occur during preconstruction meeting or other mutually agreed upon time before initial groundbreaking takes place.
a) Duration: Approximately 1 hour.
b) Training will be recorded, and a digital copy of Mesa
Verde Cactus awareness training will be provided to Contractor.
3) Require onsite personnel to complete required Mesa Verde Cactus awareness training before being allowed to work in project area.
4) Maintain training records.
5) Onsite personnel added after completion of Government-provided training session shall view digital copy of training before being allowed to work in project area.
6) The Contractor shall adhere to all requirements outlined in the Mesa Verde Cactus Education and Awareness training, which will include requirements Reclamation develops in coordination with the United States Fish and Wildlife Service (FWS) during preparation of the Mesa Verde Cactus Construction Plan.
a) Construction Plan is a required Conservation Measure of the FWS’s 2022 Final Re-issued Biological Opinion, No, 2- 22-01-F-532.
C. Raptors:
1. Raptor nesting may occur in the area from January 15th to July 15th:
a. Minimize disturbance to raptors. Government will conduct raptor surveys prior to construction that is to begin between January 15th and July 15th.
Evaluation shall be performed no more than 5 days prior to area disturbance. The survey will include all potential nesting habitat within specified buffer distances (0.25-mile to 0.625-mile, depending on the species) of the construction right- of-way.
2. Notify COR 10 days prior to construction to allow for raptor nest surveys.
01 57 60 - 4
3. Do not disturb an active raptor nest:
a. Government will notify Contractor of nest locations.
b. No construction will be allowed within the above months within 0.25-mile to 0.625-mile of active nests, depending on the species.
4. Raptor Safe Utility Poles:
a. All above ground utility poles shall conform to a design standard(s) that comply with the Raptor Electrocution Prevention Regulations RCS-43-08 published September 10, 2008. This is to avoid unintentional electrocution of raptors that may perch on the utility pole.
D. Ferruginous Hawk
1. Nesting may occur in the area from March 1st to July 31st.
a. Government will conduct pre-construction surveys for nesting hawks in areas to be disturbed within 1.0 km (0.62 miles) of suitable nesting habitat during species breeding and chick reading seasons (March 1st to July 31st, of any year). Evaluations shall be performed no more than 5 days before an area is disturbed.
b. Notify COR 10 days before disturbing an area.
c. Do not disturb nesting birds within buffers established by Navajo Nation
Department of Fish and Wildlife.
1) Avoid hawks and modify construction activities as directed by
COR.
E. Burrowing Owl
1. Nesting may occur in the area from March 1st15th to August 31st.
a. Government will survey for burrowing owls if any work is proposed during the species’ active season (March 1st15th to August 31st, of any given year). Surveys shall occur within 0.4 km (1/4 mile) of the project location and follow appropriate protocols.
1) If burrowing owl(s) are found during survey, no surface work shall occur within ¼ mile of the active nest until after the nesting period (March 1st -August 15th); additionally, no habitat alteration is allowed year-round within 0.2 km of nest site.
2) If burrowing owls are found that impact the contractor’s work, a contract modification may be issued.
b. Notify COR 10 days before disturbing an area.
c. Do not disturb nesting owls within buffers established by Navajo Nation
Department of Fish and Wildlife.
1) Avoid owls and modify construction activities as directed by
COR.
01 57 60 - 5
F. Kit Fox
1. Active Kit fox den sites may occur in the project area.
a. Government will survey for kit fox den sites in areas disturbed.
b. Notify COR 30 days before disturbing an area.
c. Do not disturb kit fox den sites during breeding and reproduction season
(December 1st to August 1st) within buffers established by Navajo Nation Department of Fish and Wildlife (0.2 km or 1/8 mile).
1) Avoid kit fox den site and modify construction activities as directed by COR.
G. Prairie Dogs
1. Active prairie dog colonies may be present in portions of the project area.
a. Government will survey for prairie dogs in these project areas if any work is proposed in the species’ breeding and reproduction season (March 1st to June 1st).
b. Notify COR 10 30 days before disturbing an area.
2. Do not disturb prairie dogs during breeding and reproduction season.
a. Breeding and reproduction may occur from March 1st to June 1st.
b. Avoid breeding prairie dogs and modify construction activities as directed by COR.
3. Modify construction activities as directed by the Government.
1.04 REPLACEMENT PLANTS
A. Protected plant species shall not be removed or damaged by Contractor.
1. If inadvertent effects occur to protected species during construction:
a. Notify COR:
1) Verbal: Within 2 hours.
2) Written: Within 24 hours.
b. Cease work in affected work area until consultation commitments are completed.
2. Government, in consultation with Bureau of Indian Affairs (BIA) and State of New Mexico, will manage required removal/replacement planting in accordance with consultation commitments.
3. Replacement numbers/ratio in accordance with consultation commitments.
01 57 60 - 6
1.05 DISCOVERY OF RESOURCES
A. When Contractor or parties operating or associated with Contractor, in performance of this contract discover threatened and endangered species on ROW:
1. Immediately cease work within 50 feet of discovery location.
a. Place temporary safety fence in accordance with 01 56 32 –Temporary Safety fence to prevent disturbance until biologist can investigate to avoid inadvertent disturbance by construction activities.
2. Verbally notify CO and OGR within 2 hours, giving location and nature of findings.
a. Follow with written confirmation to CO within 12 hours.
3. Verbally notify Reclamation staff biologist within 2 hours.
a. Name of assigned staff biologist and telephone number will be provided at preconstruction meeting.
B. Do not disturb or damage threatened and endangered species discovered during construction activities. Provide cooperation and assistance to preserve findings for removal or other disposition by CO.
C. Government, in consultation with appropriate regulatory agencies upon discovery of threatened and endangered species, will manage required removal/replacement planting in accordance with consultation commitments.
1. When discovery mitigation has been completed, CO will notify Contractor that work can resume in discovery area.
2. Do not resume work in area of discovery until receipt of written notice to proceed from CO.
D. Where appropriate by reason of discovery, CO may order delays in time of performance or changes in work or both. When such delays or changes are ordered, an equitable adjustment will be made in the contract in accordance with applicable clauses of the contract.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 MESA VERDE CACTUS MONITORING AREA
A. See Section 01 14 12 – Work Restriction and Limitations for access to north and west sides of Road 6800.
01 57 60 - 7
B. Provide 30-day notice to OGR prior to approaching or entering the Mesa Verde Cactus Monitoring Area (Road 6800) for construction activities.
1. Coordinate with the Government for a biological monitor for new ground disturbing construction activities along the Shumway Arroyo HDD or other areas as directed by COR.
C. Install approximately 1,300 feet of fence from Sta 2375+57 to Sta 2388+63 1,800 feet of fence prior to disturbing these areas.
1. Fence shall be installed and remain in place for the duration of ground disturbing activities. of the contract.
2. Government Biologist will be on site during fence installation
a. COR will coordinate Government Biologists attendance.
b. Notify COR 7 days prior to fence installation.
3. Fence will be built of materials that will not draw attention to the sensitive area and shall be simple t-post and wire. Refer to wire safety fence in Section 01 56 32
– Temporary Safety Fence.
4. Government may direct Contractor to remove fence prior to completion of the project.
a. Government Biologist will be on site during fence removal.
5. Notify COR 28 days prior to project completion for direction from the government.
6. When construction is complete, temporary access roads and staging areas within suitable Mesa Verde Cactus will be closed and hand-raked to remove tire tracks.
01 57 60 - 8
Revised Gravel Surfacing
32 15 10 - 1
SECTION 32 15 10
GRAVEL SURFACING
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedules for items of work where gravel surfacing is needed.
1.02 REFERENCE STANDARDS
A. ASTM International (ASTM)
1. ASTM D4632/D4632M-15a(2023) Grab Breaking Load and Elongation of
Geotextiles
2. ASTM D4751-21a Determining Apparent Opening Size of a
Geotextile
3. ASTM D6241-22a Measuring Static Puncture Strength of
Geotextiles and Geotextile-Related Products Using a 50 mm Probe
B. New Mexico State Department of Transportation (NMDOT)
1. NMDOT SS 2019 Standard Specifications for Highway and
Bridge Construction
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 – Submittals
B. RSN 32 15 10-1, Gravel Certification:
1. Gravel gradation range with percent passing by weight of respective sieve sizes.
2. Representative 300-lb (150 kg) sample.
C. RSN 32 15 10-2, Geotextile Installation:
1. Manufacturer’s recommendation.
D. RSN 32 15 10-3, Geotextile Certification:
1. Geotextile meets specified requirements.
32 15 10 - 2
1.04 GENERAL
A. Place gravel surfacing at the following locations as needed:
1. Access Roads.
PART 2 PRODUCTS
2.01 GRAVEL
A. NMDOT SS Table 303.2.2:2 – Type II Base Course Gradation Band.
B. NMDOT SS Table 303.2.2:3 – Base Course Physical…
This is the start of the file's text. The full file is on GovTribe.