140R4026R0002_Attachment_2_-_00_00_02_Dwgs-B_NGWSP-Block2-3HDD_11x17_20251027.pdf

PDF 23 MB Posted

Attached to
NGWSP BLOCK 2-3 HDD
Solicitation number
140R4026R0002
Issued by

About this file

These documents are technical drawings and plans for the Navajo Agricultural Project Irrigation (NAPI) pipeline, specifically detailing Horizontal Directional Drilling (HDD) routes and construction laydown areas across multiple locations in New Mexico. The project involves installing pipelines at several critical crossings, including the Shumway Arroyo, San Juan River, Nenahnezad Bluff, Chaco River, and associated contractor use areas.

The technical drawings provide comprehensive details on pipeline routing, including precise geographic coordinates, elevation profiles, geological data, and construction right-of-way specifications. Key technical elements include 36-inch and 42-inch pipelines with varying pipe lengths (ranging from approximately 1,100 to 3,300 linear feet), multiple HDD segments, and detailed geologic mapping of terrain including soil types like Qal (alluvium), Kpc (sedimentary rock), and Kl (limestone). The project appears to be managed by the Bureau of Reclamation and involves crossing multiple waterways and terrain types, with careful consideration of existing infrastructure like waterlines, roads, and utility corridors.

View the file

Other files

File Type Posted
140R4026R0002_Attachment_1_3_33_05_22_-_Horizontal_Directional_Drilling_(HDD)_0005.pdf PDF
Sol_140R4026R0002_Amd_0005.pdf PDF
Sol_140R4026R0002_Amd_0004.pdf PDF
Questions___Answers_-_Round_3_0004.pdf PDF
Sol_140R4026R0002_Amd_0003.pdf PDF
Questions___Answers_-_Round_2_0003.pdf PDF
140R4026R0002_Attachment_2_2_00_00_02_Drawings_01162026_0003.pdf PDF
140R4026R0002_Attachment_1_2_00_00_01_Specifications_01162026_0003.pdf PDF
140R4026R0002_Attachment_2_1_00_00_02_-_Drawings_12102025_0002.PDF PDF
140R4026R0002_Attachment_1_1_00_00_01_-_Specifications_12102025_0002.pdf PDF
Sol_140R4026R0002_Amd_0002.pdf PDF
Questions___Answers_-_Round_1_0002.pdf PDF
Sol_140R4026R0002_Amd_0001.pdf PDF
Site_Tour_Sign-in_Sheet_0001.pdf PDF
NGWSP_-_Block_2-3_HDD_Site_Tour_-_2_DECEMBER_2025_0001.pdf PDF
Sol_140R4026R0002.pdf PDF
140R4026R0002_Attachment_9_-_Construction_Contract_Administration.pdf PDF
140R4026R0002_Attachment_4_-_WD_NM20250040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4026R0002_Attachment_1_-_00_00_01_NGWSP-BLK2-3-HDD_Specifications_10272025.pdf PDF
140R4026R0002_NGWSP_Block_2-3_HDD_17NOV25.pdf PDF
140R4026R0002_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4026R0002_Attachment_3_-_00_00_02A_GeologyDwgsAndLogs_NGWSP-BLK2-3-HDD_11x17_20251027.pdf PDF
140R4026R0002_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM.pdf PDF
140R4026R0002_Attachment_8_-_Key_Personnel_Form.docx DOCX document
140R4026R0002_Attachment_7_-_Experience_Form.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cibola National Forest

Cibola National Forest

Cibola National Forest

Cibola National Forest

NAPI TO

Tsé Da’azkání Pumping Plant (2)

Tó Ałts’íísí Pumping Plant (3)

Tooh Haltsooi Pumping Plant (4)

Bahastł’ah Pumping Plant (7)

Tohlakai Hill Pumping Plant (9,10)

Pumping Plant No. 1(c)

Pumping Plant No. 2(c)

14.3a Pumping Plant

14.1 Pumping Plant

14.2 Pumping Plant

14.6 Pumping Plant

14.7a Pumping Plant

Pumping Plant No. 3(c)

Reach 25 Booster Station

Phase 3 Booster Station

Phase 2 Booster Station

JICACARILLLLLLRILLAAAA

APACP E ININNDIANDIANDIANDIDIDI

RESERESEESER RVATRRVA IONONONN

Huerfano Turnout

Nageezi Turnout

Counselor Turnout

Ojo-Encino North Turnout

Pueblo Pintado Turnout

Torreon Turnout

Tohatchi/Buffalo Springs TO

Sheep Springs N Turnout

Sanostee/Burnham Turnout

Rock Springs Turnout

Newcomb Turnout

Naschitti Turnout

Window Rock Turnout

Jicarilla Apache Nation Turnout

Twin Lakes Turnout

Na v a j o I nd i an I r r i gat i on P r o j e c t

Ma i n Can a l

R io

A rr ib a

San Juan

S an do va l

McKinley

A pa ch e

Cibola

BECLAIBITO

SHIPROCK

RED VALLEY

NENAHNEZAD

FRUITLAND UPPER

SANOSTEE

HUERFANO

LUKACHUKAI

COVE

ROUND ROCK

WEETWATER

TSAILE/WHEATFIELDS

NEWCOMB

TWO GREY HILLS

BURNHAM

SHEEP SPRINGS

CRYSTAL

SAWMILL

NASCHITTI

WHITEROCK LAKE VALLEY

NAGEEZI

RED LAKE MEXICAN SPRINGS

TOHATCHI

FORT DEFIANCE

TWIN LAKES

COYOTE CANYON

NAHODISHGISH

STANDING ROCK

ROCK SPRINGS

TSAYATCH

CHURCH ROCK

MARIANO LAKE

IYANBITO SMITH LAKE

CASAMERA LAKE

LITTLEWATER

CROWNPOINT

THOREAU

RED ROCK

MANUEITO

BREADSPRINGS

BACA/HAYSTACK

CHICHILTAH

LUPTON

HOUCK

OAKS SPRINGS

INLICHEE

CANONCITO

WHITE HORSE LAKE

PUEBLO PINTADO

BECENTI

TORREON

OJO ENCINO

COUNSELOR

SAINT MICHAELS

NAHATA DZIIL

RAMAH

CHINLE

NAZLINI

CUTTER

RESERVOIR

AAAANIM

ANIM

ANIM

ASASS

RIVER

RIV

R VEVERR

RIVRIVRIVRRIVRIVRRRIV R

RIRIRRI

Pumping Plant (1)

FRANK FRANK CHEE WILHEE WILLETTOLETTO

RESERVORVOIR

NMOMORGANMORGANMORGANNMOMORGANMORGAN

LAKELAKELAKELAKELAKELAKELA

NAPI Turnout 1)))))))) ttttttt

Pumping Plant No.12 Standing Rock Pumping Plant

Crownpoint Turnout

Pumping Plant No.13

Pumping Plant No.14

Shiprock Turnout

Pumping Plant No. 8

REACH 3

For Location Map see drawing number 1695-D-62449

REACH 2

For Location Map see drawing number 1695-D-62449

Dona Ana

Los Alamos Harding Mora

Taos Rio Arriba

Quay

Guadalupe

San Juan

Sandoval

Sierra

Lincoln

Bernalillo

Union

Valencia

Hidalgo

Curry

Roosevelt

Chaves

De Baca

Santa Fe

Otero

San Miguel

Grant

Luna

Lea

Torrance

Catron

Cibola

Colfax

Socorro

McKinley

Eddy

COLORADO

A R

IZ

O N

A

O K

LA

H O

M A

TEX

A S

NEW MEXICO

Rio San Juan

Saaaa

BerBee

McKinley

MEXICO

R io

A rr ib a

San Juan

S an do va l

McKinley

A pa ch e

Cibola

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-0 7-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

GENERAL MAP

DENVER, CO

1695-D-62448

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

KARUN WINSTEIN

KARUN WINSTEIN

JALISSA DEHAAN

WASHINGTON

OREGON

MONTANA

WYOMING

IDAHO

CALIFORNIA

NEW MEXICO

ARIZONA

KEY MAP

COLORADO

NEVADA

UTAH

LEGEND

Miles 0 5 10

Reach 4C

Tó Ałts’íísí Pumping Plant (3)

Reach 4B

Tsé Da’azkání Pumping Plant (2)

Reach 4A

San Juan Lateral Water Treatment Plant

Reach 3

Location Area Map

Reach 2

SAN JUAN RIVER

INTAKE (REACH 1)

Existing 42" Pipeline (Reach 1)

Pumping Plant (1)

N.A.P.I.

Turnout

Reach 3

Reach 2

Pumping Plant (1)

SAN JUAN RIVER

INTAKE (REACH 1)

Existing 42" Pipeline (Reach 1)

SHUMWAY HDD

SAN JUAN

HDD

NENAHNEZAD

HDD

CHACO HDD

N.A.P.I. Turnout

Dona Ana

Los Alamos Mora

Taos

Sierra

Sandoval

Lincoln

Union

Valencia Curry

Hidalgo

Chaves

De Baca

Grant

Santa Fe San Miguel

Cibola

Socorro Catron

Eddy

Harding

Rio Arriba

Guadalupe

Quay Bernalillo

Roosevelt

Otero

Luna

Lea

Torrance

Colfax

McKinley

San Juan

Vicinity Map Area

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

KARUN WINSTEIN

KARUN WINSTEIN

JALISSA DEHAAN

KEY MAP

VICINITY MAP

LOCATION MAP

Feet 0 24000 48000

Feet 0 10000 20000

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -2

.D W

G

LA

S T

S A V

ED

D A

TE

-0 7-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

LOCATION MAP

DENVER, CO

1695-D-62449

GENERAL NOTES

1. General Notes, Symbols, Abbreviations, and Pipe Classification apply to all plan and profile drawings.

2. Contractor shall determine the voltage at all power lines and share this information with the COR, prior to mobilization.

3. Stations are approximate and may be varied as directed.

4. Grid based on New Mexico State Coordinate System West Zone.

5. Reach 2 and 3 ground to grid conversion factor is 0.999713762328.

6. CAUTION: Call New Mexico One Call 811 before you dig.

PIPE CLASSIFICATIONS

The line pipe is designated as 36HDD425, 36HDD325, 42HDD425, etc. The first number (36, 42, etc.) indicates the nominal pipe diameter in inches. The letters HDD denotes Horizontal Directional Drill. The second number (425, 325, etc.) denotes the maximum allowable hydrostatic pressure head, in feet, measured at the centerline of the pipe.

SYMBOLS

Centerline

Intersect Zone

Diameter

Siphon

Waterline

Irrigation Line

OVH Power Line

Culvert

Road

Fence

ABBREVIATIONS

ROW Right of Way BVCS Beginning of Vertical Curve Station BVCE Beginning of Vertical Curve Elevation EVCS End of Vertical Curve Station EVCE End of Vertical Curve Elevation HDD Horizontal Directional Drilling BOR Bureau of Reclamation LF Linear Foot NTUA Navajo Tribal Utility Authority PVI Point of Vertical Inflection R Radius STA Station ELEV Elevation NNMP Navajo Nation Municipal Pipeline NAPI Navajo Agricultural Products Industry APS Arizona Public Service SJLWTP San Juan Lateral Water Treatment Plant

W

IRR

GEOLOGIC NOTE

For General Geologic Legend, Explanations and Notes, see the 1695-529-60340.

2398+00 2400+00 2402+00 2404+00 2406+00 2408+00 2410+00 2412+00 2414+00 2416+00 2418+00 2420+00 2422+00

2000 LF 36HDD375

(2016' PIPE LENGTH)

EL. 5122.92

EL. 5146.46

Proposed Shumway HDD

S=-0.19443

S=0.004

S=0.19432

S ta rt H

D D

Δ

.0

0°

En d

H D

D Δ

.0

0°

In ve rt S hu m w ay

A rr oy o

EL. 5114.87

B O

R

2" W at er lin e

B O

R

2" W at er lin e

Fa rm er s

M ut ua l

C on cr et e S ip ho n

PVI STA = 2404+78

PVI ELEV = 5030.00

R = 3750'

B V C S

.5

B V C E:

0.

EV

C S

.0

EV

C E:

1.

PVI STA = 2414+21

PVI ELEV = 5034.00

R = 3750'

B V C S

.2

B V C E:

2.

EV

C S

.7

EV

C E:

1.

Kpc

Qal

QalOriginal ground surface

D H

R 2-

-8

El ev

.9

19.3

T.D. 40.0

SM

g(CL)s

22.7

SM

27.6

SHALE

28.2

38.4

31.2

SC

SHALE

SS

D H

R 2-

-3

El ev

.6

19.0 20.0 20.8 22.8 25.8 26.3

39.2 41.8 45.0

50.0

55.0

T.D. 60.0'

SS

CLSTN

SS/SLTSTN/CLSTN

SS

CLSTN

SS

SLTSTN

SS

SS/SLTSTN/CLSTN

SS/SLTSTN/CLSTN

SS

4.5

8.3

SC

(SP)g

(SP-SM)

D H

R 2-

-3

El ev

.5

T.D. 19.8'

(SP)g8.4 11.8

15.2 SS

SP

SC

D H

R 2-

-3

El ev

.9

4.5

24.0 25.0

32.9 39.3

58.4

SC

(SP-SM)

CLSTN

SS

CLSTN

SS

SLTSTN

SS/SLTSTN/CLSTN

T.D. 79.1' 78.1

D H

R 2-

-3

El ev

.9

6.5 (SM)g

11.5

16.1

24.5 25.9 28.2

37.9

(SC)g s(CL)g

(SP)g

(CL)sg

SS

SS/CLSTN

T.D. 95.5

No Recovery

7.3 4.0

SP-SM

40.5 CLSTN

Shale

S ta

B ur ie d

W at er L in e

(t o be r em ov ed

S ta

B ur ie d

El ec tr ic

L in e (t o be r em ov ed

S ta

-i nc h Ir r Pi pe

TO

P

T .B

.D

2419+96 Buried Water Line (to be removed)

IR

R

Farmers Mutual Canal

RD 6800 PROPOSED SHUMWAY HDD

2420+00

END HDD

N=2097083.71 E=2542739.58

2400+00

START HDD

N=2099082.88 E=2542771.70

Construction

ROW

2407+90 Farmers Mutual 18" Concrete Siphon N=2098292.81 E=2542759.01

2407+66 BOR 42" Waterline N=2098317.35 E=2542759.40

2406+81 BOR 42" Waterline N=2098401.77 E=2542760.76

30'

151'

98'

41'

2413+93 ROW Change

2404+15 ROW Change

100'

DHR2-22-8

DHR2DHR2-24-38DHR2-24-37

DHR2-24-35

Kpc

Qal

Kpc

Qal

Embankment

Farmers Mutual Concrete Siphon

5130 51

5140 5140

51505160

5140 51

2409+00 Shumway Arroyo

2412+75 ROW Change

2420+21 Buried Electric Line (to be removed)

2418+68 Irrigation Pipe

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -3

.D W

G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

SHUMWAY ARROYO

PLAN AND PROFILE

(METALLIC)

DENVER, CO

1695-D-62450

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

MARK SUTER

MARK SUTER

KYLIE PELZER

0 100' 200'

PLAN - SHUMWAY ARROYO HDD

PROFILE - SHUMWAY ARROYO HDD

HOR: 1" = 100', VERT: 1" = 20'

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi st

2398+00 2400+00 2402+00 2404+00 2406+00 2408+00 2410+00 2412+00 2413+00

1100 LF 36HDD350

(1109' PIPE LENGTH)

EL. 5121.18

S=-0.19434

S=-0.004

S=0.19434

S ta rt H

D D

Δ

.0

0°

En d

H D

D Δ

.0

0°

In ve rt S hu m w ay

A rr oy o

EL. 5114.87

B O

R

2"

W at er lin e

B O

R

2"

W at er lin e

Fa rm er s

M ut ua l

C on cr et e S ip ho n

PVI STA = 2402+41

PVI ELEV = 5074.44

R = 900'

B V C S

.3

B V C E:

0.

EV

C S

.2

EV

C E:

4.

PVI STA = 2406+96

PVI ELEV = 5072.53

R = 900'

B V C S

.1

B V C E:

2.

EV

C S

.5

EV

C E:

9.

Kpc

Original ground surface

SS/SLTSTN/CLSTN

Kpc

D H

R 2-

-3

El ev

.6

19.0 20.0 20.8 22.8 25.8 26.3

39.2 41.8 45.0

50.0

55.0

T.D. 60.0'

SS

CLSTN

SS/SLTSTN/CLSTN

SS

CLSTN

SS

SLTSTN

SS

SS/SLTSTN/CLSTN

SS/SLTSTN/CLSTN

SS

4.5

8.3

SC

(SP)g

(SP-SM)

D H

R 2-

-3

El ev

.9

4.5

24.0 25.0

32.9 39.3

58.4

SC

(SP-SM)

CLSTN

SS

CLSTN

SS

SLTSTN

SS/SLTSTN/CLSTN

T.D. 79.1' 78.1

D H

R 2-

-3

El ev

.9

6.5 (SM)g

11.5

16.1

24.5 25.9 28.2

37.9

(SC)g s(CL)g

(SP)g

(CL)sg

SS

SS/CLSTN

T.D. 95.5

40.5 CLSTN

EL. 5151.11

D H

R 2-

-8

El ev

.9

19.3

T.D. 40.0

SM

g(CL)s

22.7

SM

27.6

SHALE

28.2

38.4

31.2

SC

SHALE

SS

D H

R 2-

-3

El ev

.6

19.0 20.0 20.8 22.8 25.8 26.3

39.2 41.8 45.0

50.0

55.0

T.D. 60.0'

SS

CLSTN

SS/SLTSTN/CLSTN

SS

CLSTN

SS

SLTSTN

SS

SS/SLTSTN/CLSTN

SS/SLTSTN/CLSTN

SS

4.5

8.3

SC

(SP)g

(SP-SM)

D H

R 2-

-3

El ev

.5

T.D. 19.8'

(SP)g8.4 11.8

15.2 SS

SP

SC

D H

R 2-

-3

El ev

.9

4.5

24.0 25.0

32.9 39.3

58.4

SC

(SP-SM)

CLSTN

SS

CLSTN

SS

SLTSTN

SS/SLTSTN/CLSTN

T.D. 79.1' 78.1

D H

R 2-

-3

El ev

.9

6.5 (SM)g

11.5

16.1

24.5 25.9 28.2

37.9

(SC)g s(CL)g

(SP)g

(CL)sg

SS

SS/CLSTN

T.D. 95.5

7.3 4.0

SP-SM

40.5 CLSTN

Shale

Proposed Shumway HDD

Qal

Qal

IR

R

IR

R

IR

R

30'

DHR2-22-8

DHR2-24-38DHR2-24-37

DHR2-24-35

Kpc

Qal

Kpc

Qal

Embankment

IR

R

DHR2-22-8

DHR2-24-38DHR2-24-37

DHR2-24-35

Kpc

Qal

Kpc

Qal

Embankment

RD 6800 PROPOSED SHUMWAY HDD

2400+00

START HDD

N=2098733.02 E=2542766.08

Construction

ROW

2404+40 Farmers Mutual 18" Concrete Siphon N=2098292.81 E=2542759.01

2404+16 BOR 42" Waterline N=2098317.35 E=2542759.40

2403+31 BOR 42" Waterline N=2098401.77 E=2542760.76

151'

98'

41'

2410+43 ROW Change

2400+65 ROW Change

100'

Farmers Mutual Concrete Siphon

5130 51

5140 5140

51605120

2405+50 Shumway Arroyo

Farmers Mutual Canal

2411+00

END HDD

N=2097633.48 E=2542748.42

2409+25 ROW Change

Buried water line

Buried electric line

Irrigation line

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -4

.D W

G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

SHUMWAY ARROYO

PLAN AND PROFILE

(PLASTIC)

DENVER, CO

1695-D-61852

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

MARK SUTER

MARK SUTER

KYLIE PELZER

0 100' 200'

PLAN - SHUMWAY ARROYO HDD

PROFILE - SHUMWAY ARROYO HDD

HOR: 1" = 100', VERT: 1" = 20'

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi

2375+572376+00 2378+00 2380+00 2382+00 2384+00 2386+00 2388+00 2390+00 2392+00 2394+00 2396+00 2398+00 2400+00 2401+00

O ve rh ea d U til ity

.5 ft w ir e he ig ht

La yd ow n

Ex te nt

Original ground surface

S ta rt L ay do w n

D ri ve w ay

Shumway ArroyoRD 6800

CONSTRUCTION ROW

2375+57 Laydown Extent N=2101297.85 E=2543479.78

51505160

2391+89 Overhead utility

PROPOSED

PIPE LAYDOWN

PROPOSED SHUMWAY HDD

+0

2385+44 Driveway

2395+88 ROW change

150' 200'

2386+61 ROW Change

2383+67 ROW Change

2381+94 ROW Change

Avoid structure 99'

554'519'

554'

343'

2380+96 ROW Change

2379+79 ROW Change

2378+78 ROW Change

Construction

ROW

Bend laydown within road ROW

2400+00 Start Laydown N=2099082.88 E=2542771.70

2383+20 ROW Change

2388+64 End installation of Temporary Safety Fence

2378+78 ROW Change 2378+78 ROW Change

Install Temporary

Safety Fence along Construction

ROW

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -5

.D W

G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

SHUMWAY ARROYO

PIPE LAYDOWN AREA

DENVER, CO

1695-D-62451

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

MARK SUTER

MARK SUTER

KYLIE PELZER

0 100' 200'

PLAN - SHUMWAY ARROYO CONSTRUCTION LAYDOWN

PROFILE - SHUMWAY ARROYO CONSTRUCTION LAYDOWN

HOR: 1"=100', VERT: 1"=20'

DHR2-22-13

DHR2-22-15

OWR2-22-16

OWR2-22-17

Kpc

Qtg

Qal

Construction ROW

San Juan River

2624+00 Start HDD N=2089767.25 E=2542838.93

40'

40'

2600+00 End HDD N=2091902.85 E=2543932.51

200'

200'

200'

2620+60 Unpaved Ditch

2621+49 Unpaved Ditch

2600+05 Unpaved Ditch

2613+75 Jewett Valley Ditch

PROPOSED SAN JUAN HDD

2618+00 San Juan River

5060 50

80509051 005110

Tucson Electric, 345kV, 36', typ.

2610+25.58 City of Farmington 7.9kV, 26.17' N=2090990.26 E=2543465.20

2599+00 2600+00 2602+00 2604+00 2606+00 2608+00 2610+00 2612+00 2614+00 2616+00 2618+00 2620+00 2622+00 2624+00 2625+00

En d

H D

D Δ

9.

PVI STA = 2619+73

PVI ELEV = 4982.00

R = 3750'

B V C S

.4

B V C E:

3.

EV

C S

.0

EV

C E:

2.

PVI STA = 2608+54

PVI ELEV = 4987.00

R = 3750'

B V C S

.6

B V C E:

2.

EV

C S

.7

EV

C E:

5.

Original ground surface

S ta rt H

D D

Δ

.0

0°

El. 5122.28

El. 5065.00

Kl

Kl

Qtg Qtg

Qtg

Kl

Kpc

S an

J ua n R iv er

See Note 1

See Note 1

U np av ed

D itc h

U np av ed

D itc h

Je w et t

V al le y

D itc h

U np av ed

D itc h

Proposed San Juan HDD

2400 LF 36HDD525

(2416' PIPE LENGTH)

D H

R 2-

-1

El ev

.4

13.6

T.D. 120.0

18.6

SS

26.0

SHALE

SHALE

33.6 35.0 37.2

SS

SHALE

D H

R 2-

-1

El ev

.5

T.D. 80.0

10.5

SHALE

O W

R 2-

-1

El ev

.4

T.D. 80.0

COBBLES AND

BOULDERS

SHALE

12.9

O W

R 2-

-1

El ev

.2

T.D. 50.0

SHALE

12.9

SHALE (Kpc)

COBBLES AND

BOULDERS

S=-0.15838

S=-0.004

S=0.19443

Intersect zone

.5

C ity o f

Fa rm in gt on 7.

9k V

.1

7'

COBBLES AND BOULDERS

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -6

.D W

G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

SAN JUAN RIVER

PLAN AND PROFILE

DENVER, CO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

MARK SUTER

MARK SUTER

KYLIE PELZER

TE

C H

A

PP

R

S U

B M

IT

TE

D

A

PP

R O

V

ED

GEOLOGY

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi st

PLAN - SAN JUAN HDD

PROFILE - SAN JUAN HDD

HOR: 1" = 100', VERT: 1" = 25'

Construction ROW

2600+00 Start Laydown ROW Change N=2091902.84 E=2543932.53

TPR2-22-10

HDD Entry Pit 40'

40'

5130 51

2580+85 Laydown Extent N=2093592.88 E=2544831.92

200'

838' 2586+45 Farm Track

2595+54 Unpaved Ditch

PROPOSED

PIPE LAYDOWN

PROPOSED SAN JUAN HDD

PROPOSED ADDITIONAL

PIPE LAYDOWN

221'

2600+05 Ditch

ROW Point N=2093108.59 E=2544551.21

2580+85 2582+00 2584+00 2586+00 2588+00 2590+00 2592+00 2594+00 2596+00 2598+00 2600+00 2601+00

Fa rm

T ra ck

U np av ed

D itc h

La yd ow n

Ex te nt

S ta rt L ay do w n

Original ground surface

D itc h

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -7

.D W

G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

SAN JUAN RIVER

PIPE LAYDOWN AREA

DENVER, CO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

MARK SUTER

MARK SUTER

KYLIE PELZER

PLAN - SAN JUAN CONSTRUCTION LAYDOWN

PROFILE - SAN JUAN CONSTRUCTION LAYDOWN

HOR: 1" = 100', VERT: 1" = 20'

IR

R

IR

R

IR

R

W

W

W

IR

R

IR

R

IRR

TPR2-22-17

2-13

TPR2-22-16

TPR2-22-14

DHR2-22-18

Kl

Qal

Kpc

Fill Qal

Kpc

Kl

Fill

Qal al

Kl

Kpc

Kl

Kpc

Kpc

Qal

Kpc Qal

QalKpc

Kpc

NTUA

Waterline

NNMP Waterline

2800+00 Begin HDD N=2089075.44 E=2541214.56

Proposed Nenahnezad HDD

2832+94 End HDD N=2086090.79 E=2539823.11

Yellowman Waterline

APS Waterline

NTUA

Waterline

Construction

ROW

50'

2826+13.42 N=2086760.03 E=2539997.84 124.45

50'

2796+00 2800+00 2804+00 2808+00 2812+00 2816+00 2820+00 2824+00 2828+00 2832+00 2834+00

3294 LF 42HDD600

(3323' PIPE LENGTH)

Original ground surface

S=-0.17643

S=0.15835

S ta rt H

D D

Δ

.0

PVI STA = 2808+40.00

PVI ELEV = 4941.60

R = 4400'

B V C S

.7

B V C E:

9.

EV

C S

.4

EV

C E:

6.

El. 5089.8

El. 5330.2

Optional intersect zone

En d

H D

D Δ

9.

0°

2808+58± NTUA 18"Ø Waterline Top of Pipe = 5176.1±

2825+68± APS 36"Ø Waterline

Top of Pipe = 5344.1±

172'

126'

R oa d N

R oa d N

B ur ie d

Te le co m lin e

B ur ie d

Te le co m lin e

Proposed Nenahnezad HDD

2822+41± NTUA 18"Ø Waterline

Top of Pipe = 5321.2±

2824+60.95± NTUA 18"Ø Waterline

Top of Pipe = 5332.47±

D H

R 2-

-1

El ev

.5

T.D. 21.0

16.4

SS(Kpc)

SHALE(Kpc)

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -8

.D W

G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

NENAHNEZAD BLUFF

PLAN AND PROFILE

DENVER, CO

1695-D-62454

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

A. Marner

A. Marner

K. Pelzer

PLAN - HDD NENAHNEZAD BLUFF

1" = 200'

PROFILE - HDD NENAHNEZAD BLUFF

HOR: 1" = 200', VERT: 1" = 100'

DRILL HOLE R2-22-18 STICK LOG

NOT TO SCALE

TE

C H

A

PP

R

S U

B M

IT

TE

D

A

PP

R O

V

ED

GEOLOGY

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi

IR

R

IR

R

IR

R

IR

R

W

W

W

IRR

IR

R

IRR

TPR2-22-13

TPR-22-12

TPR2-22-14

Qal

Kpc

FillQal

Kpc

Fill

Qa

Qal

Kl

Kl

NNMP Waterline 2800+00 Begin HDD N=2089075.44 E=2541214.56

250' x 200'

STAGING AREA

Yellowman Waterline

NTUA Waterline

2832+00 2834+00 2836+00 2838+00 2840+00 2842+00 2844+00 2846+00 2848+00 2850+00 2852+00 2854+00 2856+00 2858+00 2860+00 2862+00 2864+00 2866+00 2868+00 2870+00 2872+00

EN

D

H D

D

D R

IL

L

EX

IT

B

EG

IN

P

U

LL

B A C K

El. 5330.2

S=0.15835

EN

D H

D D

L A

YO

U T

TPR2-22-17

TPR2-22-19

TPR2-22-18

DHR2-22-19

Kpc

Kpc

Kpc

Kpc

Kpc

KpcQal

Qal

Qal

Qal

Qeo

Qal

Qal 2832+94 End HDD N=2086090.79 E=2539823.11

100'

100'

LAYDOWN ROW

2866+17

END LAYOUT AREA

N=2083079.87 E=2538419.41

PROPOSED

PIPE LAYDOWN

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -9

.D W

G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

NENAHNEZAD BLUFF

PIPE LAYDOWN AREA

DENVER, CO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

A. Marner

A. Marner

K. Pelzer

Hor. 1" = 200' Vert. 1" = 40'

0 0

Qal D H

PN

M

-2 1-

El ev

.1

Pr oj

Lt

.6

CLSTNE4.9

5.9

TP

R 3-

-1

2.3 SC

SHALE

El ev

.5

Pr oj

R t.

.8

D H

PN

M

-2 1-

El ev

.0

Pr oj

Lt

.8

T.D. 80.0

2.2 SM

SHALE

31.4 33.3

38.6

51.5

58.7

SS

SHALE

SS

SHALE

SS

D H

PN

M

-2 1-

El ev

.2

Pr oj

Lt

.3

T.D. 50.0

6.5

SC

SM

18.2

SM

19.2 22.5 24.5

34.2

SS

CL

(SP)g

T.D. 80.0

SS

Kl

Qal

Kch

Qal Kch

Qal

Kmf

H7, W7, FD0

H3, W5, FD0

H3, W3, FD0

H5, W3, FD0

H3, W3, FD0

H5, W5, FD0

H3, W5, FD0

H3, W5, FD3

H3, W7, FD0

H7, W7, FD0

H3, W7, FD0

SS

26.8

SC

(SP-SM)

SS

SM1.5

38.2 (GC)s

11.6 T.D. 5.0

3798+00 3800+00 3802+00 3804+00 3806+00 3808+00 3810+00 3812+00 3814+00 3816+00 3818+00 3820+00 3822+00

40.0'

PVI STA = 3806+50.00

PVI ELEV = 4940.50

R = 3750'

B V C S

.1

B V C E:

2.

EV

C S

.6

EV

C E:

9.

PVI STA = 3815+50.00

PVI ELEV = 4936.90

R = 3750'

B V C S

.8

B V C E:

8.

EV

C S

.3

EV

C E:

6.

C ha co R iv er

S ta rt /E nd H

D D

Δ

.6

El. 5061.90

El. 5054.07Original ground surface

S=-0.18677

S=-0.00400

S= 0.

S ta rt /E nd H

D D

Δ

.5

2080 LF 36HDD550

(2099' PIPE LENGTH)

D ir t

R oa d

D ir t

R oa d

D ir t

R oa d

D ir t

R oa d

Qal

Qal

Qal

Qal

Kmf

Kl

Kch

Qal

Kch

Kch

DHPNM-21-7 DHPNM-21-8

TPR3-21-18

DHPNM-21-6

N1 2E

49SE

N 2W

60NE

N

37E

N

5E20SE

70 50

60 5060

70 50

5060 50

90 50

3820+80 Start/End HDD N=2077543.43 E=2517648.36

3800+00 Start/End HDD ROW Changes N=2078063.12 E=2519661.78

3815+10 Chaco River

3804+60 Dirt Road

N=2077948.12 E=2519216.53

3805+46 Dirt Road

N=2077926.73 E=2519133.24

3818+63 Dirt Road

N=2077597.70 E=2517858.40

3816+96.46 ROW Changes

3817+38 Dirt Road

N=2077628.76 E=2517979.45

50'

50'38

CONSTRUCTION ROW

100'

100' 200'

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

0.

D

W G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

CHACO RIVER

PLAN AND PROFILE

DENVER, CO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

JALISSA DEHAAN

JALISSA DEHAAN

KYLIE PELZER

C hr is B ey er

K ri st op he r G ra ha m

C hr is B ey er

S up er vi so ry

G eo lo gi

3818+00 3820+00 3822+00 3824+00 3826+00 3828+00 3830+00 3832+00 3834+00 3836+00 3838+00 3840+00 3842+00 3844+00

Original ground surface

See Note 2

3777+00 3778+00 3780+00 3782+00 3784+00 3786+00 3788+00 3790+00 3792+00 3794+00 3796+00 3798+00 3800+00 3802+00

Original ground surface

See Note 3

CONSTRUCTION

ROW

100'

100'

3820+80 Start Laydown N=2077544.33 E=2517654.35

3841+60 End Laydown N=2077024.64 E=2515640.91

Qal Qal

Kmf

Kmf

DHPNM-21-8 N1

2E

49SE

N

3842+10 End ROW N=2077012.15 E=2515592.51

3779+20 End Laydown N=2078583.71 E=2521681.23

CONSTRUCTION

ROW

100'

100'

PROPOSED

PIPE LAYDOWN

TPR3-21-17

3778+80 End ROW N=2078593.71

E=2521719.95 PROPOSED CHACO RIVER HDD

3800+00 Start Laydown N=2078064.02 E=2519667.79

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

1.

D

W G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

CHACO RIVER

PIPE LAYDOWN AREAS

DENVER, CO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

JALISSA DEHAAN

JALISSA DEHAAN

KYLIE PELZER

HOR: 1 " = 100' , VER: 1" = 20'

HOR: 1 " = 100' , VER: 1" = 20'

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

2.

D

W G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

CHACO RIVER

CONTRACTOR USE AREA

DENVER, CO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

JALISSA DEHAAN

JALISSA DEHAAN

KYLIE PELZER

Contractor Use Area

Contractor Use Area

To Rte. 362

To Rte. 362

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

3.

D

W G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

SAN JUAN RIVER

CONTRACTOR USE AREA

DENVER, CO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

MARK SUTER

MARK SUTER

KYLIE PELZER

LINE TABLE PARCEL 3

LINE

L301

L302

L303

L304

L305

L306

L307

L308

L309

L310

L311

L312

L313

L314

L315

L316

L317

LENGTH

37.86

63.00

194.11

1252.97

364.04

911.86

116.67

235.07

285.39

221.21

1947.32

60.00

84.91

80.00

84.88

60.00

94.38

BEARING

S0°57'31"W

S89°02'29"E

S1°05'29"W

S39°11'04"E

S21°44'12"E

N27°04'53"E

N87°59'23"E

N1°22'46"E

N27°04'53"E

S88°12'47"E

S27°04'53"W

N62°54'09"W

S27°06'57"W

N62°53'03"W

N27°06'57"E

N62°53'03"W

N27°02'56"E

LINE TABLE PARCEL 3

LINE

L318

L319

L320

L321

L322

L323

L324

LENGTH

179.28

368.68

1284.06

249.20

37.00

37.20

50.00

BEARING

N1°19'36"E

N21°44'12"W

N39°11'04"W

N0°57'31"E

S89°25'43"E

N0°57'31"E

S89°47'58"E

LINE TABLE PARCEL 4

LINE

L401

L402

L403

L404

L405

L406

L407

L408

L409

LENGTH

391.56

454.61

75.63

200.00

199.65

101.83

368.75

275.79

170.05

BEARING

N33°30'15"E

N60°15'21"E

N27°06'57"E

S62°53'03"E

S27°06'57"W

N62°53'03"W

S60°15'21"W

S33°30'15"W

N84°35'52"W

To Rte. 362

LINE TABLE PARCEL 5

LINE

L501

L502

L503

L504

L505

L506

L507

L508

L509

L510

L511

L512

LENGTH

49.95

124.73

102.36

102.85

50.00

250.00

200.00

12.65

42.12

231.20

17.25

15.54

BEARING

N65°00'18"W

S24°59'42"W

N52°39'58"W

N24°59'42"E

N65°00'18"W

N24°59'42"E

S65°00'18"E

S24°59'42"W

S84°12'14"E

S30°49'23"W

N84°07'11"W

S25°10'23"W

LINE TABLE PARCEL 6

LINE

L601

L602

L603

L604

L605

L606

L607

L608

LENGTH

103.39

738.69

50.00

3392.00

200.00

3392.00

50.00

764.94

BEARING

S50°17'41"E

S24°59'42"W

S65°00'18"E

S24°59'42"W

N65°00'18"W

N24°59'42"E

S65°00'18"E

N24°59'42"E

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D

-6

-R

D -1

4.

D

W G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

A M

A R N

ER

N A V A

JO

-G A

LL

U P

W A

TE

R S

U

PP

LY

P

R O

JE

C T

N

EW

M

EX

IC

O

S A N

J U

A N

L A

TE

R A L

B

LO

C K

H O

R

IZ

O N

TA

L

D

IR

EC

TI

O N

A L

D R

IL

LI

N

G

NENAHNEZAD BLUFF

CONTRACTOR USE AREA

DENVER, CO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

MARK SUTER

MARK SUTER

KYLIE PELZER

Contractor Use Area

1.50"

34.00"

0.75"

.0

0"

G O

V

ER

N M

EN

T

TI

TL

E B

LO

C K

S ee

N ot e

See Note 4

Trim line, see Note 5

Trim line, see Note 5

See Note 2

0.

0.

SHEET

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

PR

O

JE

C T

N A M

E D

IV

IS

IO

N

CITY, STATE

PRJ-STA-SEQ

YYYY-MM-DD

NUMBER

DRAWN

ACCEPTED

BUREAU OF RECLAMATION

U.S. DEPARTMENT OF THE INTERIOR

YAKIMA PROJECT

KENNEWICK DIVISION

DRAWN

MANUFACTURER OR CONTRACTOR

ACCEPTED

TITLE

1. Government will provide contractor with an electronic AutoCAD template to be used by manufacturer for submittal of manufacturer's/contractors drawing in Government format.

2. The manufacturer's title block and drawing revisions as a result of the submittal process, may be located anywhere outside of the trim lines. The location shown on this drawing is the Government's preferred area.

3. The manufacturer shall show the Government solicitation/specification number, the manufacturer's name, drawing and sheet number in this area.

4. Government drawing number(s) will be issued at the end of the submittal process and drawing will be entered into the Government's electronic drawing system by the Government.

5. Trim lines shall be shown on all submitted drawings.

NOTES

AL

W

AY

S

TH

IN

K

SA

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

S

TA

N D

A R D

D R A W

IN

G

S

S

TA

N D

A R D

A N

D T

YP

IC

A L

D

ES

IG

N

S

G O

V

ER

N M

EN

T

D R A W

IN

G

F O

R M

A T

DRAWING BORDER,

SAMPLE TITLE BLOCK,

AND SIGNATURE LINES

DENVER, CO

40-D-7102

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

S. NITTA

S. NITTA

D. CRAWFORD

-1 2-

D

E.

M en dl in

U

PD

A

TE

D T

IT

LE

B

LO

C K A

N D

S

IG

N A

TU

R E

LI

N

ES

-0 3-

D

B ar th el

R od ne y

J P.

E.

U

PD

A

TE

D T

IT

LE

B

LO

C K A

N D

S

IG

N A

TU

R E

LI

N

ES

-0 4-

D

U

PD

A

TE

D D

R A W

IN

G

T O

C U

R R

EN

T D

R A W

IN

G

R

EC

O R D

S S

YS

TE

M

M

IN

O R R

EV

IS

IO

N

S

1. Information Management Handbook (IMH - 2020), Chapter 2, Section 9.A.4 - "Sheet Border" and Figures G2, G3, and G4.

REFERENCE

R. BARTHEL, P.E.

R.W. LAFOND, P.E.

Re le as ed

File details come from the government source that posted it. Updated .