This document is a pre-proposal site visit presentation for the YOSE 196416 Rehabilitate El Portal Wastewater Treatment Facility and Administrative Camp project in Yosemite National Park, California.

The project will rehabilitate the 45-year-old, 1.0 MGD El Portal wastewater treatment facility, including constructing new headworks, secondary treatment, and aerobic digestion processes, as well as rehabilitating the existing tertiary and dewatering systems and upgrading the electrical systems and SCADA. It will also rehabilitate the former El Portal Trailer Village to serve as RV sites for construction workforce housing and a contractor staging area. The solicitation will be posted in October 2024, with award expected in the first quarter of 2025. The contract will be a single firm-fixed price award with a 1,460 calendar day period of performance. Questions should be directed to the National Park Service's Denver Service Center contracting personnel.

View the file

Other files

File Type Posted
Sol_140P2025R0008_Amd_0013.pdf PDF
B09_Amend_13_Attach_1_QandA_2025_01_02_0013.xlsx XLSX spreadsheet
B09_Amend_12_SF30_140P2025R0008_0012.pdf PDF
B09_Amend_12_Attach_1_QandA_2024_12_23_0012.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0012.pdf PDF
B09_Amend_11_Attach_2_Q204_YOSE_El_Portal_Monitoring_Wells_0011.pdf PDF
B09_Amend_11_Attach_5_Q20_22__10_01_13B_AMD_HDPE_Pipe_and_Fittings_Propane_and_LPG_Service_Data_Sheet_0011.pdf PDF
B09_Amend_11_Attach_3_Q207_35570462ConDWGB_0011.pdf PDF
B09_Amend_11_Attach_4_Q207_35590153_ConDWG_B-100_DO_0011.pdf PDF
B09_Amend_11_Attach_1_QandA_2024_12_20_0011.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0011.pdf PDF
B09_Amend_10_Attach_4_Q_192_-_Detail_2210-720_0010.pdf PDF
B09_Amend_10_Attach_1_QandA_2024_12_16_0010.xlsx XLSX spreadsheet
B09_Amend_10_Attach_6_QM10_43_40_02_Fiberglass_Reinforced_Plastic_Tank_0010.pdf PDF
B09_Amend_10_SF30_140P2025R0008_0010.pdf PDF
B09_Amend_10_Attach_3_Q103_-_65E601_Revised_0010.pdf PDF
Sol_140P2025R0008_Amd_0010.pdf PDF
B09_Amend_10_Attach_7_QM10_43_40_02B_Sup02_Tank_Data_Sheets_0010.pdf PDF
B09_Amend_10_Attach_5_Q_Huber_1_-_40D402_Revised_0010.pdf PDF
B09_Amend_10_Attach_2_Q20_22_10_01_13B__DS_0010.pdf PDF
B09_Amend_9_Attach_1_QandA_2024_11_27_0009.xlsx XLSX spreadsheet
B09_Amend_9_SF30_140P2025R0008_0009.pdf PDF
Sol_140P2025R0008_Amd_0009.pdf PDF
B09_Amend_8_Attach_1_QandA_2024_11_26_0008.xlsx XLSX spreadsheet
B09_Amend_8_Attach_3_sign_in_sheet_second_Visit_0008.pdf PDF
Sol_140P2025R0008_Amd_0008.pdf PDF
B09_Amend_8_Attach_2_Question_173_Conduit_Schedule-_45E801_Revised_0008.pdf PDF
Sol_140P2025R0008_Amd_0007.pdf PDF
B09_Amend_7_SF30_140P2025R0008-Bid_Due_Date_0007.pdf PDF
B09_Amend_6_Attach_4_Second_Site_Vist_0006.pdf PDF
B09_Amend_6_SF30_140P2025R0008_0006.pdf PDF
B09_Amend_6_Attach_1_YOSE_196416_QandA_2024_11_13_0006.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0006.pdf PDF
B09_Amend_6_Attach_3_40_90_00B_Sup02_AMD_PLC_Input_Output_List_0006.pdf PDF
B09_Amend_6_Attach_2_40_90_00B_Sup01_AMD_Instrument_List_0006.pdf PDF
Sol_140P2025R0008_Amd_0005.pdf PDF
B09_Amend_4_SF30_140P2025R0008_0004.pdf PDF
B09_Amend_4_Attach_1_QandA_2024_11_07_0004.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0004.pdf PDF
Sol_140P2025R0008_Amd_0003.pdf PDF
B09_Amend_3_Attach_1_WD_CA20240018_2024_10_18_0003.pdf PDF
B09_Amend_2_Attach_2_PreProposal_SiteVisit_TriFold_-_YOSE_El_Portal_WWTF__0002.docx DOCX document
B09_Amend_2_Attach_4_Solit_Clauses_Construction_El_Portal_0002.docx DOCX document
B09_Amend_2_Attach_3_YOSE_196416_Pre-Bid_PPT_FINAL_0002.pptx PPTX presentation
B09_Amend_2_Attach_1_Prebid_Attendees_List_0002.pdf PDF
Sol_140P2025R0008_Amd_0002.pdf PDF
B09_AMend_2_SF30_140P2025R0008_0002.pdf PDF
B09_Amend_1_Attach_1_YOSE_196416_Specs_Div_1_Geotech_and_Hazmat_El_Portal_WWTP_Unsecured_0001.pdf PDF
B09_Amend_1_Attach_1_YOSE_196416_Specs_Vol2_El_Portal_WWTP_Unsecured_0001.pdf PDF
B09_Amend_1_SF_30_140P2025R0008_0001.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NPS ● 2024

PRE-PROPOSAL SITE VISIT

FOR

REHABILITATE EL PORTAL WASTEWATER

TREATMENT

FACILITY AND ADMIN CAMP

YOSEMITE NATIONAL PARK

Notice ID: 140P2025R0008

NPS PMIS #: YOSE 196416

October 23, 2024

THIS MEETING WILL BE NOT RECORDED

AGENDA

• CONFERENCE ROOM 8:00-8:45 am

• INTRODUCTIONS and WELCOME - (Mike Luecker & Paula Teague)

• Yosemite Staff, Jacobs Engineering (Dan Robillard) & DSC (Patrick Naulty & Evan Yates)

• PURPOSE, PROJECT OVERVIEW & TIMELINE (Mike Luecker& Paula Teague)

• BREAK 8:45-9:00 am

• WALK THROUGH EL PORTAL WWTF 9:00-10:30 am

• BREAK/TRAVEL 10:30am-11:00am

• WALK THROUGH ADMIN CAMP AREA 11:00am-12:00pm

• Closing remarks at the conclusion of admin camp walk through.

• Attendees List, presentation & handouts will be included as an Amendment to the Solicitation

2 YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

PURPOSE

• Visual orientation for contractors and subcontractors who are interested in the project

• Opportunity to visit the site

• Provide questions in writing to Contracting

Ground Rules

• Site Access is not permitted beyond Pre-Proposal site visit

• Pictures are allowed during Pre-Proposal site visit

• Stay with group during site visit

• Please leave no trace

• Park/drive on paved surfaces at Admin Camp

• No restrooms or potable water available at Admin Camp

• Information provided or responses to questions that may be stated during the Pre-Proposal site visit may not be reflected in the solicitation. Interested parties must review the requirements as posted in the solicitation and amendments as issued.

YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

YOSE - 196416 El Portal WWTF and Admin Camp

• Location: Yosemite National Park, California

• Magnitude of Construction: Greater Than $150M

• Design & Construction Method: Design – Bid – Build

• EP WWTP and Admin Camp are connected; One firm fixed contract with a single period of performance

• Procurement Method: Full & Open

• Key Dates:

• Sources Sought Posting: January 2024

• Solicitation: Posted October 4, 2024

• Award: Expected 1st quarter 2025 (Jan-March)

• Solicitation #: 140P2025R0008

• NAICS: 237990

• Period of Performance: 1,460 Calendar Days

• Construction Management Representative

Services: Procurement via General Services Administration (GSA) Task Order

4 YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

El Portal WWTF This project will rehabilitate the 45-year-old WWTF to improve treatment efficiency & meet current standards. Project Scope includes:

• The wastewater processes will be designed for a nominal capacity of 1.0 MGD.

• New treatment processes constructed at the existing plant site including headworks, secondary treatment, and aerobic digestion.

• Rehabilitation of the existing tertiary and dewatering processes.

• Replacement and upgrade of the electrical systems throughout the treatment plant.

• New operations and maintenance facilities.

• The new facilities will be constructed on the existing site, while maintaining operation of the existing treatment processes.

• Upgrade SCADA for El Portal WWTF and wastewater lift stations within the El Portal service area.

• Demolition of the old treatment process facilities.

5 YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

Admin Camp - Improvements The existing El Portal Trailer Village will be rehabilitated for use as a contractor camp for the duration of the El Portal WWTF project. Project Scope includes:

• Development and rehabilitation of 30 RV camping sites

• Improvement of existing roadways and paved areas

• Rehabilitation and/or replacement of existing utilities

(water, sewer and electrical)

• Removal of existing structures & clean up

• Temporary RV Sites outside limits of construction

• Does not include rehabilitation/replacement of the existing laundry, restroom and shower facility.

6 YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

Questions

•Direct all questions to the DSC Contracting Office

• Contracting Officer: Paula_Teague@NPS.gov

• Contracting Specialist: Patrick_Naulty@NPS.gov

•Attendees List, presentation & handouts will be included as an Amendment to the Solicitation

• Information provided or responses to questions that may be stated during the Pre- Proposal site visit may not be reflected in the solicitation. Interested parties must review the requirements as posted in the solicitation and amendments as issued.

YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

WWTF Tour Route

8 YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

Admin Camp Tour Route

Pre-Proposal Site Visit Parking

Meet at Laundry Bldg

NOTICE:

Please leave no trace Park/drive on paved surfaces only Do not enter structures No restrooms available No potable water available

YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

Lift Station Route

Thank you

10 YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

Information provided or responses to questions that may be stated during the Pre-Proposal site visit may not be reflected in the solicitation. Interested parties must review the requirements as posted in the solicitation.

PRE-PROPOSAL SITE VISIT�FOR� Rehabilitate El Portal Wastewater Treatment�Facility and Admin Camp�YOSEMITE National Park
AGENDA
PURPOSE
YOSE - 196416 El Portal WWTF and Admin Camp
El Portal WWTF
Admin Camp - Improvements
Questions
WWTF Tour Route
Admin Camp Tour Route
10