This is a technical drawing showing detailed specifications for hose rack installations at the El Portal Wastewater facility in Yosemite National Park, California. The drawing (number 2210-720) provides dimensional requirements and mounting instructions for two types of hose racks: Type A for 3/4" & 1" hose, and Type B for 1-1/2" hose.

The drawing includes specifications for three mounting configurations: wall-mounted, stanchion mounted, and handrail post mounted installations. It details that interior units must be fabricated from 1/8" A-36 steel plate with hot dip galvanization, while exterior units require 3/16" 6061-T6 aluminum alloy plate. The mounting hardware specifications include 3/8" stainless steel stud type wedge anchors for concrete walls, and 3/8" stainless steel bolts for handrail or post mounting. The drawing provides precise measurements for all components and includes a detailed dimension table specifying measurements A through J for both hose rack types.

View the file

Other files

File Type Posted
Sol_140P2025R0008_Amd_0013.pdf PDF
B09_Amend_13_Attach_1_QandA_2025_01_02_0013.xlsx XLSX spreadsheet
B09_Amend_12_SF30_140P2025R0008_0012.pdf PDF
B09_Amend_12_Attach_1_QandA_2024_12_23_0012.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0012.pdf PDF
B09_Amend_11_Attach_2_Q204_YOSE_El_Portal_Monitoring_Wells_0011.pdf PDF
B09_Amend_11_Attach_5_Q20_22__10_01_13B_AMD_HDPE_Pipe_and_Fittings_Propane_and_LPG_Service_Data_Sheet_0011.pdf PDF
B09_Amend_11_Attach_3_Q207_35570462ConDWGB_0011.pdf PDF
B09_Amend_11_Attach_4_Q207_35590153_ConDWG_B-100_DO_0011.pdf PDF
B09_Amend_11_Attach_1_QandA_2024_12_20_0011.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0011.pdf PDF
B09_Amend_10_Attach_1_QandA_2024_12_16_0010.xlsx XLSX spreadsheet
B09_Amend_10_Attach_6_QM10_43_40_02_Fiberglass_Reinforced_Plastic_Tank_0010.pdf PDF
B09_Amend_10_SF30_140P2025R0008_0010.pdf PDF
B09_Amend_10_Attach_3_Q103_-_65E601_Revised_0010.pdf PDF
Sol_140P2025R0008_Amd_0010.pdf PDF
B09_Amend_10_Attach_7_QM10_43_40_02B_Sup02_Tank_Data_Sheets_0010.pdf PDF
B09_Amend_10_Attach_5_Q_Huber_1_-_40D402_Revised_0010.pdf PDF
B09_Amend_10_Attach_2_Q20_22_10_01_13B__DS_0010.pdf PDF
B09_Amend_9_Attach_1_QandA_2024_11_27_0009.xlsx XLSX spreadsheet
B09_Amend_9_SF30_140P2025R0008_0009.pdf PDF
Sol_140P2025R0008_Amd_0009.pdf PDF
B09_Amend_8_Attach_1_QandA_2024_11_26_0008.xlsx XLSX spreadsheet
B09_Amend_8_Attach_3_sign_in_sheet_second_Visit_0008.pdf PDF
Sol_140P2025R0008_Amd_0008.pdf PDF
B09_Amend_8_Attach_2_Question_173_Conduit_Schedule-_45E801_Revised_0008.pdf PDF
Sol_140P2025R0008_Amd_0007.pdf PDF
B09_Amend_7_SF30_140P2025R0008-Bid_Due_Date_0007.pdf PDF
B09_Amend_6_Attach_4_Second_Site_Vist_0006.pdf PDF
B09_Amend_6_SF30_140P2025R0008_0006.pdf PDF
B09_Amend_6_Attach_1_YOSE_196416_QandA_2024_11_13_0006.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0006.pdf PDF
B09_Amend_6_Attach_3_40_90_00B_Sup02_AMD_PLC_Input_Output_List_0006.pdf PDF
B09_Amend_6_Attach_2_40_90_00B_Sup01_AMD_Instrument_List_0006.pdf PDF
Sol_140P2025R0008_Amd_0005.pdf PDF
B09_Amend_4_SF30_140P2025R0008_0004.pdf PDF
B09_Amend_4_Attach_1_QandA_2024_11_07_0004.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0004.pdf PDF
Sol_140P2025R0008_Amd_0003.pdf PDF
B09_Amend_3_Attach_1_WD_CA20240018_2024_10_18_0003.pdf PDF
B09_Amend_3_Attach_2_YOSE_196416_Pre-Bid_PPT_FINAL_0003.pdf PDF
B09_Amend_2_Attach_2_PreProposal_SiteVisit_TriFold_-_YOSE_El_Portal_WWTF__0002.docx DOCX document
B09_Amend_2_Attach_4_Solit_Clauses_Construction_El_Portal_0002.docx DOCX document
B09_Amend_2_Attach_3_YOSE_196416_Pre-Bid_PPT_FINAL_0002.pptx PPTX presentation
B09_Amend_2_Attach_1_Prebid_Attendees_List_0002.pdf PDF
Sol_140P2025R0008_Amd_0002.pdf PDF
B09_AMend_2_SF30_140P2025R0008_0002.pdf PDF
B09_Amend_1_Attach_1_YOSE_196416_Specs_Div_1_Geotech_and_Hazmat_El_Portal_WWTP_Unsecured_0001.pdf PDF
B09_Amend_1_Attach_1_YOSE_196416_Specs_Vol2_El_Portal_WWTP_Unsecured_0001.pdf PDF
B09_Amend_1_SF_30_140P2025R0008_0001.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1'-0"

PLAN-POST MOUNT

O N W

A L L

2'-0" SQ

CAP

2'-0"

STANCHION

SIDEWALK

SEE NOTE 4

BOLT LOCATION MTG

HOLES FOR POST

MOUNT, TYP FOR 4

2" DIA SCHED 40

PIPE, HOT DIP GALV

D

C

A B

HRADIUS

BOLT

SEE NOTE 3

POST

TOP RAIL

SEE NOTE 4

G

J E

F

MIDDLE

RAIL

BOLT

LOCATION OF

MTG HOLES,

WALL MOUNT,

TYP

W/ PL

W/ PL

RACK TYPE A B C

14 12 12

9 9 18 3

24 4 10 13 2

D E G H J

DIMENSION IN INCHES

1.

2.

ALLOY PLATE.

TYPE WEDGE ANCHORS.

ATTACH TO VERTICAL HANDRAIL OR INDIVIDUAL POST WITH PLATES

3.

4.

5.

EACH CORNER. INSERT DOUBLE SPACER NUTS BETWEEN COLUMN AND

HOSE RACK.

AND ENTIRE UNIT SHALL BE HOT DIP GALVANIZED AFTER FABRICATION.

INTERIOR UNITS SHALL BE FABRICATED FROM 1/8" A-36 STEEL PLATE

EXTERIOR UNITS SHALL BE FABRICATED FROM 3/16" 6061-T6 ALUMINUM

ATTACH TO CONCRETE WALL WITH (4) - 3/8" STAINLESS STEEL STUD

AND (4)- 3/8" STAINLESS STEEL BOLTS.

ATTACH TO STEEL COLUMN WITH (4)- 3/8" ROUND HEAD BOLTS, ONE IN

10-1/2TYPE A-3/4" & 1" HOSE 6

F

7-1/2 9-3/4 1-1/2

TYPE B-1 1/2" HOSE3/8" BOLTS W/

PL 1/8x2x4"

3/8" BOLTS

1/8x2x4"

3/8" BOLTS

1/8x2x4"

PL 1/8x2x4", 1/8

1/8

SECTION

J E

F

WALL MOUNTED

STANCHION MOUNTED

HANDRAIL POST MOUNTED

NOTES:

2024\12\042210-720.dgn

NTS

HOSE RACKS

2210-720

© JACOBS

UNITED STATES DEPARTMENT OF THE INTERIOR

EL PORTAL WASTEWATER

YOSEMITE NATIONAL PARK, CALIFORNIA