This is an engineering diagram/drawing showing electrical infrastructure details for a primary extension at Trailer Court Road in El Portal. The drawing depicts the layout of a 12kV primary voltage line with various technical specifications including latitude (37.6729), longitude (-119.7945), and voltage area details. The diagram shows multiple markers, poles, and electrical components along the route, with precise measurements and distances noted.
The drawing includes specific technical information such as mile marker positions, pole locations, and various electrical specifications. It appears to be part of the broader El Portal Wastewater Treatment Facility rehabilitation project documentation, providing detailed electrical infrastructure information for contractors. The drawing is dated 12/03/2024, has a scale of 1"=100', and includes reference numbers and contact information for project personnel. The diagram also contains standard safety warnings about underground utilities and proper procedures for excavation work.
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
182'
216'
213'
154'
219'
327'
164'
130'
408'
307 '
M
ILE
M A
R K
E R
50.00
SV
File details come from the government source that posted it. Updated .