B09_Amend_2_Attach_3_YOSE_196416_Pre-Bid_PPT_FINAL_0002.pptx

PPTX presentation 9 MB Posted

Attached to
YOSE 196416 Rehabilitate El Portal Wastewater Trea
Solicitation number
140P2025R0008
Issued by

About this file

This document is a pre-proposal site visit presentation for a federal contract opportunity to rehabilitate the El Portal Wastewater Treatment Facility (WWTF) and Administrative Camp in Yosemite National Park, California. The solicitation number is 140P2025R0008, and the total construction value is estimated to be greater than $150 million under a design-bid-build contract with a single firm fixed-price and a period of performance of 1,460 calendar days. The project scope includes upgrades to the 45-year-old WWTF to improve treatment efficiency and meet current standards, as well as the rehabilitation of the former El Portal Trailer Village to be used as RV sites for construction workforce housing and a contractor staging area. The solicitation was posted on October 4, 2024, with an expected award in the first quarter of 2025. The National Park Service is the contracting agency, and construction management services will be procured via a GSA task order. The presentation provides details on the project timeline, vegetation and topsoil protection, and logistics for the pre-proposal site visit.

View the file

Other files

File Type Posted
Sol_140P2025R0008_Amd_0013.pdf PDF
B09_Amend_13_Attach_1_QandA_2025_01_02_0013.xlsx XLSX spreadsheet
B09_Amend_12_SF30_140P2025R0008_0012.pdf PDF
B09_Amend_12_Attach_1_QandA_2024_12_23_0012.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0012.pdf PDF
B09_Amend_11_Attach_2_Q204_YOSE_El_Portal_Monitoring_Wells_0011.pdf PDF
B09_Amend_11_Attach_5_Q20_22__10_01_13B_AMD_HDPE_Pipe_and_Fittings_Propane_and_LPG_Service_Data_Sheet_0011.pdf PDF
B09_Amend_11_Attach_3_Q207_35570462ConDWGB_0011.pdf PDF
B09_Amend_11_Attach_4_Q207_35590153_ConDWG_B-100_DO_0011.pdf PDF
B09_Amend_11_Attach_1_QandA_2024_12_20_0011.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0011.pdf PDF
B09_Amend_10_Attach_4_Q_192_-_Detail_2210-720_0010.pdf PDF
B09_Amend_10_Attach_1_QandA_2024_12_16_0010.xlsx XLSX spreadsheet
B09_Amend_10_Attach_6_QM10_43_40_02_Fiberglass_Reinforced_Plastic_Tank_0010.pdf PDF
B09_Amend_10_SF30_140P2025R0008_0010.pdf PDF
B09_Amend_10_Attach_3_Q103_-_65E601_Revised_0010.pdf PDF
Sol_140P2025R0008_Amd_0010.pdf PDF
B09_Amend_10_Attach_7_QM10_43_40_02B_Sup02_Tank_Data_Sheets_0010.pdf PDF
B09_Amend_10_Attach_5_Q_Huber_1_-_40D402_Revised_0010.pdf PDF
B09_Amend_10_Attach_2_Q20_22_10_01_13B__DS_0010.pdf PDF
B09_Amend_9_Attach_1_QandA_2024_11_27_0009.xlsx XLSX spreadsheet
B09_Amend_9_SF30_140P2025R0008_0009.pdf PDF
Sol_140P2025R0008_Amd_0009.pdf PDF
B09_Amend_8_Attach_1_QandA_2024_11_26_0008.xlsx XLSX spreadsheet
B09_Amend_8_Attach_3_sign_in_sheet_second_Visit_0008.pdf PDF
Sol_140P2025R0008_Amd_0008.pdf PDF
B09_Amend_8_Attach_2_Question_173_Conduit_Schedule-_45E801_Revised_0008.pdf PDF
Sol_140P2025R0008_Amd_0007.pdf PDF
B09_Amend_7_SF30_140P2025R0008-Bid_Due_Date_0007.pdf PDF
B09_Amend_6_Attach_4_Second_Site_Vist_0006.pdf PDF
B09_Amend_6_SF30_140P2025R0008_0006.pdf PDF
B09_Amend_6_Attach_1_YOSE_196416_QandA_2024_11_13_0006.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0006.pdf PDF
B09_Amend_6_Attach_3_40_90_00B_Sup02_AMD_PLC_Input_Output_List_0006.pdf PDF
B09_Amend_6_Attach_2_40_90_00B_Sup01_AMD_Instrument_List_0006.pdf PDF
Sol_140P2025R0008_Amd_0005.pdf PDF
B09_Amend_4_SF30_140P2025R0008_0004.pdf PDF
B09_Amend_4_Attach_1_QandA_2024_11_07_0004.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0004.pdf PDF
Sol_140P2025R0008_Amd_0003.pdf PDF
B09_Amend_3_Attach_1_WD_CA20240018_2024_10_18_0003.pdf PDF
B09_Amend_3_Attach_2_YOSE_196416_Pre-Bid_PPT_FINAL_0003.pdf PDF
B09_Amend_2_Attach_2_PreProposal_SiteVisit_TriFold_-_YOSE_El_Portal_WWTF__0002.docx DOCX document
B09_Amend_2_Attach_4_Solit_Clauses_Construction_El_Portal_0002.docx DOCX document
B09_Amend_2_Attach_1_Prebid_Attendees_List_0002.pdf PDF
Sol_140P2025R0008_Amd_0002.pdf PDF
B09_AMend_2_SF30_140P2025R0008_0002.pdf PDF
B09_Amend_1_Attach_1_YOSE_196416_Specs_Div_1_Geotech_and_Hazmat_El_Portal_WWTP_Unsecured_0001.pdf PDF
B09_Amend_1_Attach_1_YOSE_196416_Specs_Vol2_El_Portal_WWTP_Unsecured_0001.pdf PDF
B09_Amend_1_SF_30_140P2025R0008_0001.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL SITE VISIT

FOR

Rehabilitate El Portal Wastewater Treatment Facility and Admin Camp YOSEMITE National Park Notice ID: 140P2025R0008

NPS PMIS #: YOSE 196416

October 23, 2024

THIS MEETING WILL BE NOT RECORDED

NPS ● 2024

AGENDA

CONFERENCE ROOM 8:00-8:45 am INTRODUCTIONS and WELCOME - (Mike Luecker & Paula Teague) Yosemite Staff, Jacobs Engineering (Dan Robillard) & DSC (Patrick Naulty & Evan Yates) PURPOSE, PROJECT OVERVIEW & TIMELINE (Mike Luecker& Paula Teague) VEGETATION & TOPSOIL (Alisa Simonoff-Smith – 1 Slide)

BREAK8:45-9:00 am
WALK THROUGH EL PORTAL WWTF9:00-10:30 am
BREAK/TRAVEL10:30am-11:00am
WALK THROUGH ADMIN CAMP AREA11:00am-12:00pm

Closing remarks at the conclusion of admin camp walk through.

Attendees List, presentation & handouts will be included as an Amendment to the Solicitation

YOSE 196416 EL PORTAL WWTF & ADMIN CAMP PRE-PROPOSAL SITE VISIT

PURPOSE

Visual orientation for contractors and subcontractors who are interested in the project Opportunity to visit the site Provide questions in writing to Contracting

Ground Rules Site Access is not permitted beyond Pre-Proposal site visit Pictures are allowed during Pre-Proposal site visit Stay with group during site visit Please leave no trace Park/drive on paved surfaces at Admin Camp No restrooms or potable water available at Admin Camp

Information provided or responses to questions that may be stated during the Pre-Proposal site visit may not be reflected in the solicitation. Interested parties must review the requirements as posted in the solicitation and amendments as issued.

YOSE - 196416 El Portal WWTF and Admin Camp Location: Yosemite National Park, California Magnitude of Construction: Greater Than $150M Design & Construction Method: Design – Bid – Build EP WWTP and Admin Camp are connected; One firm fixed contract with a single period of performance Procurement Method: Full & Open Key Dates:

Sources Sought Posting: January 2024 Solicitation: Posted October 4, 2024 Award: Expected 1st quarter 2025 (Jan-March) Solicitation #: 140P2025R0008

NAICS: 237990

Period of Performance: 1,460 Calendar Days Construction Management Representative Services: Procurement via General Services Administration (GSA) Task Order

El Portal WWTF This project will rehabilitate the 45-year-old WWTF to improve treatment efficiency & meet current standards. Project Scope includes:

The wastewater processes will be designed for a nominal capacity of 1.0 MGD.

New treatment processes constructed at the existing plant site including headworks, secondary treatment, and aerobic digestion.

Rehabilitation of the existing tertiary and dewatering processes.

Replacement and upgrade of the electrical systems throughout the treatment plant.

New operations and maintenance facilities.

The new facilities will be constructed on the existing site, while maintaining operation of the existing treatment processes.

Upgrade SCADA for El Portal WWTF and wastewater lift stations within the El Portal service area.

Demolition of the old treatment process facilities.

Admin Camp - Improvements The existing El Portal Trailer Village will be rehabilitated for use as a contractor camp for the duration of the El Portal WWTF project. Project Scope includes:

Development and rehabilitation of 30 RV camping sites Improvement of existing roadways and paved areas Rehabilitation and/or replacement of existing utilities (water, sewer and electrical) Removal of existing structures & clean up Temporary RV Sites outside limits of construction Does not include rehabilitation/replacement of the existing laundry, restroom and shower facility.

WWTF & Admin Camp – Vegetation, Topsoil and Restoration Vegetation Protection Root zone and steps to protect roots during excavation, particular emphasis on roots 2" or greater (see specifications).

Barriers to protect vegetation, emphasis on materials and placement locations Damage to trees must be documented with location of tree noted to allow for monitoring.

Duff & Topsoil Duff needs to be removed first and stockpiled.

Salvage topsoil. Differences between organic topsoil and mineral soil.

Restoration Area Preparation Contour areas of infrastructure removals to blend with natural landscape Decompact/scarify soil to proper depth (see specifications). The park has had good results using a claw to "squeeze" the soil with less root damage Place salvaged topsoil to proper (see specifications).

Information provided or responses to questions that may be stated during the Pre-Proposal site visit may not be reflected in the solicitation. Interested parties must review the requirements as posted in the solicitation and amendments as issued.

Questions Direct all questions to the DSC Contracting Office Contracting Officer: Paula_Teague@NPS.gov Contracting Specialist: Patrick_Naulty@NPS.gov Attendees List, presentation & handouts will be included as an Amendment to the Solicitation

Information provided or responses to questions that may be stated during the Pre-Proposal site visit may not be reflected in the solicitation. Interested parties must review the requirements as posted in the solicitation and amendments as issued.

WWTF Tour Route

Admin Camp Tour Route

Pre-Proposal Site Visit Parking Meet at Laundry Bldg

NOTICE:

Please leave no trace Park/drive on paved surfaces only Do not enter structures No restrooms available No potable water available

Lift Station Route

Information provided or responses to questions that may be stated during the Pre-Proposal site visit may not be reflected in the solicitation. Interested parties must review the requirements as posted in the solicitation.