B09_Amend_10_Attach_5_Q_Huber_1_-_40D402_Revised_0010.pdf
PDF 638 KB Posted
- Solicitation number
- 140P2025R0008
About this file
This is a mechanical engineering drawing showing an enlarged plan view (3/8"=1'-0" scale) of digesters and dewatering equipment for the El Portal Wastewater Treatment Facility rehabilitation project at Yosemite National Park. The drawing (Sheet 40D402) details process mechanical components including a digester equipment room, truck loading dewatering area, and Digester 1 (040-DGR-110).
The plan shows specific equipment placement including two feed pumps (040-P-540 and 040-P-550), various pipe sizes and types (6" CENT, 1" POL, 8" V405), valves (FV305, FV306), and dimensional information for equipment spacing. There are red text annotations indicating required modifications such as "REPLACE ELBOW WITH TEE, ADD 1-1/2" V330 BALL VALVES AS SHOWN" and instructions to "INSTALL MALE CAM-LOCK FITTING." The drawing is part of the July 2024 final CD submittal package and includes professional engineer stamps and signatures.
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4'-6"
DATE:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
DESIGNED:
Y O
S E
F
IL
E N
A M
E
P L
O T D
A T
E
P L
O T T
IM
E
:0
:5
A
M /1
/2
YOSEMITE NATIONAL PARK, EL PORTAL
175209
196416
D
D .d g n
F
IN
A L C
D S
U B
M
IT
T A
L
JULY 2024
40D402
P MURPHY
B KASPAR
PROCESS MECHANICAL
ENLARGED PLAN
ENLARGED PLAN
3/8" = 1'-0"
40D130
DCB
E
TRUCK LOADING
DEWATRING
040-M-500
6" CENT
33'-0"15'-0"15'-3"2'-7"
2'-4" 8'-5" 9'-9" 4'-1" 2'-2"
1" POL1" POL
6" CENT6" CENT
EQUIPMENT ROOM
DIGESTER
40101
040-DGR-110
DIGESTER 1
B
40D302
B
40D302
C
40D303
C
40D303
D
40D304
D
40D304
G
40D307
G
40D307
H
40D308
H
40D308
I
40D309
I
40D309
J
40D309
J
40D309
B MISSLIN
DIGESTERS AND DEWATERING
SYSTEM
POLYMER
6" CENT
PIPE HANGER
4005-550 , TYP
1" POL 1" POL1 1/2" POL
3'-7" 16'-6"
8" x 6" RDCR 6" ALP
1" POL
040-P-540
FEED PUMP 1
040-P-550
FEED PUMP 2
3'-2" 3'-6"
1" V400
FE
FV
FV
STL WALL PIPE
4027-605 , TYP
8" V405
R
EE
NI
GN
E L
ANOISSEFORP DERETSI
G E
R
L
ACINAHCE
M
AINROFILAC FO E
TAT
S
DR
ALLI
BOR LEINAD
36246
06/27/2024
Dan Robillard Callout
REPLACE ELBOW WITH TEE; ADD 1-1/2" V330 BALL VALVES AS SHOWN.
Dan Robillard Line
Dan Robillard Ball Valve
Dan Robillard Ellipse
Dan Robillard Rectangle
Dan Robillard Ball Valve
Dan Robillard Ellipse
Dan Robillard Callout
INSTALL MALE CAM-LOCK FITTING
Dan Robillard Callout ROUTE 1" W3 PIPE DOWN FROM OVERHEAD 3" W3 PIPE, SEE PLUMBING DRAWING. SPLIT PIPE AND CONNECT 1" W3 TO EACH POLYMER FEED SYSTEM
File details come from the government source that posted it. Updated .