B09_Amend_1_Attach_1_YOSE_196416_Specs_Vol2_El_Portal_WWTP_Unsecured_0001.pdf

PDF 3 MB Posted

Attached to
YOSE 196416 Rehabilitate El Portal Wastewater Trea
Solicitation number
140P2025R0008
Issued by

About this file

This document is a Request for Proposals (RFP) for the YOSE 196416 Rehabilitate El Portal Wastewater Treatment Facility and Administrative Camp project in Yosemite National Park, El Portal, California. The work involves rehabilitating the 45-year-old El Portal wastewater treatment facility, which is the largest in the National Park Service and serves Yosemite Valley, El Portal, and surrounding communities. The project will replace aging and undersized infrastructure, including the electrical system, to improve treatment processes, operations, and maintenance. Additionally, the former El Portal Trailer Village (Administrative Camp) will be rehabilitated to provide RV sites for construction workforce housing and a contractor staging area. The National Park Service is the procuring agency. Proposals are being solicited with an unspecified award date.

View the file

Other files

File Type Posted
Sol_140P2025R0008_Amd_0013.pdf PDF
B09_Amend_13_Attach_1_QandA_2025_01_02_0013.xlsx XLSX spreadsheet
B09_Amend_12_SF30_140P2025R0008_0012.pdf PDF
B09_Amend_12_Attach_1_QandA_2024_12_23_0012.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0012.pdf PDF
B09_Amend_11_Attach_2_Q204_YOSE_El_Portal_Monitoring_Wells_0011.pdf PDF
B09_Amend_11_Attach_5_Q20_22__10_01_13B_AMD_HDPE_Pipe_and_Fittings_Propane_and_LPG_Service_Data_Sheet_0011.pdf PDF
B09_Amend_11_Attach_3_Q207_35570462ConDWGB_0011.pdf PDF
B09_Amend_11_Attach_4_Q207_35590153_ConDWG_B-100_DO_0011.pdf PDF
B09_Amend_11_Attach_1_QandA_2024_12_20_0011.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0011.pdf PDF
B09_Amend_10_Attach_4_Q_192_-_Detail_2210-720_0010.pdf PDF
B09_Amend_10_Attach_1_QandA_2024_12_16_0010.xlsx XLSX spreadsheet
B09_Amend_10_Attach_6_QM10_43_40_02_Fiberglass_Reinforced_Plastic_Tank_0010.pdf PDF
B09_Amend_10_SF30_140P2025R0008_0010.pdf PDF
B09_Amend_10_Attach_3_Q103_-_65E601_Revised_0010.pdf PDF
Sol_140P2025R0008_Amd_0010.pdf PDF
B09_Amend_10_Attach_7_QM10_43_40_02B_Sup02_Tank_Data_Sheets_0010.pdf PDF
B09_Amend_10_Attach_5_Q_Huber_1_-_40D402_Revised_0010.pdf PDF
B09_Amend_10_Attach_2_Q20_22_10_01_13B__DS_0010.pdf PDF
B09_Amend_9_Attach_1_QandA_2024_11_27_0009.xlsx XLSX spreadsheet
B09_Amend_9_SF30_140P2025R0008_0009.pdf PDF
Sol_140P2025R0008_Amd_0009.pdf PDF
B09_Amend_8_Attach_1_QandA_2024_11_26_0008.xlsx XLSX spreadsheet
B09_Amend_8_Attach_3_sign_in_sheet_second_Visit_0008.pdf PDF
Sol_140P2025R0008_Amd_0008.pdf PDF
B09_Amend_8_Attach_2_Question_173_Conduit_Schedule-_45E801_Revised_0008.pdf PDF
Sol_140P2025R0008_Amd_0007.pdf PDF
B09_Amend_7_SF30_140P2025R0008-Bid_Due_Date_0007.pdf PDF
B09_Amend_6_Attach_4_Second_Site_Vist_0006.pdf PDF
B09_Amend_6_SF30_140P2025R0008_0006.pdf PDF
B09_Amend_6_Attach_1_YOSE_196416_QandA_2024_11_13_0006.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0006.pdf PDF
B09_Amend_6_Attach_3_40_90_00B_Sup02_AMD_PLC_Input_Output_List_0006.pdf PDF
B09_Amend_6_Attach_2_40_90_00B_Sup01_AMD_Instrument_List_0006.pdf PDF
Sol_140P2025R0008_Amd_0005.pdf PDF
B09_Amend_4_SF30_140P2025R0008_0004.pdf PDF
B09_Amend_4_Attach_1_QandA_2024_11_07_0004.xlsx XLSX spreadsheet
Sol_140P2025R0008_Amd_0004.pdf PDF
Sol_140P2025R0008_Amd_0003.pdf PDF
B09_Amend_3_Attach_1_WD_CA20240018_2024_10_18_0003.pdf PDF
B09_Amend_3_Attach_2_YOSE_196416_Pre-Bid_PPT_FINAL_0003.pdf PDF
B09_Amend_2_Attach_2_PreProposal_SiteVisit_TriFold_-_YOSE_El_Portal_WWTF__0002.docx DOCX document
B09_Amend_2_Attach_4_Solit_Clauses_Construction_El_Portal_0002.docx DOCX document
B09_Amend_2_Attach_3_YOSE_196416_Pre-Bid_PPT_FINAL_0002.pptx PPTX presentation
B09_Amend_2_Attach_1_Prebid_Attendees_List_0002.pdf PDF
Sol_140P2025R0008_Amd_0002.pdf PDF
B09_AMend_2_SF30_140P2025R0008_0002.pdf PDF
B09_Amend_1_Attach_1_YOSE_196416_Specs_Div_1_Geotech_and_Hazmat_El_Portal_WWTP_Unsecured_0001.pdf PDF
B09_Amend_1_SF_30_140P2025R0008_0001.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YOSEMITE NATIONAL PARK

CALIFORNIA

Rehabilitate El Portal Wastewater Treatment Facility

YOSE

196416

Volume 2 of 6 Division 02 through Division 08

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE (NPS)

DENVER SERVICE CENTER (DSC)

YOSE 196416 SEALS PAGES

PW\DEN003\D3167637 00 01 07 - 1

SECTION 00 01 07

SEALS PAGE

See Table of Contents for author of each specification section, identified by author’s initials as follows:

AUTHOR’S NAME = INITIALS

BECKY K. CHELONIS = BKC JEREMY A. KELLOGG = JAK

LINDA CYRA-KORSGAAD = LCK GEOFFREY B. KIRSTEN = GBK

BENJAMIN L. FRANCIS = BLF BRIAN M. PILMER = BMP

KENNETH J. GALARDI = KJG DANIEL ROBILLARD = DM

FORREST M. GIST = FMG MARK TWEDE = MT

LIV HAUGEN = LH CRAIG ALLEN VANHORN = CAV

COLIN HOFFMAN = CH

Daniel Robillard

06/27/2024

SEALS PAGES YOSE 196416

00 01 07 - 2 PW\DEN003\D3167637

Becky K Chelonis

06/27/2024

PW\DEN003\D3167637 00 01 07 - 3

Linda Cyra-Korsgaad

02/29/2024

07/31/202307/31/2023

02/28/2026

06/26/2024

0002/28/02/28/ 626202202

00 01 07 - 4 PW\DEN003\D3167637

Benjamin L. Francis

PW\DEN003\D3167637 00 01 07 - 5

Kenneth J. Galardi

DIGITALLY SIGNED 06/20/2024

00 01 07 - 6 PW\DEN003\D3167637

Forrest M. Gist

EXPIRES: 06/30/2026

Date: 2024.06.27 10:33:08-07'00'

PW\DEN003\D3167637 00 01 07 - 7

Liv Haugen

00 01 07 - 8 PW\DEN003\D3167637

Colin Hoffman

PW\DEN003\D3167637 00 01 07 - 9

Jeremy A. Kellogg

8/30/2024

00 01 07 - 10 PW\DEN003\D3167637

Geoffrey B. Kirsten

DATE SIGNED: 7/6/2021

2/18/22

DATE SIGNED: 06/26/2024

PW\DEN003\D3167637 00 01 07 - 11

Brian M. Pilmer

DATE SIGNED: 6/21/2024

00 01 07 - 12 PW\DEN003\D3167637

Mark Twede 6/26/24

PW\DEN003\D3167637 00 01 07 - 13

Craig Allen Vanhorn

END OF SECTION

06/28/2024

YOSE 196416 TABLE OF CONTENTS

PW\DEN003\D3167637 00 01 10 - 1

TABLE OF CONTENTS

Person Section Responsible Title Pages

VOLUME 2

SPECIFICATIONS

DIVISION 02—EXISTING CONDITIONS

02 41 00 CH Demolition .................................................................................. 1- 14 Supplement:

Salvaged Items List ..................................................................... 1- 2 02 81 00 CH Transportation and Disposal of Hazardous Materials ................. 1- 11 Supplement:

Attachment A: Sample Offsite Policy Certification Memo ........ 1- 1 02 82 00 CH Asbestos Remediation ................................................................. 1- 28 02 83 00 CH Lead Remediation ....................................................................... 1- 18 02 84 16 CH Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury ............................................................................. 1- 7 02 84 33 CH Removal and Disposal of Polychlorinated Biphenyls (PCBs)..................................................................... 1- 11

DIVISION 03—CONCRETE

03 01 32 JAK Repair of Vertical and Overhead Concrete Surfaces .................. 1- 14 03 01 33 JAK Repair of Horizontal Concrete Surfaces ..................................... 1- 13 03 10 00 JAK Concrete Forming and Accessories ............................................ 1- 11 03 15 00 JAK Concrete Joints and Accessories ................................................. 1- 13 03 21 00 JAK Steel Reinforcement .................................................................... 1- 6 03 24 00 JAK Fibrous Reinforcing .................................................................... 1- 3 03 30 00 JAK Cast-in-Place Concrete................................................................ 1- 30 Supplements:

JAK Concrete Mix Design, CMD-1 .................................................... 1- 2 JAK Concrete Mix Design, CMD-2 .................................................... 1- 2 JAK Concrete Mix Design, CMD-3 .................................................... 1- 2 JAK Concrete Mix Design, CMD-4 .................................................... 1- 2 JAK Concrete Mix Design, CMD-5 .................................................... 1- 2 03 35 00 JAK Concrete Finishing ...................................................................... 1- 6 03 39 00 JAK Concrete Curing .......................................................................... 1- 5 03 40 00 JAK Architectural Precast Concrete ................................................... 1- 23 03 62 00 JAK Grouting ...................................................................................... 1- 11 Supplement:

JAK 24-hour Evaluation of Nonshrink Grout Test Form and Grout Testing Procedures ........................................................ 1- 3 03 63 00 JAK Concrete Doweling ..................................................................... 1- 5

Person Section Responsible Title Pages

TABLE OF CONTENTS YOSE 196416

00 01 10 - 2 PW\DEN003\D3167637

03 64 23 JAK Epoxy Resin Injection Grouting ................................................. 1- 12 03 64 24 JAK Polyurethane Injection Grouting ................................................. 1- 10

DIVISION 04—(NOT USED)

DIVISION 05—METALS

05 05 19 JAK Post-Installed Anchors ................................................................ 1- 7 05 05 23 JAK Welding ....................................................................................... 1- 6 Supplement:

JAK Welding and Nondestructive Testing Table ............................... 1- 2 05 12 00 JAK Structural Steel Framing ............................................................. 1- 14 05 21 19 JAK Open Web Steel Joist Framing ................................................... 1- 4 05 31 00 JAK Steel Decking .............................................................................. 1- 6 05 41 00 JAK Structural Metal Stud Framing .................................................... 1- 8 05 50 00 JAK Metal Fabrications ...................................................................... 1- 23 05 52 16 JAK Aluminum Railings ..................................................................... 1- 9 05 53 00 JAK Metal Gratings ............................................................................ 1- 6

DIVISION 06—WOOD, PLASTICS, AND COMPOSITES

06 10 00 GBK Rough Carpentry ......................................................................... 1- 7 06 41 00 GBK Architectural Wood Casework .................................................... 1- 10 06 82 00 GBK Glass-Fiber-Reinforced Plastic ................................................... 1- 11

DIVISION 07—THERMAL AND MOISTURE PROTECTION

07 14 00 GBK Fluid-Applied Waterproofing ..................................................... 1- 5 07 18 00 GBK Traffic Coatings .......................................................................... 1- 6 07 21 00 GBK Thermal Insulation ...................................................................... 1- 6 07 26 16 GBK Belowgrade Vapor Retarders ...................................................... 1- 3 07 41 13 GBK Metal Roof, Wall, and Soffit Panels ........................................... 1- 17 07 42 00 GBK Prefabricated Metal Canopies ..................................................... 1- 5 07 53 23 GBK Ethylene-Propylene-Diene-Monomer Roofing ........................... 1- 10 07 62 00 GBK Sheet Metal Flashing and Trim ................................................... 1- 8 07 70 01 GBK Roof Specialties and Accessories ............................................... 1- 5 07 84 00 GBK Firestopping ................................................................................ 1- 6 07 92 00 GBK Joint Sealants .............................................................................. 1- 7

DIVISION 08—OPENINGS

08 11 00 GBK Metal Doors and Frames ............................................................. 1- 8 08 14 00 GBK Wood Doors ................................................................................ 1- 5 08 30 00 GBK Specialty Doors ........................................................................... 1- 6 08 41 13 GBK Aluminum-Framed Entrances and Storefronts ........................... 1- 10

PW\DEN003\D3167637 00 01 10 - 3

08 45 00 GBK Translucent Wall Assemblies ..................................................... 1- 9 08 71 00 GBK Door Hardware ............................................................................ 1- 22 08 80 00 GBK Glazing ........................................................................................ 1- 11 08 90 00 GBK Louvers ....................................................................................... 1- 4

VOLUME 3

DIVISION 09—FINISHES

09 22 16 GBK Nonstructural Metal Framing ...................................................... 1- 4 09 29 00 GBK Gypsum Board ............................................................................ 1- 11 09 30 00 GBK Tiling ........................................................................................... 1- 9 09 51 13 GBK Acoustical Panel Ceilings ........................................................... 1- 5 09 65 00 GBK Resilient Flooring........................................................................ 1- 8 09 90 00 CAV Painting and Coating ................................................................... 1- 25 Supplements:

CAV Paint System Data Sheet (PSDS) ................................................ 1- 1 CAV Paint Product Data Sheet (PPDS) ............................................... 1- 1 CAV Volatile Organic Compound (VOC) Limit List .......................... 1- 2 09 96 35 CAV Chemical-Resistant Coatings ...................................................... 1- 4 09 97 13 CAV Steel Tank Coatings .................................................................... 1- 14 Supplements:

CAV Paint System Data Sheet (PSDS) ................................................ 1- 2 CAV Paint Product Data Sheet (PPDS) ............................................... 1- 1

DIVISION 10—SPECIALTIES

10 14 00 GBK Signage ........................................................................................ 1- 14 Supplement:

GBK Sign Schedule.............................................................................. 1- 6 10 21 00 GBK Compartments and Cubicles ....................................................... 1- 7 10 28 00 GBK Toilet and Bath Accessories........................................................ 1- 4 10 44 00 GBK Fire Protection Specialties and Safety Equipment ...................... 1- 5 10 51 00 GBK Lockers and Benches .................................................................. 1- 4 10 80 00 GBK Miscellaneous Specialties ........................................................... 1- 12

DIVISION 11—EQUIPMENT

11 31 00 GBK Appliances................................................................................... 1- 3 11 53 00 GBK Laboratory Equipment ................................................................ 1- 5

DIVISION 12—FURNISHINGS

12 35 53.13 GBK Metal Laboratory Casework ....................................................... 1- 21 12 49 00 GBK Roller Shades .............................................................................. 1- 5

00 01 10 - 4 PW\DEN003\D3167637

DIVISION 13—SPECIAL CONSTRUCTION

13 34 19 JAK Metal Building Systems .............................................................. 1- 11 13 34 23 JAK Fabricated Structures .................................................................. 1- 8

DIVISION 14 THROUGH DIVISION 20 (NOT USED)

DIVISION 21—FIRE SUPPRESSION

21 13 13 DR Wet-Pipe Sprinkler Systems ....................................................... 1- 20

DIVISION 22—PLUMBING

22 05 48 DR Vibration and Seismic Control for Plumbing Piping and Equipment ......................................................................... 1- 12 22 07 00 DR Plumbing Piping Insulation......................................................... 1- 7 22 10 01 DR Plumbing Piping and Accessories ............................................... 1- 19 Supplement:

DR Plumbing Piping Schedule .......................................................... 1- 3 22 10 01.02 DR Polyvinyl Chloride Drain Waste and Vent (PVC-DWV) Pipe and Fittings Data Sheet .................................................... 1- 1 22 10 01.03 DR Cast Iron Soil Pipe (CISP) and Fittings Data Sheet .................... 1- 1 22 30 00 DR Plumbing Equipment .................................................................. 1- 7 Supplements:

DR Instantaneous Water Heater Data Sheet ...................................... 1- 1 DR Gas Water Heater (Commercial) Data Sheet .............................. 1- 2 DR Domestic Water Expansion Tank Data Sheet ............................. 1- 1 DR Backflow Preventers Data Sheet ................................................. 1- 1 22 40 00 DR Plumbing Fixtures ....................................................................... 1- 14

DIVISION 23—HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 05 14 DR HVAC Adjustable Frequency Drives ......................................... 1- 11 23 05 48 DR Vibration Isolation and Seismic Control for HVAC Piping and Equipment ................................................. 1- 13 23 05 93 DR Testing, Adjusting, and Balancing for HVAC ............................ 1- 8 23 07 00 DR HVAC Insulation ........................................................................ 1- 11 23 09 00 DR Instrumentation and Control Devices for HVAC ....................... 1- 15 23 09 13 DR HVAC Controls, Field Components, and Instruments ............... 1- 9 23 09 23 DR Direct-Digital Control System for HVAC .................................. 1- 9 23 13 00 DR Aboveground Fuel Storage Tank and Accessories ..................... 1- 16 23 23 00 DR Refrigerant Piping ....................................................................... 1- 7 23 31 13 DR Metal Ducts and Accessories ...................................................... 1- 30 23 31 16.16 KJG Foul Air Ductwork and Accessories ........................................... 1- 16 23 34 00 DR HVAC Fans ................................................................................. 1- 15

PW\DEN003\D3167637 00 01 10 - 5

23 34 05 KJG Odor Control Fans....................................................................... 1- 14 Supplement:

KJG Odor Control Fans Schedule ....................................................... 1- 1 23 37 00 DR Air Outlets and Inlets .................................................................. 1- 3 23 77 00 DR Air Handling Units ...................................................................... 1- 22 23 81 00 DR Unitary Air-Conditioning Equipment ......................................... 1- 21 23 82 00 DR Terminal Heating and Cooling Units .......................................... 1- 7

DIVISION 24 AND DIVISION 25 (NOT USED)

VOLUME 4

DIVISION 26—ELECTRICAL

26 05 02 BMP Basic Electrical Requirements .................................................... 1- 7 26 05 04 BMP Basic Electrical Materials and Methods ..................................... 1- 10 26 05 05 BMP Conductors .................................................................................. 1- 18 26 05 10 BMP Network Communication System ............................................... 1- 24 26 05 26 BMP Grounding and Bonding for Electrical Systems ......................... 1- 5 26 05 33 BMP Raceway and Boxes .................................................................... 1- 28 26 05 70 BMP Electrical Systems Analysis ........................................................ 1- 8 26 08 00 BMP Commissioning of Electrical Systems ........................................ 1- 24 26 09 13 BMP Power Measurement and Control ................................................ 1- 4 26 12 02 BMP Oil-Filled Pad Mounted Transformers ........................................ 1- 6 26 14 13 BMP Switchboards ............................................................................... 1- 9 26 20 00 BMP Low-Voltage AC Induction Motors ............................................ 1- 12 26 22 00 BMP Low-Voltage Transformers ......................................................... 1- 3 26 24 16 BMP Panelboards ................................................................................. 1- 7 26 24 19 BMP Low-Voltage Motor Control ....................................................... 1- 11 26 27 26 BMP Wiring Devices ........................................................................... 1- 9 26 29 23 BMP Low-Voltage Adjustable Frequency Drive System .................... 1- 11 26 32 13.13 BMP Diesel Engine Generator Set ....................................................... 1- 15 26 36 23 BMP Automatic Transfer Controller .................................................... 1- 4 26 41 00 BMP Facility Lightning Protection ...................................................... 1- 6 26 42 01 CAV Pipe Bonding and Test Stations .................................................. 1- 11 Supplement:

CAV Joint Bond Continuity Test Schematic ....................................... 1- 1 26 43 00 BMP Surge Protective Devices ............................................................ 1- 4 26 50 00 BMP Lighting ....................................................................................... 1- 20

00 01 10 - 6 PW\DEN003\D3167637

DIVISION 27—(NOT USED)

DIVISION 28—ELECTRONIC SAFETY AND SECURITY

28 13 00 FMG Security Systems ......................................................................... 1- 5 28 31 00 BMP Fire Detection and Alarm............................................................ 1- 22 Supplement:

BMP Sequence of Operations Matrix .................................................. 1- 4

DIVISION 29 AND DIVISION 30 (NOT USED)

DIVISION 31—EARTHWORK

31 10 00 MT Site Clearing................................................................................ 1- 3 31 23 13 MT Subgrade Preparation .................................................................. 1- 3 31 23 16 MT Excavation................................................................................... 1- 5 31 23 19.01 MT Dewatering .................................................................................. 1- 2 31 23 23 MT Fill and Backfill .......................................................................... 1- 8 31 23 23.15 MT Trench Backfill ........................................................................... 1- 10

DIVISION 32—EXTERIOR IMPROVEMENTS

32 00 00 LCK Tree Removal and Protection ...................................................... 1- 4 32 11 23 BKC Aggregate Base Course ............................................................... 1- 4 32 12 16 BKC Asphalt Paving ............................................................................ 1- 9 32 16 00 BKC Concrete Curbs and Sidewalks ................................................... 1- 3 32 17 23 BKC Pavement Markings .................................................................... 1- 2 32 31 13 BKC Chain Link Fences and Gates ..................................................... 1- 11 32 31 15 BKC Gate Operator Systems ............................................................... 1- 7 32 84 23 LCK Landscape Irrigation Systems ..................................................... 1- 11 32 91 13 LCK Restoration Topsoil Placement ................................................... 1- 8 32 92 00 LCK Restoration Turf and Grasses ...................................................... 1- 4

DIVISION 33—UTILITIES

33 05 01 LV Conveyance Piping—General ..................................................... 1- 10 33 05 01.09 LV Polyvinyl Chloride (PVC) Pressure Pipe and Fittings ................ 1- 5 33 05 01.12 LV Gravity Sewer Pipe and Fittings ................................................. 1- 14 33 05 01.12.03 LV Polyvinyl Chloride (PVC)—Gravity Sanitary Sewer Data Sheet ................................................................................ 1- 1 33 05 13 LV Manholes ..................................................................................... 1- 12 33 12 19 LV Water Utility Distribution Fire Hydrants .................................... 1- 5

PW\DEN003\D3167637 00 01 10 - 7

33 13 00 LV Disinfection of Water Utility Distribution Facilities .................. 1- 5 33 41 01 BKC Storm Drain Piping ..................................................................... 1- 4 33 41 01.03 BKC Polyvinyl Chloride (PVC) Data Sheet ........................................ 1- 1 33 41 01.05 BKC Reinforced Concrete Data Sheet ................................................. 1- 2 33 44 13.13 BKC Catch Basins................................................................................ 1- 2

DIVISION 34—(NOT USED)

DIVISION 35—WATERWAY AND MARINE CONSTRUCTION

35 20 16.25 DR Fabricated Slide Gates ................................................................ 1- 10 Supplement:

Slide Gate Schedule .................................................................... 1- 2

DIVISION 36 THROUGH DIVISION 39 (NOT USED)

VOLUME 5

DIVISION 40—PROCESS INTERCONNECTIONS

40 05 15 DR Piping Support Systems .............................................................. 1- 9 40 05 33 DR Pipe Heat Tracing ....................................................................... 1- 6 40 27 00 DR Process Piping—General ............................................................ 1- 23 40 27 00.01 DR Cement-Mortar, Glass-Lined Ductile Iron Pipe and Fittings Data Sheet ............................................................ 1- 3 40 27 00.02 DR Carbon Steel Pipe and Fittings—Special Service ....................... 1- 2 40 27 00.03 DR Carbon Steel Pipe and Fittings—General Service Data Sheet ................................................................................ 1- 5 40 27 00.08 DR Stainless Steel Pipe and Fittings—General Service Data Sheet ................................................................................ 1- 3 40 27 00.10 DR Polyvinyl Chloride (PVC) Pipe and Fittings Data Sheet ............ 1- 2 40 27 00.15 DR Double Wall Containment Piping Data Sheet ............................ 1- 2 40 27 01 DR Process Piping Specialties........................................................... 1- 16 40 27 02 DR Process Valves and Operators ..................................................... 1- 27 Supplements:

DR Electric Actuated Valve Schedule .............................................. 1- 5 DR Self Regulated Valve Schedule ................................................... 1- 3 40 42 13 DR Process Piping Insulation ............................................................ 1- 7 Supplement:

DR Service and Insulation Thickness Table ..................................... 1- 1

00 01 10 - 8 PW\DEN003\D3167637

40 80 01 DR Process Piping Leakage Testing ................................................. 1- 4 40 90 00 BLF Instrumentation and Control for Process Systems ...................... 1- 34 Supplements:

BLF Instrument List ............................................................................ 1- 2 BLF PLC Input and Output List .......................................................... 1- 2 BLF PLC Component List .................................................................. 1- 3 BLF Option Items PLC Input and Output List .................................... 1- 1 BLF Option Items PLC Component List ............................................ 1- 2 BLF Preparation for Testing and Functional Test Forms ................... 1- 3 BLF Performance Test Sheet .............................................................. 1- 1 40 91 00 BLF Instrumentation and Control Components .................................. 1- 48 40 92 01 BLF Control Panels ............................................................................. 1- 25 Supplement:

BLF Control Panel Schedule ............................................................... 1- 1 Option Items Control Panel Schedule ......................................... 1- 1 40 95 60 BLF Telemetry System ....................................................................... 1- 14 40 95 80 BLF Fiber Optic Communication System ........................................... 1- 14 Supplements:

BLF On-Reel Fiber Optic Cable Test Summary Form ....................... 1- 1 BLF Fiber Optic Attenuation Performance Test Form ....................... 1- 1 BLF Post-Installation Fiber Optic Cable Test Summary Form........... 1- 2 40 99 90 BLF Package Control Systems ............................................................ 1- 23 40 99 93 BMP Temporary Photovoltaic System for High Pressure Tank Level Control .................................................................. 1- 6 40 99 94 BMP Temporary Level Control System High Pressure Tank .............. 1- 11 Supplements:

BMP Component Specifications .......................................................... 1- 2 BMP Instrument List ............................................................................ 1- 1 BMP PLC / SOLAR / RADIO Equipment List ................................... 1- 1 BMP PLC / SOLAR / RADIO IO List ................................................. 1- 1 BMP Preparation for Testing and Functional Test Forms ................... 1- 1 BMP Performance Test Sheet .............................................................. 1- 1

VOLUME 6

DIVISION 41—MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 03.07 DR Davit Cranes, Jib Cranes, and Portable Lifting Equipment ........ 1- 8 41 22 13.17 DR Portable Gantry Crane................................................................. 1- 3

PW\DEN003\D3167637 00 01 10 - 9

41 22 23.19 DR Monorail Hoists .......................................................................... 1- 8 Supplements:

DR Facility 30, Tertiary, Hoist/Monorail Data Sheet ....................... 1- 1 DR Facility 30, Tertiary, Hoist/Monorail Dimension Sheet ............. 1- 1 DR Facility 40, Dewatering, Hoist/Monorail Data Sheet .................. 1- 1 DR Facility 40, Dewatering, Hoist/Monorail Dimension Sheet ........ 1- 1 DR Facility 40, Dewatering, Induction Motor Data Sheet ................ 1- 1

DIVISION 42—(NOT USED)

DIVISION 43—PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND

STORAGE EQUIPMENT

43 12 01 DR Compressed Air Systems ............................................................ 1- 8 Supplement:

DR Air Compressors 1 and 2 Induction Motor Data Sheet ............... 1- 1 43 22 56.02 DR Vertical Mixers ........................................................................... 1- 10 Supplements:

DR Aerobic Zone 1 Mixer/Aerator Data Sheet ................................. 1- 1 DR Aerobic Zone 1 Mixer/Aerator Drive Induction Motor Data Sheet ................................................................................ 1- 1 DR Aerobic Zone 2 Mixer/Aerator Data Sheet ................................. 1- 1 DR Aerobic Zone 2 Mixer/Aerator Drive Induction Motor Data Sheet ................................................................................ 1- 1 DR Anoxic Mixer Data Sheet............................................................ 1- 1 DR Anoxic Mixer Drive Induction Motor Data Sheet ...................... 1- 1 DR Post Anoxic Mixer Data Sheet .................................................... 1- 1 DR Post Anoxic Mixer Drive Induction Motor Data Sheet .............. 1- 1 DR Digester Mixer/Aerator Data Sheet ............................................ 1- 1 DR Digester Mixer/Aerator Induction Motor Data Sheet ................. 1- 1 43 22 56.03 DR Tertiary Treatment Top Entry Vertical Shaft Rapid and Flocculation Mixers ................................................................. 1- 6 Supplements:

DR Rapid Mix Reactor Mixers Induction Motor Data Sheet ............ 1- 1 DR Stage 1 Flocculation Reactor Mixers Induction Motor Data Sheet ................................................................................ 1- 1 DR Stage 2 Flocculation Reactor Mixers Induction Motor Data Sheet ................................................................................ 1- 1 43 40 01 DR Polyethylene Storage Tank ......................................................... 1- 10 Supplement:

DR Polyaluminum Chloride Tank Data Sheet .................................. 1- 1

00 01 10 - 10 PW\DEN003\D3167637

43 40 02 DR Fiberglass Reinforced Plastic Tank ............................................ 1- 9 Supplements:

DR FRP Tank Schedule..................................................................... 1- 2 DR Tank Data Sheets ........................................................................ 1- 5

DIVISION 44—POLLUTION AND WASTE CONTROL EQUIPMENT

44 42 19.04 DR Rotary Positive Displacement Blower ........................................ 1- 16 44 42 24.01 DR Secondary Clarifier Mechanism ................................................. 1- 24 Supplement:

Secondary Clarifier 1/Secondary Clarifier 2 Induction Motor Data Sheet ................................................................................ 1- 1 44 42 24.04 DR Rotating Scum Pipes ................................................................... 1- 4 44 42 25.02 Prefabricated Aluminum Flat Cover ........................................... 1- 5 44 42 28 DR Launder Covers and Weir and Baffle Plates ............................... 1- 6 44 42 30 DR Floating Decanters ...................................................................... 1- 4 44 42 31 DR Septage Receiving System .......................................................... 1- 12 44 42 33 Biofilter Odor Control System .................................................... 1- 17 44 42 35 DR Mechanically Cleaned Inclined Spiral Screen ............................ 1- 12 Supplement:

Inclined Spiral Screen Induction Motor Data Sheet ................... 1- 1 44 42 40 DR Vortex Grit Chamber Equipment ................................................ 1- 7 Supplement:

DR Grit Chamber Data Sheet ............................................................ 1- 1 44 42 41 DR Cyclone Separator and Grit Washer ........................................... 1- 10 Supplement:

DR Grit Washer/Grit Conveyor Data Sheet ...................................... 1- 1 44 42 48.04 DR Automatic Composite Sampler (Refrigerated, Peristaltic Type) ................................................ 1- 7 44 42 56.01 DR Screw-Induced Flow Centrifugal Pumps .................................... 1- 5 Supplement:

DR RAS Pumps 1, 2, 3, 4 Data Sheet ............................................... 1- 2 44 42 56.03 DR Vertical Turbine and Mixed Flow Pumps ................................... 1- 8 Supplements:

DR Plant Water Pump 1, Plant Water Pump 2, Plant Water Pump 3 Data Sheet ................................................................... 1- 3 DR Bioreactor 1 MLR Pumps, Bioreactor 2 MLR Pump, Bioreactor 3 MLR Pump Data Sheet ....................................... 1- 3 44 42 56.04 DR Submersible Pumps ..................................................................... 1- 11 Supplements:

DR Secondary Clarifier Scum Pump Data Sheet .............................. 1- 2 DR Return Flow Feed Pumps 1, 2, 3 Data Sheet .............................. 1- 2 DR Bioreactor Pumps (Facility 15) Data Sheet ................................ 1- 2

PW\DEN003\D3167637 00 01 10 - 11

44 42 56.13 DR Progressing Cavity Pumps .......................................................... 1- 5 Supplements:

DR WAS Pumps 1 and 2 Data Sheet................................................. 1- 3 DR Dewatering Feed Pumps 1 and 2 Data Sheet .............................. 1- 3 44 42 56.16 DR Peristaltic Hose Pump ................................................................. 1- 5 Supplement:

DR Septage Transfer Pump 1 and Septage Transfer Pump 2 Data Sheet ................................................................................ 1- 3 44 43 30 DR Filter Media ................................................................................. 1- 4 44 43 34 DR Tertiary Filtration System ........................................................... 1- 13 44 44 13.01 DR Chemical Metering Pumps .......................................................... 1- 9 Supplements:

DR Magnesium Hydroxide Feed Pumps 1 and 2 Data Sheet ............ 1- 2 DR Polyaluminum Chloride Feed Pumps 1 and 2 Data Sheet .......... 1- 2 DR Aluminum Sulfate Feed Pumps 1 and 2 Data Sheet ................... 1- 2 44 44 57 DR Parallel Plate Settler System ....................................................... 1- 10 44 44 63.02 DR Polymer Feed System, Dry ......................................................... 1- 7 44 44 73 DR Ultraviolet Disinfection Equipment for Wastewater .................. 1- 34 44 45 16.01 DR Coarse Bubble Air Diffuser System ........................................... 1- 8

DIVISION 45 (NOT USED)

DIVISION 46—WATER AND WASTEWATER EQUIPMENT

46 76 27 DR Dewatering Screw Press ............................................................. 1- 17

DIVISION 47 THROUGH DIVISION 49 (NOT USED)

PART 4—DRAWINGS

END OF SECTION

SPECIFICATIONS

YOSE 196416 DEMOLITION

PW\DEN003\D3167637 02 41 00 - 1

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

1.01 REFERENCES

A. The following is a list of standards which may be referenced in this section:

1. Air-Conditioning, Heating and Refrigeration Institute (AHRI):

Guideline K, (2009) Guideline for Containers for Recovered Non- Flammable Fluorocarbon Refrigerants.

2. American Association of State Highway and Transportation Officials

(AASHTO):

a. M 145, (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes.

b. T 180, (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

3. American Society of Safety Professionals (ASSP): A10.6, (2006) Safety & Health Program.

4. Requirements for Demolition Operations – American National Standard for Construction and Demolition Operations

5. ASTM International (ASTM): D2487, (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System).

6. Carpet and Rug Institute (CRI):

a. 104, (2015) Carpet Installation Standard for Commercial Carpet.

b. 105, (2015) Carpet Installation Standard for Residential Carpet.

7. U.S. Army Corps of Engineers (USACE): EM 385-1-1, (2014) Safety – Safety and Health Requirements Manual.

8. U.S. Defense Logistics Agency (DLA): 4145.25, (Jun 2000; Reaffirmed Oct 2010) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders;

https://www.dla.mil/Portals/104/Documents/DispositionServices/ddsr/d ocs/cylinderjointpub.pdf.

9. U.S. Department of Defense (DOD):

a. 4000.25-1-M, (2006) MILSTRIP - Military Standard

Requisitioning and Issue Procedures.

b. MIL-STD-129, (2014; Rev R; Change 1 2018; Change 2 2019;

Change 3 2023) Military Marking for Shipment and Storage

10. U.S. Federal Aviation Administration (FAA): AC 70/7460-1, (2016;

Rev L; Change 2) Obstruction Marking and Lighting.

https://www.dla.mil/Portals/104/Documents/DispositionServices/ddsr/docs/cylinderjointpub.pdf https://www.dla.mil/Portals/104/Documents/DispositionServices/ddsr/docs/cylinderjointpub.pdf

DEMOLITION YOSE 196416

02 41 00 - 2 PW\DEN003\D3167637

11. U.S. National Archives and Records Administration (NARA):

a. 40 CFR 61, National Emission Standards for Hazardous Air

Pollutants.

b. 40 CFR 82, Protection of Stratospheric Ozone.

c. 49 CFR 173.301, Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels.

1.02 PROJECT DESCRIPTION

A. Definitions:

1. Demolition: Demolition is the process of tearing apart and removing any feature of a facility together with any related handling and disposal operations.

2. Demolition Plan: Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.

B. Demolition Plan: Prepare a Demolition Plan and submit proposed demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, and a detailed description of methods and equipment to be used for each operation and of the sequence of operations.

Identify components and materials to be salvaged for reuse or recycling with reference to Article Existing Facilities to be Removed. Append tracking forms for all removed materials indicating type, quantities, condition, destination, and end use. Coordinate with Waste Management Plan in accordance with Section 01 74 19, Construction Waste Management and Disposal. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan must be approved by Contracting Officer prior to work beginning.

C. General Requirements: Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes the recycling of materials. Remove rubbish and debris from the Project Site; do not allow accumulations inside or outside the buildings. The work includes demolition of identified items and materials, and removal of resulting rubbish and debris.

Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable sections.

PW\DEN003\D3167637 02 41 00 - 3

1.03 ITEMS TO REMAIN IN PLACE

A. Comply with FAR 52.236-9 to protect existing vegetation, structures, equipment, utilities, and improvements. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded.

Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this Contract. Do not overload structural elements or pavements to remain.

Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

B. Existing Construction Limits and Protection: Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.

C. Weather Protection: For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.

D. Trees: Protect trees within the Project Site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 1.8-m (6-foot) high fence. Erect and secure fence a minimum of 1.5 m (5 feet) from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this Contract with like-kind or as approved by the Contracting Officer.

E. Utility Service: Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, the Government will disconnect and seal utilities serving each area of alteration or removal upon written request from the Contractor.

F. Facilities: Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, 02 41 00 - 4 PW\DEN003\D3167637 shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this Contract.

1.04 BURNING

A. The use of burning at the Project Site for the disposal of refuse and debris will not be permitted.

1.05 SUBMITTALS

A. Preconstruction Submittals:

1. Demolition Plan.

2. Existing Conditions

B. Certificates: Notification.

C. Closeout Submittals: Receipts.

1.06 QUALITY ASSURANCE

A. Submit timely notification of demolition and renovation projects to federal, state, regional, and local authorities in accordance with 40 CFR 61, Subpart M. Notify the State’s environmental protection agency, local air pollution control district/agency, and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the “Contract Clauses,” conform to the safety requirements contained in ASSP A10.6.

Comply with the Environmental Protection Agency requirements specified.

Use of explosives will not be permitted.

B. Dust and Debris Control: Prevent the spread of dust and debris to occupied portions of the building and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum and dust the work area daily. Sweep pavements as often as necessary to control the spread of debris.

1.07 PROTECTION

A. Traffic Control Signs: Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.

PW\DEN003\D3167637 02 41 00 - 5

B. Protection of Personnel: Before, during and after the demolition work continuously evaluate the condition of the Site specific features being demolished and take immediate action to protect all personnel working in and around the Project Site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.08 RELOCATIONS

A. Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer. See Supplement below for a list of items and equipment that are to be salvaged or relocated.

1.09 EXISTING CONDITIONS

A. Before beginning any demolition or deconstruction work, survey the Site and examine the Drawings and Specifications to determine the extent of the work.

Record existing conditions in the presence of the Contracting Officer or the Contracting Officer’s Representative showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs or electronic images with a minimum resolution of 3072 x 2304 pixels, capable of a print resolution of 300 dpi, will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to starting work. It is the Contractor’s responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the Record Document. Submit survey results to the Contracting Officer or the Contracting Officer’s Representative.

PART 2 PRODUCTS

2.01 FILL MATERIAL

A. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures.

B. Provide fill material conforming to the definition of satisfactory soil material as defined in ASTM D2487 or AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5, and A-3. In addition, fill material must be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 50 mm (2 inches) in any dimension.

02 41 00 - 6 PW\DEN003\D3167637

C. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:

1. Soil Classification: AASHTO M 145.

2. Moisture-Density Relations: AASHTO T 180, Method B or D.

PART 3 EXECUTION

3.01 EXISTING FACILITIES TO BE REMOVED

A. Inspect and evaluate existing structures onsite for reuse. Disassemble existing construction scheduled to be removed for reuse. Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified. Designate materials for reuse onsite whenever possible.

B. Structures:

1. Remove existing structures indicated to be removed. Remove interior walls, other than retaining walls and partitions as indicated in demolition drawings. Break up basement slabs to permit drainage.

Remove sidewalks, curbs, gutters and street light bases as indicated.

2. Demolish structures in a systematic manner from the top of the structure to the ground. Complete demolition work above each tier or floor before the supporting members on the lower level are disturbed. Demolish concrete and masonry walls in small sections. Remove structural framing members and lower to ground by means of derricks, platforms hoists, or other suitable methods as approved by the Contracting Officer.

3. Locate demolition and deconstruction equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.

4. Building, or the remaining portions thereof, not exceeding 25 m (80 feet) in height may be demolished by the mechanical method of demolition.

C. Utilities and Related Equipment:

1. General Requirements: Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.

2. Disconnecting Existing Utilities: Remove existing utilities, as indicated and terminate in a manner conforming to the nationally recognized code

PW\DEN003\D3167637 02 41 00 - 7

covering the specific utility and approved by the Contracting Officer.

When utility lines are encountered but are not indicated on the Drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.

D. Chain Link Fencing: Remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas.

Remove gates as whole units.

E. Paving and Slabs: Remove sawcut concrete and asphaltic concrete paving and slabs including aggregate base as indicated. Provide neat sawcuts at limits of pavement removal as indicated. Move, grind and store pavement and slabs designated to be recycled and utilized in this Project as directed by the Contracting Officer. Remove pavement and slabs not to be used in this Project from the Project Site at Contractor’s expense.

F. Roofing: Remove existing roof system and associated components in their entirety down to existing roof deck. Cut existing felts, membrane, and insulation along straight lines unless roofing can be removed intact in a manor that will allow for transportation and disposal. Sequence work to minimize building exposure between demolition or deconstruction and new roof materials installation.

1. Temporary Roofing: Install temporary roofing and flashing as necessary to maintain a watertight condition throughout the course of the work.

Remove temporary work prior to installation of permanent roof system materials unless approved otherwise by the Contracting Officer

2. Reroofing: When removing the existing roofing system from the roof deck, remove only as much roofing as can be recovered by the end of the work day, unless approved otherwise by the Contracting Officer. Do not attempt to open the roof covering system in threatening weather.

Reseal all openings prior to suspension of work the same day.

G. Masonry: Sawcut and remove masonry so as to prevent damage to surfaces to remain, and to facilitate the installation of new work. Where new masonry adjoins existing, abut or tie the new work into the existing construction as indicated. Provide square, straight edges and corners where existing masonry adjoins new work and other locations.