B09_Summary_of_Changes_-_Amendment_09_0009.pdf

PDF 68 KB Posted

Attached to
BICY 229154 Federal contract opportunity
Solicitation number
140P2024R0084
Issued by
Department of the Interior National Park Service National Office

About this file

This is Amendment #09 to solicitation #140P2024R0084 for the construction of a Fire Station at Big Cypress National Preserve Headquarters Complex. The amendment details extensive plan revisions across multiple drawing sheets to accommodate a building relocation and stormwater management modifications.

The key changes include shifting the building location 18' south and approximately 53' east to avoid wetland impacts, relocating the stormwater pond to the southeast of the building, and revising the parking configuration. Technical modifications include updates to pollution prevention controls, demolition extents, site grading, drainage systems, utility connections, and foundation details. The amendment also includes revisions to architectural, electrical, plumbing, and structural drawings to reflect the building's new location and associated system modifications. Specification changes were made to section 13 3419 Metal Building Systems to remove FM Global requirements from paragraphs 1.2 and 2.1.L.

View the file

Other files for this federal contract opportunity

Other files attached to BICY 229154, newest first.
File Type Posted
Sol_140P2024R0084_Amd_0013.pdf PDF
B09_140P2024R0084_Amendment_0013_BICY229154_clauses_0013.pdf PDF
B09_Amendment_0013_140P2024R0084_BICY229154_0013.pdf PDF
B09_Amendment_0012_140P2024R0084_BICY229154_0012.pdf PDF
B09_140P2024R0084_Amendment_0012_BICY229154_clauses_0012.pdf PDF
Sol_140P2024R0084_Amd_0011.pdf PDF
B09_Amendment_0011_140P2024R0084_BICY229154_0011.pdf PDF
B09_140P2024R0084_Amendment_0010_BICY229154_pg68_0010.pdf PDF
Sol_140P2024R0084_Amd_0009.pdf PDF
B09_BICY_229154_Questions_Responses_Spreadsheet_Amend09_0009.pdf PDF
B09_BICY_229154_-_Drawings_-_Amendment_09_0009.pdf PDF
B09_BICY_229154_-_Specification_Section_13_3419-METAL_BUILDING_SYSTEMS-Amendment_09_0009.pdf PDF
B09_140P2024R0084_Amendment_0009_BICY229154_0009.pdf PDF
Sol_140P2024R0084_Amd_0008.pdf PDF
B09_140P2024R0084_Amendment_0008_BICY229154_0008.pdf PDF
B09_BICY_229154_Questions_Responses_Spreadsheet_Amend08_0008.pdf PDF
B09_140P2024R0084_Amendment_0007_BICY229154_0007.pdf PDF
Sol_140P2024R0084_Amd_0006.pdf PDF
B09_Amendment06_01_40_00_-_Quality_Requirements_0006.pdf PDF
B09_Amendment06_09_91_13_-_Exterior_Painting_0006.pdf PDF
B09_Amendment06_32_92_00_-_Seeding_and_Mulching_0006.pdf PDF
B09_Amendment06_13_34_19_-_Metal_Building_Sysytems_0006.pdf PDF
B09_Amendment06_PERMIT_240408_NPS_Big_Cypress_Fire_Station_-_FDEP_Wastewater_0006.pdf PDF
B09_140P2024R0084_Amendment_0006_BICY229154_0006.pdf PDF
Sol_140P2024R0084_Amd_0005.pdf PDF
B09_BICY_229154_Questions_Responses_Spreadsheet_Amend05_0005.xlsx XLSX spreadsheet
B09_140P2024R0084_Amendment_0005_BICY229154_0005.pdf PDF
B09_BICY_29154_sign_in_sheet_2_Amend_04_0004.pdf PDF
B09_140P2024R0084_Amendment_0004_BICY229154_0004.pdf PDF
B09_140P2024R0084_Amendment_0003_BICY229154_0003.pdf PDF
Sol_140P2024R0084_Amd_0003.pdf PDF
B09_Amendment_P0003__RFIs_Sheet_140P2024R0084_BICY229154_0003.pdf PDF
B09_140P2024R0084_Amendment_0002_BICY229154_0002.pdf PDF
B09_Amend0002_GEO_RPT_Construct_Fire_Station___BICY_HQ_Complex_s_s_0002.pdf PDF
Sol_140P2024R0084_Amd_0002.pdf PDF
B09_Amendment_02_BICY229154_Updated_SectionJ_pg49_0002.pdf PDF
B09_Amendment_02_BICY229154_Updated_Site_Visit_pg65_0002.pdf PDF
Sol_140P2024R0084_Amd_0001.pdf PDF
B09_Amendment_P0001_140P2024R0084_0001.pdf PDF
B09_Sign_in_Sheet_for_BICY_Prebid_Amendment_1_0001.pdf PDF
B08_Attachment_08_Limitations_on_Subcontracting_Sorksheet.xlsx XLSX spreadsheet
B08_Attachment_2__Drawings_BICY_229154.pdf PDF
B08_140P2024R0084_BICY_229154.pdf PDF
B08_Attachment_1__Specifications_BICY_229154_FinalCDs.pdf PDF
Sol_140P2024R0084.pdf PDF
B08_Attachment_05_PastPerf_REQD.docx DOCX document
B08_Attachment_04_Project_Exp_REQD_pdf.docx DOCX document
B08_Attachment_06_Contract_Price_Schedule_.xlsx XLSX spreadsheet
B08_Attachment_07_GenRefs.pdf PDF
B08_Attachment_03_Wage_Decision_F20240125.pdf PDF
Show all 50

BICY 229154 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140P2024R0084 Project Name: Construct Fire Station at Big Cypress National Preserve Headquarters Complex

PMIS: 229154

Amendment #: 09

Summary of Changes

PLAN REVISIONS:

G0.00 COVER: Replace this sheet in its entirety with the attached revised sheet.

a. Updated sheet to show revision

C0.03 GENERAL NOTES AND DETAILS: Replace this sheet in its entirety with the attached revised sheet.

a. Updated pollution prevention plan notes to reflect new stormwater pond.

C1.01 STORMWATER POLLUTION PREVENTION PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Updated pollution prevention controls to reflect new building, stormwater inlet and pond locations

C1.02 DEMOLITION AND TREE PROTECTION PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Updated demolition extents and silt fence locations to reflect new building and stormwater pond locations.

C1.03 MASTER PLANNING PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Shifted building 18’ south and ±53’ east to avoid wetland impacts.

b. Relocated stormwater pond to southeast of building.

c. Removed parking from south side of stabilized area and added parking to north side to accommodate building shift.

C1.04 DETAILED HORIZONTAL CONTROL AND SITE PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Shifted building 18’ south and ±53’ east to avoid wetland impacts.

b. Relocated stormwater pond to southeast of building.

c. Removed parking from south side of stabilized area and added parking to north side to accommodate building shift.

C1.05 DETAILED GRADING, DRAINAGE AND UTILITY PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Updated cross sections to reflect new layout and pond location.

C1.06 DETAILED GRADING, DRAINAGE AND UTILITY PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Shifted building 18’ south and ±53’ east to avoid wetland impacts.

b. Relocated stormwater pond and associated piping to southeast of building.

c. Relocated storm header pipe from north side of building to west side.

d. Added one storm area drain east of the building.

e. Adjusted site grades to meet WMD criteria for containing 25-year storm with the new pond.

f. Raised sanitary invert outside of building and raised corresponding elevations for lift station wet well invert, float elevations, and wet well bottom elevation.

A1.01 ARCHITECTURAL SITE PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Removed drawing

A2.01 EXTERIOR ELEVATIONS: Replace this sheet in its entirety with the attached revised sheet.

a. Revised downspout location on drawing 2

A4.01 ENLARGED ARCHITECTURAL SITE PLAN – PROJECT SITE: Replace this sheet in its entirety with the attached revised sheet.

a. Revised site plan to reflect updated building location

b. Revised parking area

A5.09 EXTERIOR DETAILS: Replace this sheet in its entirety with the attached revised sheet.

a. Revised stem wall note on detail 2

E0.03 ELECTRICAL SITE PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Transformer, generator, and incoming electrical service relocated.

b. Telecommunications incoming service relocated.

P0.02 PLUMBING SITE PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Building sanitary connection to civil relocated.

b. Storm water boot relocated.

P1.00 FOUNDATION PLUMBING PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Building sanitary connection to civil relocated.

b. Associated sub-slab sanitary piping relocated to meet new civil connection.

P3.01 PLUMBING PART PLANS: Replace this sheet in its entirety with the attached revised sheet.

a. 4” FCO relocated to mechanical room.

S0.01 GENERAL NOTES: Replace this sheet in its entirety with the attached revised sheet.

a. Revised foundation notes

S1.01 FOUNDATION PLAN: Replace this sheet in its entirety with the attached revised sheet.

a. Revised extents of stem wall per revised grading

S3.01 SECTIONS: Replace this sheet in its entirety with the attached revised sheet.

a. Revised sections per revised grading

S3.02 SECTIONS: Replace this sheet in its entirety with the attached revised sheet.

a. Revised sections per revised grading

S3.03 SECTIONS: Replace this sheet in its entirety with the attached revised sheet.

a. Revised sections per revised grading

S5.01 TYPICAL DETAILS: Replace this sheet in its entirety with the attached revised sheet.

SPECIFICATION REVISIONS:

a. Revised step wall detail

a. Revised paragraphs 1.2 and 2.1.L to remove FM Global requirements.

13 3419 Metal Building Systems