This is a Questions and Answers document (Amendment P0009) related to the construction of a Fire Station at Big Cypress National Preserve Headquarters Complex. The document addresses two specific technical questions regarding electrical specifications:

Question 57 confirms that an Energy Reduction Maintenance Switch (ERMS) should be installed on the 600A docking station breaker per design choice, despite this typically being required only for breakers 1200A and above. Question 58 clarifies a discrepancy between drawings E6.03 and E8.02 regarding the generator setup, confirming that the generator is a non-separately derived source and both Automatic Transfer Switches (ATS-E1 and ATS-E2) should be 3-pole rather than 4-pole as incorrectly shown in the schedule on sheet E8.02.

View the file

Other files

File Type Posted
Sol_140P2024R0084_Amd_0013.pdf PDF
B09_Amendment_0013_140P2024R0084_BICY229154_0013.pdf PDF
B09_140P2024R0084_Amendment_0013_BICY229154_clauses_0013.pdf PDF
B09_Amendment_0012_140P2024R0084_BICY229154_0012.pdf PDF
Sol_140P2024R0084_Amd_0012.pdf PDF
B09_140P2024R0084_Amendment_0012_BICY229154_clauses_0012.pdf PDF
Sol_140P2024R0084_Amd_0011.pdf PDF
B09_Amendment_0011_140P2024R0084_BICY229154_0011.pdf PDF
B09_140P2024R0084_Amendment_0010_BICY229154_pg68_0010.pdf PDF
B09_Amendment_0010_140P2024R0084_BICY229154_0010.pdf PDF
Sol_140P2024R0084_Amd_0010.pdf PDF
B09_BICY_229154_-_Drawings_-_Amendment_09_0009.pdf PDF
B09_Summary_of_Changes_-_Amendment_09_0009.pdf PDF
Sol_140P2024R0084_Amd_0009.pdf PDF
B09_140P2024R0084_Amendment_0009_BICY229154_0009.pdf PDF
B09_BICY_229154_-_Specification_Section_13_3419-METAL_BUILDING_SYSTEMS-Amendment_09_0009.pdf PDF
Sol_140P2024R0084_Amd_0008.pdf PDF
B09_140P2024R0084_Amendment_0008_BICY229154_0008.pdf PDF
B09_BICY_229154_Questions_Responses_Spreadsheet_Amend08_0008.pdf PDF
Sol_140P2024R0084_Amd_0007.pdf PDF
B09_140P2024R0084_Amendment_0007_BICY229154_0007.pdf PDF
Sol_140P2024R0084_Amd_0006.pdf PDF
B09_140P2024R0084_Amendment_0006_BICY229154_0006.pdf PDF
B09_Amendment06_PERMIT_240408_NPS_Big_Cypress_Fire_Station_-_FDEP_Wastewater_0006.pdf PDF
B09_Amendment06_13_34_19_-_Metal_Building_Sysytems_0006.pdf PDF
B09_Amendment06_PERMIT_240715_NPS_Big_Cypress_Fire_Station_-_FDEP_NOI_0006.pdf PDF
B09_Amendment06_32_92_00_-_Seeding_and_Mulching_0006.pdf PDF
B09_Amendment06_09_91_13_-_Exterior_Painting_0006.pdf PDF
B09_Amendment06_01_40_00_-_Quality_Requirements_0006.pdf PDF
B09_140P2024R0084_Amendment_0005_BICY229154_0005.pdf PDF
Sol_140P2024R0084_Amd_0005.pdf PDF
B09_BICY_229154_Questions_Responses_Spreadsheet_Amend05_0005.xlsx XLSX spreadsheet
B09_BICY_29154_sign_in_sheet_2_Amend_04_0004.pdf PDF
Sol_140P2024R0084_Amd_0004.pdf PDF
B09_140P2024R0084_Amendment_0004_BICY229154_0004.pdf PDF
Sol_140P2024R0084_Amd_0003.pdf PDF
B09_Amendment_P0003__RFIs_Sheet_140P2024R0084_BICY229154_0003.pdf PDF
B09_140P2024R0084_Amendment_0003_BICY229154_0003.pdf PDF
B09_Amendment_02_BICY229154_Updated_SectionJ_pg49_0002.pdf PDF
B09_Amend0002_GEO_RPT_Construct_Fire_Station___BICY_HQ_Complex_s_s_0002.pdf PDF
B09_140P2024R0084_Amendment_0002_BICY229154_0002.pdf PDF
B09_Amendment_02_BICY229154_Updated_Site_Visit_pg65_0002.pdf PDF
Sol_140P2024R0084_Amd_0002.pdf PDF
B09_Sign_in_Sheet_for_BICY_Prebid_Amendment_1_0001.pdf PDF
Sol_140P2024R0084_Amd_0001.pdf PDF
B09_Amendment_P0001_140P2024R0084_0001.pdf PDF
B08_Attachment_07_GenRefs.pdf PDF
B08_Attachment_03_Wage_Decision_F20240125.pdf PDF
B08_140P2024R0084_BICY_229154.pdf PDF
B08_Attachment_05_PastPerf_REQD.docx DOCX document
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARK: BICY

PMIS #: 229154

Description Construct Fire Station

Amendment P0009

Question # Question: Answer:

57 On drawing sheet E6.01 indicates a ERMS on the docking station’s 600A breaker. This is usually a code requirement for breakers 1200A and above. It is understood this could be included for additional safety measures or per the engineer’s design choice. Do we proceed per the drawings?

Yes, per our design choice please proceed with an ERMS on the 600A docking station breaker.

58 On drawing sheet E6.03, the generator is indicated to be non-separately derived source. However, drawing sheet E8.02, Automatic Transfer Switch Schedule indicates the ATS-E1 and ATS-E2 to be 4 pole which are only needed on separately derived sources. Non-separately derived sources use 3 switched pole. Please advise how to proceed.

Per sheet E6.03 the generator is indeed a non-separately derived source. The Automatic Transfer Switch Schedule on sheet E8.02 is incorrect, both ATS-E1 and ATS-E2 should be 3-pole.

File details come from the government source that posted it. Updated .