This document contains a schedule of unit prices for rehabilitation work at the First Bank building in Independence National Historical Park. The schedule lists 24 separate work items needed to rehabilitate the interior and exterior of the building, including asbestos abatement, stone and brick masonry repair and repointing, wood repair, plaster repair, and other restoration tasks. Specification sections are identified for each work item. Estimated quantities are provided for the base bid scope of work as well as seven optional scopes. Unit prices must be provided by the contractor and will be used to adjust the contract value if actual quantities differ from estimates. The National Park Service is the contracting agency for the INDE 245589 rehabilitation project at First Bank in Philadelphia, Pennsylvania.
View the file
Other files
Show 40 more
Latest 50 of 185 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDE-391-186336
PMIS 245589
01 22 000 A- 1
UNIT PRICES
SECTION 01 22 00 A – UNIT PRICES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section identifies Unit Prices and describes the method of pricing the change in quantity of the item of work for which the price is stated. Unit prices may be used to price additions and/or subtractions to the contract amount.
1.2 RELATED WORK
A. Applicable provisions of Bidding Requirements, Contract Requirements and other Division 1 sections.
B. Referenced Specifications Sections stipulate pertinent requirements for products and methods to achieve the work required for each Unit Price.
1. Section 02 82 14 – Asbestos Remediation
2. Section 04 03 22 – Historic Brick Masonry Restoration
3. Section 04 03 32 – Historic Stone Masonry Restoration
4. Section 04 03 42 – Historic Fieldstone Masonry Restoration
5. Section 06 01 10 – Historic Wood Repair
6. Section 09 03 20 – Historic Treatment of Decorative Plaster
7. Section 09 23 00 – Flat Gypsum Plaster
1.3 SUBMITTALS
A. Submit completed Schedule of Unit Prices with the Bid Proposal Form.
1.4 SCHEDULE OF UNIT PRICES
A. Payment for additional work and credit for deductions in work caused by modifications to the Contract, shall be computed in accordance with the following Schedule of Unit Prices, which schedule shall remain in effect until all Work of the Contract has been completed and accepted.
B. The Unit Prices shall be firm lump sums all-inclusive of the materials, work, layout, drafting, submittals, testing, tools, sundries, scaffolding, trucking, transportation, cleaning, supervision, overhead, profit, applicable taxes and any and all other costs for each of the items listed.
01 22 000 A- 2
C. The calculations for determining the number of units of work shall be of actual surface, volume, length, hours or number of individual items listed for the class of work, complete in place and accepted or omitted. No allowance for waste, loss, breakage, damage, or difficulties shall be made.
D. Number of units of work for all other work will be determined by Contractor. The Contracting Officer reserves the right to independently verify units of Work.
1.5 UNIT PRICE SCHEDULE: State the amount (unit price), which shall include all expenses, including overhead and profit, which shall be used to make adjustments to the Contract Sum should the quantity of work require revision. The unit price shall be the same for additional, deducted or omitted units of work. Unit prices shall be established by the Contractor in conjunction with the Contracting Officer and written into the Contract.
01 22 000 A- 3
Unit Price No.
Description of Work Spec Section
Unit Base Bid Qty
Opt. 1 Qty
Opt. 2 Qty
Opt. 3 Qty
Opt. 4 Qty
Opt. 5 Qty
Opt. 6 Qty
Opt. 7 Qty
1 Enlarging of trenches in existing concrete and patching
024119 Square Foot
700 0 0 0 0 0 0 0
2 Trenching and patching of existing concrete floor slabs for conduit installation
030130 Linear Foot
450 0 0 0 0 0 0 0
3 Raking and repointing of brick masonry (Key Note R1)
040322 Square Foot
1,520 0 0 0 0 0 126 0
4 Replacement of brick, face units (Key Notes R7 and R8)
040322 Each 0 0 0 0 0 0 28 0
5 Rake and repoint marble/limestone masonry (General Notes, Key Notes C10, C11 and R14)
040332 Linear Foot
800 0 0 0 3,175 116 116 150
6 Cementitious patching of stone masonry (Key Notes C4, C6, R2, R4)
040332 Cubic Inch
0 0 0 0 374 72 54 0
7 Clean soiling and/or efflorescence – Process E-1 (Key Notes R6, R10 and R30)
040310 Square Foot
0 0 0 0 3250 3000 127 0
8 Crack Repair (Key Note R9) 040332 Linear Foot
110 0 0 0 0 22 10 0
9 Stone Dutchman (Key Note R5) 040332 Cubic Inch
0 0 0 0 0 216 0 0
10 Slurry Repairs (Key Notes C5 and R29)
040332 Linear Foot
0 0 0 0 690 0 0 0
11 Dutchman window head (Key Note C1)
040332 Each 0 0 0 0 8 0 0 0
01 22 000 A- 4
No.
Description of Work Spec Section
Unit Base Bid Qty
Opt. 1 Qty
Opt. 2 Qty
Opt. 3 Qty
Opt. 4 Qty
Opt. 5 Qty
Opt. 6 Qty
Opt. 7 Qty
12 Installation and patching of helical anchors (Key Note C3)
040332 Each 0 0 0 0 10 0 0 0
13 Installation and patching of micro-pins (Key Note C2)
040332 Each 0 0 0 0 469 0 0 0
14 Rake and repoint fieldstone masonry 040342 Square Foot
650 0 0 0 0 0 0 0
15 Consolidate and patch deteriorated wood (Key Notes R25 and R28)
060110 Per 6-inch square to a depth of 1-inch
0 0 0 0 0 0 24 0
16 Patching of decorative plaster cornice elements
090320 Square Foot
43 0 0 0 0 0 0 0
17 Replace decorative plaster cornice (main hall), full section
090320 Linear foot
2 0 0 0 0 0 0 0
18 Patch cracks in decorative plaster cornice
090320 Linear foot
22 0 0 0 0 0 0 0
19 Preparation and abatement of cracks in flat plaster containing asbestos
028214 Linear foot
24 0 0 0 0 0 0 0
20 Removal and abatement of flat plaster containing asbestos
028214 Square foot
1914 0 0 0 0 0 0 0
21 Filled crack repair in flat plaster (preparation by others)
092300 Linear Foot
46 0 0 0 0 0 0 0
22 Patch/new flat 3--coat gypsum wall or ceiling plaster (preparation by
092300 Square Foot
1914 0 0 0 0 0 0 0
01 22 000 A- 5
No.
Description of Work Spec Section
Unit Base Bid Qty
Opt. 1 Qty
Opt. 2 Qty
Opt. 3 Qty
Opt. 4 Qty
Opt. 5 Qty
Opt. 6 Qty
Opt. 7 Qty others) 23 Patch finish plaster on existing scratch and brown coat (preparation by others)
092300 Square Foot
359 0 0 0 0 0 0 0
24 Infill masonry walls where ductwork / piping removed
040342 Cubic Foot
26 0 0 0 0 0 0 0
01 22 000 A- 6
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
END OF SECTION 01 22 00