This document contains a contract price schedule template and related federal contract opportunity for the rehabilitation of the interior and exterior of the First Bank in Independence National Historical Park in Philadelphia, Pennsylvania. The contract price schedule template includes twenty base line items covering various aspects of the construction project such as foundations, basement construction, superstructure, exterior enclosure, and site work. It also includes seven option line items for additional work such as restoration of a leaded glass dome and rehabilitation of various types of masonry. The template requires offerors to submit pricing for both the base line items and all option line items. The related federal contract opportunity is solicitation number 140P2023R0002 being conducted by the National Park Service for the rehabilitation of First Bank identified as project number INDE 245589. The response is due on the date specified in the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 185 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule Template National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:
PARK - PMIS: 245589
(Project Management Information System)
Developed Area: First Bank, INDE
Project Title: Rehabilitate the Interior and Exterior of First Bank
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1 Base Bid - Foundations 1 Lump Sum
2 Base Bid - Basement Construction 1 Lump Sum
3 Base Bid - Superstructure 1 Lump Sum
4 Base Bid - Exterior Enclosure 1 Lump Sum
5 Base Bid - Roofing 1 Lump Sum
6 Base Bid - Interior Construction 1 Lump Sum
7 Base Bid - Stairs 1 Lump Sum
8 Base Bid - Interior Finishes 1 Lump Sum
9 Base Bid - Conveying Systems 1 Lump Sum
10 Base Bid - Plumbing Systems 1 Lump Sum
11 Base Bid - HVAC 1 Lump Sum
12 Base Bid - Fire Protection 1 Lump Sum
13 Base Bid - Electrical 1 Lump Sum
14 Base Bid - Equipment 1 Lump Sum
15 Base Bid - Furnishings 1 Lump Sum
16 Base Bid - Selective Building Demolition 1 Lump Sum
17 Base Bid - Site Preparation 1 Lump Sum
18 Base Bid - Site Improvements 1 Lump Sum
19 Base Bid - Site Mechanical 1 Lump Sum
20 Base Bid - Site Electrical 1 Lump Sum
TOTAL BASE PRICE (Contract Line Item Number 1 through 20) ---------------------------------------------------------------------------------
21 OPTION 1, Restore entire leaded glass dome 1 Lump Sum
OPTION 2, Terrazzo in lieu of carpet,1st floor of historic building
1 Lump Sum
OPTION 3, Full replacement of metal roof at main building in lieu of patching
1 Lump Sum
OPTION 4, Rehabilitation of marble masonry at East Elevation above water table
1 Lump Sum
OPTION 5, Rehabilitation of marble watertable, portico steps, landing, and window wells
1 Lump Sum
OPTION 6, Rehabilitation of brick masonry at N, S, W elevations, limestone entrance and cornice
1 Lump Sum
27 OPTION 7, Restore site gates and masonry piers 1 Lump Sum
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 21 through 27) -----------------------------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 27) --------------------------
Unit Price No. Description of Work Unit Unit Price
Enlarging of trenches in existing concrete and patching
Square Foot
Trenching and patching of existing concrete floor slabs for conduit installation Linear Foot
3 Raking and repointing of brick masonry (R1) Linear Foot
4 Replacement of brick, face units (R7, R8) Each
Rake and repoint marble/limestone masonry (General Note, C10, C11, R14)
Linear Foot
Cementitious patching of stone masonry (C4, C6, R2, R4)
Cubic Inch
Clean soiling and/or efflorescence – Process E-1 (R6, R10, R30)
Square Foot
8 Crack Repair (R9) Linear Foot
9 Stone Dutchman (R5) Cubic Inch
10 Slurry Repairs (C5, R29) Linear Foot
11 Dutchman window head (C1) Each
12 Installation and patching of helical anchors (C3) Each
13 Installation and patching of micro-pins (C2) Each
14 Rake and repoint fieldstone masonry Square Foot
Consolidate and patch deteriorated wood (R25, R28)
Per 6-inch square to a depth of 1-inch
16 Patching of decorative plaster cornice elements Square Foot
17 Replace decorative plaster cornice (main hall), full section
Linear Foot
18 Patch cracks in decorative plaster cornice Linear Foot
19 Preparation and abatement of cracks in flat plaster containing asbestos
Linear Foot
20 Removal and abatement of flat plaster containing asbestos
Square Foot
21 Filled crack repair in flat plaster (preparation by others)
Linear Foot
22 Patch/new flat 3--coat gypsum wall or ceiling plaster (preparation by others)
Square Foot
Patch finish plaster on existing scratch and brown coat (preparation by others)
Square Foot
Infill masonry walls where ductwork/piping removed
Cubic Foot
Replacement board sheathing at existing roof
Square Foot