This document contains a unit price schedule for a federal construction contract to rehabilitate the interior and exterior of the First Bank building in Independence National Historical Park in Philadelphia, Pennsylvania. The schedule lists 25 separate line items covering a range of construction and restoration tasks such as raking and repointing brick masonry, replacing stone elements, repairing wood and plasterwork, asbestos abatement, and roof sheathing replacement. For each line item, the schedule specifies the work description, applicable specification section, unit of measure, estimated base contract quantity, and optional additional quantities that may be ordered. Pricing is to be provided per unit for each line item for additions, deductions or omissions to the contract amount. The National Park Service is the contracting agency.

View the file

Other files

File Type Posted
Sol_140P2023R0002_Amd_0008.pdf PDF
INDE_245589_Final_questions_and_answers_0008.xlsx XLSX spreadsheet
B08_Attach_125_REV_A7_12-_3RD_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_139_REV_1st_Bank_01_27_00_1A_ContractPriceSchedule_0007.pdf PDF
B08_Attach_117_REV_A3_3-TRANS_SECTS_THRU_ADDN_0007.pdf PDF
B08_Attach_148_REV_A8_15-_DECOR_PLASTER___TRENCH_DTLS_0007.pdf PDF
B08_Attach_126_REV_A8_1-FIRST_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_93_REV_1st_Bank_028214_Asbestos_Remediation_0007.pdf PDF
B08_Attach_104_REV_1st_Bank_142400A_Hydraulic_Elevators_0007.pdf PDF
B08_Attach_94_REV_1st_Bank_042000_Unit_Masonry_0007.pdf PDF
B08_Attach_158_REV__096623_Resin_Matrix_Terrazzo_Flooring_0007.pdf PDF
B08_Attach_115_REV_A2_2-WEST_ELEV_0007.pdf PDF
B08_Attach_133_REV_A9_6-EX_RAILING_MODIFICATIONS_0007.pdf PDF
B08_Attach_157_REV_1st_Bank_096519_Vinyl_Tile_0007.pdf PDF
B08_Attach_90_REV_C1_0_EXIST_COND___DEMO_OVERALL_PLAN_0007.pdf PDF
B08_Attach_143_REV_A2_3-SOUTH_ELEV_0007.pdf PDF
B08_Attach_136_REV_1st_Bank_01_40_00_Quality_Requirements_0007.pdf PDF
B08_Attach_113_REV_A2_0C-PORTICO_ELEV_EXT_REHAB_0007.pdf PDF
B08_Attach_161_REV_1st_Bank_142400B_Hydraulic_Elevators_0007.pdf PDF
B08_Attach_155_REV_084123_FireRated_Glass_and_Framing_Systems_0007.pdf PDF
B08_Attach_98_REV_1st_Bank_057313_Glazed_Decorative_Metal_Railings_0007.pdf PDF
B08_Attach_111_REV_A1_9A-ATTIC___3RD_FLR_SLAB_EDGE_PLN_ADDN_0007.pdf PDF
B08_Attach_160_REV_1st_Bank_122413A_Roller_Window_Shades_0007.pdf PDF
B08_Attach_119_REV_A6_7-_DOOR___FRAME_DETAILS_0007.pdf PDF
B08_Attach_156_REV_1st_Bank_088000_Glass_and_Glazing_0007.pdf PDF
B08_Attach_116_REV_A2_3-SOUTH_ELEV_0007.pdf PDF
B08_Attach_135_G1_0_SHEET_INDEX_0007.pdf PDF
B08_Attach_142_REV_01_27_00_DefinitionofContracLineItems_0007.pdf PDF
B08_Attach_109_REV_A1_8A-2ND_FLR_SLAB_EDGE_PLN_ADDN_0007.pdf PDF
B08_Attach_129_REV_A8_4-2ND_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_130_REV_A8_6-_3RD_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_138_REV_1st_Bank_017700_1_Closeout_OM_Requirements_0007.pdf PDF
B08_Attach_110_REV_A1_9-3RD_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_145_REV_A6_13-WDO_SCHED___DTLS_0007.pdf PDF
B08_Attach_106_REV_A1_5-BSMT_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_101_REV_1st_Bank_084413_Glazed_Aluminum_Curtain_Walls_0007.pdf PDF
B08_Attach_149_REV_A9_8_-_STAIR_RAILING___ADDITION_0007.pdf PDF
B08_Attach_92_REV_1st_Bank_015000_Temporary_Facilities_And_Controls_0007.pdf PDF
B08_Attach_146_REV_A8_0-FINISH_SCHED___DTLS_0007.pdf PDF
B08_Attach_123_REV_A7_10-1ST_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_150_REV_C3_0_Utility_Plan_0007.pdf PDF
B08_Attach_107_REV_A1_6-1ST_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_124_REV_A7_11-_2ND_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_137_REV_1st_Bank01_27_00_1AContractPriceSchedule_0007.xlsx XLSX spreadsheet
B08_Attach_105_REV_A1_4-ROOF_PLN_0007.pdf PDF
B08_Attach_100_REV_1st_Bank_076200_Flashing_and_Sheet_Metal_0007.pdf PDF
B08_Attach_151_REV_G0_0_COVER_0007.pdf PDF
B08_Attach_114_REV_A2_1-NORTH_ELEV_0007.pdf PDF
B08_Attach_121_REV_A7_1_1ST_FLR_RCP_0007.pdf PDF
B08_Attach_91_REV_1st_Bank_013323_1_Submittal_List_-_1st_Bank_0007.pdf PDF
Show 40 more

Latest 50 of 185 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDE-391-186336

PMIS 245589

01 22 000 A- 1

UNIT PRICES

SECTION 01 22 00 A – UNIT PRICES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section identifies Unit Prices and describes the method of pricing the change in quantity of the item of work for which the price is stated. Unit prices may be used to price additions and/or subtractions to the contract amount.

1.2 RELATED WORK

A. Applicable provisions of Bidding Requirements, Contract Requirements and other Division 1 sections.

B. Referenced Specifications Sections stipulate pertinent requirements for products and methods to achieve the work required for each Unit Price.

1. Section 02 82 14 – Asbestos Remediation

2. Section 04 03 22 – Historic Brick Masonry Restoration

3. Section 04 03 32 – Historic Stone Masonry Restoration

4. Section 04 03 42 – Historic Fieldstone Masonry Restoration

5. Section 06 01 10 – Historic Wood Repair

6. Section 06 16 00, “Sheathing”

7. Section 09 03 20 – Historic Treatment of Decorative Plaster

8. Section 09 23 00 – Flat Gypsum Plaster

1.3 SUBMITTALS

A. Submit completed Schedule of Unit Prices with the Bid Proposal Form.

1.4 SCHEDULE OF UNIT PRICES

A. Payment for additional work and credit for deductions in work caused by modifications to the Contract, shall be computed in accordance with the following Schedule of Unit Prices, which schedule shall remain in effect until all Work of the Contract has been completed and accepted.

B. The Unit Prices shall be firm lump sums all-inclusive of the materials, work, layout, drafting, submittals, testing, tools, sundries, scaffolding, trucking, transportation, 01 22 000 A- 2 cleaning, supervision, overhead, profit, applicable taxes and any and all other costs for each of the items listed.

C. The calculations for determining the number of units of work shall be of actual surface, volume, length, hours or number of individual items listed for the class of work, complete in place and accepted or omitted. No allowance for waste, loss, breakage, damage, or difficulties shall be made.

D. Number of units of work for all other work will be determined by Contractor. The Contracting Officer reserves the right to independently verify units of Work.

1.5 UNIT PRICE SCHEDULE: State the amount (unit price), which shall include all expenses, including overhead and profit, which shall be used to make adjustments to the Contract Sum should the quantity of work require revision. The unit price shall be the same for additional, deducted or omitted units of work. Unit prices shall be established by the Contractor in conjunction with the Contracting Officer and written into the Contract.

01 22 000 A- 3

Unit Price No.

Description of Work Spec Section

Unit Base Bid Qty

Opt. 1 Qty

Opt. 2 Qty

Opt. 3 Qty

Opt. 4 Qty

Opt. 5 Qty

Opt. 6 Qty

Opt. 7 Qty

1 Enlarging of trenches in existing concrete and patching

024119 Square Foot

700 0 0 0 0 0 0 0

2 Trenching and patching of existing concrete floor slabs for conduit installation

030130 Linear Foot

450 0 0 0 0 0 0 0

3 Raking and repointing of brick masonry (Key Note R1)

040322 Square Foot

1,520 0 0 0 0 0 126 0

4 Replacement of brick, face units (Key Notes R7 and R8)

040322 Each 0 0 0 0 0 0 28 0

5 Rake and repoint marble/limestone masonry (General Notes, Key Notes C10, C11 and R14)

040332 Linear Foot

800 0 0 0 3,175 116 116 150

6 Cementitious patching of stone masonry (Key Notes C4, C6, R2, R4)

040332 Cubic Inch

0 0 0 0 374 72 54 0

7 Clean soiling and/or efflorescence – Process E-1 (Key Notes R6, R10 and R30)

040310 Square Foot

0 0 0 0 3250 3000 127 0

8 Crack Repair (Key Note R9) 040332 Linear Foot

110 0 0 0 0 22 10 0

9 Stone Dutchman (Key Note R5) 040332 Cubic Inch

0 0 0 0 0 216 0 0

10 Slurry Repairs (Key Notes C5 and R29)

040332 Linear Foot

0 0 0 0 690 0 0 0

11 Dutchman window head (Key Note C1)

040332 Each 0 0 0 0 8 0 0 0

01 22 000 A- 4

No.

Description of Work Spec Section

Unit Base Bid Qty

Opt. 1 Qty

Opt. 2 Qty

Opt. 3 Qty

Opt. 4 Qty

Opt. 5 Qty

Opt. 6 Qty

Opt. 7 Qty

12 Installation and patching of helical anchors (Key Note C3)

040332 Each 0 0 0 0 10 0 0 0

13 Installation and patching of micro-pins (Key Note C2)

040332 Each 0 0 0 0 469 0 0 0

14 Rake and repoint fieldstone masonry 040342 Square Foot

650 0 0 0 0 0 0 0

15 Consolidate and patch deteriorated wood (Key Notes R25 and R28)

060110 Per 6-inch square to a depth of 1-inch

0 0 0 0 0 0 24 0

16 Patching of decorative plaster cornice elements

090320 Square Foot

43 0 0 0 0 0 0 0

17 Replace decorative plaster cornice (main hall), full section

090320 Linear foot

2 0 0 0 0 0 0 0

18 Patch cracks in decorative plaster cornice

090320 Linear foot

22 0 0 0 0 0 0 0

19 Preparation and abatement of cracks in flat plaster containing asbestos

028214 Linear foot

24 0 0 0 0 0 0 0

20 Removal and abatement of flat plaster containing asbestos

028214 Square foot

1914 0 0 0 0 0 0 0

21 Filled crack repair in flat plaster (preparation by others)

092300 Linear Foot

46 0 0 0 0 0 0 0

22 Patch/new flat 3--coat gypsum wall or ceiling plaster (preparation by

092300 Square Foot

1914 0 0 0 0 0 0 0

01 22 000 A- 5

No.

Description of Work Spec Section

Unit Base Bid Qty

Opt. 1 Qty

Opt. 2 Qty

Opt. 3 Qty

Opt. 4 Qty

Opt. 5 Qty

Opt. 6 Qty

Opt. 7 Qty others) 23 Patch finish plaster on existing scratch and brown coat (preparation by others)

092300 Square Foot

359 0 0 0 0 0 0 0

24 Infill masonry walls where ductwork / piping removed

040342 Cubic Foot

26 0 0 0 0 0 0 0

25 Replacement board sheathing at existing roof

061600 Square Foot

0 0 0 200 0 0 0 0

01 22 000 A- 6

PART 2 PRODUCTS Not Used

PART 3 EXECUTION Not Used

END OF SECTION 01 22 00