This document contains a specification section for vinyl tile flooring for a federal construction project. The project involves rehabilitating the interior and exterior of the First Bank building in Independence National Historical Park in Philadelphia, Pennsylvania. The specification requires installing new premium luxury vinyl tile plank flooring and accessories over an existing concrete substrate, using a glue-down installation method. It provides details on submittal requirements, quality assurance, delivery and storage, project conditions, floor tile and installation accessory materials, and execution of the floor tile installation work. Product data, samples, attic stock, warranty, and maintenance information are to be submitted. The installer must be qualified and the flooring must meet specified fire resistance, smoke density, and wear layer thickness standards.

View the file

Other files

File Type Posted
Sol_140P2023R0002_Amd_0008.pdf PDF
INDE_245589_Final_questions_and_answers_0008.xlsx XLSX spreadsheet
B08_Attach_125_REV_A7_12-_3RD_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_139_REV_1st_Bank_01_27_00_1A_ContractPriceSchedule_0007.pdf PDF
B08_Attach_117_REV_A3_3-TRANS_SECTS_THRU_ADDN_0007.pdf PDF
B08_Attach_141_REV_1st_Bank_01_22_00B_Unit_Prices_0007.pdf PDF
B08_Attach_148_REV_A8_15-_DECOR_PLASTER___TRENCH_DTLS_0007.pdf PDF
B08_Attach_126_REV_A8_1-FIRST_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_93_REV_1st_Bank_028214_Asbestos_Remediation_0007.pdf PDF
B08_Attach_104_REV_1st_Bank_142400A_Hydraulic_Elevators_0007.pdf PDF
B08_Attach_94_REV_1st_Bank_042000_Unit_Masonry_0007.pdf PDF
B08_Attach_158_REV__096623_Resin_Matrix_Terrazzo_Flooring_0007.pdf PDF
B08_Attach_115_REV_A2_2-WEST_ELEV_0007.pdf PDF
B08_Attach_133_REV_A9_6-EX_RAILING_MODIFICATIONS_0007.pdf PDF
B08_Attach_90_REV_C1_0_EXIST_COND___DEMO_OVERALL_PLAN_0007.pdf PDF
B08_Attach_143_REV_A2_3-SOUTH_ELEV_0007.pdf PDF
B08_Attach_136_REV_1st_Bank_01_40_00_Quality_Requirements_0007.pdf PDF
B08_Attach_113_REV_A2_0C-PORTICO_ELEV_EXT_REHAB_0007.pdf PDF
B08_Attach_161_REV_1st_Bank_142400B_Hydraulic_Elevators_0007.pdf PDF
B08_Attach_155_REV_084123_FireRated_Glass_and_Framing_Systems_0007.pdf PDF
B08_Attach_98_REV_1st_Bank_057313_Glazed_Decorative_Metal_Railings_0007.pdf PDF
B08_Attach_111_REV_A1_9A-ATTIC___3RD_FLR_SLAB_EDGE_PLN_ADDN_0007.pdf PDF
B08_Attach_160_REV_1st_Bank_122413A_Roller_Window_Shades_0007.pdf PDF
B08_Attach_119_REV_A6_7-_DOOR___FRAME_DETAILS_0007.pdf PDF
B08_Attach_156_REV_1st_Bank_088000_Glass_and_Glazing_0007.pdf PDF
B08_Attach_116_REV_A2_3-SOUTH_ELEV_0007.pdf PDF
B08_Attach_135_G1_0_SHEET_INDEX_0007.pdf PDF
B08_Attach_142_REV_01_27_00_DefinitionofContracLineItems_0007.pdf PDF
B08_Attach_109_REV_A1_8A-2ND_FLR_SLAB_EDGE_PLN_ADDN_0007.pdf PDF
B08_Attach_129_REV_A8_4-2ND_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_130_REV_A8_6-_3RD_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_138_REV_1st_Bank_017700_1_Closeout_OM_Requirements_0007.pdf PDF
B08_Attach_110_REV_A1_9-3RD_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_145_REV_A6_13-WDO_SCHED___DTLS_0007.pdf PDF
B08_Attach_106_REV_A1_5-BSMT_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_101_REV_1st_Bank_084413_Glazed_Aluminum_Curtain_Walls_0007.pdf PDF
B08_Attach_149_REV_A9_8_-_STAIR_RAILING___ADDITION_0007.pdf PDF
B08_Attach_92_REV_1st_Bank_015000_Temporary_Facilities_And_Controls_0007.pdf PDF
B08_Attach_146_REV_A8_0-FINISH_SCHED___DTLS_0007.pdf PDF
B08_Attach_123_REV_A7_10-1ST_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_150_REV_C3_0_Utility_Plan_0007.pdf PDF
B08_Attach_107_REV_A1_6-1ST_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_124_REV_A7_11-_2ND_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_137_REV_1st_Bank01_27_00_1AContractPriceSchedule_0007.xlsx XLSX spreadsheet
B08_Attach_105_REV_A1_4-ROOF_PLN_0007.pdf PDF
B08_Attach_100_REV_1st_Bank_076200_Flashing_and_Sheet_Metal_0007.pdf PDF
B08_Attach_151_REV_G0_0_COVER_0007.pdf PDF
B08_Attach_114_REV_A2_1-NORTH_ELEV_0007.pdf PDF
B08_Attach_121_REV_A7_1_1ST_FLR_RCP_0007.pdf PDF
B08_Attach_91_REV_1st_Bank_013323_1_Submittal_List_-_1st_Bank_0007.pdf PDF
Show 40 more

Latest 50 of 185 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDE-391-186336 09 65 19A - 1

PMIS 245589 VINYL TILE

SECTION 09 65 19A -- VINYL TILE

1.1 SUMMARY: The work of this Section includes, but is not necessarily limited to, the following:

A. Furnish and install new premium luxury vinyl tile plank flooring and accessories.

1. Assume glue-down installation over existing concrete substrate

1.2 RELATED WORK

A. Division 1 requirements

B. Section 02 41 19 “Selective Demolition”

C. Section 12 35 30, “Casework and Appliances”

1.3 SUBMITTALS

A. Product data: Submit manufacturer’s product data for new luxury vinyl tile flooring, accessories and accessory materials including floor leveling compounds and adhesives.

B. Base Samples: Submit samples of manufacturer’s full color range of tile and base for selection by Contracting Officer.

C. Vinyl Tile Samples: Submit sample of vinyl tile for approval.

1.4 CLOSEOUT SUBMITTALS

A. Closeout submittal: Maintenance data for new luxury vinyl tile

B. Attic stock:

1. Provide one carton of each type and color of vinyl tile required.

2. Provide no less than 50 linear feet of each color required.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: An entity that employs installers and supervisors who are competent in techniques required by manufacturer for floor tile installation.

B. Warranty

1. Provide manufacturer’s 15-year warranty against wear-through of the finish surface to the printed layer.

1.6 DELIVERY, STORAGE AND HANDLING

INDE-391-186336 09 65 19A - 2

A. Deliver new vinyl tile and accessories to the project site in manufacturer’s original packaging with product identification information clearly visible thereon. Store tile and adhesives in accordance with manufacturer’s recommendations.

1.7 PROJECT CONDITIONS

A. Coordinate vinyl tile installation with other trades affected by the work of this Section including, but not limited to, casework, interior carpentry, ceramic tile and painting, to avoid damage to finished work and/or delays in the project schedule.

PART 2 - PRODUCTS

2.1 VINYL TILE

A. Performance Characteristics

1. Fire-Test-Response Characteristics: For resilient floor tile, as determined by testing identical products according to ASTM E 648 or NFPA 253 by a qualified testing agency.

a. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm.

b. Smoke Density: ASTM E 662 Part A; less than 450

B. Luxury Vinyl Tile: ASTM F 1700, Class III, Printed Vinyl Tile

1. Overall Thickness: 4.5 mm.

2. Wearing Surface: 22 mil, vinyl with UV-cured urethane

3. Glue-down installation

4. Edge profile: Straight edge

5. Performance Class: Best/Class III Commercial

6. Size: Nominal 20” x 20”

C. Manufacturers:

1. Basis of Design: Mohawk Group, C0178 Optic Hues Interface – Textured Stones LVT;

Level Set Collection, Product #A003, Color: A00301 Polished Cement

2. Alternate Manufacturers:

a. Armstrong

b. Congoleum

c. Mannington

INDE-391-186336 09 65 19A - 3

d. Mohawk

e. Contracting Officer-approved equivalent

2.2 INSTALLATION ACCESSORIES

A. Wall Base: Vinyl, 4” cove

B. Floor Transitions

C. Manufacturers:

1. Basis of Design: Mohawk Group, Elemental Edges

2. Alternate Manufacturers:

b. Armstrong

f. Congoleum

g. Mannington

h. Contracting Officer-approved equivalent

2.3 ACCESSORY MATERIALS

A. Floor leveling compound: Latex-modified, Portland-cement-based or blended hydraulic-cement-based formulation provided or approved by floor tile manufacturer for applications indicated; 3000 psi minimum.

B. Adhesive: Water-resistant type recommended by floor tile and adhesive manufacturers to suit floor tile and substrate conditions indicated.

C. Floor Polish: Provide protective, liquid floor-polish products recommended by floor tile manufacturer.

PART 3 - EXECUTION

3.1 PREPARATION

A. Prepare substrates according to floor tile manufacturer's written instructions to ensure adhesion of resilient products.

B. Wood Substrates: Prepare according to ASTM F 1482.

C. Fill joints in substrates with trowelable, non-shrink, leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.

INDE-391-186336 09 65 19A - 4

D. Do not install floor tiles until materials are the same temperature as space where they are to be installed.

1. At least 48 hours in advance of installation, move resilient floor tile and installation materials into spaces where they will be installed.

E. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient floor tile.

3.2 FLOOR TILE INSTALLATION

A. Comply with manufacturer's written instructions for installing floor tile.

B. Lay out floor tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than one-half tile at perimeter.

1. Lay tiles square with room axis.

C. Match floor tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed tiles.

1. Lay tiles with grain running in one direction using quarter-turn installation method.

D. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames. Where new cabinetry is to be provided, extend tile flooring underneath new cabinet locations.

E. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.

F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent marking device.

G. Adhere floor tiles to substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.

H. Floor Polish: Remove soil, adhesive, and blemishes from floor tile surfaces before applying liquid floor polish.

1. Apply two coat(s).

END OF SECTION 09 65 19

A. Furnish and install new premium luxury vinyl tile plank flooring and accessories.
1. Assume glue-down installation over existing concrete substrate
A. Product data: Submit manufacturer’s product data for new luxury vinyl tile flooring, accessories and accessory materials including floor leveling compounds and adhesives.
B. Base Samples: Submit samples of manufacturer’s full color range of tile and base for selection by Contracting Officer.
C. Vinyl Tile Samples: Submit sample of vinyl tile for approval.
A. Closeout submittal: Maintenance data for new luxury vinyl tile
B. Attic stock:
1. Provide one carton of each type and color of vinyl tile required.
2. Provide no less than 50 linear feet of each color required.
A. Installer Qualifications: An entity that employs installers and supervisors who are competent in techniques required by manufacturer for floor tile installation.
1. Fire-Test-Response Characteristics: For resilient floor tile, as determined by testing identical products according to ASTM E 648 or NFPA 253 by a qualified testing agency.
a. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm.
A. Floor leveling compound: Latex-modified, Portland-cement-based or blended hydraulic-cement-based formulation provided or approved by floor tile manufacturer for applications indicated; 3000 psi minimum.
B. Adhesive: Water-resistant type recommended by floor tile and adhesive manufacturers to suit floor tile and substrate conditions indicated.
C. Floor Polish: Provide protective, liquid floor-polish products recommended by floor tile manufacturer.
PART 3 - EXECUTION
3.1 PREPARATION
A. Prepare substrates according to floor tile manufacturer's written instructions to ensure adhesion of resilient products.
B. Wood Substrates: Prepare according to ASTM F 1482.
C. Fill joints in substrates with trowelable, non-shrink, leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.
D. Do not install floor tiles until materials are the same temperature as space where they are to be installed.
1. At least 48 hours in advance of installation, move resilient floor tile and installation materials into spaces where they will be installed.

E. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient floor tile.

3.2 FLOOR TILE INSTALLATION
A. Comply with manufacturer's written instructions for installing floor tile.
B. Lay out floor tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than one-half tile at perimeter.
1. Lay tiles square with room axis.
C. Match floor tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed tiles.
1. Lay tiles with grain running in one direction using quarter-turn installation method.
D. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames. Where new cabinetry is to be provided, extend tile flooring underneath ...
E. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.
F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent marking device.
G. Adhere floor tiles to substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperf...
H. Floor Polish: Remove soil, adhesive, and blemishes from floor tile surfaces before applying liquid floor polish.
1. Apply two coat(s).