This document contains a price schedule template for a construction contract to rehabilitate the interior and exterior of the First Bank building in Independence National Historical Park in Philadelphia, Pennsylvania. The contract includes 20 line items for base bid work covering foundations, basement construction, superstructure, exterior enclosure, roofing, interior construction, stairs, interior finishes, conveying systems, plumbing systems, HVAC, fire protection, electrical, equipment, furnishings, selective building demolition, site preparation, site improvements, site mechanical, and site electrical. It also contains 27 optional line items covering restoration of a leaded glass dome, terrazzo flooring, metal roof replacement, and various masonry rehabilitation work. Offerors are required to provide lump sum pricing for base bid line items and unit prices with extended totals for optional line items. The solicitation number is 140P2023R0002 and is being conducted by the National Park Service, Department of the Interior for the referenced construction project at Independence National Historical Park.
View the file
Other files
Show 40 more
Latest 50 of 185 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | |||||
| PARK - PMIS: | 245589 | ||||
| (Project Management Information System) | |||||
| Developed Area: | First Bank, INDE | ||||
| Project Title: | Rehabilitate the Interior and Exterior of First Bank | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Base Bid - Foundations | 1 | Lump Sum | ||
| 2 | Base Bid - Basement Construction | 1 | Lump Sum | ||
| 3 | Base Bid - Superstructure | 1 | Lump Sum | ||
| 4 | Base Bid - Exterior Enclosure | 1 | Lump Sum | ||
| 5 | Base Bid - Roofing | 1 | Lump Sum | ||
| 6 | Base Bid - Interior Construction | 1 | Lump Sum | ||
| 7 | Base Bid - Stairs | 1 | Lump Sum | ||
| 8 | Base Bid - Interior Finishes | 1 | Lump Sum | ||
| 9 | Base Bid - Conveying Systems | 1 | Lump Sum | ||
| 10 | Base Bid - Plumbing Systems | 1 | Lump Sum | ||
| 11 | Base Bid - HVAC | 1 | Lump Sum | ||
| 12 | Base Bid - Fire Protection | 1 | Lump Sum | ||
| 13 | Base Bid - Electrical | 1 | Lump Sum | ||
| 14 | Base Bid - Equipment | 1 | Lump Sum | ||
| 15 | Base Bid - Furnishings | 1 | Lump Sum | ||
| 16 | Base Bid - Selective Building Demolition | 1 | Lump Sum | ||
| 17 | Base Bid - Site Preparation | 1 | Lump Sum | ||
| 18 | Base Bid - Site Improvements | 1 | Lump Sum | ||
| 19 | Base Bid - Site Mechanical | 1 | Lump Sum | ||
| 20 | Base Bid - Site Electrical | 1 | Lump Sum | ||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 20) --------------------------------------------------------------------------------- | |||||
| 21 | OPTION 1, Restore entire leaded glass dome | 1 | Lump Sum | ||
| 22 | OPTION 2, Terrazzo in lieu of carpet,1st floor of historic building | 1 | Lump Sum | ||
| 23 | OPTION 3, Full replacement of metal roof at main building in lieu of patching | 1 | Lump Sum | ||
| 24 | OPTION 4, Rehabilitation of marble masonry at East Elevation above water table | 1 | Lump Sum | ||
| 25 | OPTION 5, Rehabilitation of marble watertable, portico steps, landing, and window wells | 1 | Lump Sum | ||
| 26 | OPTION 6, Rehabilitation of brick masonry at N, S, W elevations, limestone entrance and cornice | 1 | Lump Sum | ||
| 27 | OPTION 7, Restore site gates and masonry piers | 1 | Lump Sum | ||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 21 through 27) ----------------------------------------------------------- | |||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 27) -------------------------- | |||||
| Unit Price No. | Description of Work | Unit | Unit Price | ||
| 1 | Enlarging of trenches in existing concrete and patching | Square Foot | |||
| 2 | Trenching and patching of existing concrete floor slabs for conduit installation | Linear Foot | |||
| 3 | Raking and repointing of brick masonry (R1) | Linear Foot | |||
| 4 | Replacement of brick, face units (R7, R8) | Each | |||
| 5 | Rake and repoint marble/limestone masonry (General Note, C10, C11, R14) | Linear Foot | |||
| 6 | Cementitious patching of stone masonry (C4, C6, R2, R4) | Cubic Inch | |||
| 7 | Clean soiling and/or efflorescence – Process E-1 (R6, R10, R30) | Square Foot | |||
| 8 | Crack Repair (R9) | Linear Foot | |||
| 9 | Stone Dutchman (R5) | Cubic Inch | |||
| 10 | Slurry Repairs (C5, R29) | Linear Foot | |||
| 11 | Dutchman window head (C1) | Each | |||
| 12 | Installation and patching of helical anchors (C3) | Each | |||
| 13 | Installation and patching of micro-pins (C2) | Each | |||
| 14 | Rake and repoint fieldstone masonry | Square Foot | |||
| 15 | Consolidate and patch deteriorated wood (R25, R28) | Per 6-inch square to a depth of 1-inch | |||
| 16 | Patching of decorative plaster cornice elements | Square Foot | |||
| 17 | Replace decorative plaster cornice (main hall), full section | Linear Foot | |||
| 18 | Patch cracks in decorative plaster cornice | Linear Foot | |||
| 19 | Preparation and abatement of cracks in flat plaster containing asbestos | Linear Foot | |||
| 20 | Removal and abatement of flat plaster containing asbestos | Square Foot | |||
| 21 | Filled crack repair in flat plaster (preparation by others) | Linear Foot | |||
| 22 | Patch/new flat 3--coat gypsum wall or ceiling plaster (preparation by others) | Square Foot | |||
| 23 | Patch finish plaster on existing scratch and brown coat (preparation by others) | Square Foot | |||
| 24 | Infill masonry walls where ductwork/piping removed | Cubic Foot | |||
| 25 | Replacement board sheathing at existing roof | Square Foot |