B08_Attach_88_REV_1st_Bank_07_84_13_-_THROUGH_PENETRATION_FIRESTOPPING_0007.pdf

PDF 1 MB Posted

Attached to
INDE 245589, Rehabilitation of First Bank, Indepen
Solicitation number
140P2023R0002
Issued by

About this file

This document contains specifications for through-penetration firestopping systems for a federal construction project to rehabilitate the interior and exterior of First Bank in Independence National Historical Park in Philadelphia, Pennsylvania. The specifications require firestopping systems rated for one-hour and two-hour fire resistive constructions. Acceptable manufacturers include 3M, Hilti, and Specified Technologies. Systems must be selected from UL or Warnock Hersey testing and listed in their directories under the appropriate series based on substrate and penetrating item. Installers must be certified by the manufacturer and systems must be installed per manufacturer's instructions and UL/Warnock Hersey listings. A one year warranty on materials and labor is required.

View the file

Other files

File Type Posted
Sol_140P2023R0002_Amd_0008.pdf PDF
INDE_245589_Final_questions_and_answers_0008.xlsx XLSX spreadsheet
B08_Attach_125_REV_A7_12-_3RD_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_139_REV_1st_Bank_01_27_00_1A_ContractPriceSchedule_0007.pdf PDF
B08_Attach_117_REV_A3_3-TRANS_SECTS_THRU_ADDN_0007.pdf PDF
B08_Attach_141_REV_1st_Bank_01_22_00B_Unit_Prices_0007.pdf PDF
B08_Attach_148_REV_A8_15-_DECOR_PLASTER___TRENCH_DTLS_0007.pdf PDF
B08_Attach_126_REV_A8_1-FIRST_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_93_REV_1st_Bank_028214_Asbestos_Remediation_0007.pdf PDF
B08_Attach_104_REV_1st_Bank_142400A_Hydraulic_Elevators_0007.pdf PDF
B08_Attach_94_REV_1st_Bank_042000_Unit_Masonry_0007.pdf PDF
B08_Attach_158_REV__096623_Resin_Matrix_Terrazzo_Flooring_0007.pdf PDF
B08_Attach_115_REV_A2_2-WEST_ELEV_0007.pdf PDF
B08_Attach_133_REV_A9_6-EX_RAILING_MODIFICATIONS_0007.pdf PDF
B08_Attach_157_REV_1st_Bank_096519_Vinyl_Tile_0007.pdf PDF
B08_Attach_90_REV_C1_0_EXIST_COND___DEMO_OVERALL_PLAN_0007.pdf PDF
B08_Attach_143_REV_A2_3-SOUTH_ELEV_0007.pdf PDF
B08_Attach_136_REV_1st_Bank_01_40_00_Quality_Requirements_0007.pdf PDF
B08_Attach_113_REV_A2_0C-PORTICO_ELEV_EXT_REHAB_0007.pdf PDF
B08_Attach_161_REV_1st_Bank_142400B_Hydraulic_Elevators_0007.pdf PDF
B08_Attach_155_REV_084123_FireRated_Glass_and_Framing_Systems_0007.pdf PDF
B08_Attach_98_REV_1st_Bank_057313_Glazed_Decorative_Metal_Railings_0007.pdf PDF
B08_Attach_111_REV_A1_9A-ATTIC___3RD_FLR_SLAB_EDGE_PLN_ADDN_0007.pdf PDF
B08_Attach_160_REV_1st_Bank_122413A_Roller_Window_Shades_0007.pdf PDF
B08_Attach_119_REV_A6_7-_DOOR___FRAME_DETAILS_0007.pdf PDF
B08_Attach_156_REV_1st_Bank_088000_Glass_and_Glazing_0007.pdf PDF
B08_Attach_116_REV_A2_3-SOUTH_ELEV_0007.pdf PDF
B08_Attach_135_G1_0_SHEET_INDEX_0007.pdf PDF
B08_Attach_142_REV_01_27_00_DefinitionofContracLineItems_0007.pdf PDF
B08_Attach_109_REV_A1_8A-2ND_FLR_SLAB_EDGE_PLN_ADDN_0007.pdf PDF
B08_Attach_129_REV_A8_4-2ND_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_130_REV_A8_6-_3RD_FLR_INT_ELEVS_0007.pdf PDF
B08_Attach_138_REV_1st_Bank_017700_1_Closeout_OM_Requirements_0007.pdf PDF
B08_Attach_110_REV_A1_9-3RD_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_145_REV_A6_13-WDO_SCHED___DTLS_0007.pdf PDF
B08_Attach_106_REV_A1_5-BSMT_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_101_REV_1st_Bank_084413_Glazed_Aluminum_Curtain_Walls_0007.pdf PDF
B08_Attach_149_REV_A9_8_-_STAIR_RAILING___ADDITION_0007.pdf PDF
B08_Attach_92_REV_1st_Bank_015000_Temporary_Facilities_And_Controls_0007.pdf PDF
B08_Attach_146_REV_A8_0-FINISH_SCHED___DTLS_0007.pdf PDF
B08_Attach_123_REV_A7_10-1ST_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_150_REV_C3_0_Utility_Plan_0007.pdf PDF
B08_Attach_107_REV_A1_6-1ST_FLR_PLN_ADDN_0007.pdf PDF
B08_Attach_124_REV_A7_11-_2ND_FLR_ADDN_FLOORING_PATTERN_0007.pdf PDF
B08_Attach_137_REV_1st_Bank01_27_00_1AContractPriceSchedule_0007.xlsx XLSX spreadsheet
B08_Attach_105_REV_A1_4-ROOF_PLN_0007.pdf PDF
B08_Attach_100_REV_1st_Bank_076200_Flashing_and_Sheet_Metal_0007.pdf PDF
B08_Attach_151_REV_G0_0_COVER_0007.pdf PDF
B08_Attach_114_REV_A2_1-NORTH_ELEV_0007.pdf PDF
B08_Attach_121_REV_A7_1_1ST_FLR_RCP_0007.pdf PDF
Show 40 more

Latest 50 of 185 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDE-391-177832

PMIS 245589

07 84 13 - 1

THROUGH PENETRATION FIRESTOPPING

SECTION 07 84 13 28 05 03 THROUGH PENETRATION FIRESTOPPING

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Through-Penetration Firestopping.

1.2 QUALITY ASSURANCE

A. Manufacturer: Company specializing in manufacturing products specified in this

Section.

B. Installer: Individuals performing work shall be certified by the manufacturer of the system selected for installation.

1.3 REFERENCES

A. UL 263 – Fire Tests of Building Construction and Materials

B. UL 723 - Surface Burning Characteristics of Building Materials

C. ANSI/UL 1479 - Fire Tests of Through Penetration Firestops

D. UL 2079 Tests for Fire Resistance of Building Joint Systems

E. UL Fire Resistance Directory Through Penetration Firestop Systems (XHEZ)

F. Intertek / Warnock Hersey - Directory of Listed Products

G. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building

Materials

H. ASTM E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops

I. 2015 International Building Code

1.4 SUBMITTALS

A. Submit under provisions of Section 28 05 00.

B. Submit Firestopping Installers Certification for all installers on the project.

C. Shop Drawings: Submit for each condition requiring firestopping. Include descriptions of the specific penetrating item, actual wall/floor construction, manufacturer’s installation instructions, and UL or Intertek / Warnock Hersey

Assembly number.

D. Through-Penetration Firestop System Schedule: Indicate locations of each through-penetration firestop system, along with the following information:

1. Types of penetrating items.

2. Types of constructions penetrated, including fire-resistance ratings and, where applicable, thicknesses of construction penetrated.

3. Through-penetration firestop systems for each location identified by firestop design designation of qualified testing and inspecting agency.

4. F and T ratings for each firestop system.

ccarter Line

07 84 13 - 2

E. Maintain a notebook on the job site at all times that contains copies of approved submittals for all through penetration firestopping to be installed. Notebook shall be made available to the Authority Having Jurisdiction at their request and turned over to the Owner at the end of construction as part of the O&M Manuals.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Store, protect and handle products on site. Accept material on site in factory containers and packing. Inspect for damage. Protect from deterioration or damage due to moisture, temperature changes, contaminants, or other causes. Follow manufacturer’s instructions for storage.

B. Install material prior to expiration of product shelf life.

1.6 PERFORMANCE REQUIREMENTS

A. General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated.

1. Fire-resistance-rated walls including fire partitions, fire barriers, and smoke barriers.

2. Fire-resistance-rated horizontal assemblies including floors, floor/ceiling assemblies, and ceiling membranes of roof/ceiling assemblies.

B. Rated Systems: Provide through-penetration firestop systems with the following ratings determined per UL 1479:

1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated, but not less than that equaling or exceeding fire-resistance rating of constructions penetrated.

2. T-Rated Systems: For the following conditions, provide through-penetration firestop systems with T-ratings indicated, as well as F-ratings:

a. Floor penetrations located outside wall cavities.

b. Floor penetrations located outside fire-resistance-rated shaft enclosures.

C. For through-penetration firestop systems exposed to light, traffic, moisture, or physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction.

D. For through-penetration firestop systems exposed to view, provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84.

E. For through-penetration firestop systems in air plenums, provide products with flame-spread and smoke-developed indexes of less than 25 and 50, respectively, as determined per ASTM E 84.

07 84 13 - 3

WARRANTY

F. Provide one year warranty on parts and labor.

G. Warranty shall cover repair or replacement of firestop systems which fail in joint adhesion, cohesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain resistance, general durability, or appear to deteriorate in any manner not clearly specified by the manufacturer as an inherent quality of the material.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Products: Subject to compliance with requirements, provide one of the through-penetration firestop systems indicated for each application that are produced by one of the following manufacturers. All firestopping systems installed shall be provided by a single manufacturer.

1. 3M; Fire Protection Products Division

2. Hilti, Inc.

3. Specified Technologies Inc. (S.T.I.)

2.2 THROUGH PENETRATION FIRESTOP SYSTEMS

A. Provide materials and systems classified by or listed by Intertek / Warnock Hersey to provide firestopping equal to time rating of construction being penetrated.

B. All firestopping materials shall be free of asbestos, lead, PCB’s, and other materials that would require hazardous waste removal.

C. Firestopping shall be flexible to allow for normal penetrating item movement due to expansion and contraction.

D. Firestopping systems for plumbing and wet pipe sprinkler piping shall be moisture resistant.

E. Provide firestopping systems capable of supporting floor loads where systems are exposed to possible floor loading or traffic.

F. Provide firestopping systems allowing continuous insulation for all insulated pipes.

G. Provide firestopping systems classified by UL or listed by Intertek / Warnock Hersey for penetrations through all fire rated construction. Firestopping systems shall be selected from the UL or listed by Intertek / Warnock Hersey Fire Resistance

Directory Category XHEZ based on substrate construction and penetrating item size and material and shall fall within the range of numbers listed:

07 84 13 - 4

1. Combustible Framed Floors and Chase Walls - 1 or 2 Hour Rated F Rating = Floor/Wall Rating T Rating = Floor/Wall Rating L Rating = Penetrations in Smoke Barriers

Penetrating Item UL System No.

No Penetrating Item FC 0000-0999* Metallic Pipe or Conduit FC 1000-1999 Non-Metallic Pipe or Conduit FC 2000-2999

Insulated Pipes FC 5000-5999 Bus Duct and Misc. Electrical FC 6000-6999 Duct without Damper and Misc. Mechanical FC 7000-7999 Multiple Penetrations FC 8000-8999

2. Non-Combustible Framed Walls - 1 or 2 Hour Rated F Rating = Wall Rating T Rating = 0 L Rating = Penetrations in Smoke Barriers

Penetrating Item UL System No.

No Penetrating Item WL 0000-0999* Metallic Pipe or Conduit WL 1000-1999 Non-Metallic Pipe or Conduit WL 2000-2999

Insulated Pipes WL 5000-5999 Bus Duct and Misc. Electrical WL 6000-6999 Duct without Damper and Misc. Mechanical WL 7000-7999 Multiple Penetrations WL 8000-8999

3. Concrete or Masonry Floors and Walls - 1 or 2 Hour Rated F Rating = Wall/Floor Rating T Rating (Walls) = 0 or Wall Rating T Rating (Floors) = Floor Rating L Rating = Penetrations in Smoke Barriers

Penetrating Item UL System No.

No Penetrating Item CAJ 0000-0999* Metallic Pipe or Conduit CAJ 1000-1999 Non-Metallic Pipe or Conduit CAJ 2000-2999

Insulated Pipes CAJ 5000-5999 Bus Duct and Misc. Electrical CAJ 6000-6999 Duct without Damper and Misc. Mechanical CAJ 7000-7999 Multiple Penetrations CAJ 8000-8999

07 84 13 - 5

*Alternate method of firestopping is patching opening to match original rated construction.

H. Any opening in walls or floors not covered by the listed series of numbers shall be coordinated with the firestopping manufacturer.

I. Any openings in floors or walls not described in the UL or listed by Intertek /

Warnock Hersey Fire Resistance Directory, or outlined in manufacturer’s information shall be sealed in a manner agreed upon by the Firestopping

Manufacturer, Owner, and the Authority Having Jurisdiction.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Ensure all surfaces that contact seal materials are free of dirt, dust, grease, oil, rust, or loose materials. Clean and repair surfaces as required. Remove laitance and form-release agents from concrete.

B. Ensure substrate and penetrating items have been permanently installed prior to installing firestopping systems. Ensure penetrating items have been properly spaced and have proper clearance prior to installing firestopping systems.

C. Surfaces to which sealing materials are to be installed must meet the selected UL or

Intertek / Warnock Hersey system substrate criteria.

D. Prime substrates where recommended in writing by through-penetration firestop system manufacturer. Confine primer to area of bond.

3.2 INSTALLATION

A. In existing construction, provide firestopping of openings prior to and after installation of penetrating items. Remove any existing coatings on surfaces prior to firestopping installation. Temporary firestopping shall consist of packing openings with fire resistant mineral wool for the full thickness of substrate, or an alternate method approved by the Authority Having Jurisdiction. All openings shall be temporarily firestopped immediately upon their installation and shall remain so until the permanent UL or listed by Intertek / Warnock Hersey listed firestopping system is installed.

B. Install penetration seal materials in accordance with printed instructions of the UL or Intertek / Warnock Hersey Fire Resistance Directory and with the manufacturer’s printed application instructions.

C. Install dams as required to properly contain firestopping materials within openings and as required to achieve required fire resistance rating. Remove combustible damming after appropriate curing.

07 84 13 - 6

3.3 CLEANING AND PROTECTING

A. Clean excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not cause damage.

B. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements.

END OF SECTION

File details come from the government source that posted it. Updated .