140P2022R0036_Att02b-STLI_305028-Drawings-Final_220601.pdf

PDF 11 MB Posted

Attached to
STLI-312431, Rehab Exterior Systems of MIB (GAOA)
Solicitation number
140P2022R0036
Issued by

About this file

This document provides details for a federal contract solicitation to rehabilitate exterior systems of the Main Immigration Building of the Statue of Liberty National Monument and Ellis Island in New York. The solicitation number is 140P2022R0036 issued by the National Park Service, National Office within the Department of the Interior. Services required include rehabilitating exterior systems such as replacing deteriorated terra cotta, repairing steel structural components, and performing waterproofing. The contractor will be selected through a competitive proposal process with proposals due by June 1, 2022 and work expected to be completed by September 2023.

View the file

Other files

File Type Posted
140P2022R0036-0010_Att01_QuestionsAndResponses-Final_01-112_221129_0010.pdf PDF
140P2022R0036-0010_Att02-RevClausesAndProvisions_221129_0010.pdf PDF
140P2022R0036-0010_Att01a-Q55_ContractPriceSchedule-Final_221129_0010.xlsx XLSX spreadsheet
Sol_140P2022R0036_Amd_0010.pdf PDF
140P2022R0036-0009_Att01b-Q39_HazMatTestingReport_211119_0009.pdf PDF
140P2022R0036-0009_Att01a-Q39_EllisIslandHazMatSurvey-Finalwattachs_211108_0009.pdf PDF
Sol_140P2022R0036_Amd_0009.pdf PDF
140P2022R0036-0009_Att01_QuestionsAndResponses_01-58_221118_0009.pdf PDF
140P2022R0036-0008_Att01_QuestionsAndResponses_01-38_221110_0008.pdf PDF
Sol_140P2022R0036_Amd_0008.pdf PDF
Sol_140P2022R0036_Amd_0007.pdf PDF
140P2022R0036-0007_Att02-STLI_305028-RevSpec085200-Wood_Windows_221107_0007.pdf PDF
140P2022R0036-0007_Att01_QuestionsAndResponses_01-34_221108_0007.pdf PDF
140P2022R0036-0006_Att01-DVB_GD_No_NY03_New_York-BHHR_221104_0006.pdf PDF
Sol_140P2022R0036_Amd_0006.pdf PDF
Sol_140P2022R0036_Amd_0005.pdf PDF
140P2022R0036-0005_Att01-SiteVisitSignIn_221103_0005.pdf PDF
Sol_140P2022R0036_Amd_0004.pdf PDF
140P2022R0036-0004-Att01a-Q06_MIBLimitedAsbestosInspectionReport_200722_0004.pdf PDF
140P2022R0036-0004_Att01_QuestionsAndResponses_01-18_221027_0004.pdf PDF
Sol_140P2022R0036_Amd_0003.pdf PDF
140P2022R0036-0002_Att01a-PreProposal_Mtg_Presentation_wNotes_221019_0002.pdf PDF
140P2022R0036-0002_Att03a-STLI_305028-Specifications-Rev_221017_0002.pdf PDF
140P2022R0036-0002_Att01b-PreproposalMeetingSignInSheet_221019_0002.pdf PDF
140P2022R0036-0002_Att03b-XRF_LBP_InspectionReport_200722_0002.pdf PDF
140P2022R0036-0002_Att02-RevClausesAndProvisions_221021_0002.pdf PDF
Sol_140P2022R0036_Amd_0002.pdf PDF
140P2022R0036-0001_Att01-_DVB_GD_No_NY03_New_York-BHHR_220916_0001.pdf PDF
Sol_140P2022R0036_Amd_0001.pdf PDF
140P2022R0036_Att01a-STLI_312431-Specifications-Final_220520.pdf PDF
Sol_140P2022R0036.pdf PDF
140P2022R0036_Att05-SubKPlanForm_220509.docx DOCX document
140P2022R0036_Att02a-STLI_312431-Drawings-Final_220601.pdf PDF
140P2022R0036_Att04a-ProposalSubmissionPackage_220602.zip ZIP file
140P2022R0036_Att03-DVB_GD_No_NY03_New_York-BHHR_220805.pdf PDF
140P2022R0036_Att04b_ProposalSubmissionPackage-Sample_220602.pdf PDF
140P2022R0036_Att06-StatementOfStructuralTestsSpecialInspections_220513.pdf PDF
140P2022R0036_Att07-Final_CloseoutProcedures_OM_220601.pdf PDF
140P2022R0036_Att01b-STLI_305028-Specifications-Final_210423.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFER TO PACKAGE 312431 FOR SITE

ACCESS & PRELIMINARY CONTRACTOR

STAGING AREA

REFER TO PACKAGE 312431 FOR MASONRY, STRUCTURAL, & ROOF SCOPE AT CLERESTORY

REFER TO PACKAGE 312431 FOR MASONRY, STRUCTURAL, & ROOF SCOPE AT CLERESTORY

GENERAL NOTES

11. SEE ARCHITECT DRAWINGS FOR ALL MOUNTING

DETAILS AND CORRESPONDING SPECIFICATIONS.

LIGHTING FIXTURE MANUFACTURER TO APPROVE

MOUNTING DETAILS PRIOR TO FINAL ORDER.

2. CONTRACTOR SHALL VERIFY THAT ALL LIGHTING

EQUIPMENT SPECIFIED - IN ITS APPLICATION ON

THIS PROJECT - COMPLIES WITH ALL APPLICABLE

NATIONAL AND LOCAL CODES, ORDINANCES,

REGULATIONS AND JURISDICTIONS PRIOR TO

ORDERING ANY EQUIPMENT.

3. DO NOT SCALE ELECTRICAL DRAWING FOR

EXACT LOCATION OF THE LIGHTING FIXTURES. IN

GENERAL, THE EXHIBIT LIGHTING LAYOUT INDICATE

THE PROPER LOCATION OF LIGHTING FIXTURES.

4. WRITTEN DIMENSIONS ON DRAWINGS SHALL

HAVE AUTHORITY OVER SCALED MEASUREMENTS.

CONTRACTORS AND MANUFACTURERS SHALL

VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS

AND CONDITIONS ON THE JOB AND INFORM THE

CONTRACTING OFFICER OF ALL VARIATIONS FROM

DRAWINGS PRIOR TO PERFORMING THE WORK.

5. FOR ALL REMOTE LOCATION DIMMERS, THE

ELECTRICAL CONTRACTOR SHALL PROVIDE SEPARATE

NEUTRALS FOR EACH DIMMING CIRCUIT (I.E., NO

COMMON NEUTRALS).

6. A LINE ITEM PRICE FOR THE COST TO

PROVIDE AND INSTALL EACH LIGHTING FIXTURE TYPE

IS REQUIRED.

THESE DRAWINGS AND ALL THE IDEAS,

ARRANGEMENTS, DESIGNS & PLANS INDICATED

THEREON OR REPRESENTED THEREBY ARE OWNED BY

AND REMAIN THE PROPERTY OF AVAILABLE LIGHT AND

HAVE BEEN CREATED AND DEVELOPED FOR USE ON

AND IN CONNECTION WITH THE SPECIFIED PROJECT.

NEITHER THIS DRAWING, NOR ANY SUCH IDEAS,

ARRANGEMENTS, DESIGNS OR PLANS SHALL BE

APPROPRIATED BY OR DISCLOSED TO ANY PERSON,

FIRM OR CORPORATION FOR ANY USE OR PURPOSE

WHATSOEVER, EXCEPT BY THE SPECIFIC AND

WRITTEN PERMISSION OF AVAILABLE LIGHT.

THESE DRAWINGS REPRESENT VISUAL CONCEPTS AND

SUGGESTIONS ONLY. PLEASE RIGIDLY OBSERVE ALL

LOCAL ELECTRICAL, STRUCTURAL AND SAFETY

PROCEDURES AND CODES. AVAILABLE LIGHT IS

UNQUALIFIED TO DETERMINE STRUCTURAL, ELECTRICAL

OR SAFETY APPROPRIATENESS AND WILL NOT ASSUME

RESPONSIBILITY OR LIABILITY FOR IMPROPER

ENGINEERING, CONSTRUCTION OR HANDLING OF

THESE DESIGN CONCEPTS.

REFERENCE NOTES (SPECIFIC TO THIS PAGE ONLY)

22" WIDE SURFACE-MOUNTED LINEAR LED

COVE FIXTURE MOUNTED IN ARCHITECTURAL

TROUGH WITH 25º BEAM SPREAD TO

UPLIGHT WINDOWS AND CEILING. SEE 2/L1.0

FOR MOUNTING DETAIL AT EAST-WEST

WINDOWS AND 3/L1.0 FOR MOUNTING DETAIL

AT NORTH-SOUTH WINDOWS. (TYPE LSA)

TYPICAL.

ELLIS ISLAND MAIN IMMIGRATION BUILDING

STATUE OF LIBERTY NATIONAL MONUMENT

BID OPTION 03

LIGHTING LAYOUT

CONSTRUCTION

DOCUMENTS

NOT FOR

CONSTRUCTION

JGWA

DESIGNED:

TECH. REVIEW:

DATE:

04/23/21

AVAILABLE LIGHT

YIC

RAG

SUB SHEET NO.

L1.0

TITLE OF SHEET

166781

305028

14 20

DRAWING NO.

PMIS/PKG NO.

SHEET

OF

ELLIS ISLAND MAIN IMMIGRATION BUILDING

STATUE OF LIBERTY NATIONAL MONUMENT

SCALE OF INCHES

SSCALE J

FFIXTURE BEAM SPREAD AND FOCUS SKETCH55

L1.0

225º

TTYPE LSA AIMED UP TO REVEAL

ARCHITECTURAL DETAILS

225º

NO SCALE

LLSALSA

LLSA LSA LSA

LSA LSA LSA

CCLESTORY PLAN • LIGHTING LAYOUT11

L1.0

118'-0" 118'-0" 118'-0"

118'-0"118'-0"118'-0"

LL1.0

LL1.0

SSCALE B

EEAST-WEST TROUGH TYPE LSA MOUNTING DETAIL22

L1.0

BBLOCKING TO RAISE

FIXTURE MOUNTING HEIGHT

AALL DIMESIONS TO BE

VERIFIED IN THE FIELD

PRIOR TO PROCEEDING

WITH INSTALLATION.

EEXISTING HOLLOW

CHANNEL FOR CONDUIT

TTROV INTERIOR 25º AIMED

UP TO REVEAL

ARCHITECURAL DETAILS.

(TYPE LSA)

44"

55 1/2"

225°

33"

MMOUNTINIG HINGE

SSCALE J

NNORTH-SOUTH TROUGH TYPE LSA MOUNTING DETAIL33

L1.0

TTROV INTERIOR 25º AIMED

UP TO REVEAL

ARCHITECURAL DETAILS.

(TYPE LSA)

BBLOCKING TO RAISE

FIXTURE MOUNTING HEIGHT

AALL DIMESIONS TO BE

VERIFIED IN THE FIELD

PRIOR TO PROCEEDING

WITH INSTALLATION.

225°

55"

66"

22" MMOUNTINIG HINGE

SSCALE J

88 0 8 16

SCALE OF FEET

SSCALE B

BID OPTION 03

LIGHTING CONTROL RISER

CONSTRUCTION

DOCUMENTS

NOT FOR

CONSTRUCTION

JGWA

DESIGNED:

TECH. REVIEW:

DATE:

YIC

RAG

04/23/21

SUB SHEET NO.

L1.1

ELLIS ISLAND MAIN IMMIGRATION BUILDING

STATUE OF LIBERTY NATIONAL MONUMENT

TITLE OF SHEET

166781

305028

DRAWING NO.

PMIS/PKG NO.

SHEET

OF

356AVAILABLE LIGHT

15 20

PPOWER

SUPPLY EELV DIMMER

NNORTH WINDOWS

LSA

EEAST WINDOWS

LSA

SSOUTH WINDOWS

LSA

WWEST WINDOWS

LSA

EELV DIMMER

EELV DIMMER

EELV DIMMER

PP1 PP1

PP1

PP1

EEC EEC

EEC

EEC

PP1

PP1

PP1

CONTROL 1CONTROL 2 CONTROL 3 CONTROL 4

TIMECLOCKKEYPAD

PRESETS

ZONE 1

ZONE 2

ZONE 3

ZONE 4

EEC

EEC

PP1

KKEY

NOTES:

SEE LIGHT FIXTURE SCHEDULE FOR COMPLETE

FIXTURE AND CONTROL EQUIPMENT PART

NUMBERS AND DESCRIPTIONS.

SEE LIGHTING LAYOUT DRAWING FOR FIXTURE

LENGTHS, PLACEMENT AND ZONING.

LINE VOLTAGE 120V

ETC CONNNECT WIRING

PP1

EEC

EEXACT LOCATION TBD

PP1

CONTROL 1

CONTROL 1

CONTROL 1

LLIGHTING CONTROL RISER11

L1.1

NO SCALE

ELLIS ISLAND WINDOWS LIGHTING CONTROL NARRATIVE

LIGHTING FIXTURES TO BE CONTROL VIA STANDALONE CONTROL

SYSTEM WITH SYSTEM CONTROL PER LIGHTING DRAWINGS.

SYSTEM TO ALLOW FOR FIXTURES TO TURN ON AND OFF AT

PREDETERMINED TIMES BASED ON TIME OF DAY.

PRESET KEYPAD TO ALLOW FOR MANUAL ON/OFF, DIMMING AND

OVERRIDES OF PRESETS.

PRESETS SCENES TO BE PROGRAMMED* TO INCLUDE:

1. DAYTIME

2. NIGHTIME

3. ALL ON

4. ALL OFF

*EXACT LIGHT LEVELS TBD IN FIELD WITH CONTRACTING

OFFICER.

FIXTURES TO TURN ON AUTOMATICALLY IN THE MORNING AND

INCORPORATE A LIGHTS OUT SWEEP AT END OF DAY.

SYSTEM SHALL CONTROL LIGHTING FIXTURES VIA ELV DIMMING

PROTOCOL PER THE LIGHTING FIXTURE SCHEDULE, RISER AND

SEQUENCE OF OPERATIONS ZONE SCHEDULE.

SYSTEM DOES NOT ALLOW FIXTURES TO BE CONTROLLED AS

PART OF EMERGENCY LIGHTING SYSTEM.

Fixture Type Purpose

Ellis Island Windows Lighting Zone Schedule by Area 100% Construction Documents

Channel Quantity Watts Each Load NotesLoad Type

• A local standalone control system will allow window lighting fixtures with local and manual overides for each zone.

• Preset Levels to be determined onsite with Contracting Officer.

Control System Notes

Windows

• See Zone Schedule Below.

Notes

Auto On via Timeclock with manual override via button station control.

Manual raise and lower via Button Station Auto Off via timeclock with manual off via button station control.

TimeclockAuto On via Timeclock with manual override via button station control.

ON

Manual raise and lower via Button Station

ADJUST

Auto Off via timeclock with manual off via button station control.

OFF

Timeclock

SENSORS, INTERFACES

1: North Windows

1 Window UplightLSA-1 12 726ELV

1 Window UplightLSA-4 48 57612ELV

2: East Windows

2 Window UplightLSA-4 48 2886ELV

2 Window UplightLSA-1 12 121ELV

3: South Windows

3 Window UplightLSA-4 48 57612ELV

3 Window UplightLSA-1 12 726ELV

4: West Windows

4 Window UplightLSA-1 12 121ELV

4 Window UplightLSA-4 48 2886ELV

1,896 WWatts Total

1. Dimming is to be ELV.

2. Occupied, unoccupied and late-night hours to be determined by Contacting Officer.

BID OPTION 03

LIGHTING FIXTURE SCHEDULE

CONSTRUCTION

DOCUMENTS

NOT FOR

CONSTRUCTION

JGWA

DESIGNED:

TECH. REVIEW:

DATE:

YIC

RAG

04/23/21

SUB SHEET NO.

L1.2

ELLIS ISLAND MAIN IMMIGRATION BUILDING

STATUE OF LIBERTY NATIONAL MONUMENT

TITLE OF SHEET

166781

305028

DRAWING NO.

PMIS/PKG NO.

SHEET

OF

356AVAILABLE LIGHT

16 20

Ellis Island Windows 100% Construction DocumentsFixture Schedule

Type Scope/Notes/LocationManufacturer Description Lamp/Details

LSA-1

Location: Window Troffs

Notes: 4, 5, 6, 7, 13, 15

Provide all necessary parts and pieces for a complete and working system.

EcoSense L50-I-12-12-30-80-MULT-25x25

Provide with:

- CBL-3P-UNV-TBD (Leader Jumper Cable)

1-5/8” Wide by 2-1/4” tall by 12” long surface-mounted linear LED cove fixture with beamspread optics, adjustable lockable aiming, and plug ‘n play connectors.

Provide fixture with leader/jumper cables as needed per fixture lengths and layouts.

12 W per fixture

Volts: 120~277V Color Temp: 3000K

CRI: 80+

Beam Spread: 25° Lumens: 923 per fixture Dim: ELV Mount: Surface Finish: Standard Rating: Interior

LSA-4

Location: Window Troffs

Notes: 4, 5, 6, 7, 13, 15

Provide all necessary parts and pieces for a complete and working system.

EcoSense L50-I-48-12-30-80-MULT-25x25

Provide with:

- CBL-3P-UNV-TBD (Leader Jumper Cable)

1-5/8” Wide by 2-1/4” tall by 48” long surface-mounted linear LED cove fixture with beamspread optics, adjustable lockable aiming, and plug ‘n play connectors.

Provide fixture with leader/jumper cables as needed per fixture lengths and layouts.

48 W per fixture

Volts: 120~277V Color Temp: 3000K

CRI: 80+

Beam Spread: 25° Lumens: 3692 per fixture Dim: ELV Mount: Surface Finish: Standard Rating: Interior

Control 1

Location: Exact location to be coordinated with GC

Notes: 6, 13ETC

ELVD-G2-TBD

Provide with:

- E4VB (4" installation box with low-voltage barrier)

Phase-Adaptive dimmer with forward or reverse phase dimming for loads up to 600 watts.

Volts: Per EE Dim: ELV

Control 2

Location: Exact location to be coordinated with GC

Notes: 1, 13ETC

E1006-TBD

Provide with:

- EACC-5 EchoAccess Interface, White

Six button station keypad with (4) Presets and On/ Off buttons. Keypad to have rear illuminated LEDs to indicate system status.

Control 3

Location: Exact location to be coordinated with GC

Notes: 1, 13ETC

E-ATC-TBD

Provide with:

- E-2-TBD (Two-gang Locking Cover)

Timeclock station with astronomical timeclock with +/- sunset and sunrise settings and programmable latitude/longitude, 24 hour real time clock with user configurable daylight saving time, four recurrence setting and 50 field programmable events.

Control 4

Location: Exact location to be coordinated with GC

Notes: 6, 13ETC

E-SPS-DIN KIT

Provide with:

- DIN8 Enclosure

Station power module for use with Echoconnect enabled station responsive controls or power controllers and din rail mount enclosure.

General Notes

Contractor shall supply and install a complete, fully functioning lighting system, including but not limited to: mounting hardware and accessories;

appropriately sized transformers; power supplies; drivers; lamps; optical accessories; and electrical appurtenances.

A

Contractor shall be responsible for final fixture counts of all lighting fixtures and accessories, as well as linear fixture run lengths, as shown on Architect's drawings.

B

Contractor shall be responsible for verifying mounting conditions with mounting locations to ensure compatibility. Contractor shall notify Contacting Officer of any conflicts with all trades prior to the ordering of the equipment. For fixtures where more than one manufacturer is specified, mounting requirements may vary.

C

Contractor shall verify compliance of all lighting equipment specified in its intended application on this project with all applicable national and local codes, ordinances, regulations and jurisdictions prior to ordering any equipment.

D

Contractor shall supply "Contractor net" unit pricing for each lighting product specified. Unit price shall be for equipment only and shall not include installation or other costs. The unit price supplied shall be guaranteed for the project and valid for additions and deletions of product throughout the duration of the project.

E

All drawings represent visual concepts and suggestions only. Available Light is not qualified to determine structural or electrical suitability and will not assume liability for improper engineering, construction or handling of design concepts.

F

The accompanying drawings and all the ideas, arrangements, designs, and plans indicated thereon or represented thereby are owned by and remain the property of Available Light and have been created and developed for use on and in connection with the specified project. Neither this drawing, nor any such ideas, arrangements, designs, or plans shall be appropriated by or disclosed to any person, firm, or corporation for any use or purpose whatsoever, except by the specific and written permission of Available Light.

G

Written dimensions on drawings shall have authority over scaled measurements. Contractor shall field verify all dimensions on the job and inform the Contacting Officer of any proposed variations from drawings prior to performing the work.

H

Do not scale electrical drawings for exact location of the lighting fixtures. Refer to Architect drawings and other lighting layouts for proper locations of lighting fixtures.

I

Contractor shall not substitute products unless approved in writing by Contacting Officer. Lighting fixture, ballast, driver, power supply, lamp, and/or accessory substitutions shall be formally presented to Contacting Officer no later than fourteen (14) working days prior to bid due date.

All proposed substitute fixtures must:

1) Be proven to meet or exceed the standards of quality, design, appearance, and performance as established by the lighting fixture specified by Available Light. See next note for list of items to be submitted for all substitutions.

Contractor shall coordinate changes due to use of approved substitutes with all trades.

J

For a fixture type where a manufacturer is named as equal, the equal shall meet aesthetic criteria of the specified fixture, including but not limited to:

dimensional criteria, finishes, including custom finishes; mounting details; and specified modifications.

Additionally, for a fixture type where a manufacturer is named as equal, the equal shall meet the minimum performance requirements as defined by specified product, including but not limited to: regulatory listings; output as measured in delivered lumens; center beam candle power (CBCP);

baseline efficacies as measured in lumens delivered per watt; cut-off angle as measured from nadir; LED binning; color rendering (CRI); color temperature (CCT); Duv per Manufacturers supporting documentation; dimming and method; five (5) year minimum warranty including LED engine and driver; L70 lumen maintenance tested according to IES LM79; and specified modifications.

K

Contractor shall provide the following items to the Contacting Officer for evaluation of proposed substitutions:

1) A current manufacturer's data sheet with luminaire catalog numbers.

2) A complete and working sample wired with cord and plug for 120V operation furnished upon request.

3) A complete photometric report for the proposed substitute fixture using the same lamp type, wattage, and distribution as per the specification. The photometric report should include TM-30 or CRI documentation with R 1-14 values, tabulated candlepower values, a coefficient of utilization table, and an ISO foot-candle diagram from an independent testing laboratory. The photometric report must reflect the fixture specified without modification to the file.

4) The specified product defines minimum performance requirements as defined by specified product including but not limited to: regulatory listings;

output as measured in delivered lumens; center beam candle power (CBCP); baseline efficacies as measured in lumens delivered per watt; cut-off angle as measured from nadir; LED binning; color rendering (CRI); color temperature (CCT); Duv per Manufacturers supporting documentation;

dimming and method; five (5) year minimum warranty including LED engine and driver; and L70 lumen maintenance tested according to IES LM79.

L

Contractor shall provide the following items to the Contacting Officer for evaluation of specified fixtures:

1) Manufacturer’s product data sheets for each luminaire indicating luminaire type, dimensions, driver/ballast/power supply/transformer quantity and type, lamp quantity and type, photometric data (including lumnen output, CRI & TM-30 data), materials, finishes, accessories, voltage, input wattage, CFM data, and photographic image of luminaire.

2) Manufacturer’s data sheet for each driver/ballast/power supply/transformer including driver/ballast/power supply/transformer type, power factor, input voltage, input watts, and ballast factor.

3) Scaled and dimensioned detail plan and elevation drawings of custom and continuous row type luminaires including joints, mounting points and type, power connection locations(s), and emergency or separate switching configurations.

4) For custom luminaires, manufacturer shall perform and submit all engineering calculations as required to ensure the safe and proper installation and operation of the luminaire.

5) Dimming Power Supply Compatibility Certificates: Signed by driver/ballast/power supply manufacturer certifying that driver/ballast/power supply is compatible with dimming systems and equipment with which they are used.

6) All submittals shall have project name and luminaire type clearly shown.

M

Project Specific Notes

Final finish of fixture shall be approved in writing by Contacting Officer.1

Not used2

Not used3

Fixture shall be aimed and focused by Contractor under the direction of the Contacting Officer.4

The Contractor shall provide all ladders and mechanical lifts (i.e scissors lifts, articulating boom arm lifts, etc.) for the exclusive use of the aim and focus effort. The number and type of lifts and/or ladders to be pre-approved by the Contacting Officer. Crew shall arrive at aim and focus equipped with appropriate aim and focus tools including wrenches, gloves, electrical testers, etc., as per industry standards for a theatrical lighting technician.

All costs associated with aiming and focusing shall be included in the bid, including but not limited to travel expenses, parking, storage, etc.

Junction boxes and/or conduit that is used to wire fixtures and that is open to view shall be painted to match adjacent structure.6

Fixture or track shall be mounted to structure in a manner recommended by the manufacturer without compromising the integrity of the structure.

Contractor shall be responsible for all materials required to insure a safe and proper pendant installation. Contractor to coordinate changes in size of fixtures or track due to use of approved substitutes with all trades. Tracks shall be mounted to prevent twisting when fixtures are aimed and focused causing an asymmetrical load.

All luminaires shall be installed in the proper positions as indicated in the construction documents. Accessories (spread lenses, color filters, screens, gobos, top hats, snoots, etc.) shall be installed under the supervision of Contacting Officer during the aim and focus period.

Remote transformers, power supplies, or drivers shall be located in nearby accessible, concealed-from-view location with manufacturer recommended ventilation available. As per manufacturer's recommendations, Contractor shall not exceed the maximum allowable distance between any luminaire and its associated remote control devices. Contractor shall supply manufacturer's transformer, power supply or driver of proper capacity.

Not used10

Not used11

Not used12

Fixture shall be furnished and installed by Contractor. Contractor shall be responsible for final electrical termination.13

Not used14

Due to rapid advances in LED technology, Contacting Officer reserves the right to change lamp or LED module specifications at the time of submittal to another lamp or LED module of equal or lesser cost.

Electronic devices that generate radio frequency energy must not interfere with other electronic devices and must not be susceptible to interference from other devices. Equipment shall not be an Electromagnetic (EM) polluter or be effected by EM pollution. All relevant equipment shall comply with current EMC standards.

N

Unless otherwise specified all downlights (recessed, wallwasher, and adjustable) shall be supplied by the same manufacturer, and all linear fixtures (recessed, pendant, and surface mounted) shall be supplied by the same manufacturer.

O

Unless otherwise specified, all retrofit LED lamps shall be manufactured by LEDvance (Osram-Sylvania), Philips, GE, Soraa, or Green Creative. All lamps of a given type shall be supplied by the same manufacturer.

P

Unless otherwise specified, all LED drivers shall be manufactured by one of the following: Advance (Philips), LEDvance (Osram Sylavnia), Hatch, EldoLED, or Lutron.

Q

All fixtures shall be supplied with specified lamp(s). Contractor shall provide an additional 10% replacement lamps (minimum two of each lamp type specified). For fixtures that use replaceable LED modules and drivers rather than lamps, Contractor shall provide an additional 5% (minimum one) of each driver and module type.

R

Fixture construction and installation shall ensure no light leaks between ceiling trims of recessed lighting equipment and the ceiling plane. For applications in perforated or partially transparent ceilings, fixture construction shall also ensure no light leaks above the ceiling line.

S

Reflectors, reflector cones, and visible trim of all lighting fixtures shall not be installed until completion of plastering, ceiling tile work, painting, and general cleanup. Reflectors, reflector cones, and visible trim shall be carefully handled to avoid scratching or fingerprinting.

T

At the time of acceptance by the Contacting Officer, all lighting fixtures shall have been thoroughly cleaned with materials and methods recommended by the manufacturers, all broken parts shall have been replaced, and all lamps and/or LED modules shall be operative.

U

Fixtures may produce light past their rated life, however, lamps/ballasts/drivers/components must be replaced at or before rated end-of-life for the luminaire to meet minimum photometric performance standards. Neither the Architect nor Available Light shall be held responsible or liable for improper service and maintenance of lighting systems.

V

Not usedW

Contractor shall supply all low-voltage control data lines and wiring in order to properly network and dim fixtures together per control intent documentation and manufacturer’s documentation. Data runs must be properly terminated.

X

A-SHEETS
Sheets and Views
T1.0-COVER SHEET-Layout1
map
T1.1-GENERAL NOTES-Layout1
map
C1.0-SITE PLAN-Layout1
map
A1.0-CLERESTORY PLAN-Layout1
map
A2.0-EXT ELEVATIONS-Layout1
map
A2.1-EXT ELEVATIONS-Layout1
map
A3.0-SECTION-Layout1
map
A4.0-WINDOW DETAILS-Layout1
map
A4.1-WINDOW DETAILS-Layout1
map
A4.2-WINDOW DETAILS-Layout1
map
A4.3-WINDOW DETAILS-Layout1
map
A4.4-WINDOW DETAILS-Layout1
map
A4.5-WINDOW DETAILS-Layout1
map
L-SHEETS-flattened
STLI Windows H-Sheets
Sheets and Views
H1.0 ACM KEY PLAN-H1.0
map
H2.1 LBP DETAILS-H2.1
map
H1.1 LBP KEY PLAN-H1.1
map
H2.0 ACM DETAILS-H2.0
map
2022-06-01T09:18:28-0600
CHRISTINA WATSON

File details come from the government source that posted it. Updated .