140P2022R0036_Att02a-STLI_312431-Drawings-Final_220601.pdf
PDF 27 MB Posted
- Solicitation number
- 140P2022R0036
About this file
This document provides details for a federal contract solicitation to rehabilitate exterior systems of the Main Immigration Building at the Statue of Liberty National Monument and Ellis Island in New York. The solicitation number is 140P2022R0036 issued by the National Park Service, National Office within the Department of the Interior. Offerors are invited to submit proposals to rehabilitate exterior systems like walls, windows, and roofing. The solicitation includes drawings as an attachment to outline the scope of work. Proposals are due by June 1, 2022, and the contract is to be awarded by September 2022 to be completed within one year.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TUNNEL
78 JERSEY CITY,
NEW JERSEY
HUDSON RIVER
ELLIS
ISLAND
LIBERTY
ISLAND
FERRY
FERRY
FERRY
STATEN ISLAND MANHATTAN FERRY
GOVERNOR'S ISLAND
MANHATTAN
UPPER NEW YORK BAY
EAST RIVER
BROOKLYN
TU
NN
EL
NEW YORK & NEW JERSEY 2,00002,000
SCALE OF FEET
ACCESS
BRIDGE
NEW IMMIGRATION
BUILDING
NEW FERRY
BUILDNG BAKERY AND
CARPENTRY
COOLING TOWER
FUEL PUMPS
BURIED FUEL TANK
FU
EL
D
OC
K
STORAGE
WATER
TANK
MAIN POWERHOUSE
KITCHEN AND
LAUNDRY
BAGGAGE AND
DORMITORY
MAIN
IMMIGRATION
BUILDING
CANOPY
RAILROAD
OFFICE
(INCLUDED IN
SCOPE)
WALL OF HONOR
FLAGPOLE
SERVICE BRIDGE FROM LIBERTY
STATE PARK, NEW JERSEY; ACCESS
TO BE COORDINATED WITH
CONTRACTING OFFICER
NEW YORK HARBOR
RECREATION HALL
LAUNDRY
PSYCHIATRIC
WARD
RECREATION
SHELTER
HOSPITAL 1
ADMINISTRATION
BUILDING
ADMINISTRATION
BUILDING
HOSPITAL 2
WARD
WARD
WARD
WARD
WARD
WARD
WARD
STAFF
HOUSE
KITCHEN
WARD
WARD
WARD
WARD
POWERHOUSE
NEW YORK HARBOR
FE
RR
Y
SL
IP
S
LEGEND
VEHICULAR ACCESS ROUTE
NATIONAL MONUMENT
BOUNDARY
PARKINGANIMAL
HOUSE
QUARTERS/
LABORATORY
(OVERFLOW)
PROJECT SITE
COORDINATE THE WORK
OF THIS CONTRACT
WITH CONCURRENT
PROJECT BY OTHERS TO
RESTORE EXISTING
ELLIS ISLAND SEAWALL
AND PARK MIB LIFE
SAFETY PROJECT
VEHICLE ROUTE TO
PROJECT SITE FROM
ACCESS BRIDGE
ELLIS ISLAND
GATE
FIRE HYDRANT; MAINTAIN
CLEAR ACCESS
STAGING AREA;
MAINTAIN 4'-0" BUFFER
ON ALL SIDES FOR
PEDESTRIAN ACCESS;
REMAIN OFF OF
PLANTING AREA
LAYDOWN AREA; MAINTAIN 5'-0"
BUFFER ON ALL SIDES BETWEEN
LAYDOWN AND SIDEWALK
EXG TO REMAIN
CHAIN LINK FENCE
EXG GATE AND
FENCE TO REMAIN
MAINTAIN EXG
DOOR ACCESS
CONTRACTOR MAY
ACCESS THIS AREA;
EXTERIOR STAIR IS
OFF-LIMITS
SITE ACCESS NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR VANPOOLING WORKERS TO ELLIS ISLAND. GENERAL
ACCESS TO AND EGRESS FROM THE PROJECT WILL BE FROM THE ELLIS ISLAND SERVICE BRIDGE IN
COORDINATION WITH CONTRACTING OFFICER AND UNITED STATES PARK POLICE.
2. DELIVERIES ARE TO BE SCHEDULED IN ADVANCE WITH THE CONTRACTING OFFICER. CONTRACTOR
SHALL COMPLY WITH WEIGHT AND HAULING RESTRICTIONS ON PARK ROADS AND ELLIS ISLAND
SERVICE BRIDGE.
3. THE CONTRACTOR WILL BE ALLOWED LIMITED VEHICLE ACCESS BEHIND THE BAGGAGE &
DORMITORY BUILDING. NO VEHICLE ACCESS IS ALLOWED ON LANDSCAPED AREAS UNLESS OTHERWISE
SPECIFICALLY PERMITTED FOR STAGING PURPOSES.
4. CONTRACTOR IS ONLY ALLOWED TO ACCESS DESIGNATED AREAS. ACCESS TO THE SOUTH END OF
ELLIS ISLAND IS NOT PERMITTED UNLESS CONTRACT REQUIRES ENTRY AND PERMISSIONS IS
AUTHORIZED BY THE CONTRACTING OFFICER.
5. CONTRACTOR SHALL HAVE LIMITED USE OF THE EXISTING STAIR TOWERS FOR ACCESS TO THE ROOF AND REGISTRY ROOM. ACCESS ROUTES WITHIN THE MAIN IMMIGRATION BUILDING WILL BE ESTABLISHED WITH THE CONTRACTING OFFICER AND PARK STAFF FOLLOWING SUBMISSION OF THE CONTRACTOR'S WORK PLAN. CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT OR DEBRIS WITHIN
STAIR TOWER CAUSED BY CONSTRUCTION ACTIVITY.
6. THE BUILDING WILL BE OCCUPIED THROUGHOUT THE DURATION OF THE CONTRACT AND MUST REMAIN SAFE AND ACCESSIBLE THROUGHOUT THE PERIOD. ALL ENTRANCE DOORS SHALL REMAIN OPERABLE AT ALL TIMES UNLESS OTHERWISE NOTED. ALL EGRESS DOORS AND EGRESS PATHWAYS
SHALL REMAIN CLEAR AT ALL TIMES.
7. OVERHEAD PROTECTION AT PERIMETER OF BUILDING TO BE PROVIDED FOR THE PUBLIC AND PARK
STAFF TO ACCOMMODATE CONSTRUCTION. CONTRACTOR TO COORDINATE INSTALLATION OF
TEMPORARY PROTECTIONS AND CATCHEMENT SYSTEMS WITH THE CONTRACTING OFFICER.
DRAWINGS AND WORK PLAN TO BE REVIEWED BY THE PARK FOR MAINTAINING OPERATIONS AND
PROTECTING HISTORIC FABRIC AND CULTURAL RESOURCES.
OF
TITLE OF DRAWING DRAWING NO.
PKG
NO. SHEET
176547
CONSTRUCTION DRAWINGS
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
LOCATION WITHIN PARK
NAME OF PARK
STATUE OF LIBERTY NATIONAL MONUMENT
ELLIS ISLAND
REGION COUNTY STATE
N. ATLANTIC KINGS NEW YORK
312431
A/E FIRMS
ARCH: STRUCTURAL: SKYLIGHTS:
BEYER BLINDER
BELLE
NEW YORK, NY
SILMAN
NEW YORK, NY
WJE ENGINEERS &
ARCHITECTS
NEW YORK, NY
PRIME/LANDSCAPE:
DHM DESIGN
NEW YORK, NY
Mark Sheet REVISION Date Initial QUALITY DESIGN CERTIFICATION Prepared in Accordance with Design Development (Title I)
OR
Variance from Design Development (Title I) Approved by Superintendent on
OR
Construction Drawing Not Preceded by Design Development (Title I)
Project Manager Date
Drawing No.
Date
MAIN IMMIGRATION BUILDING
HAZMAT:
MABBET
NEW YORK, NY
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t 5/1
9/2
2 9 :37
:43 A
M
SCALE OF FEET
50 10050
010 10 20 30
SCALE OF METERS
CHRISTINA WATSON Digitally signed by CHRISTINA WATSON Date: 2022.06.01 09:21:59 -06'00'
GENERAL NOTES:
1. THIS PROPERTY HAS BEEN DETERMINED TO POSSESS HISTORIC (E.G., ARCHITECTURAL, ENGINEERING, ARTISTIC) SIGNIFICANCE AND IS LISTED IN THE NATIONAL REGISTER OF HISTORIC PLACES (NRHP REF #66000058).
THE ENTIRETY OF ELLIS ISLAND IS A HISTORIC DISTRICT AND MOST OF THE SURROUNDING BUILDINGS ARE CONTRIBUTING. THE CONTRACTOR SHALL RECOGNIZE THAT ALL ASPECTS OF THE PROPERTY MAY POTENTIALLY CONTRIBUTE TO THE SIGNIFICANCE AND THE CONTRACTOR SHALL NOT JUDGE THE RELATIVE SIGNIFICANCE OF ANY FEATURES NOR THE IMPACT OF ANY OF THE PROPOSED WORK; THIS RESPONSIBILITY SHALL REST SOLELY WITH THE CONTRACTING OFFICER. CONSEQUENTLY, NO DEVIATIONS FROM THE CONTRACT DOCUMENTS SHALL BE PERFORMED AND NO FEATURES OR MATERIALS SHALL BE ALTERED, REMOVED, REUSED, OR TAKEN FROM THE PREMISES, WITHOUT THE WRITTEN APPROVAL OF THE CONTRACTING OFFICER AS BEING CONSISTENT WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. ALL WORK SHALL BE CONSISTENT WITH THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES.
2. DIMENSIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE. THE DRAWINGS GENERALLY REFLECT EXISTING CONDITIONS AND DO NOT REPRESENT A COMPLETE AND COMPREHENSIVE SURVEY OF THE EXISTING CONDITIONS. SCALING THE DRAWINGS MAY RESULT IN DISCREPANCIES. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE DIMENSIONS IN THE FIELD BEFORE PROCEEDING. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF ANY INCONSISTENCY BETWEEN THE CONDITIONS FOUND AND THOSE SHOWN ON DRAWINGS.
3. THE SCOPE OF THE WORK IS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACT DOCUMENTS INCLUDE THE CONSTRUCTION DRAWINGS AND THE SPECIFICATIONS. REFERENCE TO BOTH IS REQUIRED.
4. EXECUTION OF THE WORK SHALL BE THE RESPONSIBILITY OF THE PRIME CONTRACTOR AND SHALL BE COORDINATED WITH NPS CONTRACTING OFFICER.
5. THE WORK OF ALL TRADES SHALL CONFORM TO CURRENT APPLICABLE FEDERAL, STATE, AND LOCAL CODES & REQUIREMENTS.
6. THE CONTRACTOR SHALL PROTECT THE STRUCTURE AND THE SITE AGAINST DAMAGE RELATING TO THE WORK, AND SHALL BE RESPONSIBLE FOR REPAIRING AND REFINISHING ANY DAMAGE RELATING TO THE WORK TO
THE SATISFACTION OF AND AT NO COST TO NPS.
7. THE CONTRACTOR SHALL USE ALL NECESSARY PHYSICAL MEANS REQUIRED TO RESTRICT ACCESS AND PROTECT ALL PERSONS IN AND AROUND WORK AREAS. SAFETY DEVICES SHALL BE USED IN CONFORMANCE WITH CURRENT APPLICABLE FEDERAL, STATE, AND LOCAL BUILDING CODES AND ORDINANCES IN FORCE.
8. THE CONTRACTOR SHALL PROVIDE AND EMPLOY TEMPORARY ENCLOSURES AND OTHER SUITABLE AND STABLE METHODS TO LIMIT THE TRAVEL OF DUST, DIRT, AND WATER BEYOND THE REQUIRED WORK AREAS. THE CONTRACTOR SHALL PROTECT ALL OPENINGS, VENTS, AIR INTAKES, AND MISCELLANEOUS EQUIPMENT FROM CONSTRUCTION RELATED DUST, DIRT AND WATER. THE CONTRACTOR SHALL COMPLY WITH ALL CURRENT
REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.
9. DETAILS AND REPAIR METHODS SHOWN IN THE CONTRACT DOCUMENTS ARE INTENDED TO ESTABLISH THE CHARACTER OF THE WORK TO BE COMPLETED. THE CONTRACTOR MAY PROPOSE OTHER DETAILS AND REPAIR METHODS TO THE CONTRACTING OFFICER FOR CONSIDERATION BEFORE PROCEEDING WITH THE SPECIFIC WORK ITEM OR RELATED REPAIR ITEM. ANY SUBMITTED DETAILS SHALL CONFORM TO THE INTENT OF THE CONTRACT DOCUMENTS. THE CONTRACTOR IS NOT TO PROCEED WITH ANY ALTERNATIVE REPAIR METHODS WITHOUT WRITTEN APPROVAL OF THE CONTRACTING OFFICER.
10. ALL MASONRY REPAIRS TO THE STRUCTURE SHALL BE EXECUTED IN A GOOD WORKMANSHIP MANNER TO PRODUCE A WATERTIGHT FINISH JOINT AND FINISH SURFACE AND IN A MANNER AS TO SHED WATER AWAY FROM
THE BUILDING ELEMENT OR BUILDING FACE.
11. ALL LOOSE FURNITURE AND EQUIPMENT SHALL BE REMOVED WHETHER OR NOT THEY ARE SHOWN ON THE PLANS. VERIFICATION OF EXISTING CONDITIONS, I.E. FURNITURE, EXHAUST FANS, ETC. CAN BE ASCERTAINED VIA THE PRE-BID WALKTHROUGH. FAILURE TO PERFORM A SITE VISIT PRIOR TO BID DOES NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF REMOVING ALL EXISTING EQUIPMENT AND FURNITURE AS NOTED.
SYMBOLS
SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC SYMBOLS
Sheet No.
Sequence
Discipline
WINDOW TAG
NORTH
ARROW
CENTER LINE
DETAIL
SPOT
ELEVATION
MARKERS
EXTERIOR
ELEVATION
SECTION
SHEET No.
A3.1
A2.1
A1
DETAIL
SHEET
DETAIL
SHEET
DETAIL
REFERRING
SHEET
XX.XX
A2
DETAIL
SHEET
ABBREVIATIONS
SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC ABBREVIATIONS
APPROX APPROXIMATELY
AVG. AVERAGE
B.O. BOTTOM OF
CO CONTRACTING OFFICER
CONC CONCRETE
CONT CONTINUOUS
DEMO DEMOLITION
DN DOWN
DR DRAIN
DWGS DRAWINGS
ELEC ELECTRICAL
ELEV ELEVATION
EOR ENGINEER OF RECORD
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EXG EXISTING
HORIZ HORIZONTAL
INCL INCLUDE(D)/INCLUDING
INSUL INSULATE/INSULATION
JT JOINT
MECH MECHANICAL
MIB MAIN IMMIGRATION BUILDING
MIN MINIMUM
MISC MISCELLANEOUS
MNFR MANUFACTURER
MTD MOUNTED
MTL METAL
DOOR TAGD.XX
PTD PAINTED
PLUMB PLUMBING
PLY PLYWOOD
REQ REQUIRED
RR RAILROAD
SEQ SEQUENCE
STR, STRUCT STRUCTURAL
SUG SUGGESTED
THRU THROUGH
TOS TOP OF STEEL
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
VERT VERTICAL
W/ WITH
WD WOOD
W/O WITHOUT
1. CONFORM TO IBC 2021 (INTERNATIONAL BUILDING CODE). USE NFPA 101 LIFE SAFETY CODE WHEN IBC IS SILENT.
2. CONFORM TO IEBC 2021 (INTERNATIONAL EXISTING BUILDING CODE).
3. CONFORM TO ABAAS (ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS).
APPLICABLE CODES
SUMMARY OF WORK
THE SCOPE OF WORK IS LIMITED TO THE RESTORATION OF MASONRY FACADES, WINDOWS AND DOORS, REPLACEMENT OF SKYLIGHTS, REPAIRS TO THE UPPER ROOF, AND UNDERLYING STRUCTURAL ISSUES THAT NEED
TO BE ADDRESSED TO RESTORE THESE ELEMENTS.
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:37 :49
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
DRAWING LISTAP
CR, JG
05/20/22
BBB
T1.1
5 A1.0 ROOF PLAN
6 A1.2 UPPER ROOF PLAN
7 A2.0 FACADE RESTORATION SOUTH ELEVATION WEST
8 A2.1 FACADE RESTORATION SOUTH ELEVATION EAST
9 A2.2 FACADE RESTORATION EAST ELEVATION
10 A2.3 FACADE RESTORATION NORTH ELEVATION EAST
11 A2.4 FACADE RESTORATION NORTH ELEVATION WEST
12 A2.5 FACADE RESTORATION WEST ELEVATION
13 A2.6 FACADE RESTORATION NORTH CLERESTORY ELEVATIONS
14 A2.7 FACADE RESTORATION SOUTH CLERESTORY ELEVATIONS
15 A2.8 FACADE RESTORATION PARTIAL TOWER ELEVATIONS
16 A3.0 SECTION THROUGH CLERESTORY
17 A3.1 SECTIONS THROUGH SKYLIGHTS BID OPTIONS 1-6
18 A4.0 WINDOW & DOOR KEY SOUTH ELEVATION
19 A4.1 WINDOW & DOOR KEY EAST & WEST ELEVATIONS
20 A4.2 WINDOW & DOOR KEY NORTH ELEVATION
21 A4.3 WINDOW TYPES
22 A4.4 WINDOW & DOOR TYPES
23 A4.5 WINDOW SCHEDULE
24 A4.6 WINDOW DETAILS FOR REPLACEMENT WINDOW
25 A4.7 TYPICAL WINDOW REPLACEMENT PROFILES
26 A4.8 DOOR SCHEDULE & PROFILE REPLACEMENTS
27 A5.0 MASONRY REPAIR DETAILS
28 A5.1 MASONRY REPAIR DETAILS
29 A5.2 ROOF DETAILS - ENLARGED PLANS & SECTIONS
30 A5.3 ROOF DETAILS - TILE
31 A5.4 ROOF DETAILS - FLASHINGS
32 A5.5 ROOF DETAILS - SHEETMETAL
SHEET SUB-SHEET TITLE OF SHEET
1 T1.0 COVER SHEET
2 T1.1 DRAWING LIST
3 C1.0 SITE PLAN
4 D1.0 ROOF DEMOLITION PLAN
48 S1.1 ROOF PLAN
49 S1.2 UPPER ROOF PLAN
50 S1.3 PLANS - LOW ROOFS
51 S2.1 NORTH CLERESTORY
52 S2.2 EAST CLERESTORY
53 S2.3 SOUTH CLERESTORY
54 S2.4 WEST CLERESTORY
55 S4.1 SECTIONS
56 S4.2 SECTIONS
57 S4.3 PURLIN REPAIR DETAILS
58 S5.1 TYPICAL DETAILS
59 S5.2 TYPICAL DETAILS
60 S5.3 SKYLIGHT CURB DETAILS
33 W0 SCOPE OF WORK & GENERAL NOTES
34 W1 OVERALL ROOF PLAN
35 W2 SECTIONS THROUGH ATRIUM AND TYPICAL LIBRARY SKYLIGHTS
36 W3 ENLARGED ATRIUM SKYLIGHT PLANS
37 W4 ENLARGED ORAL HISTORY LISTENING ROOM, READING ROOM & CIRCULATION SKYLIGHT PLANS
38 W5 EXISTING TO BE REMOVED AND NEW CROSS-SECTION SKYLIGHT DETAILS
39 W6 EXISTING (REMOVALS) ATRIUM SKYLIGHT DETAILS (OPTIONS 1/1A)
40 W7 EXISTING (REMOVALS) LIBRARY SKYLIGHT DETAILS (OTIONS 2/2A)
41 W8 NEW ATRIUM SKYLIGHT DETAILS (OPTIONS 1/1A)
42 W9 NEW ATRIUM SKYLIGHT DETAILS (OPTIONS 1/1A)
43 W10 NEW ORAL HISTORY LISTENING ROOM/READING ROOM SKYLIGHT DETAILS (OPTIONS 2/2A)
44 W11 EXISTING (REMOVALS) AND NEW CIRCULATION SKYLIGHT DETAILS (OPTIONS 3/3A)
45 W12 SKYLIGHT APEX PLANS AND FRAMING PLANS
46 W13 MISCELLANEOUS DETAILS
47 W14 CURB FLASHING DETAILS (BID OPTIONS 1-3A)
61 ABT1.0 ASBESTOS ABATEMENT PLAN
SHEET SUB-SHEET TITLE OF SHEET
1 T1.0 COVER SHEET
2 T1.1 DRAWING INDEX & GENERAL NOTES
3 C1.0 SITE PLAN
4 A1.0 CLERESTORY PLAN
5 A2.0 EXTERIOR CLERESTORY ELEVATIONS NORTH AND SOUTH
6 A2.1 EXTERIOR CLERESTORY ELEVATIONS EAST AND WEST
7 A3.0 SECTION THROUGH REGISTRY ROOM
8 A4.0 WINDOW TYPES & SCHEDULE
9 A4.1 WINDOW SASH DETAILS
10 A4.2 WINDOW TYPE A DETAILS
11 A4.3 WINDOW TYPE B DETAILS
12 A4.4 WINDOW HARDWARE DETAILS
13 A4.5 STORM WINDOW DETAILS
14 L1.0 LIGHTING LAYOUT
15 L1.1 LIGHTING CONTROL RISER
16 L1.2 LIGHTING FIXTURE SCHEDULE
17 H1.0 ASBESTOS-CONTAINING MATERIAL LOCATIONS KEY PLAN
18 H1.1 LEAD-BASED PAINT LOCATIONS KEY PLAN
19 H2.0 ASBESTOS-CONTAINING MATERIAL LOCATIONS WINDOW DETAILS
20 H2.1 LEAD-BASED PAINT LOCATIONS WINDOW DETAILS
ENTRANCE CANOPY
RAILROAD TICKET
OFFICE
BAGGAGE AND
DORMITORY BUILDING
KTICHEN AND LAUNDRY BUILDING
AMERICAN IMMIGRANT WALL OF HONOR
AMERICAN IMMIGRANT WALL OF HONOR AND FORT GIBSON SITE
OUTDOOR CAFE
FE
RR
Y
SL
IP
T
O
MA
NH
AT
TA
N
AN
D
LIB
ER
TY
IS
LA
ND
EXISTING GATE
CONTRACTOR VEHICLE
ACCESS ROUTE
TO ELLIS ISLAND
BRIDGE; SEE
COVER SHEET FOR
VEHICLE ROUTE
PUBLIC STAIR AND
ACCESS RAMP
MA
IN
P
UB
LIC
EN
TR
AN
CE
DOOR INTO BAGGAGE &
DORMITORY BUILDING TO
REMAIN CLEAR AT ALL TIMES
EXISTING CHAIN
LINK FENCE
METAL GATE & FENCE
CONNECTING COVERED
WALKWAY BETWEEN
BUILDINGS
STAGING AREA; MAINTAIN 4'-0"
BUFFER ON ALL SIDES FOR
PEDESTRIAN ACCESS; REMAIN
OFF OF PLANTING AREA
LEAVE PEDESTRIAN ACCESS
BETWEEN MIB AND KITCHEN
& LAUNDRY BUILDING CLEAR
AT ALL TIMES
CONTRACTOR MAY USE THIS
COURTYARD FOR STAGING - USE
OF EXTERIOR STAIR IS
PROHIBITED
LEGEND
LANDSCAPED AREA WITH
LAWN IRRIGATION SYSTEMS
MAIN IMMIGRATION
BUILDING
WATER
PUBLIC ENTRANCE/EXIT
CONTRACTOR VEHICLE
ACCESS ROUTE
PUBLIC PEDESTRIAN
PATHWAYSTAGING AREA
SITE NOTES:
1. SITE ACCESS: PROJECT SITE IS LOCATED ON ELLIS ISLAND WITHIN A SIGNIFICANT
AREA OF PEDESTRIAN TRAFFIC. GENERAL ACCESS TO AND EGRESS FROM THE
PROJECT WILL BE FROM THE ELLIS ISLAND SERVICE BRIDGE USING THE ACCESS
ROUTE INDICATED ON COVER SHEET. CONTRACTOR WILL BE ALLOWED LIMITED
VEHICLE ACCESS BEHIND THE BAGGAGE AND DORMITORY BUILDING. NO ACCESS
BY VEHICLES, CONSTRUCTION VEHICLES AND EQUIPMENT IS ALLOWED ON
LANDSCAPED AREAS.
2. PARKING: CONTRACTOR SHALL HAVE LIMITED PARKING AVAILABLE WHERE
AUTHORIZED BY PARK; PARKING NOT ALLOWED ON SITE OR ON LANDSCAPED
AREAS.
3. LIMITS OF WORK: REFER TO SHEETS A1.0 THROUGH A5.5 FOR PROJECT AREA
LIMITS WITHIN THE MAIN IMMIGRATION BUILDING.
4. THE STAGING AREAS WILL ACCOMMODATE MATERIALS STORAGE, DUMPSTERS,
AND SANITARY FACILITIES. THE EXACT CONFIGURATION AND LOCATION OF THE
STAGING AREA WILL BE ESTABLISHED WITH THE CONTRACTING OFFICER AND PARK
STAFF FOLLOWING SUBMISSION OF THE CONTRACTOR'S WORK PLAN. NO
MATERIALS MAY BE STORED ON OR INSIDE THE BUILDING, OR ON THE SITE OUTSIDE
THE LIMITS OF WORK.
5. A WORKPLAN WITH APPROPRIATE PROTECTIONS MUST BE SUBMITTED TO THE
CONTRACTING OFFICER FOR APPROVAL FOR ACCESS AND STAGING ON ANY ROOF,
AND FOR ANY WORK ON FACADES IN THE VICINITY OF ENTRANCES.
6. ELECTRICAL POWER FOR THE PROJECT SHALL BE PROVIDED FROM THE EXISTING
PANELS SERVING THE BUILDING ON THE INTERIOR OF THE SECOND FLOOR.
CONTRACTOR SHALL BE RESPONSIBLE FOR CODE COMPLIANT CONNECTION AND
SHALL PROVIDE DETAILED CONNECTION DRAWINGS SIGNED BY A NEW YORK STATE
LICENSED ELECTRICIAN FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK.
7. POTABLE WATER FOR CONSTRUCTION SHALL BE PROVIDED FROM THE EXISTING
WATER SERVICE SERVING THE BUILDING AT THE EXTERIOR OF THE GROUND LEVEL.
CONTRACTOR SHALL BE RESPONSIBLE FOR CODE COMPLIANT CONNECTION AND
SHALL PROVIDE DETAILED CONNECTION DRAWINGS FOR APPROVAL PRIOR TO
COMMENCEMENT OF WORK.
8. EMERGENCY FIRST RESPONDERS AND NPS WILL HAVE EMERGENCY ACCESS TO
THE BUILDING AT ALL TIMES.
9. SITE RESTORATION: CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY
DAMAGES TO LANDSCAPED AREAS, IRRIGATION SYSTEMS AND SITE FEATURES
INCURRED BY CONSTRUCTION ACTIVITIES.
10. CONTRACTOR TO PROVIDE WORK PLAN FOR ALL AREAS FOR APPROVAL FROM
CONTRACTING OFFICER PRIOR TO COMMENCEMENT OF WORK.
11. CONTRACTOR TO COORDINATE ALL GATE USE/ACCESS WITH NPS PARK STAFF.
12. NO CONTRACTOR USE OF ELEVATORS AT ANY TIME.
13. KEEP ALL DESIGNATED FIRE ROUTES FREE AND CLEAR AT ALL TIMES.
14. SUPPORT AND SCAFFOLD IS NOT PERMITTED IN THE GUTTERS OF THE TOWERS.
SCAFFOLD IS NOT PERMITTED TO BE ATTACHED TO THE BUILDING. ANY SCAFFOLD
INSTALLED MUST HAVE ANTI-CLIMB PROTECTION.
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:37 :37
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
SITE PLANAP
CR, JG
05/20/22
BBB
C1.0
32 0 32 64
SCALE OF FEET
BID OPTION 2 & 2A:
REMOVE EXG LIBRARY
SKYLIGHT & FRAMING.
PROVIDE TEMPORARY
ENCLOSURE AT
SKYLIGHT OPENING.
BID OPTION 2 & 2A:
REMOVE EXG LIBRARY
SKYLIGHT & FRAMING.
PROVIDE TEMPORARY
ENCLOSURE AT
SKYLIGHT OPENING.
BID OPTION 1 & 1A: REMOVE
EXG ATRIUM SKYLIGHT &
FRAMING. PROVIDE
TEMPORARY ENCLOSURE AT
SKYLIGHT OPENING.
REFER TO DWG A1.0 FOR EXTENT OF
REMOVALS AT UPPER ROOF
EXG LOW BITUMINOUS
MEMBRANE ROOF TO REMAIN
EXG LOW BITUMINOUS MEMBRANE ROOF TO REMAIN
EXG RR TICKET OFFICE ROOF TO REMAIN
BID OPTION 3 & 3A:
REMOVE EXG
CIRCULATION
SKYLIGHT & FRAMING.
PROVIDE TEMPORARY
ENCLOSURE AT
SKYLIGHT OPENING.
LAYDOWN IS PERMITTED WITHIN DELINEATED AREA.
AREA APPROXIMATELY CORRESPONDS TO LIMIT OF
OUTER RANGE OF CONCRETE PAVERS, EXCEPT AT
WEST WHERE WORK AREA EXTENDS BEYOND PAVERS
TO PARAPET. REFER TO STRUCTURAL ROOF PLAN
FOR ALLOWABLE LOADING CAPACITY AT ROOFS.
CONTRACTOR TO PROVIDE A DETAILED PLAN FOR ALL
ROOF ACCESS AND PROTECTION FOR APPROVAL BY
CONTRACTING OFFICER PRIOR TO COMMENCEMENT
OF WORK. PLAN MUST INCLUDE DRAWINGS TO
CONFIRM THAT PROPOSED LOADS CAN BE
SUPPORTED BY THE EXISITNG ROOF STRUCTURE AND
BE STAMPED BY A STRUCTURAL ENGINEER.
DN DN
METAL
ROOFING TO
REMAIN
EXG LOW BITUMINOUS MEMBRANE ROOF TO REMAIN
EXG LOW
BITUMINOUS
MEMBRANE ROOF
TO REMAIN
EXG RR TICKET
OFFICE VESTIBULE
ROOF TO REMAIN
PROTECT EXISTING TO
REMAIN DOWNSPOUTS,
SEE 2/D1.0
PROTECT EXISTING TO
REMAIN DOWNSPOUTS,
SEE 2/D1.0
GENERAL DEMOLITION NOTES
1.ALL EXISTING SURFACES AND EQUIPMENT TO REMAIN
SHALL BE FULLY PROTECTED FROM DAMAGE DURING
CONSTRUCTION. CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR DAMAGE AND SHALL MAKE REPAIRS
REQUIRED WITHOUT ADDITIONAL COST TO THE OWNER.
2.NO DEBRIS SHALL BE ALLOWED TO ACCUMULATE ON THE
ROOF OR SITE. THE CONTRACTOR SHALL REMOVE DEBRIS AS
THE JOB PROCEEDS. THE ROOF AND SITE SHALL BE LEFT
BROOM CLEANED AT THE COMPLETION OF DEMOLITION.
3.NO STRUCTURAL ELEMENTS SHALL BE REMOVED UNLESS
PORTIONS AFFECTED ARE ADEQUATELY SUPPORTED BY
EITHER TEMPORARILY SHORING OR NEW STRUCTURAL
ELEMENTS AS REQUIRED TO PROTECT THE STABILITY AND
INTEGRITY OF THE EXISTING STRUCTURE. ALL STRUCTURAL
REMOVALS TO BE COORDINATED WITH STRUCTURAL
DRAWINGS.
4.SPRINKLER PIPES ARE SUPPORTED FROM SKYLIGHTS TO BE
REMOVED. CONTRACTOR TO REVIEW ALL EXISTING SYTEMS
ATTACHED TO OR ADJACENT TO SKYLIGHT REMOVAL.
TEMPORARILY SUPPORT SPRINKLER LINES DURING
CONSTRUCTION AND PROVIDE PERMANENT SUPPORT AFTER
INSTALLATION OF NEW SKYLIGHTS.
5. CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN ALL
TEMPORARY BARRIERS AND GUARDS AND ALL TEMPORARY
SHORING, BRACING, AND TEMPORARY HEAT AS REQUIRED BY
OSHA.
6.CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER
PROTECTION FOR THE BUILDING AND ITS CONTENTS DURING
THE COURSE OF CONSTRUCTION. ALL OPENINGS IN ANY WALL
OR ROOF SHALL BE PROTECTED FROM ALL FORMS OF
WATER PENETRATION.
7.AT AREAS OF REMOVAL DIRECTLY ADJACENT TO WORK NIC,
CAREFULLY DISMANTLE MATERIALS SO AS NOT TO DAMAGE
ADJACENT MATERIALS TO REMAIN.
8.REFER TO HAZARDOUS MATERIALS SURVEY REPORTS -
CONTRACTOR RESPONSIBLE FOR ALL ABATEMENT REQUIRED
TO COMPLETE WORK.
9. COORDINATE ALL RELATED SPRINKLER, FIRE ALARM, AND
MEP WORK WITH THE CONTRACTING OFFICER AND THE PARK.
WORK MUST BE APPROVED BY CONTRACTING OFFICER PRIOR
TO COMMENCEMENT OF WORK.
10. PROTECT ALL RAIN LEADERS AND ROOF DRAINS
THROUGHOUT CONSTRUCTION.
PROTECT EXG
DOWNSPOUTS TO
REMAIN
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:37 :41
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
ROOF DEMOLITION PLANAP
CR, JG
05/20/22
Designer
D1.0
16 0 16 32
SCALE OF FEET
NTSD1.0
2 TYP ROOF DOWNSPOUTS
A1.2
A1.0
ACCESS TO EAST ELEVATION;
AREA INACCESIBLE FROM
NORTH ELEVATION
ACCESS TO WEST ELEVATION;
AREA INACCESSIBLE FROM
NORTH ELEVATION
A2.7
A2.6
A2.8A2.8
A2.2A2.5
A2.3
A2.7
A2.8 A2.8
A2.5
A2.4
A2.1
A3.0A1.0
A3.0A1.0
BID OPTION 1 & 1A:
ATRIUM SKYLIGHT; SEE
W-SERIES DWGS FOR
SKYLIGHT SCOPE
BID OPTION 2 & 2A:
LIBRARY SKYLIGHT; SEE W-
SERIES DWGS FOR
SKYLIGHT SCOPE
BID OPTION 2 & 2A:
LIBRARY SKYLIGHT; SEE W-
SERIES DWGS FOR
SKYLIGHT SCOPE
BID OPTION 3 & 3A:
CIRCULATION
SKYLIGHT; SEE W-
SERIES DWGS FOR
SKYLIGHT SCOPE
EXISTING LOW ROOF N.I.C.
EXISTING LOW ROOF N.I.C.
EXISTING LOW ROOF N.I.C.
EXISTING LOW ROOF N.I.C.
A2.4
A2.4
CONTRACTOR TO PROTECT
ALL DOWNSPOUTS AND PIPING
(TYP)
LAYDOWN IS PERMITTED WITHIN
DELINEATED AREA. AREA
APPROXIMATELY CORRESPONDS
TO LIMIT OF OUTER RANGE OF
CONCRETE PAVERS, EXCEPT AT
WEST WHERE WORK AREA
EXTENDS BEYOND PAVERS TO
PARAPET. SEE STRUCTURAL
DRAWINGS FOR PERMITTED
LOADS.
A2.0
EXISTING RAILROAD TICKET OFFICE ROOF N.I.C.
UPPER ROOF METAL
ROOFING TO
REMAIN
EXISTING RAILROAD
TICKET OFFICE
VESTIBULE ROOF
N.I.C.
EXG CONCRETE
PAVERS TO
REMAIN
A3.1 A1.0 2
A3.1 A1.0
SCAFFOLDING & SUPPORTS NOT
PERMITTED TO BEAR ON
SKYWARD FACING TOWER
ELEMENTS, INCLUDING GUTTER &
CORNICES, TYP.
NOTES:
1. REFER TO STRUCTURAL ROOF PLAN FOR ALLOWABLE LOADING
CAPACITY AT ROOFS. CONTRACTOR TO PROVIDE A DETAILED PLAN FOR
ALL ROOF ACCESS AND PROTECTION FOR APPROVAL BY CONTRACTING
OFFICER PRIOR TO COMMENCEMENT OF WORK. PLAN MUST INCLUDE
DRAWINGS TO CONFIRM THAT PROPOSED LOADS CAN BE SUPPORTED BY
THE EXISITNG ROOF STRUCTURE AND BE STAMPED BY A STRUCTURAL
ENGINEER.
2. CONTRACTOR TO CERTIFY LIGHTNING PROTECTION MEETS UL 96 AND
96A AND NFPA 780 REQUIREMENTS AT COMPLETION OF ROOF WORK.
CONTRACTOR TO PROVIDE ANY UPGRADES TO LIGHTINING PROTECTION
SYSTEM REQUIRED TO MEET UL CERTIFICATION.
3. PROTECT ALL RAIN LEADERS AND ROOF DRAINS THROUGHOUT
CONSTRUCTION.
4. SUPPORT AND SCAFFOLD IS NOT PERMITTED IN THE GUTTERS OF THE
TOWERS.
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:36 :16
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
ROOF PLANAP
CR, JG
05/20/22
BBB
A1.0
16 0 16 32
A3.0A1.0
A4.1
A4.1
A4.1
A4.1
A3.0A1.0
A5.4A1.2
DR DR DRDR
DR DR DRDR
A4.2
A4.0
6" V
.I.F
8'
- 0
" V .I.F
194' - 8" V.I.F.
FLASHING TYPE A TYP
29' - 9" V.I.F.
DO
RM
E R T
YP
2" V
.I.F
A5.2
3 A5.2
A1.2
FLASHING TYPE A TYP.
9' - 7"
EXISTING TERRA COTTA TILE ROOF
PROTECT AREAS NOT IN SCOPE
V.I.F.
5' - 8"
TO REMAIN TYP
EXISTING ORN. CORNICE & FLASHING
34' - 3"
V.I.F.
8' - 0"
2 T
ILE
S
TYP.
WIDE
6 TILES
LO
NG
4 T
ILE
S
WIDE TYP
2 TILES
LO
NG
T
YP
1 T
ILE
TYP. 4
CORNERS
4'
- 6
8' - 0"
5' - 6"
6'
- 6
2' - 0"
4'
- 0
2'
- 0
2' - 0"
28' - 0"
V.I.F .25'
- 3 " V.I.F.
7' - 2"V.I.F.
26' - 6"
4' - 0"
2'
- 0
EXISTING BALUSTRADE
NOT OPEN FOR PASSAGE
EXISTING STEP
OPEN FOR INCIDENTAL PASSAGE
EXISTING BALUSTRADE
NOT OPEN FOR PASSAGE
EXISTING STEP OPEN FOR
INCIDENTAL PASSAGE
MIN.
9' - 3"
A5.3A1.2
A5.3A1.2
TYP
LEGEND
TYPE 1 ROOF REPAIR - SINGLE TILE
REMOVE BROKEN TERRACOTTA TILE
REMOVE DETERIORATED PORTION OF ROOF FELT
SPLICE SELF-ADHERED SHEET MEMBRANE INTO FELT
INSTALL NEW REPLICA TILE WITH CLIPS
TYPE 2 ROOF REPAIR - MULTIPE TILE
REMOVE & SALVAGE EXISTING TERRACOTTA TILE
REMOVE EXISTING ROOF FELT FROM DECK
SPLICE SELF-ADHERED SHEET MEMBRANE INTO FELT
REINSTALL TILE WITH HEAD AND NOSE CLIPS
INCLUDE REPLACEMENT OF 15% OF EACH TILE
SHAPE DUE TO SALVAGE & REINSTALLATION
TYPE 3 ROOF REPAIR - TILE & WOOD DECK
REMOVE & SALVAGE EXISTING TERRACOTTA TILE
PROVIDE REPLACEMENT TREATED WOOD SLEEPERS,
TREATED PLYWOOD DECK AND SELF-ADHERED
SHEET MEMBRANE
REINSTALL TILE WITH HEAD AND NOSE CLIPS
TYPE 4 ROOF REPAIR - TILE, WOOD DECK &
STRUCTURAL DECK
REMOVE & SALVAGE EXISTING TERRACOTTA TILE
REMOVE FELT MEMBRANE, PLYWOOD DECK,
SLEEPERS AND FLAT MASONRY STRUCTURAL TILE
ROOF DECK
REPAIR AND REPLACE ROOF STRUCTURE PER S-
DRAWINGS
PROVIDE REPLACEMENT TILE DECK, CEMENTIOUS
LEVELING COAT, ROOF MEMBRANE, TREATED WOOD
SLEEPERS, TREATED PLYWOOD DECK AND SELF-
ADHERED SHEET MEMBRANE
REINSTALL TILE WITH HEAD AND NOSE CLIPS
TYPE A FLASHING REPAIR
REMOVE EXISTING FLAT-SEAM COPPER FLASHING
REMOVE PLYWOOD DECK
REPAIR EXISTING WOOD GUTTER BLOCKING
PROVIDE MEMBRANE UNDERLAYMENT FLASHED TO
BI-LEVEL DRAIN
PROVIDE REPLACEMENT 20 OZ COPPER FLASHING
FLAT SEAM JOINTS FULLY SOLDERED OVER ROSIN-
SIZED PAPER
TYPE B FLASHING REPAIR
PROVIDE 16 OZ COPPER COPING COVERS AND
FASCIA OVER EXISTING LIMESTONE
COPING JOINT REPAIR
SEAL JOINT BETWEEN COPINGS WITH LEAD CAP
LIMESTONE DUTCHMAN
SAW-CUT DETERIORATED LIMESTONE AT JOINT
SECURE LIMESTONE DUTCHMAN WITH EPOXY
DRAIN REPLACEMENT
REMOVE CONDUCTOR HEAD
INSTALL BI-LEVEL DRAIN CONNECTED TO TYPE A
FLASHING UNDERLAYMENT AT LOWER LEVEL AND
COPPER GUTTER AT UPPER LEVEL
INSTALL REPLICA CONDUCTOR HEAD
CLEAN EXTERIOR LEADER OF DEBRIS
EXISTING ROOF - PROTECT EXISTING
CONSTRUCTION TO REMAIN
DR
NOTES
3' - 7"
1. PRIOR TO COMMENCEMENT OF WORK
CONTRACTOR TO PERFORM FULL
UPPER ROOF LEVEL SURVEY & SUBMIT
QUANTITIES & LOCATION OF EACH TYPE
OF REPAIR FOR CONTRACTING
OFFICER'S APPROVAL.
2. CONTRACTOR TO CERTIFY LIGHTNING
PROTECTION MEETS UL 96 AND 96A AND
NFPA 780 REQUIREMENTS AT
COMPLETION OF WORK. CONTRACTOR
TO PROVIDE ANY UPGRADES TO
LIGHTNING PROTECTION SYSTEM
REQUIRED. SEE A5.4.
3. SALVAGE & REINSTALL EXISTING ROOF
TILE WHERE INDICATED. REPLACE IN-
KIND MISSING TILE & TILE LOST OR
DAMAGED DURING RESTORATION.
4. REPLICA ROOF TILE TO MATCH EXIST.
BASIS OF DESIGN LUDOWICI 13-1/4"
SPANISH BARREL TILE.
5. REFER TO A5.2 - A5.5 FOR ROOF REPAIR
DETAILS.
6. TILE LAYOUT
INTERSPERSE SALVAGED AND
REINSTALLED TILE WITH REPLACEMENT
TILE. "RED" TILE TO BE INSTALLED ON
THE MAIN RIDGE AND "ORANGE" TILE ON
DORMERS.
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:36 :30
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
UPPER ROOF PLANAP, GR
CR, JG
05/20/22
BBB
A1.2
6 0 6 12
SCALE OF FEET
6"x18"
DUTCHMAN
GENERAL NOTES
1. THE RESTORATION ELEVATIONS ARE
BASED ON A RECTIFIED LASER POINT
CLOUD SCAN. CONTRACTOR TO VERIFY
QUANTITIES, AS THE DRAWINGS INCLUDE
DISTORTIONS, NON-ORTHOGONAL
SURFACES, AND LIMITED AREAS NOT
VISIBLE.
2. REFER TO A4 DRAWINGS FOR WORK AT
WINDOWS AND DOORS.
REPOINT OPEN JOINTS AT
GRANITE & LIMESTONE
STAIR, 8 TREADS AND
PARAPET; ASSUME 100%;
SEE 5/A2.0
REPOINT OPEN JOINTS AT
LIMESTONE WATER
TABLE; ASSUME 100%;
REPOINT SKY-FACING
JOINTS PER 2/A5.1
REPOINT OPEN JOINTS AT
TERRACOTTA & LIMESTONE CORNICE
SEE 3/A2.0 FOR REFERENCE PHOTO;
ASSUME 100%; REPLACE BROKEN
TERRACOTTA UNITS WITH CUSTOM TO
MATCH EXISTING, ASSUME 15%
REQUIRE REPLACEMENT. SEE 3/A5.1
REPOINT OPEN JOINTS AT
LIMESTONE BASE; ASSUME
100%
REPOINT OPEN JOINTS AT
LIMESTONE
ENTABLATURE. ASSUME
100%. REPLACE ALL
SKYWARD JOINTS PER
1/A5.1
REPOINT OPEN
JOINTS AT TOWER
BRICK, THIS ELEV.
ASSUME 20%.
REPOINT OPEN JOINTS AT BRICK
AT SOUTHWEST FACADE,
MULTIPLE LOCATIONS; ASSUME
10% TOTAL
REPAIR LARGE INCIPIENT
SPALL AT LIMESTONE
WATER TABLE; PROVIDE
DUTCHMAN REPAIR TO
MATCH ORIGINAL STONE
REPOINT OPEN
JOINTS AT
LIMESTONE
ENTABLATURE;
ASSUME 100%
REPOINT OPEN JOINTS AT
LIMESTONE ENTABLATURE;
ASSUME 100%.
REPLACE ALL SKYWARD
SEALANT JOINTS PER 1/A5.1
STRIP PAINT &
REMOVE CORROSION
FROM WINDOW
GUARDS. REPLACE
ALL FAILED ANCHORS
WITH NEW STAINLESS
STEEL ANCHORS. RE-
PAINT WITH 3-COAT
HIGH PERFORMANCE
FINISH. TYP ALL 3RD
FLR WINDOW
GUARDS THIS ELEV.
SE
E
DW
G
A2 .1
SE
E
DW
G
A2 .1
STAIR N.I.C.
CF
A2.7
A1.0
REPOINT OPEN JOINTS
AT METAL GRATE
ANCHORS, ASSUME
RESETTING 8 BRICKS
PER GRATE. TYP ALL
3RD FLOOR WINDOWS
WITH METAL GUARDS
THIS ELEV. SEE 2/A2.0
REMOVE LOOSE PAINT &
CORROSION FROM CAST
IRON BALCONIES, REPLACE
MISSING ELEMENTS, TYP.
ALL BALCONIES.
LIMESTONE UPPER BASE
GRANITE LOWER BASE
REPLACE FAILED SEALANT AT JOINTS
BETWEEN LIMESTONE ENTABLATURE &
COPPER CLADDING, TYP ALL TOWER
ELEVATIONS, SEE 4/A2.0
LEGEND
REPAIR CRACK
1. FOR STONE CRACK REPAIR SEE
1/A5.0 & 2/A5.0
2. FOR BRICK CRACK REPAIR SEE
8/A5.0
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
4. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
REPAIR FRACTURE
1. FOR STONE REPAIR SEE 3/A5.0
2. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
REPAIR STAR CRACK, PROVIDE
DUTCHMAN REPAIR, SEE 6/A5.0
REMOVE & RESET DISPLACED
BRICK/STONE
REPOINT OPEN JOINT; SEE 7/A5.0
PATCH SMALL STONE SPALL; SEE
4/A5.0
PROVIDE DUTCHMAN REPAIR AT
LARGE STONE SPALL; SEE 6/A5.0
REPLACE SPALLED BRICK; SEE
9/A5.0
REMOVE FERROUS INSERTS;
REPAIR PER 5/A5.0; CLEAN
CORROSION STAINING
REMOVE EFFLORESCENCE
REMOVE GYPSUM CRUST, TYP ALL
EXPOSED SIDES OF STONE
REPLACE FAILED REPAIR; SEE 5/A5.1
FOR PATCH REPAIRS
REPLACE INCOMPATIBLE REPAIR;
SEE 5/A5.1 FOR PATCH REPAIRS
REPLACE FAILED SEALANT
BURSTING, PROVIDE DUTCHMAN
REPAIR; SEE 6/A5.0 TYP; AT
LIMESTONE SILLS, SEE 4/A5.1
IR
FR
CF
SS
SL
REPOINT OPEN JOINTS AT
METAL GUARD ANCHORS.
REPLACE ALL FAILED
ANCHORS WITH NEW SS
ANCHORS. ASSUME
RESETTING 8 BRICKS PER
GRATE
TERRA COTTA
LIMESTONE
COPPER CLADDING NIC
REPLACE FAILED
SEALANT AT JOINTS
BETWEEN
LIMESTONE
ENTABLATURE AND
COPPER CLADDING,
TYP ALL TOWER
ELEVATIONS
REPOINT OPEN
JOINTS AT
GRANITE STAIR
TREADS
REPOINT OPEN
LIMESTONE &
GRANITE JOINTS AT
STAIR PARAPET, TYP.
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:36 :32
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
FACADE RESTORATION SOUTH
ELEVATION WEST
AP
CR, JG
05/20/22
BBB
A2.0
8 0 8 16
SCALE OF FEET
A2.0
1 SOUTH ELEVATION WEST
NTSA2.0
2 TYP 3RD FLOOR METAL GRATE
3" = 1'-0"
3 3RD FLOOR TERRA COTTA & LIMESTONE CORNICE
NTSA2.0
4 TYP TOWER ENTABLATURE
3" = 1'-0"
5 SOUTH FACADE STAIR
REPOINT OPEN JOINTS
AT LIMESTONE &
GRANITE BASE; ASSUME
100%
REPOINT OPEN JOINTS
AT LIMESTONE WATER
TABLE, ASSUME 100%;
REPOINT SKY-FACING
JOINTS PER 2/A5.1
REPOINT OPEN
JOINTS AT
LIMESTONE
ENTABLATURE;
ASSUME 100%
REPOINT OPEN
JOINTS IN BRICK;
ASSUME 100%
REPOINT OPEN JOINTS AT
LIMESTONE ENTABLATURE,
ASSUME 100%; REPLACE ALL
SKYWARD FACING JOINTS PER
1/A5.1
REPOINT OPEN JOINTS AT
TOWER BRICK THIS ELEV.
ASUME 50%
REPOINT OPEN JOINTS AT LIMESTONE
ENTABLATURE, ASSUME 100%;
REPLACE ALL SKYWARD FACING
JOINTS PER 1/A5.1
INSTALL SEALANT AT JOINT BETWEEN
STONE AND BRICK MASONRY.
REPOINT OPEN JOINTS AT
METAL GRATE ANCHORS,
ASSUME RESETTING 8
BRICKS PER GRATE. TYP ALL
3RD FLOOR WINDOWS WITH
METAL GUARDS THIS ELEV.
STRIP PAINT &
REMOVE
CORROSION FROM
METAL WINDOW
GUARDS. RE-PAINT
WITH 3-COAT HIGH
PERFORMANCE
FINISH. TYP ALL 3RD
FLR WINDOW
GUARDS THIS
ELEVATION. SEE
2/A2.0
SE
E
DW
G
A2 .0
SE
E
DW
G
A2 .0
SEE W SERIES FOR
SKYLIGHT REPLACEMENT
REPLACE 10
SPALLED BRICK
A2.7
A1.0
REPLACE BROKEN TERRACOTTA
UNITS WITH CUSTOM TO MATCH
EXISTING, ASSUME 15% REQUIRE
REPLACEMENT. SEE 3/A5.1
REPLACE FAILED SEALANT AT
JOINTS BETWEEN LIMESTONE
ENTABLATURE & COPPER
CLADDING, TYP ALL TOWER
ELEVATIONS, SEE 4/A2.0
GENERAL NOTES
1. THE RESTORATION ELEVATIONS ARE
BASED ON A RECTIFIED LASER POINT
CLOUD SCAN. CONTRACTOR TO VERIFY
QUANTITIES, AS THE DRAWINGS INCLUDE
DISTORTIONS, NON-ORTHOGONAL
SURFACES, AND LIMITED AREAS NOT
VISIBLE.
2. REFER TO A4 DRAWINGS FOR WORK AT
WINDOWS AND DOORS.
LEGEND
REPAIR CRACK
1. FOR STONE CRACK REPAIR SEE
1/A5.0 & 2/A5.0
2. FOR BRICK CRACK REPAIR SEE
8/A5.0
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
4. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
REPAIR FRACTURE
1. FOR STONE REPAIR SEE 3/A5.0
2. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
REPAIR STAR CRACK, PROVIDE
DUTCHMAN REPAIR, SEE 6/A5.0
REMOVE & RESET DISPLACED
BRICK/STONE
REPOINT OPEN JOINT; SEE 7/A5.0
PATCH SMALL STONE SPALL; SEE
4/A5.0
PROVIDE DUTCHMAN REPAIR AT
LARGE STONE SPALL; SEE 6/A5.0
REPLACE SPALLED BRICK; SEE
9/A5.0
REMOVE FERROUS INSERTS;
REPAIR PER 5/A5.0; CLEAN
CORROSION STAINING
REMOVE EFFLORESCENCE
REMOVE GYPSUM CRUST, TYP ALL
EXPOSED SIDES OF STONE
REPLACE FAILED REPAIR; SEE 5/A5.1
FOR PATCH REPAIRS
REPLACE INCOMPATIBLE REPAIR;
SEE 5/A5.1 FOR PATCH REPAIRS
REPLACE FAILED SEALANT
BURSTING, PROVIDE DUTCHMAN
REPAIR; SEE 6/A5.0 TYP; AT
LIMESTONE SILLS, SEE 4/A5.1
IR
FR
CF
SS
SL
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:36 :34
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
FACADE RESTORATION SOUTH
ELEVATION EAST
AP
CR, JG
05/20/22
BBB
A2.1
A2.1
1 SOUTH ELEVATION EAST
8 0 8 16
REPOINT OPEN
BRICK JOINTS;
ASSUME 100%
(TYP) AT
DELINEATED
AREAS
REPOINT ALL OPEN
JOINTS AT 2ND FLR
WINDOW SILLS (TYP.
THIS ELEV)
REPOINT OPEN JOINTS AT
LIMESTONE WATER TABLE;
ASSUME 100%; REPOINT SKY-
FACING JOINTS PER 2/A5.1
REPOINT OPEN JOINTS AT
TERRACOTTA CORNICE.
ASSUME 100%
REPLACE BROKEN
TERRACOTTA UNITS,
ASSUME 15% REQUIRE
REPLACEMENT
REPOINT OPEN BRICK
JOINTS AT DELINEATED
AREA; ASSUME 60%.
REPOINT OPEN
JOINTS AT BRICK AND
LIMESTONE PIER;
ASSUME 100%
REPOINT OPEN JOINTS AT
LIMESTONE ENTABLATURE;
ASSUME 100%. REPOINT
SKY-FACING JOINTS PER
1/A5.1.
REPOINT OPEN JOINTS AT
LIMESTONE
ENTABLATURE, ASSUME
100%; REPOINT SKY-
FACING JOINTS PER 1/A5.1
REPOINT OPEN JOINTS AT
TOWER BRICK, THIS ELEV.
ASSUME 50%.
REPOINT OPEN
JOINTS AT TOWER
BRICK, THIS ELEV.
ASSUME 60%
REPOINT OPEN JOINTS AT
BRICK AND LIMESTONE
PIER; ASSUME 100%
REPLACE CRACKED
TERRA COTTA ARCH
ELEMENTS (3)
REPLACE CRACKED
TERRA COTTA ARCH
ELEMENTS (4)
REPLACE 26
SPALLED BRICKS
REPOINT OPEN BRICK
JOINTS, ASSUME 100%
REPLACE 3 SPALLED
BRICKS
REPOINT OPEN BRICK
JOINTS, ASSUME 100% AT
DELINEATED AREA;
REPLACE 32 SPALLED
BRICKS
FR(x1)
FR
FR
REPLACE 2 SPALLED
BRICKS
SS(x2)
CF(x2)
REMOVE &
RESET 1
STONE UNIT
REMOVE & RESET 1
LIMESTONE UNIT
REPOINT OPEN BRICK
JOINTS; ASSUME 100% AT
DELINEATED AREAS
REPOINT OPEN BRICK
JOINTS; ASSUME 100% IN
DELINEATED AREA
REPOINT OPEN
BRICK JOINTS;
ASSUME 100%
AT DELINEATED
AREAS
REPLACE
FRACTURED BRICK
IN DELINEATED
AREA; ASSUME 5%
REPOINT OPEN JOINTS AT
LIMESTONE COPING; ASSUME
100%. REPOINT SKY-FACING
JOINTS PER 1/A5.1
PROVIDE EXPANSION
JOINT SIM TO 10/A5.0
REPOINT OPEN BRICK
JOINTS IN DELINEATED
AREAS (TYP); ASSUME 100%
SS
STRIP PAINT & REMOVE CORROSION
FROM METAL GRATES. RE-PAINT WITH
3-COAT HIGH PERFORMANCE FINISH.
SS
SS
CF
CF(x2) CF SS
CONTRACTOR TO PERFORM GPR SCAN OF ENTIRE
LIMESTONE & SHEET METAL CORNICE OF
RAIROAD TICKET OFFICE TO CONFIRM METAL PINS
PRESENT AT ALL CRACK LOCATIONS
CAST IRON PILASTERS &
MULLIONS, SEE A4.4.
GR
AN
IT
E
BA
SE
STONE CORNICE IS PARTIALLY BEHIND
COPPER CORNICE FASCIA. REPOINTING
AND REPAIRS OF STONE MAY REQUIRE
TEMPORARY REMOVAL & REINSTALLATION
OF CORNICE FASCIA.
REPLACE SEALANT
AT PILASTER
BASES, TYP
REPAIR BROKEN
RAILING
CF
GENERAL NOTES
1. THE RESTORATION ELEVATIONS ARE
BASED ON A RECTIFIED LASER POINT
CLOUD SCAN. CONTRACTOR TO VERIFY
QUANTITIES, AS THE DRAWINGS INCLUDE
DISTORTIONS, NON-ORTHOGONAL
SURFACES, AND LIMITED AREAS NOT
VISIBLE.
2. REFER TO A4 DRAWINGS FOR WORK AT
WINDOWS AND DOORS.
LEGEND
REPAIR CRACK
1. FOR STONE CRACK REPAIR SEE
1/A5.0 & 2/A5.0
2. FOR BRICK CRACK REPAIR SEE
8/A5.0
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
4. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
REPAIR FRACTURE
1. FOR STONE REPAIR SEE 3/A5.0
2. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
REPAIR STAR CRACK, PROVIDE
DUTCHMAN REPAIR, SEE 6/A5.0
REMOVE & RESET DISPLACED
BRICK/STONE
REPOINT OPEN JOINT; SEE 7/A5.0
PATCH SMALL STONE SPALL; SEE
4/A5.0
PROVIDE DUTCHMAN REPAIR AT
LARGE STONE SPALL; SEE 6/A5.0
REPLACE SPALLED BRICK; SEE
9/A5.0
REMOVE FERROUS INSERTS;
REPAIR PER 5/A5.0; CLEAN
CORROSION STAINING
REMOVE EFFLORESCENCE
REMOVE GYPSUM CRUST, TYP ALL
EXPOSED SIDES OF STONE
REPLACE FAILED REPAIR; SEE 5/A5.1
FOR PATCH REPAIRS
REPLACE INCOMPATIBLE REPAIR;
SEE 5/A5.1 FOR PATCH REPAIRS
REPLACE FAILED SEALANT
BURSTING, PROVIDE DUTCHMAN
REPAIR; SEE 6/A5.0 TYP; AT
LIMESTONE SILLS, SEE 4/A5.1
IR
FR
CF
SS
SL
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:36 :36
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
FACADE RESTORATION EAST
ELEVATION
AP
CR, JG
05/20/22
BBB
A2.2
A2.2
1 EAST ELEVATION
A2.2
2 TICKET OFFICE EAST ELEV
JOINTS AT
LIMESTONE
WATERTABLE,
ASSUME 100%.
REPOINT SKY-
FACING JOINTS
PER 2/A5.1
REPOINT ALL OPEN
SKYWARD FACING
JOINTS AT ENTABLATURE
PER 1/A5.1
REPOINT OPEN JOINTS
BENEATH CORNICE;
ASSUME 100%
REPOINT 1'-0" BAND OF
OPEN BRICK JOINTS
BELOW LIMESTONE
COPING
REPOINT OPEN
JOINTS AT
LIMESTONE
ENTABLATURE;
ASSUME 100%
REPOINT OPEN JOINTS AT
LIMESTONE ENTABLATURE,
ASSUME 100%; REPLACE
OPEN SKY-FACING JOINTS
PER 1/A5.1
REPOINT OPEN
BRICK JOINTS,
ASSUME 100% AT
DELINEATED AREA
REPOINT OPEN JOINTS AT
LIMESTONE & GRANITE
BASE, ASSUME 100%.
REPOINT OPEN JOINTS
AT LIMESTONE
VOUSSOIRES (TYP),
ASSUME 50%
REPOINT OPEN BRICK JOINTS;
ASSUME 40% AT DELINEATED
AREA
REPOINT OPEN
BRICK JOINTS;
ASSUME 25% AT
DELINEATED AREA
REPOINT OPEN JOINTS
AT TERRACOTTA
CORNICE; ASSUME
100%.
REPLACE BROKEN
TERRACOTTA UNITS,
ASSUME 15% REQUIRE
REPLACEMENT. SEE
A/A5.1 FOR
REPLACEMENT DETAIL
REPOINT OPEN
BRICK JOINTS IN
DELINEATED
AREAS, ASSUME
100%
REPOINT OPEN
JOINTS AT LIMESTONE
ENTABLATURE,
ASSUME 100%;
REPLACE OPEN
SKYWARD-FACING
JOINTS PER 1/A5.1
STRIP PAINT & REMOVE CORROSION
FROM METAL WINDOW GUARDS. RE-
PAINT WITH 3-COAT HIGH
PERFORMANCE FINISH. TYP ALL 3RD
FLR WINDOW GUARDS THIS
ELEVATION. SEE 2/A2.0
SE
E
DW
G
A2 .4
SE
E
DW
G
A2 .4
REPOINT OPEN JOINTS
AT LIMESTONE
SURROUND; ASSUME
100%
REPLACE 10
SPALLED BRICK
REPLACE 18' X 3'
AREA OF SPALLED
BRICK
REPLACE 1'-6" X 3'
AREA OF SPALLED
BRICK
REPOINT OPEN JOINTS AT
METAL GRATE ANCHORS,
ASSUME RESETTING 8
BRICKS PER GRATE. TYP ALL
3RD FLOOR WINDOWS WITH
METAL GUARDS THIS ELEV.
A2.6
A1.0
REMOVE LOOSE PAINT &
CORROSION FROM CAST
IRON BALCONIES, REPLACE
MISSING ELEMENTS, TYP ALL
BALCONIES.
REPLACE CRACKED
TERRA COTTA TILE
ARCH ELEMENTS (3)
CONTRACTOR TO PERFORM GPR
SCAN OF ENTIRE LIMESTONE
CORNICE OF RAILROAD TICKET
OFFICE TO CONFIRM METAL PINS
PRESENT AT ALL CRACK LOCATIONS
REPLACE FAILED SEALANT AT
JOINTS BETWEEN LIMESTONE
ENTABLATURE & COPPER
CLADDING, TYP ALL TOWER
ELEVATIONS, SEE 4/A2.0
STONE CORNICE IS PARTIALLY BEHIND COPPER
GUTTER. REPOINTING AND REPAIRS OF STONE
MAY REQUIRE TEMPORARY REMOVAL &
REINSTALLATION OF GUTTER
REPOINT OPEN BRICK JOINTS IN
DELINEATED AREA, ASSUME 100%
GENERAL NOTES
1. THE RESTORATION ELEVATIONS ARE
BASED ON A RECTIFIED LASER POINT
CLOUD SCAN. CONTRACTOR TO VERIFY
QUANTITIES, AS THE DRAWINGS INCLUDE
DISTORTIONS, NON-ORTHOGONAL
SURFACES, AND LIMITED AREAS NOT
VISIBLE.
2. REFER TO A4 DRAWINGS FOR WORK AT
WINDOWS AND DOORS.
LEGEND
REPAIR CRACK
1. FOR STONE CRACK REPAIR SEE
1/A5.0 & 2/A5.0
2. FOR BRICK CRACK REPAIR SEE
8/A5.0
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
4. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
REPAIR FRACTURE
1. FOR STONE REPAIR SEE 3/A5.0
2. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
REPAIR STAR CRACK, PROVIDE
DUTCHMAN REPAIR, SEE 6/A5.0
REMOVE & RESET DISPLACED
BRICK/STONE
REPOINT OPEN JOINT; SEE 7/A5.0
PATCH SMALL STONE SPALL; SEE
4/A5.0
PROVIDE DUTCHMAN REPAIR AT
LARGE STONE SPALL; SEE 6/A5.0
REPLACE SPALLED BRICK; SEE
9/A5.0
REMOVE FERROUS INSERTS;
REPAIR PER 5/A5.0; CLEAN
CORROSION STAINING
REMOVE EFFLORESCENCE
REMOVE GYPSUM CRUST, TYP ALL
EXPOSED SIDES OF STONE
REPLACE FAILED REPAIR; SEE 5/A5.1
FOR PATCH REPAIRS
REPLACE INCOMPATIBLE REPAIR;
SEE 5/A5.1 FOR PATCH REPAIRS
REPLACE FAILED SEALANT
BURSTING, PROVIDE DUTCHMAN
REPAIR; SEE 6/A5.0 TYP; AT
LIMESTONE SILLS, SEE 4/A5.1
IR
FR
CF
SS
SL
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:36 :36
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
FACADE RESTORATION NORTH
ELEVATION EAST
AP
CR, JG
05/20/22
BBB
A2.3
8 0 8 16
SCALE OF FEET
A2.3
1 NORTH ELEVATION EAST
JOINTS AT
LIMESTONE
WATER TABLE,
ASSUME 100%;
REPLACE SKY-
FACING JOINTS
PER 2/A5.1
REPOINT OPEN JOINTS AT
TERRACOTTA CORNICE;
ASSUME 100%. REPLACE
BROKEN TERRACOTTA UNITS,
ASSUME 15% REQUIRE
REPLACEMENT
REPOINT OPEN JOINTS AT
LIMESTONE & GRANITE
BASE; ASSUME 100%
REPOINT OPEN JOINTS AT
LIMESTONE CORNICE,
ASSUME 100%
REPOINT OPEN JOINTS
AT LIMESTONE
ENTABLATURE, ASSUME
100%; REPLACE OPEN
SKYWARD FACING
JOINTS PER 1/A5.1
REPOINT OPEN SKY-FACING
JOINTS AT LIMESTONE
ENTABLATURE ARCH PER 1/A5.1;
ASSUME 100%
REPOINT ALL OPEN SKY-
FACING JOINTS AT
LIMESTONE & GRANITE BASE
REPOINT 1'-0"
BAND OF OPEN
BRICK JOINTS
BELOW
LIMESTONE
COPING
REPOINT ALL
OPEN JOINTS
UNDER
CORNICE
REPOINT OPEN
BRICK JOINTS IN
DELINEATED
AREA; ASSUME
100%
REPOINT OPEN
JOINTS AT
LIMESTONE
ENTABLATURE;
ASSUME 100%
REPOINT OPEN
JOINTS AT
LIMESTONE
VOUSSOIRES
(TYP); ASSUME
50%
STRIP PAINT & REMOVE
CORROSION FROM METAL
WINDOW GUARDS. RE-PAINT
WITH 3-COAT HIGH
PERFORMANCE FINISH. TYP ALL
3RD FLR WINDOW GUARDS THIS
ELEVATION. SEE 2/A2.0
SEE 3/A2.4 FOR RAILROAD TICKET
OFFICE VESTIBULE ELEVATION
SE
E
DW
G
A2 .3
SE
E
DW
G
A2 .3
IR(x4)
REPLACE 5
SPALLED BRICK
REPOINT OPEN
BRICK JOINTS
AT DELINEATED
AREA; ASSUME
40%
REPOINT OPEN JOINTS AT
METAL GRATE ANCHORS,
ASSUME RESETTING 8
BRICKS PER GRATE. TYP ALL
3RD FLOOR WINDOWS WITH
METAL GUARDS THIS ELEV.
A2.6
A1.0
CONTRACTOR TO
PERFORM GPR SCAN OF
ENTIRE LIMSETONE
CORNICE OF RAILROAD
TICKET OFFICE TO
CONFIRM METAL PINS
PRESENT AT ALL CRACK
LOCATIONS
REPAIR LARGE CONCRETE
SPALL AT WINDOW HEADER
REPOINT OPEN
BRICK JOINTS IN
DELINEATED
AREA, ASSUME
100%
REPAIR CRACK AT
GRANITE LANDING
REPLACE FAILED
SEALANT AT JOINTS
BETWEEN LIMESTONE
ENTABLATURE &
COPPER CLADDING, TYP
ALL TOWER
ELEVATIONS, SEE 4/A2.0
IR
REPOINT OPEN
JOINTS AT
LIMESTONE
CORNICE & COPING,
ASSUME 100%
SS
SS
CF
GENERAL NOTES
1. THE RESTORATION ELEVATIONS ARE
BASED ON A RECTIFIED LASER POINT
CLOUD SCAN. CONTRACTOR TO VERIFY
QUANTITIES, AS THE DRAWINGS INCLUDE
DISTORTIONS, NON-ORTHOGONAL
SURFACES, AND LIMITED AREAS NOT
VISIBLE.
2. REFER TO A4 DRAWINGS FOR WORK AT
WINDOWS AND DOORS.
REPOINT OPEN JOINTS
AT LIMESTONE
CORNICE & COPING,
ASSUME 100%
LEGEND
REPAIR CRACK
1. FOR STONE CRACK REPAIR SEE
1/A5.0 & 2/A5.0
2. FOR BRICK CRACK REPAIR SEE
8/A5.0
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
4. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
REPAIR FRACTURE
1. FOR STONE REPAIR SEE 3/A5.0
2. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
REPAIR STAR CRACK, PROVIDE
DUTCHMAN REPAIR, SEE 6/A5.0
REMOVE & RESET DISPLACED
BRICK/STONE
REPOINT OPEN JOINT; SEE 7/A5.0
PATCH SMALL STONE SPALL; SEE
4/A5.0
PROVIDE DUTCHMAN REPAIR AT
LARGE STONE SPALL; SEE 6/A5.0
REPLACE SPALLED BRICK; SEE
9/A5.0
REMOVE FERROUS INSERTS;
REPAIR PER 5/A5.0; CLEAN
CORROSION STAINING
REMOVE EFFLORESCENCE
REMOVE GYPSUM CRUST, TYP ALL
EXPOSED SIDES OF STONE
REPLACE FAILED REPAIR; SEE 5/A5.1
FOR PATCH REPAIRS
REPLACE INCOMPATIBLE REPAIR;
SEE 5/A5.1 FOR PATCH REPAIRS
REPLACE FAILED SEALANT
BURSTING, PROVIDE DUTCHMAN
REPAIR; SEE 6/A5.0 TYP; AT
LIMESTONE SILLS, SEE 4/A5.1
IR
FR
CF
SS
SL
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:36 :39
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
FACADE RESTORATION NORTH
ELEVATION WEST
AP
CR, JG
05/20/22
BBB
A2.4
8 0 8 16
SCALE OF FEET
A2.4
1 NORTH ELEV WEST
A2.4
3 RR TICKET OFFICE VESTIBULE NORTH ELEVATION
A2.4
2 RR TICKET OFFICE SOUTH ELEVATION
A2.4
4 NORTH VESTIBULE WEST ELEVATION
REPOINT 100% LIMESTONE BASE
REPOINT OPEN JOINTS AT
LIMESTONE WATER TABLE,
ASSUME 100%; REPLACE
SKYWARD FACING JOINTS
PER 2/A5.1
REPOINT OPEN JOINTS
AT TERRACOTA
CORNICE, ASSUME
100%. REPLACE
BROKEN TERRACOTTA
UNITS, ASSUME 15%
REQUIRE
REPLACEMENT
REPLACE 20
SPALLED BRICKS
TOTAL AT
VARIOUS
LOCATIONS THIS
ELEVATION
REPLACE 15 SPALLED BRICKS
REPOINT OPEN JOINTS AT
LIMESTONE
ENTABLATURE, ASSUME
100%; REPLACE OPEN
SKYWARD FACING JOINTS
PER 1/A5.1
REPOINT OPEN JOINTS
AT TOWER BRICK, THIS
ELEV; ASSUME 25%
REPOINT OPEN JOINTS
AT TOWER BRICK, THIS
ELEV; ASSUME 20%
REPOINT OPEN JOINTS AT
LIMESTONE
ENTABLATURE, ASSUME
100%; REPLACE OPEN
SKYWARD FACING JOINTS
PER 1/A5.1
REPOINT OPEN
LIMESTONE
SKYWARD-FACING
JOINTS PER 1/A5.1,
ASSUME 100%
REPLACE FAILED
PATCH REPAIR AT
SKYWARD STONE
FACE
REPOINT OPEN BRICK JOINTS
IN DELINEATED AREA,
ASSUME 100%
REPLACE 20 SPALLED BRICK
REPOINT OPEN BRICK
JOINTS IN DELINEATED
AREA, ASSUME 100%
REPLACE
100%
SEALANT
JOINTS
AT (6) ANCHOR BOLTS,
REMOVE AND REPLACE BOLT
WITH STAINLESS STEEL
REPLICA. SET IN ANCHOR
SETTING MORTAR. REMOVE
CRACKED STONE AND
PROVIDE DUTCHMAN.
REMOVE PAINT AND
CORROSION FROM
METAL GUARDS. PAINT
WITH 3-COAT HIGH
PERFORMANCE FINISH.
REPLACE 10
SPALLED BRICK
CF
REPLACE 10
SPALLED BRICKS
IR(x3)
REPOINT OPEN BOTTOM
JOINTS AROUND KEYSTONE
8" HIGH GRANITE BASE
BELOW LIMESTONE
REMOVE VEGETATION
AT JOINT BETWEEN
WALL AND LANDING
REPAIR SPALLED
CONCRETE AT RAILING
POSTS; SEE 3/A2.5
A4.6
A2.5
REPOINT OPEN BRICK JOINTS IN DELINEATED AREA, ASSUME 100%
CONTRACTOR TO PERFORM
GPR SCAN OF ENTIRE
LIMESTONE CORNICE OF
RAILROAD TICKET OFFICE TO
CONFIRM METAL PINS
PRESENT AT ALL CRACK
LOCATIONS
COPPER GUTTER
PARTIALLY COVERING
LIMESTONE CORNICE
GENERAL NOTES
1. THE RESTORATION ELEVATIONS ARE
BASED ON A RECTIFIED LASER POINT
CLOUD SCAN. CONTRACTOR TO VERIFY
QUANTITIES, AS THE DRAWINGS INCLUDE
DISTORTIONS, NON-ORTHOGONAL
SURFACES, AND LIMITED AREAS NOT
VISIBLE.
2. REFER TO A4 DRAWINGS FOR WORK AT
WINDOWS AND DOORS.
LEGEND
REPAIR CRACK
1. FOR STONE CRACK REPAIR SEE
1/A5.0 & 2/A5.0
2. FOR BRICK CRACK REPAIR SEE
8/A5.0
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
4. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
REPAIR FRACTURE
1. FOR STONE REPAIR SEE 3/A5.0
2. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
REPAIR STAR CRACK, PROVIDE
DUTCHMAN REPAIR, SEE 6/A5.0
REMOVE & RESET DISPLACED
BRICK/STONE
REPOINT OPEN JOINT; SEE 7/A5.0
PATCH SMALL STONE SPALL; SEE
4/A5.0
PROVIDE DUTCHMAN REPAIR AT
LARGE STONE SPALL; SEE 6/A5.0
REPLACE SPALLED BRICK; SEE
9/A5.0
REMOVE FERROUS INSERTS;
REPAIR PER 5/A5.0; CLEAN
CORROSION STAINING
REMOVE EFFLORESCENCE
REMOVE GYPSUM CRUST, TYP ALL
EXPOSED SIDES OF STONE
REPLACE FAILED REPAIR; SEE 5/A5.1
FOR PATCH REPAIRS
REPLACE INCOMPATIBLE REPAIR;
SEE 5/A5.1 FOR PATCH REPAIRS
REPLACE FAILED SEALANT
BURSTING, PROVIDE DUTCHMAN
REPAIR; SEE 6/A5.0 TYP; AT
LIMESTONE SILLS, SEE 4/A5.1
IR
FR
CF
SS
SL
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
REHABILITATE EXTERIOR SYSTEMS OF MAIN
IMMIGRATION BUILDING
5/1 9/2
2 9
:36 :41
A M
BI
M
0:/
/29
- E llis
Is lan d/X A-
NY
-E llis -E
XG
-R
.rv t
FACADE RESTORATION WEST
ELEVATION
AP
CR, JG
05/20/22
BBB
A2.5
A2.5
1 WEST ELEVATION
8 0 8 16
SCALE OF FEET
A2.5 2 Railroad Office West ElevationNTSA2.5
3 SPALLING CONCRETE AT WEST ELEVATION
JOINTS AT TOWER
BRICK, THIS ELEV;
ASSUME 100%
REMOVE (4) RUSTED
ANCHORS, REMOVE
DAMAGED STONE.
INSTALL NEW
DUTCHMAN AND
REANCHOR GRATE
WITH (4) STAINLESS
STEEL ANCHORS TO
MATCH SIZE OF
EXISTING.
REPLACE 2
SPALLED BRICKS
& REPOINT
REPOINT OPEN JOINTS
AT LIMESTONE
ENTABLATURE,
ASSUME 100%;
REPOINT OPEN
SKYWARD FACING
JOINTS PER 1/A5.1
REPOINT OPEN
JOINTS AT TOWER
BRICK, THIS ELEV;
ASSUME 50%
REPOINT OPEN JOINST
AT LIMESTONE
ENTABLATURE, ASSUME
100%; REPOINT OPEN
SKYWARD FACING
JOINTS PER 1/A5.1
REPOINT OPEN
BRICK JOINTS,
ASSUME 100%
REPOINT OPEN
BRICK JOINTS,
ASSUME 100%
REMOVE PAINT AND CORROSION
FROM METAL GUARDS. PAINT WITH 3-
COAT HIGH PERFORMANCE FINISH.
TYP ALL GUARDS THIS ELEVATION
BID OPTION 7:
REMOVE EFFLORESCENCE
FROM INTERIOR TOWER
BRICK, TYP (SEE ABOVE
PHOTO). ASSUME 600 SF
PER TOWER
BID OPTION 7:
REMOVE EFFLORESCENCE
FROM INTERIOR TOWER
BRICK. ASSUME 600 SF
SS
INSTALL BIRD NETTING SYSTEM AT ALL TOWER OPENINGS. ANCHOR
WITH STAINLESS STEEL TO INTERIOR FACE OF TOWER (TYP, ALL
TOWERS). SET ANCHORS IN MORTAR JOINTS, DO NOT ANCHOR IN
BRICK OR STONE
REPLACE FAILED
SEALANT AT JOINTS
BETWEEN LIMESTONE
ENTABLATURE &
COPPER CLADDING,
TYP ALL TOWER
ELEVATIONS, SEE
4/A2.0
REPLACE FAILED
SEALANT AT JOINTS
BETWEEN LIMESTONE
ENTABLATURE &
COPPER CLADDING,
TYP ALL TOWER
ELEVATIONS, SEE
4/A2.0
SCAFFOLDING &
SUPPORTS NOT
PERMITTED TO BEAR ON
SKYWARD FACING
TOWER ELEMENTS,
INCLUDING GUTTER &
CORNICES, TYP.
REMOVE CORROSION FROM EXPOSED
TRUSSES AT UNDERSIDE OF ROOF. PAINT
WITH 3-COAT HIGH PERFORMANCE FINISH.
REPOINT OPEN JOINTS
AT LIMESTONE
CORNICE, ASSUME
100%
REPLACE FAILED SEALANT
AT FLASHING, ASSUME
100%
REPOINT OPEN JOINTS AT
LIMESTONE CORNICE,
ASSUME 100%
SEE STRUCT. DWGS FOR REQUIRED BRICK
REMOVALS & STEEL REPAIR. INSTALL NEW
BACKUP BRICK PER STRUCT. DWGS. INSTALL
NEW FACEBRICK TO MATCH EXISTING
ADJACENT BRICK. APPLY WATERPROOFING
TO ALL STEEL EXPOSED BY STRUCTURAL
REPAIRS.
SEE STRUCT DWGS FOR REQUIRED BRICK REMOVALS &
STEEL REPAIR. INSTALL NEW BACKUP BRICK PER STRUCT.
DWGS. INSTALL NEW FACE BRICK TO MATCH EXISTING
ADJACENT BRICK. APPLY SHEET MEMBRANE
WATERPROOFING TO ALL STEEL EXPOSED BY
STRUCTURAL REPAIRS.
SALVAGE & REMOVE UPPER
PORTION OF PRIMARY & SECONDARY
KEYSTONES. SEE 6/A5.1 FOR
REINSTALLATION & REPAIR.
CF
REPLACE
SEALANT AT EXG
EXPANSION
JOINTS PER
10/A5.0
REPLACE SEALANT
AT EXG EXPANSION
JOINT PER 10/A5.0
REPLACE
SEALANT AT EXG
EXPANSION
JOINTS PER
10/A5.0
A5.1A2.6
CLEAN EXISTING LEADERS &
PROTECT DOWNSPOUTS,
TYP. REFER TO A5.2 FOR
MORE INFORMATION
GENERAL NOTES
1. THE RESTORATION ELEVATIONS ARE
BASED ON A RECTIFIED LASER POINT
CLOUD SCAN. CONTRACTOR TO VERIFY
QUANTITIES, AS THE DRAWINGS INCLUDE
DISTORTIONS, NON-ORTHOGONAL
SURFACES, AND LIMITED AREAS NOT
VISIBLE.
2. REFER TO A4 DRAWINGS FOR WORK AT
WINDOWS AND DOORS.
LEGEND
REPAIR CRACK
1. FOR STONE CRACK REPAIR SEE
1/A5.0 & 2/A5.0
2. FOR BRICK CRACK REPAIR SEE
8/A5.0
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
4. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
REPAIR FRACTURE
1. FOR STONE REPAIR SEE 3/A5.0
2. FOR TERRA COTTA
REPLACEMENT SEE 3/A5.1
3. AT CAST IRON CRACKS - REPAIR
CRACK WITH FILLER
REPAIR STAR CRACK, PROVIDE
DUTCHMAN REPAIR, SEE 6/A5.0
REMOVE & RESET DISPLACED
BRICK/STONE
REPOINT OPEN JOINT; SEE 7/A5.0
PATCH SMALL STONE SPALL; SEE
4/A5.0
PROVIDE DUTCHMAN REPAIR AT
LARGE STONE SPALL; SEE 6/A5.0
REPLACE SPALLED BRICK; SEE
9/A5.0
REMOVE FERROUS INSERTS;
REPAIR PER 5/A5.0; CLEAN
CORROSION STAINING
REMOVE EFFLORESCENCE
REMOVE GYPSUM CRUST, TYP ALL
EXPOSED SIDES OF STONE
REPLACE FAILED REPAIR; SEE 5/A5.1
FOR PATCH REPAIRS
REPLACE INCOMPATIBLE REPAIR;
SEE 5/A5.1 FOR PATCH REPAIRS
REPLACE FAILED SEALANT
BURSTING, PROVIDE DUTCHMAN
REPAIR; SEE 6/A5.0 TYP; AT
LIMESTONE SILLS, SEE 4/A5.1
IR
FR
CF
SS
SL
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
176547
312431
61STATUE OF LIBERTY NATIONAL MONUMENT
RE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .