This document contains a price schedule template for a federal contract solicitation to rehabilitate the exterior systems of the Main Immigration Building at the Statue of Liberty National Monument and Ellis Island in New York. The solicitation was issued by the National Park Service's Denver Service Center under number 140P2022R0036 to rehabilitate areas including the main building facade, railroad ticket office facade, windows, roofs, and efflorescence cleaning of towers. Offerors are required to submit pricing for both the base line items and all option line items covering additional areas such as skylight replacements and door restoration. Pricing is to be provided by contract line item number on a unit price basis where applicable and as total prices for lump sum items. The schedule includes 18 line items for the base work and options, and specifies the calculation of total proposed prices for the base, options, and option additions.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template-Revised
| Contract Price Schedule | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P2022R0036 | ||||
| PARK - PMIS: | STLI 312431 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Main Immigration Building, Ellis Island, Statue of Liberty National Monument and Ellis Island, New York County, New York | ||||
| Project Title: | Rehabilitate Exterior Systems of Main Immigration Building (GAOA Project) | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 001 | Clerestory Window Replacement | 1 | EA | $0.00 | |
| 002 | Structural Steel and Masonry Repairs at Clerestory Windows | 1 | EA | $0.00 | |
| 003 | Main Building Façade Restoration - does NOT include RR Ticket Office | 1 | EA | $0.00 | |
| 004 | Railroad Ticket office Façade Restoration | 1 | EA | $0.00 | |
| 005 | Main Building Window Restoration - does NOT include RR Ticket Office Windows | 1 | EA | $0.00 | |
| 006 | Upper Roof Repairs | 1 | EA | $0.00 | |
| 007 | Bird Netting | 1 | EA | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Numbers 1 through 7) -------------------------------------------------------------------------------------------------- | $0.00 | ||||
| 008 | Bid Option 1 Atrium Skylight Replacement | 1 | EA | $0.00 | |
| 009 | Bid Option 1A: Atrium Skylight Replacement with Pressure Equalized Skylight Assembly - ADD TO BID OPTION 1 | 1 | EA | $0.00 | |
| 010 | Bid Option 2: Library (Oral History Listening Room and the Reading Room) Skylight Replacement | 1 | EA | $0.00 | |
| 011 | Bid Option 2A: Library (Oral History Listening Room and the Reading Room) Skylight Replacement with Pressure Equalized Skylight Assembly - ADD TO BID OPTION 2 | 1 | EA | $0.00 | |
| 012 | Bid Option 3: Circulation (Octagon) Skylight Replacement | 1 | EA | $0.00 | |
| 013 | Bid Option 3A: Circulation (Octagon) Skylight Replacement with Pressure Equalized Skylight Assembly - ADD TO BID OPTION 3 | 1 | EA | $0.00 | |
| 014 | Bid Option 4: Replace Clerestory Lighting | 1 | EA | $0.00 | |
| 015 | Bid Option 5: Railroad Ticket Office Window Restoration | 1 | EA | $0.00 | |
| 016 | Bid Option 6: Exterior Door Restoration | 1 | EA | $0.00 | |
| 017 | Bid Option 7: Efflorescence Cleaning in Towers | 1 | EA | $0.00 | |
| 018 | Bid Option 8 - Repoint Open Brick Joints | 1,000 | LF | $0.00 | |
| TOTAL PRICE FOR ALL OPTIONS excluding OPTION ADDS -- see below (Contract Line Item Numbers 008, 010, 012, 014 through 018) ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS excluding OPTION ADDS -- see below (Contract Line Item Numbers 1 through 7, 8, 10, 12, 14 through 18) ------------------------------------------------------------------------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE FOR OPTION ADDS (Contract Line Item Number 009, 011, 013) -------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS INCLUDING ADDS (Contract Line Item Number 1 through 18) ---------------------------- | $0.00 |