Solicitation_Amend_01_Desc_of_Changes_0001.docx

DOCX document 22 KB Posted

Attached to
NOCA Stehekin Fire Fighting Facilities Federal contract opportunity
Solicitation number
140P2022R0018
Issued by
Department of the Interior National Park Service National Office

About this file

This solicitation amendment modifies the requirements for federal contract number 140P2022R0018 to establish firefighting facilities in Stehekin, Washington. The amendment removes references to several bid options including a dormitory, shade pavilion, and wastewater tank. It also replaces the contract price schedule. Additionally, it clarifies that the contractor must fell trees within the project site this year and that electric power may be available from the local public utility with payment of use charges directly to the utility. If insufficient power is available, the contractor must provide generators to complete all work, including power for the contracting officer's trailer.

View the file

Other files for this federal contract opportunity

Other files attached to NOCA Stehekin Fire Fighting Facilities, newest first.
File Type Posted
Sol_140P2022R0018_Amd_0008.pdf PDF
NOCA_Closeout-OperationMaintenance-Requirements_0008.pdf PDF
StatementOfStructuralTestsSpecialInspections_Cache_0008.pdf PDF
NOCA_Fire_Cache_-_Submittal_List_0008.pdf PDF
StatementOfStructuralTestsSpecialInspections_Generator_Shed_0008.pdf PDF
StatementOfStructuralTestsSpecialInspections_Dorm_0008.pdf PDF
StatementOfStructuralTestsSpecialInspections_Booster_Pump_House_0008.pdf PDF
NOCA_Geotech_FOR_PRINT_0007.pdf PDF
B08_QR_Tracker_140P2022R0018_-_NOCA_Fire_-Amend_7_0007.xlsx XLSX spreadsheet
Sol_140P2022R0018_Amd_0007.pdf PDF
2018_BR-Bridge_Inspection_report_0007.pdf PDF
22_07_12_-Additional_Tree_Price_List_0006.docx DOCX document
Sol_140P2022R0018_Amd_0006.pdf PDF
B08_Attach_15_Solicitation_Amendment_005_Desc_of_Changes_0005.docx DOCX document
Sol_140P2022R0018_Amd_0005.pdf PDF
B08_Attach_13_Fire_Facilities_PreBid_Mtg_DRAFT-_0004.pdf PDF
B11_Attach_14_Site_Visit_Tri_Fold_NOCA_Fire__0004.docx DOCX document
Sol_140P2022R0018_Amd_0004.pdf PDF
Sol_140P2022R0018_Amd_0003.pdf PDF
B08_Attach_4Vaccination_Certification_Notification_0002.pdf PDF
B08_Attach_11_REVISED_CertificationVaccinationPRAv7_0002.pdf PDF
B08_Attach_12_Solicitation_Amend_02_Desc_of_Changes_0002.docx DOCX document
Sol_140P2022R0018_Amd_0002.pdf PDF
B08_140P2022R0018_Solicit_package_Amend_01_0001.pdf PDF
Sol_140P2022R0018_Amd_0001.pdf PDF
B08_Attach_3__WD_WA20220006.pdf PDF
Sol_140P2022R0018.pdf PDF
B08_140P2022R0018_Solicit_package.pdf PDF
B08_Attach_4Vaccination_Certification_Notification.pdf PDF
B08_Attach_7__Past_Performance_Questionnaire.docx DOCX document
B08_Attach_2_Drawings.pdf PDF
B08_Attach_1_Specifications.pdf PDF
B08_Attach_8_Site_Visit_Information_and_Agenda.pdf PDF
B08_Attach_6_Subcontracting_Plan.doc DOC document
B08_Attach_5_Cert_of_Vaccination.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Amendment 001 NOCA Fire Cache Item #1:

Specification 01 11 00:

Add new sub-part ‘D’ to section 1.9 CONDUCT OF OPERATIONS:

“All trees, within the specified project site boundaries, that need to be removed shall be felled in place during the 2022 construction season prior to the winter shut-down. No other site preparation work will be allowed during this time.”

Item #2:

Removing all references to the following Bid Option Work:

A) Specification 01 27 00:

Remove the following from this specification as this work will be no longer in the contract, or, Not In Contract (NIC):

i. Part 3K: “Option [G] Dormitory FFE – Bid Option #7”

ii. Part 3L: “Option [G] Shade Pavilion – Bid Option #8”

iii. Part 3M: Option [H] Fiberglass BioMicrobics Tank – Bid Option #9”

B) Construction Drawings:

All references in the construction drawings to the work related to in Bid Options identified above to be removed from specification section 01 27 00 shall also be removed. This work in NIC.

C) Replace the Contract Price Schedule with attached revised CPS.

Item #3 Specification 01 50 00:

Replace sub-section 1.3C in its entirety with:

“Electric power from the existing Chelan Public Utility District (PUD) system may be available for use with a temporary utility permit and with payment of use charges directly to Chelan PUD. Contractor shall contact Chelan PUD for confirmation and information regarding the maximum amount of electrical service, if any, available. If electric power isn’t available, Contractor shall provide all electrical power, via a generator, required to complete all work identified in this contract including the power required for the Contracting Officer’s trailer. In addition, if the available amount of electric power is limited, any additional electrical loads required shall be provided by the Contractor. Provide connections and extensions of services as required for construction operations as part of any additional permit costs.”

File details come from the government source that posted it. Updated .