Solicitation_Amend_01_Desc_of_Changes_0001.docx
DOCX document 22 KB Posted
- Attached to
- NOCA Stehekin Fire Fighting Facilities Federal contract opportunity
- Solicitation number
- 140P2022R0018
About this file
This solicitation amendment modifies the requirements for federal contract number 140P2022R0018 to establish firefighting facilities in Stehekin, Washington. The amendment removes references to several bid options including a dormitory, shade pavilion, and wastewater tank. It also replaces the contract price schedule. Additionally, it clarifies that the contractor must fell trees within the project site this year and that electric power may be available from the local public utility with payment of use charges directly to the utility. If insufficient power is available, the contractor must provide generators to complete all work, including power for the contracting officer's trailer.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Amendment 001 NOCA Fire Cache Item #1:
Specification 01 11 00:
Add new sub-part ‘D’ to section 1.9 CONDUCT OF OPERATIONS:
“All trees, within the specified project site boundaries, that need to be removed shall be felled in place during the 2022 construction season prior to the winter shut-down. No other site preparation work will be allowed during this time.”
Item #2:
Removing all references to the following Bid Option Work:
A) Specification 01 27 00:
Remove the following from this specification as this work will be no longer in the contract, or, Not In Contract (NIC):
i. Part 3K: “Option [G] Dormitory FFE – Bid Option #7”
ii. Part 3L: “Option [G] Shade Pavilion – Bid Option #8”
iii. Part 3M: Option [H] Fiberglass BioMicrobics Tank – Bid Option #9”
B) Construction Drawings:
All references in the construction drawings to the work related to in Bid Options identified above to be removed from specification section 01 27 00 shall also be removed. This work in NIC.
C) Replace the Contract Price Schedule with attached revised CPS.
Item #3 Specification 01 50 00:
Replace sub-section 1.3C in its entirety with:
“Electric power from the existing Chelan Public Utility District (PUD) system may be available for use with a temporary utility permit and with payment of use charges directly to Chelan PUD. Contractor shall contact Chelan PUD for confirmation and information regarding the maximum amount of electrical service, if any, available. If electric power isn’t available, Contractor shall provide all electrical power, via a generator, required to complete all work identified in this contract including the power required for the Contracting Officer’s trailer. In addition, if the available amount of electric power is limited, any additional electrical loads required shall be provided by the Contractor. Provide connections and extensions of services as required for construction operations as part of any additional permit costs.”
File details come from the government source that posted it. Updated .