B11_Attach_14_Site_Visit_Tri_Fold_NOCA_Fire__0004.docx

DOCX document 357 KB Posted

Attached to
NOCA Stehekin Fire Fighting Facilities Federal contract opportunity
Solicitation number
140P2022R0018
Issued by
Department of the Interior National Park Service National Office

About this file

This document provides details for a federal solicitation to establish firefighting facilities in North Cascades National Park Service Complex. The solicitation involves three scopes of work: extending utility lines and installing water and power infrastructure; constructing a 3,019 square foot Fire Station-Cache-Operations building; and building a 3,705 square foot dormitory to house 8 to 16 firefighting personnel. Offerors must submit proposals by July 11, 2022 with responses to evaluation factors including technical approach, logistics, safety, and past performance. The National Park Service will award a contract without discussions using a best value tradeoff process. The selected contractor must complete all work within 575 days of receiving the notice to proceed, and liquidated damages of $1,482 per day will be assessed for delays.

View the file

Other files for this federal contract opportunity

Other files attached to NOCA Stehekin Fire Fighting Facilities, newest first.
File Type Posted
NOCA_Closeout-OperationMaintenance-Requirements_0008.pdf PDF
StatementOfStructuralTestsSpecialInspections_Cache_0008.pdf PDF
StatementOfStructuralTestsSpecialInspections_Booster_Pump_House_0008.pdf PDF
NOCA_Fire_Cache_-_Submittal_List_0008.pdf PDF
StatementOfStructuralTestsSpecialInspections_Generator_Shed_0008.pdf PDF
StatementOfStructuralTestsSpecialInspections_Dorm_0008.pdf PDF
Sol_140P2022R0018_Amd_0008.pdf PDF
B08_QR_Tracker_140P2022R0018_-_NOCA_Fire_-Amend_7_0007.xlsx XLSX spreadsheet
Sol_140P2022R0018_Amd_0007.pdf PDF
2018_BR-Bridge_Inspection_report_0007.pdf PDF
NOCA_Geotech_FOR_PRINT_0007.pdf PDF
Sol_140P2022R0018_Amd_0006.pdf PDF
22_07_12_-Additional_Tree_Price_List_0006.docx DOCX document
B08_Attach_15_Solicitation_Amendment_005_Desc_of_Changes_0005.docx DOCX document
Sol_140P2022R0018_Amd_0005.pdf PDF
Sol_140P2022R0018_Amd_0004.pdf PDF
B08_Attach_13_Fire_Facilities_PreBid_Mtg_DRAFT-_0004.pdf PDF
Sol_140P2022R0018_Amd_0003.pdf PDF
B08_Attach_4Vaccination_Certification_Notification_0002.pdf PDF
B08_Attach_12_Solicitation_Amend_02_Desc_of_Changes_0002.docx DOCX document
Sol_140P2022R0018_Amd_0002.pdf PDF
B08_Attach_11_REVISED_CertificationVaccinationPRAv7_0002.pdf PDF
B08_140P2022R0018_Solicit_package_Amend_01_0001.pdf PDF
Solicitation_Amend_01_Desc_of_Changes_0001.docx DOCX document
Sol_140P2022R0018_Amd_0001.pdf PDF
B08_140P2022R0018_Solicit_package.pdf PDF
B08_Attach_4Vaccination_Certification_Notification.pdf PDF
B08_Attach_2_Drawings.pdf PDF
B08_Attach_1_Specifications.pdf PDF
B08_Attach_8_Site_Visit_Information_and_Agenda.pdf PDF
B08_Attach_6_Subcontracting_Plan.doc DOC document
B08_Attach_5_Cert_of_Vaccination.pdf PDF
B08_Attach_7__Past_Performance_Questionnaire.docx DOCX document
B08_Attach_3__WD_WA20220006.pdf PDF
Sol_140P2022R0018.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AFTER PREPROPOSAL CONFERENCE

· Direct all questions to both Natasha DiPietro, Contracting Officer, and Seth Mercil, Contracting Specialist. Please submit all questions not later than 7/1/22.

· Questions directed to any other Government team member will be redirected to Ms. DiPietro or Mr. Mercil. No answers will be provided by any other team member. All questions and answers will be provided to all prospective offerors by amendment to the solicitation.

· Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.SAM.gov Award of a Contract:

Best Value Trade Alternate proposals shall not be accepted or evaluated The government intends to evaluate proposals and award a contract without discussions with offerors, therefore the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The government reserves the right to conduct discussions if the CO later determines them to be necessary.

Project Location:

North Cascades National Park Service Complex, 4.5 miles from Stehekin, WA NOCA 259864, NOCA 205601, NOCA 156830, Stehekin Fire Fighting Facilities Development Project

Questions asked during site visit must be submitted in writing and will be responded to by formal written amendment

Responses or discussion on site will not change the solicitation document

Changes to the solicitation document shall be made by formal written amendment only

Preproposal Conference/ Site Visit- Wednesday, June 29, 2022 at 7:30 a.m. PDT

Request for Proposals No. 140P2022R0018 CO: Natasha DiPietro natasha_dipietro@nps.gov

CS: Seth Mercil seth_mercil@nps.gov

Clauses 52.211-10 Commencement, Prosecution, and Completion of Work - Commence work within 10 days after NTP. Complete not later than 575 days after NTP.

52.211-12 Liquidated Damages – Construction - If contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1482.00 for each calendar day of delay until the work is completed or accepted.

Special Clause 2 – Key Personnel: Project Manager, Job-site Superintendent, Quality Control Manager, Safety Manager. Contractor shall not be allowed to change key personnel during the first 90 days of performance.

DIAR 1452.228-70 – Liability Insurance: The contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the CO by an insurance company which is acceptable to the CO. The amounts of insurance shall be not less than:

$100,000 each person $500,000 each occurrence $1,000,000 property damage

52.225-11 Buy American – Construction Materials (NOV 2021) – Refer to Clause for specific requirements

52.236-1 Performance of Work by the Contractor (APR 1984) – Contractor shall self-perform at least fifteen (15) percent of total amount of work to be performed under the contract.

Submission and Evaluation Instructions for the Submission of Offers

· Proposals Due July 11, 2022 12:00 MDT

· Volume I – Non-Price Proposal

· Volume II - Business and Price Proposal

· Send electronic proposals to: CS_DSC_Proposal_Submission@nps.gov CO, and CS

· Submissions shall contain the solicitation number, park-PMIS, and number of total emails (example in solicitation) Evaluation Factors:

The evaluation factors correlate to the proposal preparation instructions.

Factors 1- 6 are listed in descending order of importance.

Overall: All evaluation factors other than price, when combined, are approximately equally important to price.

FACTOR 1 – Technical Approach and Key Personnel FACTOR 2 – Logistics and Schedule FACTOR 3 – Project Experience FACTOR 4 – Safety on a Remote Project FACTOR 5 – Past Performance FACTOR 6 – Small Business Participation

Refer to solicitation for specific information on submission requirements and evaluation

Overview of project There are three different parts to this project, Utilities, Fire Cache and Dormitory. The Utilities scope of work includes extending power distribution (electrical service) lines to the firefighting facilities, providing a new water storage tank, rehabilitation of an existing groundwater well, new water distribution for both fire suppression and domestic and water service lines, and an installing new septic system sized for the treatment of wastewater produced by the fire cache and dorm facilities. The Fire Cache scope of work includes the construction of a new Fire Station-Cache-Operations building approximately 3,019 square foot in size. The Fire Dormitory scope of work includes construction of a new dormitory approximately 3,705 square foot in size and co-located with the Fire Cache. The dormitory will house 8 to 16 personnel in eight (8) bedrooms, with ability to house up to 20 personnel on a short-term basis.