This document provides details on six amendments to the solicitation for the NOCA Stehekin Fire Fighting Facilities federal contract opportunity. The amendments add specifications and notes to construction drawing C03 sheet 21 of 191. The additional specifications require removal of concrete debris and vehicles failing inspection from the project site. The new notes identify piles of rock, boulders, gravel and concrete to be removed to the park gravel pit, allow flexibility in mulch pile placement, clarify that multiple smaller trees are to be removed along with larger trees identified, and provide processing requirements for felled trees including limbing, cutting, and transport of logs and other material to park burn and log piles. The document also includes a question and answer where offerors are told they can propose standing seam roof anchor substitutions that meet specifications. The opportunity will establish fire cache, dorm and utility facilities for the National Park Service at Stehekin, Washington.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Amendment 003 NOCA Fire Cache Item #1:
Specification 01 11 00:
Add new sub-part ‘2’ to sub-section A-7-f of section 1.6 CONTRACTOR USE OF SITE:
“At no cost to the government, the Contractor shall immediately remove from the barge landing at Stehekin, back to the point of departure, any vehicle or piece of equipment that fails the NPS inspection.”
Item #2:
Construction Drawing C03, 21 of 191:
Add call-out adjacent to the existing call-outs identifying the removal of the ‘rock pile’ and ‘boulder pile’, and ‘gravel pile’. New call-out to read: “Remove concrete construction debris pile.”
Item #3:
Construction Drawing C03, 21 of 191:
Add Sheet Note #2 to Read: “The Rock Pile, Boulder Pile, Gravel Pile, and Concrete Debris Pile to be removed from project site shall be removed to the Park gravel pit approximately 1/4 -mile away from project site.”
Item #4:
Construction Drawing C03, 21 of 191:
Add Sheet Note #3 to read: “Mulch pile noted on this sheet can be pushed further away from construction boundaries as necessary to properly construct the wastewater system.”
Item #5:
Construction Drawing C03, 21 of 191:
Add Sheet Note #4 to Read: “Trees identified on this sheet to be removed only represent the larger trees in the locations noted. There are multiple smaller trees located in and around the larger trees that shall also to be removed.”
Item #6:
Construction Drawing C03, 21 of 191:
Add Sheet Note #5 to Read:
“All felled trees shall be processed on-site as follows:
1) Felled trees shall be limbed and all logs 8-inch diameter and large shall be cut into 16.5-foot lengths and stacked on runners in the Park’s log-pile approximately 150-yards south of the project site. Logs at the pile site shall be stacked into log decks no more than 10 feet high and spaced 6 feet apart;
2) All slash and tree material less than 8-inch diameter shall be hauled to the Park burn pile approximately 200 yards south of the project site.
3) All Cottonwood trees shall be limbed and cut into lengths to allow for hauling to the Park burn pile.”
The following question was received and the following answer is provided:
Question 1: Can offerors provide a standing seam roof anchor Substitution Request for this project?
Answer 1: Offerors should propose any materials to meet the specifications. If specifications identify a brand name or equal, any proposed item or material shall meet the salient characteristics of the specifications