NOCA_Closeout-OperationMaintenance-Requirements_0008.pdf
PDF 70 KB Posted
- Attached to
- NOCA Stehekin Fire Fighting Facilities Federal contract opportunity
- Solicitation number
- 140P2022R0018
About this file
This document outlines closeout and operation and maintenance requirements for a federal contract to establish firefighting facilities at Stehekin in Washington State. Key deliverables include project record drawings and documentation, training of government personnel, warranties, spare parts, tools and reports. Response dates are provided for items such as training, drawings and manuals. A one-year warranty is required for various systems and contractors. Training must be provided on fire suppression, plumbing, mechanical, electrical and other equipment and systems. The contract also involves developing fire cache, dormitory and utility facilities to support firefighting operations at Stehekin through the National Park Service.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Closeout and Operation & Maintenance (O&M) Requirements NOCA National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
Topic Specification
Section Requirement
Submittal
Date Completed
Received by Park
Project Record 013233 Construction Images
Drawings 013233 Closeout - Project Record Document DVD
017700 Project Record Drawings
083113 Record documents
211300 Fire Sprinkler Shop level drawings with calculations
213000 Diesel driven fire pump shop drawings with calculations
220000 Plumbing record drawings
230000 Mechanical record drawings
231126 Submit record drawings of installed piping, fuel storage tanks, and fuel systems products. Below grade installed products include invert elevations for piping and storage tank(s).
260000 Electrical record drawings
262416 Record changes in panelboard schedules and circuiting plans
264113 Record actual locations of air terminals, grounding electrodes, bonding connections, and routing of system conductors in project record documents.
264300 Record actual locations of surge protective devices.
270000 Communications record drawings
271500 Note labeling information at each outlet on the record drawings.
280000 Electronic Safetyand Security Basic Requirements
283100 Fire Alarm record drawings
331443 Booster pump and booster building record drawings
331600 Water storage tank record drawings
460753 Wastewater ATU and SSAS record drawings
System 013523 Training: First Aid, Hazardous Materials
Demonstration 017340 Land Surveyor Qualifications and Training 072270 Provide minimum of one (1) complete set of specialized and required Personal Protection Equipment, as needed to fully employ the fall protection assemblies
072270 Provide Owner with one (1) rescue kit suitable for rescue of workers using the installed systems.
072270 Instruct Owner’s designated safety personnel in proper use of fall protection safety devices intended for use by installed systems.
072270 Test and adjust system devices. Replace damaged or malfunctioning items
083613 Test and adjust controls and safeties
083613 Train Owner's maintenance personnel
083613 Review data in the maintenance manual
083613 Schedule training
210000 Fire Sprinkler system training: operations, scheduled inspectection times, hands-on instructions
213000 Fire Pump training: start-up,shut-down operations, inspections and testing schedule, hands-on instrucitons.
220000 Plumbing equipment and system demonstration and training.
223000 Technical training of maintenance staff includes two hours minimum per each piece of equipment.
230000 Mechanical equipment and system demonstration and training.
260000 Electrical equipment and system demonstration and training.
260920 Provide minumum of 2 hours training on the operation and use of the control system.
260924 Provide minimum of 2-hour training session to Government at a time approved by Contracting Officer. Training to include discussion of operation, adjustment, and replacement of sensors, photocells and control.
262713 One-hour video recorded training period for Government in use of meter.
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 1 of 5
Topic Specification
Section Requirement
Submittal
Date Completed
Received by Park
263100
Provide Government minimum two 4-hour training sessions on separate days with factory support, for use of both internet portal and review installation of communications system and operation of the system. Go through in detail the system control settings and sequence of operations for the different states that may be encountered: normal utility power with PV production, normal utility with load shave, generator operation upon battery depletion, generator operation when battery system capacity is exceeded, and generator operation when normal power is lost. As part of this training establish an emergency operations plan with facility personnel for emergency shutdown, de-energization, and isolation of equipment, and for procedures to be followed in case of fire, explosion, release of liquids or vapors, or other potentially dangerous conditions.
Provide audio/video record of both sessions.
263214
Training to be provided by manufacturer's technical representative to instruct Government's personnel in operation and maintenance of equipment provided. Completed emergency generator Government's training checklist to be submitted with final shop drawings and O&M manuals.
263600 Train Government's personnel on operation, adjustment, and maintenance of transfer switches. Provide minimum of four hours of training. Intructor: Manufacturer's authorized representative.
270000 Training of Operating Personnel
280000 Training of Operating Personnel
281000 Provide eight hours of training of operational instruction and two hours of maintenance instruction.
283100 Fire alarm system training: basic operation, detailed operation, hands-on instruction, classroom instruction.
331443 Booster pump demonstration and training
460753 Wastewater ATU and blower demonstration and training
460753 Wastewater SSAS pump demonstration and training
Tools 224000 Furnish special wrenches and other devices necessary for servicing plumbing fixtures and trim to Contracting Officer.
Spare Parts 263214 Provide spare lamps to allow future addition of other alarm and status functions to annunciator.
Equipment 331443
Manufacturer recommended spare parts for each pump, pressure tank, water meter, valve, water utility appurtenance and special tools
460753 Any special tools for removing, disassembling and/or adjusting equipment supplied on this project
099100 Furnish extra material
099600 Furnish extra material
105723 Extra sets of hardware items - five extra standard straight brackets of each size required
122413 Furnish extra materials matching products - equal to 5 percent of quantity installed for each size, color, and shadeband material indicated
211300 Stock of spare sprinkler heads with associated wrench
233300 Extra Fusible Links: One of each type and size.
234000 Two extra sets of filters for each piece of equipment.
237223 Filters: Two sets of filters for each unit.
Extra Stock 263214 Filter Elements: One of each type, including fuel, oil and air.
Reports 014000 Quality Control Plan
014000 Qualification Data
014000 Contractor Quality Control
014000 Test Reports
014000 Accessibility Inspection Report
014000 Off-Site Inspections Reports
014000 Permit, Licenses and Certificates
015719.11 Indoor Air Quality Management Plan
015719.11 Product Data
015719.11 Moisture Control inspections,
015719.11 Moisture content testing,
015719.11 Moisture penetration testing,
015719.11 Microbial growth testing
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 2 of 5
Section Requirement
Submittal
Date Completed
Received by Park
017419 Project Waste Management Plan
072500 Evaluation Reports
074113 Delegated-design, Analysis reports
113013 Test and Inspection Reports All Appliances
113034 Test and Inspection Reports All Ceiling Fans
123623 Accessibility Inspection Report
123661 Accessibility Inspection Report
210000 Commissioning Report
21 00 00 Commissioning Report
21 30 00 Fire pump intial start-up report, and pressure test
22 00 00 Commissioning Report
22 05 93 Plumbing test and Balance Report
23 00 00 Commissioning Report
23 00 00 Equipment Startup Reports
23 05 93 TAB Pre-Construction Report
23 05 93 TAB Contract Documents Examination Report
23 05 93 TAB Final Report
26 00 00 Commissioning Report
26 05 19 Cable Insulation test reports
26 05 26 Grounding and Bonding test reports
26 05 73 Electrical Distribution Systems Study, submit report showing final adjusted settings of protective devices.
26 09 20 Prepare and complete report of test procedures and results.
26 09 23 Provide complete report of test procedures and results.
26 09 24 Prepare and complete report of test procedures and results including the final daylighting level setpoints as a set while using a digital photometer.
26 31 00 Inverters, charge controllers, batteries, transfer switches, and inverter system communications system test results.
26 41 13 Final Inspection Report
27 00 00 Commissioning Report
28 00 00 Commissioning Report
28 31 00 Fire alarm test reports, certification of installation
330533 Pressure Test Report
331416 Water Line Disinfection Report
331416 Deflection Test
331416 Pressure and Leakage Testing
333113 Air Leakage Test
333113 Deflection Test
Reports 331443 Certified test reports covering each booster pump material utilized sufficient to determine conformance with applicable ASTM standards
331443 Booster pump installation, inspection, and start-up report
331443 Booster pump field quality-control test reports
460753 Wastewater ATU field testing and startup monitoring reports
102813 Universal keys for internal access to accessories for servicing and resupplying - minimum of six keys
Keys & Keying 262416 Two keys per panel all keyed alike.
Schedule 283100 Fire alarm keys
331600 Keys for locking hatches
460753 Keys for any locking panel and any other manufacturer provided items
O&M Data 071900 Special Warranty
Warranties 072270 Special Project Warranty
Guarantees 072500 Manufacturer's warranty
074113 Maintenance Data
074113 Special Warranty
074213 Manufacturer's warranty
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 3 of 5
Section Requirement
Submittal
Date Completed
Received by Park
074213 Installer's Warranty
074600 Maintenance Data
074600 Special Warranty
076200 Maintenance Data
076200 Special Warranty
079200 Manufacturer's warranty
079200 Installer's Warranty
081217 Manufacturer's warranty
081400 Special Warranty
083613 Finish Warranty and Delamination Warranty
085413 Manufacturer's warranty
086223 Maintenance Data
086223 Special Warranty
087100 Special Warranty
087100 Maintenance Tools and Instruction
087100 Continuing Service
088000 Manufacturer's Special Warranty for Coated-Glass Products
088000 Manufacturer's Special Warranty for Insulating Glass
088300 Special Warranties
089119 Special Finish Warranty
096516 Maintenance Data
096723 Maintenance Data
101400 Maintenance Data
102613 Maintenance Data
102813 Maintenance Data
104413 Maintenance Data
104416 Operation and Maintenance Data
105613 Maintenance Data
113013 Operation and Maintenance Data
113034 Operation and Maintenance Data
122413 Operation and Maintenance Data
123661 Maintenance Data
133423 Maintenance Data
210000 Operation and Maintenance Manuals for devices valves and sprinkler heads, including air compressor and associated parts
210000 Installing contractor warranty and guaranty certificates; 1-year labor.
220000 Plumbing Contractor 1-year Warranty and O&M Data
220513 Variable Frequency Drives: 12 months from the date of certified start-up, include parts, labor, travel time, and expenses.
221000 Plumbing Piping Warranty
223000 Plumbing Equipment Warranty and O&M Data. Gas water heater: three year unconditional tank replacement, one year on parts and devices.
224000 Plumbing Fixture Warranty and O&M Data
230000 Mechanical Contractor 1-year Warranty and O&M Data
230593 TAB 90-Day Warranty and Gaurantees
231126 Propane Piping & equipment Warranty and O&M Data
236201 VRF Compressor 5-year Warranty
238143 Heat Pump Compressor 5-year Warranty
260000 Electrical Contractor 1-year Warranty and O&M Data
260920 O&M Data, provide a 3-year warranty on hardware and software. Provide a limited 10-year warranty on the individual relay cards.
260923 O&M Data.
260924 O&M Data. 5-year factory warranty on daylighting controls and photocell.
262416 O&M Data.
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 4 of 5
Section Requirement
Submittal
Date Completed
Received by Park
262713 O&M Data.
263100 O&M Data. Minimum 20 year warranty on power output of PV modules. Provide HGII and BESS with minimum 10 year replacement warranties from th manufacturer covering parts and labor.
263214 O&M Data. Manufacturer's warranty of a 2-year term, based on date of occupancy of facility.
263600 O&M Data. Provide a comprehensive warranty that includes parts, labor, and travel to the site.
264113 O&M Data. 10-year adhesion warranty on the conductor fastening system.
264300 O&M Data. 10-year warranty, incorporating unlimited replacements of SPD if they are destroyed by transients within warranty period.
265100
O&M Data. Not less than 5 years for luminaire based on date of substantial completion. Includes cost of labor to replace luminaire. Replacement luminaire will match physical dimensions, physical appearance, chromaticity, lumen output and photometric characteristics of original installed equipment.
270000
Communications Contractor 1-year Warranty and O&M Data. Labor, materials and documentation according to selected manufacturer requirements necessary to ensure that the Government will be furnished with an Extended Product Warranty and Application Assurance Warranty will cover the failure of the wiring system to support current or future applications that are designed for the link / channel specifications of ANSI/TIA/EIA-568-C. Provide a warranty on the physical installation.
271300
O&M Data. Labor, materials and documentation according to selected manufacturer requirements necessary to ensure that the Government will be furnished with an Extended Product Warranty and Application Assurance of a minimum of 20 years in length. The Application Assurance Warranty will cover the failure of the wiring system to support current or future applications that are designed for the link/channel specifications of ANSI/TIA/EIA-568-C. Provide a warranty on the physical installation.
271500
O&M Data. Labor, materials and documentation according to selected manufacturer requirements necessary to ensure that the Government will be furnished with an Extended Product Warranty and Application Assurance of a minimum of 20 years in length. The Application Assurance Warranty will cover the failure of the wiring system to support current or future applications that are designed for the link/channel specifications of ANSI/TIA/EIA-568-C.1. A warranty on the physical installation.
280000 Contractor 1-year Warranty and O&M Data
281000 O&M Data
283100
Warranty covering fire alarm system for one year. Operation and maintenance manual with catalog cut sheets, installation sheets, manufacturer O&M manuals, data file printout, record drawings, warranty, record of completion, test reports, instruction charts.
331416 O&M Data for Valves, Backflow Preventers & Hydrants
331443 Four (4) bound copies of booster pump, influent flow switch, and chemical disinfection dosing system operation and maintenance manuals
331443 Booster pump warranty (1 year)
331443 Pressure tank warranty (1 year)
331443 Water meter warranty (1 year)
331600 Tank materials and workmanship warranty (1 year)
331600 Tank mixing system warranty (1 year)
460753 Four (4) Wastewater ATU operation and maintenance manuals
460753 Wastewater ATU and blower warranty (2 years)
460753 Wastewater SSAS dosing pump warranty (2 years)
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 5 of 5
File details come from the government source that posted it. Updated .