This is a specification document for the NIFC 100 Administration Repairs project, a FY2022 General Services Administration (GSA) funded renovation project at the National Interagency Fire Center in Boise, Idaho. The project involves demolition and renovation of portions of Building 100 to create new office and support spaces under a single prime contract. Work must be conducted during regular office hours (8:00 AM to 4:30 PM) with Government occupancy continuing throughout construction, requiring 72 hours advance notice for activities impacting normal operations. A two-week construction pause is required to allow Government installation of modular furniture, after which the contractor must pull communication lines and wire electrical power columns. The facility is secure and requires all contractor personnel to provide official photo identification, wear Government-furnished visitor badges, and restrict facility access to 30 minutes before and after scheduled work times.
The specification includes detailed requirements for asbestos-containing materials (ACM) abatement as OSHA Class II work, covering removal of asbestos-containing wallboard joint compound, vinyl asbestos tile, and mastic. The contractor must prepare comprehensive Health and Safety Plans, Asbestos Hazard Abatement Plans, and Activity Hazard Analyses identifying specific ACM materials in Rooms 112, 113, B12, B16, and surrounding areas, with quantities and abatement techniques documented in individual work task data elements. The specification mandates compliance with 29 CFR 1926.1101 and EPA requirements, including designated competent persons with minimum two years experience, medical surveillance programs, respiratory protection, and air monitoring by independent laboratories using NIOSH 2019 Method 7400. Additional work includes penetration firestopping systems in fire-resistance-rated walls and horizontal assemblies, installed by FM Approvals-approved or UL Solutions-qualified contractors with fire ratings matching or exceeding building assembly ratings, and permanent labeling of all firestopping penetrations.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 2026 SUMMARY
NIFC 100 ADMINISTRATION REPAIRS
FY2022 GAOA
011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Access to site.
4. Government Occupancy Requirements.
5. Specification and Drawing conventions.
1.2 PROJECT INFORMATION
A. Project Identification: NIFC 100 – Administration Repairs FY 2022 GAOA
1. Project Location: National Interagency Fire Center, NIFC 100-ADM, 3906 S. Vista Ave.
Boise, ID 83705, on the NIFC Campus at 3833 S Development Ave Boise, ID 83705.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
B. Work effort includes the demolition and renovation of portions of Building 100 with new office and support spaces. All other work is as delineated within these contract documents.
C. Type of Contract:
1. Project will be constructed under a single prime contract.
1.4 ACCESS TO SITE
A. Contractor shall have limited use of premises for construction operations as indicated by the Work on Drawings.
B. Schedule operations so that Work is conducted during regular office hours which are 8:00 am to 4:30 pm. Work during nights or weekends may be allowed as approved by the Government.
C. Schedule and sequence operations necessary to complete the work, including coordination with other crafts relative to the Contractor's requirements. Schedule Work in such manner as to avoid delays in overall construction and permit proper installation of work.
FY2022 GAOA
011000 - 2
1. A two week pause in construction will be required to enable the Government to install the vertical portions of Government provided modular furniture. Once installed, the contractor may resume work and will need to pull communication lines to modular furniture and wire the electrical portion of power columns.
D. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Government Occupancy: Allow for Government occupancy of Project site. Government personnel will be continuously occupying areas of the building immediately adjacent to the work area. Conduct work in a manner that will minimize needs for disruption of normal Government operations. Provide minimum 72 hours advance notice to Government of activities that will impact normal Government operations. Secure Government's written approval of activities that will impact normal Government operations to avoid delays in overall construction and permit proper installation or work.
2. Driveways and Entrances: Keep driveways parking areas, loading areas, and entrances serving premises clear and available to Government, Government employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
E. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
F. Utilities: Service interruptions of mechanical and electrical systems will be allowed for short periods per schedule approved by Government.
1.5 SECURITY
A. NIFC is a secure facility, and all Contractor personnel shall provide an official US Government or State Government issued photo identification at the security gate upon entry.
B. All contracting personnel shall wear NIFC furnished visitor badges in a visible location at all times while on the facility, and return the badge at the end of each day or at the completion of the project.
C. Contractor shall provide a list of names, to the Government, of all personnel that will be working on the facility.
D. Contractor personnel shall not enter the facility more than 30 minutes prior to the start of scheduled work day and must leave the facility within 30 minutes of the scheduled completion time.
FY2022 GAOA
011000 - 3
1.6 GOVERNMENT OCCUPANCY REQUIREMENTS
A. Full Government Occupancy: Government will continue to occupy the building during construction. Cooperate with Government during construction operations to minimize conflicts.
Perform the Work so as not to interfere with Government day-to-day operations in adjacent spaces in the building and surrounding building site. Maintain existing exits, unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1.7 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the 33-Division format and CSI/CSC's "MasterFormat" numbering system.
1. Division 01: Sections in Division 01 govern the execution of the Work of all Sections in the Specifications.
B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate.
Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications.
Requirements expressed in the imperative mood are to be performed by Contractor.
Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
C. Terminology: In Divisions 02 through 31 Specification Sections, all references to "Owner" have been replaced with the term "Government" or "Government" (when referring to the person acting for the Government). All references to "Architect" have been replaced with the term "Government".
FY2022 GAOA
011000 - 4
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
MATERIAL ABATEMENT JULY 2026
NIFC 100 - ADMINSTRATIVE REPAIRS
FY2022 GAOA
028214 -1
SECTION 028214 – MATERIALS ABATEMENT
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section
1.2 SUMMARY
A. System Description:
This section covers all operations in which asbestos-containing materials (ACM) are encountered. These procedures and equipment are required to protect workers and building occupants from airborne asbestos fibers and ACM dust and debris. Activities include OSHA Class II work operations. This section also includes containment, storage, transportation and disposal of the generated ACM wastes. Submit Detailed Drawings in accordance with state and federal requirements containing descriptions, and site layout to include worksite containment area(s), local exhaust systems locations, decontamination units and load-out units, other temporary waste storage facility, access tunnels, location of temporary utilities (electrical, water, sewer) and boundaries of each regulated area.
1. Abatement Work Tasks:
Identify the specific ACM to be abated in detailed plans and project drawings and detailed in an asbestos abatement plan. Provide a summary for each work task including the appropriate RESPONSE ACTION DETAIL SHEET (item to be abated and methods to be used) and SET-UP DETAIL SHEETS (containment techniques to include safety precautions and methods) as outlined in Table 1, "Individual Work Task Data Elements" at the end of this section.
2. Unexpected Discovery of Asbestos:
For any previously untested building components suspected to contain asbestos and located in areas impacted by the work, notify the Contracting Officer (CO) who will have the option of ordering up bulk samples to be obtained at the Contractor's expense and delivered to a laboratory accredited under the National Institute of Standards and Technology (NIST) "National Voluntary Laboratory Accreditation Program (NVLAP)" and analyzed by PLM. If the asbestos content is less than 10 percent, as determined by a method other than point counting, the asbestos content shall be verified by point counting. Any additional components identified as ACM that have been approved by the CO for removal shall be removed and will be paid for by an equitable adjustment to the contract price under the CONTRACT CLAUSE titled "changes". Sampling shall be conducted by personnel who have successfully completed the EPA Model Accreditation Plan (MAP) "Building Inspector" training course and is EPA/State certified/licensed as a "Building Inspector".
3. Wallboard/Joint Compound:
FY2022 GAOA
028214 -2
Both composite samples of the wallboard and discrete samples of the components (wallboard and joint compound) have been tested. Composite samples of the wallboard system were tested and found to contain greater than one percent asbestos in the wall joint compound.
4. Tile/Adhesive Both composite samples of the tile and the associate adhesive have been tested.
Composite samples of the flooring system were tested and found greater than one percent asbestos in some of the tile and associated mastic.
1.3 DEFINITIONS
A. Asbestos Containing Material (ACM): Material composed of asbestos of any type and in an amount greater than 1%, either alone or mixed with other fibrous or nonfibrous materials.
B. Authorized Person: Any person authorized by the Contractor and required by work duties to be present in the regulated areas.
C. Building Inspector: Individual who inspects buildings for asbestos and has EPA Model Accreditation Plan (MAP) "Building Inspector" training; accreditation required by 40 CFR 763, Subpart E, Appendix C, has EPA/State certification/license as a "Building Inspector".
D. Class II Asbestos Work: Activities defined by OSHA involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos - containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic. Certain "incidental" roofing materials such as mastic, flashing and cements when they are still intact are excluded from Class II asbestos work. Removal of small amounts of these materials which would fit into a glovebag may be classified as a Class III job.
E. Competent Person: In addition to the definition in 29 CFR 1926.32(f), a person who is capable of identifying existing asbestos hazards as defined in 29 CFR 1926.1101, selecting the appropriate control strategy, has the authority to take prompt corrective measures to eliminate them and has EPA Model Accreditation Plan (MAP) "Contractor/Supervisor" training; has EPA/State certification/license as a "Contractor/Supervisor".
F. Contractor/Supervisor: Individual who supervises asbestos abatement work and has EPA Model Accreditation Plan "Contractor/Supervisor" training; has EPA/State certification as a "Contractor/Supervisor".
G. Critical Barrier: One or more layers of plastic sealed over all openings into a regulated area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a regulated area from migrating to an adjacent area.
H. Decontamination Area: A decontamination system consisting of a clean room, a shower room, and an equipment room separated from each other and from the regulated area by airlocks. This system is used for all workers to enter and exit the regulated area and may also serve as equipment and waste pass out on small jobs.
FY2022 GAOA
028214 -3
I. Demolition: The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.
J. Disposal Bag: A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101, used for transporting asbestos waste from containment to disposal site.
K. Disturbance: Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in 1 standard sized glovebag or waste bag, not larger than 60 inches in length and width in order to access a building component.
L. Equipment Room or Area: An area adjacent to the regulated area used for the decontamination of employees and their equipment.
M. Fiber: A fibrous particulate, 5 micrometers or longer, with a length to width ratio of at least 3 to 1.
N. Friable ACM: A term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763, Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
O. Glovebag: Not more than a 60 by 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which material and tools may be handled.
P. High-Efficiency Particulate Air (HEPA) Filter: A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles 0.3 micrometers in diameter.
Q. Intact: ACM which has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix. Removal of "intact" asphaltic, resinous, cementitious products does not render the ACM non-intact simply by being separated into smaller pieces.
R. Model Accreditation Plan (MAP): USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763.
S. NESHAPS National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61, Subpart M.
T. Nonfriable ACM: A NESHAP term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material containing more than 1 percent asbestos that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.
U. Nonfriable ACM (Category I): A NESHAP term defined in 40 CFR 61, Subpart E and EPA 340/1-90/018 meaning asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos.
FY2022 GAOA
028214 -4
V. Nonfriable ACM (Category II): A NESHAP term defined in 40 CFR 61, Subpart E and EPA 340/1-90/018 meaning any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos.
W. Permissible Exposure Limits (PELS): No personnel associated with asbestos abatement work shall be exposed to an airborne concentration of asbestos in excess of the following limits, as determined by the method prescribed in Appendix A to OSHA 29 CFR 1926.1101, or by an equivalent method:
Time Weighted Average (TWA) is 0.1 fiber per cubic centimeter (f/cc) of air as an eight
(8) - hour time-weighted average.
Excursion Limit (EL) 1.0 fiber per cubic centimeter of air as averaged over a sampling period of thirty (30) minutes.
X. Regulated Area: An OSHA term defined in 29 CFR 1926.1101 meaning an area established by the Contractor to demarcate areas where Class I, II, and III asbestos work is conducted; also any adjoining area where debris and waste from such asbestos work accumulate; and an area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, the permissible exposure limit.
Y. Removal: All operations where ACM is taken out or stripped from structures or substrates, and includes demolition operations.
Z. Worker: Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101, to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation if required by the OSHA Class of work to be performed or by the state where the work is to be performed.
1.4 SUBMITTALS
A. Shop Drawings: Shop drawings for layout and construction of decontamination enclosure systems and barriers for isolation of the regulated area as detailed and required by this specification and applicable regulations.
B. Product Data: Data includes reports, forms, receipts, certificates, or other documentation for the following:
1. Asbestos waste shipment records
2. Weight bills and delivery tickets
3. Respiratory protection program
4. Training program
5. Licenses, permits, and notifications
6. Asbestos management plan
C. Work Documents: Include the following:
1. Health and Safety Plan (HASP)
2. Asbestos Hazard Abatement Plan (AHAP)
3. Activity Hazard Analyses (AHAs)
FY2022 GAOA
028214 -5
D. Certificates: Include the following:
1. Medical surveillance requirements
1.5 QUALITY ASSURANCE
In addition to detailed requirements of this specification, work performed under this contract shall comply with applicable federal, state, and local laws, ordinances, criteria, rules and regulations regarding handling, storing, transporting, and disposing of asbestos waste materials.
Matters of interpretation of standards shall be submitted to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply. The following state and local laws, rules and regulations regarding demolition, removal, encapsulation, construction alteration, repair, maintenance, renovation, spill/emergency cleanup, housekeeping, handling, storing, transporting and disposing of asbestos material apply.
A. Specific Requirements:
Designate in writing, personnel meeting the following qualifications:
1. Asbestos Abatement Contractor: Certified/licensed by applicable state agencies to perform asbestos-related activities.
2. Designated Competent Person: Qualified in accordance with 29 CFR 1926.32 and 29 CFR 1926.1101, has EPA MAP "Contractor/Supervisor" training accreditation, has EPA/State certification/license as a "Contractor/Supervisor" and is experienced in the administration and supervision of asbestos abatement projects, including exposure assessment and monitoring, work practices, abatement methods, protective measures for personnel, setting up and inspecting asbestos abatement work areas, evaluating the integrity of containment barriers, placement and operation of local exhaust systems, ACM generated waste containment and disposal procedures, decontamination units installation and maintenance requirements, site safety and health requirements, notification of other employees onsite, etc. The Designated Competent Person shall be responsible for compliance with applicable federal, state and local requirements, the Contractor's Health and Safety Plan (HASP) and Asbestos Hazard Abatement Plan (AHAP). Submit the "Contractor/Supervisor" course completion certificate and the most recent certificate for required refresher training, EPA/State certification/license with the employee "Certificate of Worker Acknowledgment". Submit evidence that this person has a minimum of 2 years of on-the-job asbestos abatement experience relevant to OSHA competent person requirements. The Designated Competent Person shall be onsite at all times during the conduct of this project.
3. Superintendent: Have EPA MAP "Contractor/Supervisor" training accreditation. Submit the "Contractor/Supervisor" course completion certificate and the most recent certificate for required refresher training, EPA/State certification/license with the employee "Certificate of Worker Acknowledgment". Also submit evidence that the Project Supervisor has a minimum of 2 years of on-the-job asbestos abatement experience relevant to project supervisor responsibilities and the other supervisors have a minimum of 1 year on-the-job asbestos abatement experience commensurate with the responsibilities they will have on this project.
FY2022 GAOA
028214 -6
4. Asbestos Abatement Workers: Meet the requirements contained in 29 CFR 1926.1101, 40 CFR 61, Subpart M, and other applicable federal, state and local requirements.
Worker training documentation shall be provided as required on the "Certificate of Workers Acknowledgment". Training documentation is required for each employee who will perform OSHA Class I, Class II, Class III, or Class IV asbestos abatement operations. Such documentation shall be submitted on a Contractor generated form titled "Certificate of Workers Acknowledgment", to be completed for each employee in the same format and containing the same information as the example certificate at the end of this section. Training course completion certificates (initial and most recent update refresher) required by the information checked on the form shall be attached.
5. Physician: Resume of the physician who will or has performed the medical examinations and evaluations of the persons who will conduct the asbestos abatement work tasks. The physician shall be currently licensed by the state where the workers will be or have been examined, have expertise in pneumoconiosis and shall be responsible for the determination of medical surveillance protocols and for review of examination/test results performed in compliance with 29 CFR 1926.1101. The physician shall be familiar with the site's hazards and the scope of this project.
6. Disposal Facility, Transporter: Written evidence that the landfill to be used is approved for asbestos disposal by the USEPA, state and local regulatory agencies. Copies of signed agreements between the Contractor (including subcontractors and transporters) and the asbestos waste disposal facility to accept and dispose of all asbestos containing waste shall be provided. The Contractor and transporters shall meet the DOT requirements of 49 CFR 171, 49 CFR 172, and 49 CFR 173 as well as registration requirements of 49 CFR 107 and other applicable state or local requirements. The disposal facility shall meet the requirements of 40 CFR 61, Sections .154 or .155, as required in 40 CFR 61 150(b), and other applicable state or local requirements.
1.6 SAFETY
Prepare a written comprehensive site-specific HASP at least 30 days prior to the preconstruction conference. The HASP shall incorporate an Asbestos Hazard Abatement Plan (AHAP), and Activity Hazard Analyses (AHAs) as separate appendices into one site-specific document. The HASP shall take into consideration all the individual asbestos abatement work tasks identified in Table 1.
A. Asbestos Hazard Abatement Plan Appendix
The AHAP shall include, but not be limited to, the following:
1. The personal protective equipment to be used;
2. The location and description of regulated areas including clean and dirty areas, access tunnels, and decontamination unit (clean room, shower room, equipment room, storage areas such as load-out unit);
3. Initial exposure assessment in accordance with 29 CFR 1926.1101;
4. Level of supervision;
5. Method of notification of other employers at the worksite;
6. Abatement method to include containment and control procedures;
7. Interface of trades;
8. Sequencing of asbestos related work;
FY2022 GAOA
028214 -7
9. Storage and disposal procedures and plan;
10. Type of wetting agent and asbestos encapsulant;
11. Location of local exhaust equipment;
12. Air monitoring methods (personal, environmental and clearance);
13. Bulk sampling and analytical methods (if required);
14. A detailed description of the method to be employed in order to control the spread of
ACM wastes and airborne fiber;
15. Fire and medical emergency response procedures;
16. The security procedures to be used for all regulated areas.
B. Activity Hazard Analyses Appendix
AHAs for each major phase of work, shall be submitted and updated during the project. The analysis shall define the activities to be performed for a major phase of work, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on that phase until the AHA has been accepted and a preparatory meeting has been conducted by the Contractor to discuss its contents with everyone engaged in the activities, including the onsite Government representatives. The AHAs shall be continuously reviewed and, when appropriate, modified to address changing site conditions or operations.
C. Local Exhaust System
Local exhaust units shall conform to AIHA Z9.2 and 29 CFR 1926.1101. Filters on local exhaust system equipment shall conform to AIHA Z9.2 and UL 586. Filter shall be UL labeled. Submit pressure differential recordings and Manufacturer's certifications showing compliance with AIHA Z9.2 for:
1. Vacuums.
2. Water filtration equipment.
3. Ventilation equipment.
4. Other equipment required to contain airborne asbestos fibers.
1.7 SECURITY
Entry into regulated areas shall only be by personnel authorized by the Contractor and the CO.
Personnel authorized to enter regulated areas shall be trained, medically evaluated, and wear the required personal protective equipment.
A. Licenses, Permits, and Notifications
Obtain necessary licenses, permits and notifications in conjunction with the project's asbestos abatement, transportation and disposal actions and timely notification furnished of such actions as required by federal, state, regional, and local authorities. The Contractor shall notify the CO in writing, at least 10 days prior to the commencement of work. The CO will notify the appropriate state agency of the anticipated work, in accordance with 40 CFR 61, Subpart M, and state and local requirements and include the mandatory "Notification of Demolition and Renovation Record" form and other required notification documents. The Contractor is responsible for the associated fees/costs for licenses, permits, and notifications.
FY2022 GAOA
028214 -8
B. Regulated Areas
All Class II asbestos work shall be conducted within regulated areas. The regulated area shall be demarcated to minimize the number of persons within the area and to protect persons outside the area from exposure to airborne asbestos. Control access to regulated areas, ensure that only authorized personnel enter, and verify that Contractor required medical surveillance, training and respiratory protection program requirements are met prior to allowing entrance.
C. Warning Signs and Tape
Warning signs and tape printed in English shall be provided at the regulated boundaries and entrances to regulated areas. Signs shall be located to allow personnel to read the signs and take the necessary protective steps required before entering the area. Warning Labels
Warning labels shall be affixed to all asbestos disposal containers, asbestos materials, scrap, waste debris, and other products contaminated with asbestos. Containers with preprinted warning labels conforming to requirements are acceptable.
1.8 MEDICAL SURVEILLANCE REQUIREMENTS
Medical surveillance requirements shall conform to 29 CFR 1926.1101. Asbestos workers shall be enrolled in a medical surveillance program that meets 29 CFR 1926.1101 (m) requirements and other pertinent state or local requirements. This requirement shall have been satisfied within the last 12 months. Submit required medical certification and the Physician's written opinion.
A. Respiratory Protection Program
The Contractor's Designated IH shall establish in writing, and implement a respiratory protection program in accordance with 29 CFR 1926.1101 and 29 CFR 1910.134. The Contractor's Designated IH shall establish minimum respiratory protection requirements based on measured or anticipated levels of airborne asbestos fiber concentrations.
B. Respiratory Fit Testing
The Contractor's Designated IH shall conduct a qualitative or quantitative fit test conforming to Appendix A of 29 CFR 1910.134 for each worker required to wear a respirator, and any authorized visitors who enter a regulated area where respirators are required to be worn. A respirator fit test shall be performed prior to initially wearing a respirator and every 12 months thereafter. If physical changes develop that will affect the fit, a new fit test shall be performed.
Functional fit checks shall be performed each time a respirator is put on and in accordance with the manufacturer's recommendation.
C. Respirator Selection and Use Requirements
Provide respirators, and ensure that they are used as required by 29 CFR 1926.1101 and in accordance with the manufacturer's recommendations. Respirators shall be approved by the National Institute for Occupational Safety and Health NIOSH, under the provisions of 42 CFR 84, for use in environments containing airborne asbestos fibers. For air-purifying respirators, FY2022 GAOA
028214 -9 the particulate filter shall be high-efficiency particulate air (HEPA)/(N-,P-100). The initial respirator selection and the decisions regarding the upgrading or downgrading of respirator type shall be made by the Contractor's Designated IH based on the measured or anticipated airborne asbestos fiber concentrations to be encountered.
D. Personal Protective Equipment
Three complete sets of personal protective equipment shall be made available to the CO and authorized visitors for entry to the regulated area. The CO and authorized visitors shall be provided with training equivalent to that provided to Contractor employees in the selection, fitting, and use of personal protective equipment and the site safety and health requirements.
Provide workers with personal protective clothing and equipment and ensure that it is worn properly. The Designated IH and Designated Competent Person shall select and approve all the required personal protective clothing and equipment.
E. Whole Body Protection
Personnel exposed to or having the potential to be exposed to airborne concentrations of asbestos that exceed the PELs, or for all OSHA Classes of work for which a required negative exposure assessment is not produced, shall be provided with whole body protection and such protection shall be worn properly. Disposable whole body protection shall be disposed of as asbestos contaminated waste upon exiting from the regulated area. Reusable whole body protection worn shall be either disposed of as asbestos contaminated waste upon exiting from the regulated area or be properly laundered in accordance with 29 CFR 1926.1101. The Contractor's Designated Competent Person, in consultation with the Designated IH, has the authority to take immediate action to upgrade or downgrade whole body protection when there is an immediate danger to the health and safety of the wearer.
1. Coveralls: Disposable-breathable coveralls with a zipper front shall be provided.
Sleeves shall be secured at the wrists, and foot coverings secured at the ankles.
2. Gloves: Gloves shall be provided to protect the hands where there is the potential for hand injuries (i.e., scrapes, punctures, cuts, etc.).
3. Foot Coverings: Cloth socks shall be provided and worn next to the skin. Footwear, as required by OSHA, that is appropriate for safety and health hazards in the area shall be worn. Reusable footwear removed from the regulated area shall be thoroughly decontaminated or disposed of as ACM waste.
4. Head Covering: Hood type disposable head covering shall be provided. In addition, protective head gear (hard hats) shall be provided as required. Hard hats shall only be removed from the regulated area after being thoroughly decontaminated.
5. Protective Eye Wear: Eye protection shall be provided, when operations present a potential eye injury hazard, and shall meet the requirements of ANSI/ISEA Z87.1.
1.9 HYGIENE
Establish a decontamination area for the decontamination of employees, material and equipment. Ensure that employees enter and exit the regulated area through the decontamination area.
A. Single Stage Decontamination Area
FY2022 GAOA
028214 -10
A decontamination area (equipment room/area) shall be provided for Class I work involving less than 25 feet or 10 square feet of TSI or surfacing ACM, and for Class II and Class III asbestos work operations where exposures exceed the PELs or where there is no negative exposure assessment. The equipment room or area shall be adjacent to the regulated area for the decontamination of employees, material, and their equipment which could be contaminated with asbestos. The area shall be covered by an impermeable drop cloth on the floor or horizontal working surface. The area must be of sufficient size to accommodate cleaning of equipment and removing personal protective equipment without spreading contamination beyond the area.
B. Decontamination Area Exit Procedures
Ensure that the following procedures are followed:
1. Before leaving the regulated area, remove all gross contamination and debris from work clothing using a HEPA vacuum.
2. Employees shall remove their protective clothing in the equipment room and deposit the clothing in labeled impermeable bags or containers for disposal and/or laundering.
3. Employees shall not remove their respirators until showering.
4. Employees shall shower prior to entering the clean room. If a shower has not been located between the equipment room and the clean room or the work is performed outdoors, ensure that employees engaged in Class I asbestos jobs: a) Remove asbestos contamination from their work suits in the equipment room or decontamination area using a HEPA vacuum before proceeding to a shower that is not adjacent to the work area; or b) Remove their contaminated work suits in the equipment room, without cleaning worksuits, and proceed to a shower that is not adjacent to the work area.
1.10 TRAINING PROGRAM
Establish and submit a training program as specified by EPA MAP, training requirements at 40 CFR 763, OSHA requirements at 29 CFR 1926.1101 (k)(9). Contractor employees shall complete the required training for the type of work they are to perform and such training shall be documented and provided to the CO.
A. Prior to commencement of work the Contractor's Designated IH and Competent Person shall instruct each worker about:
1. The hazards and health effects of the specific types of ACM to be abated; and
2. The content and requirements of the Contractor's HASP to include the AHAP and AHAs and site-specific safety and health precautions.
FY2022 GAOA
028214 -11
PART 2 - PRODUCTS
2.1 ENCAPSULANTS
Encapsulants shall conform to USEPA requirements, shall contain no toxic or hazardous substances and no solvent. Submit certificates stating that encapsulants meet the applicable specified performance requirements.
2.2 EXPANDABLE SUPPLIES
A. Glovebag:
Glovebags shall be provided as described in 29 CFR 1926.1101. The glovebag assembly shall be 6 mil thick plastic, prefabricated and seamless at the bottom with preprinted OSHA warning label.
B. Duct Tape:
Industrial grade duct tape of appropriate widths suitable for bonding sheet plastic and disposal container.
C. Disposal Containers:
Leak-tight (defined as solids, liquids, or dust that cannot escape or spill out) disposal containers shall be provided for ACM wastes as required by 29 CFR 1926.1101. Disposal containers can be in the form of:
1. Disposal bags
2. Fiberboard drums
3. Cardboard boxes
D. Sheet Plastic:
Sheet plastic shall be polyethylene of 6 mil minimum thickness and shall be provided in the largest sheet size necessary to minimize seams. Film shall conform to ASTM D4397-16, except as specified below:
1. Flame Resistant Where a potential for fire exists, flame-resistant sheets shall be provided. Film shall conform to the requirements of NFPA 701.
2. Reinforced Reinforced sheets shall be provided where high skin strength is required, such as where it constitutes the only barrier between the regulated area and the outdoor environment. The sheet stock shall consist of translucent, nylon-reinforced or woven-polyethylene thread laminated between 2 layers of polyethylene film. Film shall meet flame resistant standards of NFPA 701.
E. Mastic Removing Solvent:
FY2022 GAOA
028214 -12
Mastic removing solvent shall be nonflammable and shall not contain methylene chloride, glycol ether, or halogenated hydrocarbons. Solvents used onsite shall have a flash point greater than 140 degrees F.
F. Leak-Tight Wrapping:
Two layers of 6 mil minimum thick polyethylene sheet stock shall be used for the containment of removed asbestos-containing components or materials such as reactor vessels, large tanks, boilers, insulated pipe segments and other materials too large to be placed in disposal bags.
Upon placement of the ACM component or material, each layer shall be individually leak-tight sealed with duct tape.
2.3 EQUIPMENT
A. Scales
Scales used for measurement shall be public scales. Weighing shall be at a point nearest the work at which a public scale is available. Scales shall be standard truck scales of the beam type; scales shall be equipped with the type registering beam and an "over and under" indicator;
and shall be capable of accommodating the entire vehicle. Scales shall be tested, approved and sealed by an inspector of the State of Idaho. Scales shall be calibrated and resealed as often as necessary and at least once every three months to ensure continuous accuracy. Vehicles used for hauling ACM shall be weighed empty daily at such time as directed and each vehicle shall bear a plainly legible identification mark.
B. Tools
Vacuums shall be equipped with HEPA filters, of sufficient capacity and necessary capture velocity at the nozzle or nozzle attachment to efficiently collect, transport and retain the ACM waste material. Power tools shall not be used to remove ACM unless the tool is equipped with effective, integral HEPA filtered exhaust ventilation capture and collection system. Reusable tools shall be thoroughly decontaminated prior to being removed from regulated areas.
C. Rental Equipment
If rental equipment is to be used, written notification shall be provided to the rental agency, concerning the intended use of the equipment, the possibility of asbestos contamination of the equipment and the steps that will be taken to decontaminate such equipment.
D. Air Monitoring Equipment
The Contractor's Designated IH shall approve air monitoring equipment. The equipment shall include, but shall not be limited to:
1. High-volume sampling pumps that can be calibrated and operated at a constant airflow up to 16 liters per minute.
2. Low-volume, battery powered, body-attachable, portable personal pumps that can be calibrated to a constant airflow up to approximately 3.5 liters per minute, and a self-contained rechargeable power pack capable of sustaining the calibrated flow rate for a
FY2022 GAOA
028214 -13 minimum of 10 hours. The pumps shall also be equipped with an automatic flow control unit which shall maintain a constant flow, even as filter resistance increases due to accumulation of fiber and debris on the filter surface.
3. Single use standard 25 mm diameter cassette, open face, 0.8 micron pore size, mixed cellulose ester membrane filters and cassettes with 50 mm electrically conductive extension cowl, and shrink bands for personal air sampling.
4. A flow calibrator capable of calibration to within plus or minus 2 percent of reading over a temperature range of minus 4 to plus 140 degrees F and traceable to a NIST primary standard.
PART 3 - EXECUTION
3.1 GENERAL REQUIREMENTS
Asbestos abatement work tasks shall be performed as shown on the detailed plans and drawings, and as summarized in Table 1. Use the engineering controls and work practices required in 29 CFR 1926.1101(g) in all operations regardless of the levels of exposure.
Personnel shall wear and utilize protective clothing and equipment. Do not permit eating, smoking, drinking, chewing or applying cosmetics in the regulated area. Personnel of other trades, shall not be exposed at any time to airborne concentrations of asbestos unless all the administrative and personal protective provisions of the Contractor's HASP/AHAP are complied with. Power to the regulated area shall be locked-out and tagged in accordance with 29 CFR 1910.147, and temporary electrical service with ground fault circuit interrupters shall be provided as needed. Temporary electrical service shall be disconnected when necessary for wet removal. Stop abatement work in the regulated area immediately when the airborne total fiber concentration: (1) equals or exceeds 0.01 f/cc, or the pre-abatement concentration, whichever is greater, outside the regulated area; or (2) equals or exceeds 1.0 f/cc inside the regulated area. Correct the condition to the satisfaction of the CO, including visual inspection and air sampling. Work shall resume only upon notification by the CO. Corrective actions shall be documented.
3.2 PROTECTION OF ADJACENT WORK OR AREAS TO REMAIN
Perform asbestos abatement without damage to or contamination of adjacent work or area.
Where such work or area is damaged or contaminated, it shall be restored to its original condition or decontaminated at no expense to the Government. When spills occur, work shall stop in all effected areas immediately and the spill shall be cleaned. When satisfactory visual inspection and air sampling analysis results are obtained and have been evaluated by the Contractor's Designated IH and the CO, work shall proceed.
3.3 BUILDING VENTILATION SYSTEM AND CRITICAL BARRIERS
Building ventilation system supply and return air ducts in a regulated area shall be shut down and isolated by airtight seals to prevent the spread of contamination throughout the system. The airtight seals shall consist of air-tight rigid covers for building ventilation supply and exhaust grills where the ventilation system is required to remain in service during abatement or 2 layers
FY2022 GAOA
028214 -14 of polyethylene if system is inoperable. Edges to wall, ceiling and floor surfaces shall be sealed with industrial grade duct tape.
3.4 METHODS OF COMPLIANCE
A. Mandated Practices
The specific abatement techniques and items identified shall be detailed in the Contractor's AHAP. Use the following engineering controls and work practices in all operations, regardless of the levels of exposure:
1. Vacuum cleaners equipped with HEPA filters.
2. Wet methods or wetting agents except where it can be demonstrated that the use of wet methods is unfeasible due to the creation of electrical hazards, equipment malfunction, and in roofing.
3. Prompt clean-up and disposal.
4. Inspection and repair of polyethylene.
5. Cleaning of equipment and surfaces of containers prior to removing them from the equipment room or area.
B. Unacceptable Practices
The following work practices shall not be used:
1. High-speed abrasive disc saws that are not equipped with point of cut ventilator or enclosures with HEPA filtered exhaust air.
2. Compressed air used to remove asbestos containing materials, unless the compressed air is used in conjunction with an enclosed ventilation system designed to capture the dust cloud created by the compressed air.
3. Dry sweeping, shoveling, or other dry clean up.
4. Employee rotation as a means of reducing employee exposure to asbestos.
C. Class II Work Procedures
In addition to the requirements of paragraphs Mandated Practices and Control Methods, the following engineering controls and work practices shall be used:
1. A Competent Person shall supervise the work.
2. For indoor work, critical barriers shall be placed over all openings to the regulated area.
3. Impermeable dropcloths shall be placed on surfaces beneath all removal activity.
D. Specific Control Methods for Class II Work
1. Vinyl and Asphalt Flooring Materials:
When removing vinyl and asphalt flooring materials which contain ACM, the resilient sheeting shall be removed by adequately wet methods. Tiles shall be removed intact (if possible); wetting is not required when tiles are heated and removed intact. Flooring or its backing shall not be sanded. Scraping of residual adhesive and/or backing shall be performed using wet methods. Mechanical chipping is prohibited unless performed in a
FY2022 GAOA
028214 -15 negative pressure enclosure. Dry sweeping is prohibited. Use vacuums equipped with HEPA filter, disposable dust bag, and metal floor tool (no brush) to clean floors.
E. Class II Asbestos Work Response Action Detail Sheets
The following Class II Asbestos Work Response Action Detail Sheet is specified on Table 1 for each individual work task to be performed:
1. Interior Asbestos Cement, Fiberboard and Drywall Panels
2. Vinyl Asbestos Tile Adhered to Concrete Floor System by Asbestos Free Adhesive
F. Enclosure of ACM
Block and seal openings in areas where the release of airborne asbestos fibers can be expected.
Establish an asbestos negative pressure enclosure with the use of curtains, portable partitions, or other enclosures in order to prevent the escape of asbestos fibers from the contaminated asbestos work area. Negative pressure enclosure development shall include protective covering of uncontaminated walls, and ceilings with a continuous membrane of two layers of minimum 6-mil plastic sheet sealed with tape to prevent water or other damage. Provide two layers of 6-mil plastic sheet over floors and extend a minimum of 12 inches up walls. Seal all joints with tape. Provide local exhaust system in the asbestos control area. Openings will be allowed in enclosures of asbestos control areas for personnel and equipment entry and exit, the supply and exhaust of air for the local exhaust system and the removal of properly containerized asbestos containing materials. Replace local exhaust system filters as required to maintain the efficiency of the system. Enclosures shall be as follows:
1. Enclosure of Acoustical Wall Plaster on Masonry Wall
2. Enclosure of Asbestos Contaminated Soil
3. Enclosure of Acoustical Ceiling Plaster, Spray-on Fireproofing and Thermal Insulation
Plaster
G. Encapsulation of ACM
Prior to applying any encapsulant, the entire surface area shall be inspected for loose or damaged asbestos material:
1. Penetrating Encapsulation: Before penetrating encapsulation is applied, asbestos removal work in the area shall be complete. Substrate shall be evaluated before application to ensure that the encapsulant will not cause the substrate to fail in any way. Plug samples shall be taken to determine if full penetration has been achieved. If full penetration has not been achieved, surfaces shall be recoated while the matrix is still wet, until full penetration is achieved.
2. Bridging Encapsulation: The surface shall be encapsulated in sections of 1000 square feet or less as recommended by the encapsulant manufacturer. Upon completion of each section, the dry thickness of the bridging encapsulation shall be measured. Additional bridging encapsulant shall be applied to obtain the desired encapsulant thickness.
Additional coats shall blend with the original bridging encapsulant. Bridging encapsulation shall include:
a. Asbestos Cement Wall, Fiberboard and Drywall Panels
FY2022 GAOA
028214 -16
H. Sealing Contaminated Items Designated for Disposal
Contaminated items designated for removal shall be coated with an asbestos lockdown encapsulant before being removed from the asbestos control area. The asbestos lockdown encapsulant shall be tinted a contrasting color and shall be spray applied by airless method.
Thoroughness of sealing operation shall be visually gauged by the extent of colored coating on exposed surfaces.
3.5 FINAL CLEANING AND VISUAL INSPECTION
After completion of all asbestos removal work and the gross amounts of asbestos have been removed from every surface, any remaining visible accumulations of asbestos shall be collected. For all classes of indoor asbestos abatement projects a final cleaning shall be performed using HEPA vacuum and wet cleaning of all exposed surfaces and objects in the regulated area. Upon completion of the cleaning, conduct a visual pre-inspection of the cleaned area in preparation for a final inspection before final air clearance monitoring. The Contractor and the CO shall conduct a final visual inspection of the cleaned regulated area in accordance with ASTM E1368 and document the results. If the CO rejects the clean regulated area as not meeting final cleaning requirements, reclean as necessary and have a follow-on inspection conducted with the CO. Recleaning and follow-up reinspection shall be at the Contractor's expense.
3.6 EXPOSURE ASSESSMENT AND AIR MONITORING
A. General Requirements
1. Exposure assessment, air monitoring and analysis of airborne concentration of asbestos fibers shall be performed in accordance with 29 CFR 1926.1101, and the Contractor's air monitoring plan. Results of breathing zone samples shall be posted at the job site and made available to the CO. Submit all documentation regarding initial exposure assessments, negative exposure assessments, and air-monitoring results.
2. Worker Exposure.
a. The Contractor's Designated IH shall collect samples representative of the exposure of each employee who is assigned to work within a regulated area.
Breathing zone samples shall be taken for at least 25 percent of the workers in each shift, or a minimum of 2, whichever is greater. Air monitoring results at the 95 percent confidence level shall be calculated as shown in Table 2 at the end of this section.
b. The Contracting Officer will provide an onsite independent testing laboratory with qualified analysts and appropriate equipment to conduct sample analyses of air samples using the methods prescribed in 29 CFR 1926.1101, to…