This document is Amendment 1 (July 2026) to a construction contract for NIFC 100 Admin Additional Repairs at the United States Department of the Interior's Wildland Fire Service facility in Boise, Idaho.

The amendment modifies contract requirements across multiple technical and operational areas. Terminology changes include renaming "Bid Additive #1" to "Bid Option #1." Layout modifications to Open Office 129 require incorporation of an attached sketch into the architectural, finishes, mechanical, electrical, and furniture drawing sets, with elimination of power poles. Construction timelines are adjusted to allow the government seven calendar days to remove items from abated spaces following Notice to Proceed, reduce the construction pause in open offices from two weeks to one week, and limit total work (abatement, demolition, and construction) to 180 consecutive calendar days. Building occupancy provisions specify that designated abatement areas remain unoccupied during construction with dust control measures installed and HVAC systems shut off, while other areas remain occupied; additionally, the full building will be unoccupied for up to five consecutive business days and four non-business days for abatement activities. Electrical modifications to Open Office 134 require removal of modular furniture power poles and installation of wall-mounted power and data outlets connected to government-provided power whips, with network cable routing adjusted accordingly. Door modifications include adding three replacement doors (025, 027, and 140) with specific hardware groups featuring electromechanical mortise locks, electrified hinges, door position switches, card readers, and closers, with card reader 025 programmed for two-factor authentication and readers 027 and 140 for one-factor authentication. Additional changes specify installation of a 14"x14" white powder-coated steel eggcrate grille with integrated damper on the basement exhaust duct, deletion of restroom sign requirements, and addition of detailed room sign specifications including individual titles, names, ABA room identifications with braille, and sign material and installation standards.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

United States Wildland Fire Service

3833 S Development Ave

Boise, Idaho 83705-5354

Amendment 1 July 2026

NIFC 100 Admin Additional Repairs

The following information and clarifications shall be included as part of the contract documents for the above noted construction project:

1. All references to “Bid Additive #1” shall be changed to “Bid Option #1”

2. Attachment “Open Office 129 Amendment” changes the layout in Open Office 129.

Incorporate the sketch into the drawing set for the final layout, affecting related

Architectural, Finishes, Mechanical, Electrical, and Furniture drawings. Power poles are no longer used, following Amendment item 8 below.

3. Specification 017320.3.7: Add item B: “Upon Notice to Proceed, allow seven calendar days for the government to remove items from spaces to be abated. After this time, all remaining items shall be disposed of offsite. This includes modular furniture, tables, chairs, and office items.”

4. Specification 011000.1.4.C.1: Change “A two week pause in construction…” to “A one week pause in construction within rooms identified as Open Offices.”

5. Specification 011000.1.4.C: Add item 2 “Work occurring in the building including abatement, demolition, and construction shall be limited to 180 consecutive calendar days.”

6. Drawings H-101 and H-102: Add General Sheet Note: The building will be unoccupied during construction in the areas indicated as “General Demolition Area to be Abated,” and occupied outside of those areas. Install dust control measures to contain the air and dust within the areas of work. Shut off HVAC systems and cover openings for systems serving the areas of abatement. The basement may be scheduled to be unoccupied during demolition, as long as access is maintained for the areas outside the abatement areas to the East Stairwell, including Production Room 017 and IT Room 027.

7. Drawings H-101 and H-102: Add General Sheet Note: The full building will be unoccupied consecutively for up to five business days and four additional non-business days (weekends) to allow for abatement.

8. Drawing EP101 and ET101: See attached Furniture Plan for power and network changes to

Open Office 134.

a. Modular furniture power poles are removed and no longer used. Where indicated by “PP” on the electrical plans, instead install wall power and data. Provide connection to power whip at wall mounted junction box where power whips are indicated on the Furniture Plan.

b. Cubicle receptacles and power whips are provided by the government.

Contractor is responsible for providing power and connecting to the power whip.

c. Network outlets at cubicles: Adjust network cable routing from ET101 plan so that it is provided adjacent to the cubicle Power Whip locations shown on the

Furniture Plan.

9. Drawing sheet AE100, AE061:

a. Add additional doors to AE601 DOOR, FRAME, AND HARDWARE

SCHEDULE BASEMENT:

DOOR

NUMBER

ROOM

NUMBER

ROOM

NAME

SIZE W

H T

MTL TYPE GLAZE FR

TYPE

HARD

GRP

NOTES

025-1 025 HALL 3’x7’x1-

3/4”

DOUBLE

MTL

INSULATED

F - EXIST-

ING

1B 1

027-1 027 IT 3’x7’x1-

3/4”

DOUBLE

MTL F - EXIST-

ING

1B 1

Note 1: Demolish existing doors 025 and 027, including door hardware and closer. Install new doors into existing grouted frame, connect from existing junction boxes and raceways to new door.

b. Add to DOOR HARDWARE: DOOR HARDWARE GROUP 1B: DOUBLE

DOOR HALLWAYS W/SECURITY

• ELECTROMECHANICAL MORTISE PASSAGE STOREROOM

LOCKSET

• HINGES

• ELECTRIFIED HINGE ON ONE SIDE

• DOOR STOP

• DOOR POSITION SWITCH

• EXISTING CARD READER

• DOOR SILENCERS

• CLOSER

• DOOR LEAF WITH LOCKING LEVERS ON ONE SIDE

c. Add additional doors to AE601 DOOR, FRAME, AND HARDWARE

SCHEDULE FIRST FLOOR PLAN:

DOOR

NUMBER

ROOM

NUMBER

ROOM

NAME

SIZE W H

T

MTL TYPE GLAZE FR

TYPE

HARD

GRP

NOTES

140-1 140 IDF 3’x7’x1-

3/4”

WD VL T EXIST-

ING

1C 2

Note 2: Demolish existing door 140, including door hardware and closer. Install new door into existing metal frame, connect from existing junction boxes and raceways to new door.

d. Add to DOOR HARDWARE: DOOR HARDWARE GROUP 1C: HALLWAYS

W/SECURITY

a. ELECTROMECHANICAL MORTISE PASSAGE STOREROOM

LOCKSET

b. HINGES

c. ELECTRIFIED HINGE

d. DOOR STOP

e. DOOR POSITION SWITCH

f. EXISTING CARD READER

g. DOOR SILENCERS

h. CLOSER

10. Drawing sheet EY101:

a. This sheet also applies to replaced doors 025, 027, and 140. Hardware designations “EL”, “DS”, and “EH” apply. Program card reader 025 for “2F”

Two factor authentication. Program card reader 027 and 140 for “1F” One

Factor authentication.

11. Drawing sheet M100: Add sheet keynote:

a. Install 14”x14” White powder coated steel eggcrate grille with integrated OBD damper on the end of the 16”x16” exhaust duct in the basement mechanical room duct chase (end of duct located 15 feet above finished floor), with manual adjustment to open or close to increase the Dedicated Outdoor Air Unit exhaust air intake flow.

12. Drawing sheet INT-101:

a. Delete “SUPPLY NECESSARY RESTROOM SIGN OUTSIDE EACH

RESTROOM DOOR”

b. Delete “UNI RESTROOM SIGNS SHALL BE GENDER NON-BINARY”

13. Drawing sheet INT-101:

a. Add room sign information below:

--end---