PWS Attachment 1 Mech Rm_PM List.pdf

PDF 216 KB Posted

Attached to
Operations, Maintenance, and Repair Services of the Central Utility Plant NIST, Boulder
Solicitation number
1333ND20RNB190010
Issued by

About this file

This document provides details for a federal contract solicitation to provide operations, maintenance, and repair services for the Central Utility Plant at the National Institute of Standards and Technology Boulder Laboratory site in Boulder, Colorado. The services include preventative and scheduled maintenance activities at NIST field sites in Fort Collins, Colorado and Kekaha, Hawaii. The base period of performance is one year with four optional one-year periods, for a potential five-year total. The North American Industry Classification System code is 811310 for commercial and industrial machinery and equipment repair and maintenance with a size standard of $8 million. The solicitation is anticipated to be posted on February 25, 2020 with a closing date of March 27, 2020. The pre-proposal conference information and closing date will be included in the solicitation documents.

View the file

Other files

File Type Posted
PWS Attach 8 NIST GENERAL INSTRUCTIONS 9.28.20.pdf PDF
PWS Attach 12 - Lighting Summary WWVh Field Site Kekaha HI Amend 0006.pdf PDF
PWS Attach 10 - Primer on Safety Plan RequirementsAddendums for COVID19 Amend 0006.pdf PDF
PWS Attach 3 - CUP Monthly Report Amend 0006.pdf PDF
PWS Attach 1 - Mechanical Room and Preventative Maintenance (MR_PM) List Amend 0006.pdf PDF
PWS Attach 5 - Job Plans Amend 0006.pdf PDF
PWS Attach 11 - Emergency Generators Amend 0006.pdf PDF
1333ND20RNB190010 Conformed thru Amend 0006.pdf PDF
1333ND20RNB190010 0006.pdf PDF
CUP PWS 2020-10-01 Amend 0006.pdf PDF
PWS Attach 13 - Transition Requirements Amend 0006.pdf PDF
1333ND20RNB190010 0005.pdf PDF
1333ND20RNB190010 0004.pdf PDF
1333ND20CNB190010 0003.pdf PDF
1333ND20RNB190010 0002.pdf PDF
PWS Attachment 1 Mech Rm_PM List Amend 0001.pdf PDF
PWS Attachment 6 Daily Report.pdf PDF
PWS Attachment 2 Spare Parts Inventory.pdf PDF
PWS Attachment 9 Safety Plan Checklist for CUP 2020.pdf PDF
PWS Attachment 3 Monthly Report.pdf PDF
PWS Attachment 5 Job Plans.pdf PDF
RFP Attch A_NIST AMD Boulder PPQ Form.doc DOC document
PWS Attachment 8 NIST GENERAL INSTRUCTIONS_3-15-19.pdf PDF
RFP Attch C_KeyPersonnelStatement.docx DOCX document
RFP Attch F_PricingSheet.xlsx XLSX spreadsheet
RFP Attch B_ResumeFormKeyPersonnel.docx DOCX document
20RNB190010 Amend 001.pdf PDF
RFP Attch D SBPCD.docx DOCX document
PWS Attachment 6 Safety Plan Checklist for CUP 2020.pdf PDF
PWS Attachment 3 Daily Report.pdf PDF
PWS Attachment 5 NIST GENERAL INSTRUCTIONS_3-15-19.pdf PDF
1333ND20RNB190010.pdf PDF
PWS Attachment 2 Monthly Report.pdf PDF
PWS Attachment 4 Job Plans.pdf PDF
CUP PWS 2020-03-09.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asset Description Location Frequency Frequency Units Monthly Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

4 Year Job Plan

AC-C-070 PM AIR COMPRESSOR CUP 070 42-001 3 MONTHS JP-C-AC-Q JP-C-AC-A JP-C-AC-4Y AC-C-071 PM AIR COMPRESSOR CUP 071 42-001 3 MONTHS JP-C-AC-Q JP-C-AC-A JP-C-AC-4Y AC-C-076 PM AIR COMPRESSOR CUP 076 42-001 3 MONTHS JP-C-AC-Q JP-C-AC-A JP-C-AC-4Y AC-C-077 PM AIR COMPRESSOR CUP 077 42-001 3 MONTHS JP-C-AC-Q JP-C-AC-A JP-C-AC-4Y

AHU-C-102 CONTRACT PM AHU-C-102 42-100 6 MONTHS JP-C-AHU-S JP-C-AHU-A

AHU-C-103 CONTRACT PM AHU-C-103 42-211 6 MONTHS JP-C-AHU-S JP-C-AHU-A

AHU-C-104 CONTRACT PM AHU-C-104 42-001 6 MONTHS JP-C-AHU-S JP-C-AHU-A

AHU-C-105 CONTRACT PM AHU-C-105 42-001 6 MONTHS JP-C-AHU-S JP-C-AHU-A

AHU-C-106 CONTRACT PM AHU-C-106 42-001 6 MONTHS JP-C-AHU-S JP-C-AHU-A

AHU-C-110 CONTRACT PM AHU-C-110 42-103 6 MONTHS JP-C-AHU-S JP-C-AHU-A

AHU-C-111 CONTRACT PM AHU-C-111 42-101 6 MONTHS JP-C-AHU-S JP-C-AHU-A

AHU-C-112 CONTRACT PM AHU-C-112 42-103 6 MONTHS JP-C-AHU-S JP-C-AHU-A

AHU-C-101 CONTRACT PM AHU-C-101 42-Roof 6 MONTHS JP-C-AHU-S JP-C-AHU-A CCH-C-021 Chiller - 1500 Ton Carrier - PM - CUP 42-100 3 MONTHS JP-CCH-C-Q JP-CCH-C-A JP-CCH-C-2Y CCH-C-022 Chiller - 1500 Ton Carrier - PM - CUP 42-100 3 MONTHS JP-CCH-C-Q JP-CCH-C-A JP-CCH-C-2Y CCH-C-023 Chiller - 1500 Ton Carrier - PM - CUP 42-100 3 MONTHS JP-CCH-C-Q JP-CCH-C-A JP-CCH-C-2Y CCH-C-024 Chiller - 1500 Ton Carrier - PM - CUP 42-100 3 MONTHS JP-CCH-C-Q JP-CCH-C-A JP-CCH-C-2Y

DRY-C-076 PM AIR DRYER CUP 076 42-001 3 MONTHS JP-C-DRY-Q

DRY-C-077 PM AIR DRYER CUP 077 42-001 3 MONTHS JP-C-DRY-Q

DRY-C-201 PM AIR DRYER CUP 201 42-001 3 MONTHS JP-C-DRY-Q

DRY-C-202 PM AIR DRYER CUP 202 42-001 3 MONTHS JP-C-DRY-Q

FCU-C-101 PM FAN COIL UNIT CUP 101 42-103 1 YEARS JP-C-FCU-A

PMP-C-117 PM CIRCULATING HOT WATER PUMP CUP-117 42-211 1 YEARS JP-PMP-A

BLR-C-017 BOILER STEAM, SUPERIOR BOILER WORKS, 150 HP, NATURAL GAS 42-101 1 MONTHS JP-C-BLR-M JP-C-BLR-Q JP-C-BLR-A BLR-C-018 BOILER STEAM, SUPERIOR BOILER WORKS, 150 HP, NATURAL GAS 42-101 1 MONTHS JP-C-BLR-M JP-C-BLR-Q JP-C-BLR-A BLR-C-019 BOILER STEAM, SUPERIOR BOILER WORKS, 150 HP, NATURAL GAS 42-101 1 MONTHS JP-C-BLR-M JP-C-BLR-Q JP-C-BLR-A VFD-C-122 VFD for CCH-C-021 42-100 1 YEARS JP-C-VFD-A VFD-C-123 VFD for CCH-C-022 42-100 1 YEARS JP-C-VFD-A VFD-C-124 VFD for CCH-C-023 42-100 1 YEARS JP-C-VFD-A VFD-C-125 VFD for CCH-C-024 42-100 1 YEARS JP-C-VFD-A 42-PMP-001 Chilled water pump 42-100 1 YEARS JP-C-PMP-A 42-HX-001 Heat Exchanger 42-100 1 YEARS JP-C-HX-A

EMG-C-019 EMERGENCY GENERATOR, CUMMINS 42-100 1 MONTHS JP-C-EMG-M JP-C-EMG

EMG-C-021 EMERGENCY GENERATOR, GENERAC INDUSTRIAL POWER 42-100 1 MONTHS JP-C-EMG-M JP-C-EMG EMC-C-022 EMERGENCY GENERATOR, GENERAC INDUSTRIAL POWER 42-100 1 MONTHS JP-C-EMG-M JP-C-EMG EMC-C-023 EMERGENCY GENERATOR, GENERAC INDUSTRIAL POWER 42-100 1 MONTHS JP-C-EMG-M JP-C-EMG

42-FCU-001 PM FAN COIL UNIT 42-210 6 MONTHS JP-C-FCU-S

PMP-C-117 HOT WATER PUMP 42-211 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-118 HOT WATER PUMP 42-211 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-119 HOT WATER PUMP 42-106 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-121 CHILLED WATER PUMP 42-106 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-201 SUMP PUMP #1 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-202 SUMP PUMP #2 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-208 DA WATER RECYCLE PUMP #2 42-101 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-011 PUMP CHILLED WATER 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

List of CUP PMs

PMP-C-012 PUMP CHILLED WATER 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-013 PUMP CHILLED WATER 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-014 PUMP CHILLED WATER 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

PMP-C-031 CONDENSER WATER PUMP, AURORA PUMP 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-032 CONDENSER WATER PUMP, AURORA PUMP 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-N1A SUMP PUMP NORTH TUNNEL 1A @85 FEET INTO NORTH TUNNEL 42-TN-0000 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-N1B SUMP PUMP NORTH TUNNEL 1B @87 FEET INTO NORTH TUNNEL 42-TN-0000 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S1A SUMP PUMP SOUTH TUNNEL 1A @ 648 FEET INTO TUNNEL FROM CUP 42-T-0600 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S1B SUMP PUMP SOUTH TUNNEL 1B @ 648 FEET INTO TUNNEL FROM CUP 42-T-0600 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S2A SUMP PUMP SOUTH TUNNEL 2A @ 817 FEET INTO TUNNEL FROM CUP 42-T-0800 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S2B SUMP PUMP SOUTH TUNNEL 2B @ 819 FEET INTO TUNNEL FROM CUP 42-T-0800 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S3A SUMP PUMP SOUTH TUNNEL 3A @ 1049 FEET INTO TUNNEL FROM CUP 42-T-1000 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S3B SUMP PUMP SOUTH TUNNEL 3B @ 1049 FEET INTO TUNNEL FROM CUP 42-T-1000 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S4A SUMP PUMP SOUTH TUNNEL 4A @ 1380 FEET INTO TUNNEL FROM CUP 42-T-1300 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S4B SUMP PUMP SOUTH TUNNEL 4B @ 1380 FEET INTO TUNNEL FROM CUP 42-T-1300 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S5A SUMP PUMP SOUTH TUNNEL 5A @ 1625 FEET INTO TUNNEL FROM CUP 42-T-1600 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-S5B SUMP PUMP SOUTH TUNNEL 5B @ 1627 FEET INTO TUNNEL FROM CUP 42-T-1600 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-033 CONDENSER WATER PUMP, AURORA PUMP 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-267 BOOSTER PUMP (#1) CUP 267 42-106 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-268 BOOSTER PUMP (#2) CUP 268 42-106 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A CPMP-C-001 CHEMICAL PUMP, NEPTUNE, # 151135 42-101 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-274 PUMP CUP 274 (FOR CHWF-C-001) 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-275 PUMP CUP 275 (FOR CTF-C-001) 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A PMP-C-273 CHILLED WATER PUMP CUP 273 (FOR AIR COMP COOLING) 42-001 3 MONTHS JP-C-PMP-Q JP-C-PMP-S JP-C-PMP-C-A

TS-C-019 TRANSFER SWITCH 42-211 1 MONTHS JP-C-TS-M JP-C-TS-A

TS-C-021 TRANSFER SWITCH 42-001 1 MONTHS JP-C-TS-M JP-C-TS-A

Steam Traps PM all steam traps in the CUP and Tunnel 42-1 1 YEARS

Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

21-BLR-0001 PM Aerco Benchmark 1500 Boiler (ESCO project) 21-1008 1 MONTHS JP-C-BLR-M JP-C-BLR-Q JP-C-BLR-A

24-PAC-001 PM Package Air Carrier 24-Roof 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

25-BLR-001 PM Harsco Industrial Boiler (ESCO project) 25-1107 1 MONTHS JP-C-BLR-M JP-C-BLR-Q JP-C-BLR-A

AHU-055 PM AIR HANDLING UNIT 055 01-2058 3 MONTHS JP-C-CRAC-Q

AHU-056 PM AIR HANDLING UNIT 056 01-2058 3 MONTHS JP-C-CRAC-Q

AHU-057 PM AIR HANDLING UNIT 057 01-2058 3 MONTHS JP-C-CRAC-Q

AHU-058 PM AIR HANDLING UNIT 058 01-2058 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A

AHU-125 PM AHU-125 01-2051 3 MONTHS JP-C-CRAC-Q

AHU-126 PM AHU-126 01-2053 3 MONTHS JP-C-CRAC-Q

AHU-132 PM AHU-132 01-3430 3 MONTHS JP-C-CRAC-Q

AHU-133 PM AHU-133 01-3430 3 MONTHS JP-C-CRAC-Q

BLR-012 BOILER-012 PM 02-Roof 1 MONTHS JP-C-BLR-M JP-C-BLR-Q JP-C-BLR-A

CT-005 PM COOLING TOWER 005 01-ROOF-MS 1 MONTHS JP-C-CT-M JP-C-CT-A

CT-006 PM COOLING TOWER 006 01-ROOF-MS 1 MONTHS JP-C-CT-M JP-C-CT-A

CT-007 PM COOLING TOWER 007 01-ROOF-MS 1 MONTHS JP-C-CT-M JP-C-CT-A

25-CT-1107-1 PM COOLING TOWER 012 25-1107 1 MONTHS JP-C-CT-M JP-C-CT-A

CT-020 PM COOLING TOWER 020 01-Roof-MS 1 MONTHS JP-C-CT-M JP-C-CT-A

PAC-002 PM ROOFTOP PACKAGED A/C PAC-002 01-ROOF-L 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-026 PM ROOFTOP PACKAGED A/C PAC-026 01D-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-027 PM ROOFTOP PACKAGED A/C PAC-027 01D-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-029 PM ROOFTOP PACKAGED A/C PAC-029 26-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-031 PM ROOFTOP PACKAGED A/C PAC-031 26-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-032 PM ROOFTOP PACKAGED A/C PAC-032 26-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-045 PM ROOFTOP PACKAGED A/C PAC-045 26-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-046 PM ROOFTOP PACKAGED A/C PAC-046 26-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-047 PM ROOFTOP PACKAGED A/C PAC-047 26-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-052 PM ROOFTOP PACKAGED A/C PAC-052 02-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-053 PM ROOFTOP PACKAGED A/C PAC-053 02-2813 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-054 PM ROOFTOP PACKAGED A/C PAC-054 02-1803 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-073 PM ROOFTOP PACKAGED A/C PAC-073 01C-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-101 PM ROOFTOP PACKAGED A/C PAC-101 21-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-106 PM ROOFTOP PACKAGED A/C PAC-106 26-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-107 PM ROOFTOP PACKAGED A/C PAC-107 01-ROOF-W4-C 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-108 PM SPLIT PACKAGE A/C SYSTEM PAC-108 02-1806 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-109 PM SPLIT PACKAGE A/C SYSTEM PAC-109 02-1806 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-110 PM SPLIT PACKAGE A/C SYSTEM PAC-110 24-X-SE 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

NIST Site Equipment (Boulder)

Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

NIST Site Equipment (Boulder)

PAC-111 PM ROOFTOP PACKAGE A/C SYSTEM PAC-111 26-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-115 PM PACKAGED A/C PAC-115 01C-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-116 PM PACKAGED A/C PAC-116 01C-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-117 PM PACKAGED A/C PAC-117 02A-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-118 PM PACKAGED A/C PAC-118 02A-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-135 PM PAC-135 12-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-136 PM PAC-136 91-X-S 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-137 PM PAC-137 91-X-S 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-141 PM PAC-141 51-101A 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-143 PM PAC-143 51-B 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-144 PM PAC-144 111-X-S 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-145 PM PAC-145 111-X-S 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-146 PM PAC-146 25-TRLR 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-150 PM PAC-150 03A-ROOF 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-153 PM ROOFTOP PACKAGED A/C PAC-153 01-ROOF-W2 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-154 PM ROOFTOP PACKAGED A/C PAC-154 01-ROOF-W2 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PAC-155 PM ROOFTOP PACKAGED A/C PAC-155 01-ROOF-W2-C 6 MONTHS

JP-C-PAC-C

JP-C-PAC-H

PAC-160 PM PAC-160 51-A 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

PMP-014 PM PUMP 014 01-2058 1 YEARS JP-C-PMP-A

PMP-015 PM PUMP 015 01-2058 1 YEARS JP-C-PMP-A

PMP-016 PM PUMP 016 01-2058 1 YEARS JP-C-PMP-A

RC-002 PM RECIP AC COMPRESSOR RC-002 01-2058 6 MONTHS JP-C-RC-S JP-C-RC-A

01-F-CCH-001 CHILLER, COMPRESSOR, YORK Annex F 3 MONTHS JP-CCH-C-Q JP-CCH-C-A JP-CCH-C-2Y 01-S1-PMP-279 Heating Water Pump 01-1049 1 YEARS JP-C-PMP-A 01-S1-PMP-280 Heating Water Pump 01-1049 1 YEARS JP-C-PMP-A 01-w6-pmp-293 Heating Hot Water Pump 01-3665 1 YEARS JP-C-PMP-A 01-w6-pmp-294 Heating Hot Water Pump 01-3665 1 YEARS JP-C-PMP-A PMP-I-001 PUMP, CHILLED WATER, Armstrong, 10 HP 01F 1 YEARS JP-C-PMP-A PMP-I-002 PUMP, CHILLED WATER, Armstrong, 10 HP 01F 1 YEARS JP-C-PMP-A PMP-I-003 PUMP, CHILLED WATER, Armstrong, 1.5 HP 01F 1 YEARS JP-C-PMP-A PMP-I-004 PUMP, CHILLED WATER, Armstrong, 1.5 HP 01F 1 YEARS JP-C-PMP-A

PMP-I-008 PUMP, CHILLED WATER, MARATHON, 2 HP 01F-X 1 YEARS JP-C-PMP-A

PMP-I-009 PUMP, CHILLED WATER, MARATHON, 0.5 HP 01F-X 1 YEARS JP-C-PMP-A

PMP-I-010 PUMP, CHILLED WATER, MARATHON, 1 HP 01F-X 1 YEARS JP-C-PMP-A

01-S1-PMP-283 Building Chilled Water Primary (loop-1) 01-1049 1 YEARS JP-C-PMP-A 01-S1-PMP-284 Building Chilled Water Primary (loop-2) 01-1049 1 YEARS JP-C-PMP-A 01-S1-PMP-285 Building Chilled Water Primary (loop-3) 01-1049 1 YEARS JP-C-PMP-A 01-S1-PMP-286 Building Chilled Water Primary (stand-by) 01-1049 1 YEARS JP-C-PMP-A

Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

NIST Site Equipment (Boulder)

01-W3-PMP-302 Process Chilled Water Pump #1 PCWP-1 01-3353A 1 YEARS JP-C-PMP-A 01-W3-PMP-303 Process Chilled Water Pump #1 PCWP-2 01-3353A 1 YEARS JP-C-PMP-A 01-W3-fan-831 Exhaust Fan (EF 3-1) 01-ROOF-W3 1 YEARS JP-C-EF-A 01-W3-fan-832 Exhaust Fan (EF 3-2) 01-ROOF-W3 1 YEARS JP-C-EF-A 01-W6-fan-824 Exhaust Fan - Exhaust 01-ROOF-W6 1 YEARS JP-C-EF-A 01-W6-fan-825 Exhaust Fan - Exhaust 01-ROOF-W6 1 YEARS JP-C-EF-A

01-S2-PAC-001 PAC 01-2040 3 MONTHS JP-C-AHU-Q

01-W1-AHU-136 Air Handling Unit 136 01-ROOF-W1-NC-N 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A 01-A-AHU-134 Air Handling Unit 01-ROOF-A 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A 01-A-AHU-135 Air Handling Unit 01-ROOF-A 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A 01-FR1-AHU-137 Air Handling Unit 01-RSP1 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A 01-S2-AHU-138 Air Handling Unit 01-1007 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A AHU-I-088 AIR HANDLING UNIT, YORK,# TLKM123270 01F-X 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A AHU-I-089 AIR HANDLING UNIT, YORK,# TLKM123270 01F-X 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A 01-W3-WH-026 Electric Hot Water Heater 01-3311 1 YEARS JP-C-WH-A 01-W6-WH-024 Electric Hot Water Heater - EWH-1 01-3663 1 YEARS JP-C-WH-A MAU-003 MAKE-UP AIR UNIT A/C w/HEAT, REZNOR 02A-ROOF 3 Months 02A-MAU-Q 02A-MAU-S 02A-MAU-A 01-W3-VFD-AHU-140-FAN-A Variable Freq Drive 01-W6-AHU-140 Fan 1A 01-3311 1 YEARS JP-C-VFD-A 01-W3-VFD-AHU-140-FAN-B Variable Freq Drive 01-W6-AHU-140 Fan 1B 01-3311 1 YEARS JP-C-VFD-A 01-W6-VFD-AHU-139-FAN-A Variable Freq Drive 01-W6-AHU-139 Fan A 01-4663 1 YEARS JP-C-VFD-A 01-W6-VFD-AHU-139-FAN-B Variable Freq Drive 01-W6-AHU-139 Fan B 01-4663 1 YEARS JP-C-VFD-A 01-W6-VFD-EF-824 Variable Freq Drive Exhaust Fan 01-ROOF-W6 1 YEARS JP-C-VFD-A 01-W6-VFD-EF-825 Variable Freq Drive Exhaust Fan 01-ROOF-W6 1 YEARS JP-C-VFD-A 01-W3-VFD-EF-831 Variable Freq Drive Exhaust Fan 831 (EF-1) 01-3311 1 YEARS JP-C-VFD-A 01-W3-VFD-EF-832 Variable Freq Drive Exhaust Fan 832 01-3311 1 YEARS JP-C-VFD-A 01-W6-VFD-PMP-293 Variable Freq Drive Heating Hot Water Pump HWP-6-1 01-3665 1 YEARS JP-C-VFD-A 01-W6-VFD-PMP-294 Variable Freq Drive Heating Hot Water Pump HWP-6-2 01-3665 1 YEARS JP-C-VFD-A 01-FR1-VFD-AHU-137 Variable Freq Drive 01-FR1-AHU-137 01-RSP1 1 YEARS JP-C-VFD-A 01-S2-VFD-AHU-138 Variable Freq Drive 01-S2-AHU-138 01-1007 1 YEARS JP-C-VFD-A 01-W1-VFD-AHU-136 Variable Freq Drive 01-W1-AHU-136 01-ROOF-W1-NC-N 1 YEARS JP-C-VFD-A 01-A-VFD-AHU-134 Variable Freq Drive 01-A-AHU-134 01-ROOF-A 1 YEARS JP-C-VFD-A 01-A-VFD-AHU-135 Variable Freq Drive 01-A-AHU-135 01-ROOF-A 1 YEARS JP-C-VFD-A 01-W1-VFD-AHU-136-RF VFD AHU-136 Return Fan 01-ROOF-W1-NC-N 1 YEARS JP-C-VFD-A 01-W1-VFD-AHU-136-SF VFD AHU-136 Supply Fan 01-ROOF-W1-NC-N 1 YEARS JP-C-VFD-A

01-S1-VFD-PMP-279 VFD-PMP-279 01-1049 1 YEARS JP-C-VFD-A

01-S1-VFD-PMP-280 VFD-PMP-280 01-1049 1 YEARS JP-C-VFD-A

01-S1-VFD-PMP-283 VFD-PMP-283 01-1049 1 YEARS JP-C-VFD-A

01-S1-VFD-PMP-284 VFD-PMP-284 01-1049 1 YEARS JP-C-VFD-A

01-S1-VFD-PMP-285 VFD-PMP-285 01-1049 1 YEARS JP-C-VFD-A

01-S1-VFD-PMP-286 VFD-PMP-286 01-1049 1 YEARS JP-C-VFD-A

01-W3-AHU-140 Air Handling Unit (AHU 3-1) 01-3311 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A 01-W6-AHU-139 Air Handling Unit 01-4663 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A

02-PAC-001 PAC Unit (renamed AHU-082) 02-ROOF-UPPER-SOUTH 6 MONTHS

JP-C-PAC-C

JP-C-PAC-H

AHU-081 AIR HANDLING UNIT 02-ROOF-UPPER-SOUTH 3 MONTHS JP-C-AHU-Q JP-C-AHU-S JP-C-AHU-A RC-059 SPLIT PACKAGE A/C SYSTEM,FAN IN AHU-081, 208/230 02-ROOF-UPPER-SOUTH 1 YEARS JP-C-PAC-C

RC-TR-056 COMPRESSOR, TRANE PAC 108 02-ROOF 1 YEARS JP-C-PAC-C

RC-TR-057 COMPRESSOR, TRANE PAC 109 02-ROOF 1 YEARS JP-C-PAC-C

PMP-112 PM PUMP 112 01-R-W2-MECH 1 YEARS JP-PMP-A

PMP-113 PM PUMP 113 01-R-W2-MECH 1 YEARS JP-PMP-A

RC-007 PM RECIP AC COMPRESSOR 01-R-W2-MECH 6 MONTHS JP-C-RC-S JP-C-RC-A

RC-008 PM RECIP AC COMPRESSOR 01-3570 6 MONTHS JP-C-RC-S JP-C-RC-A

RC-011 PM RECIP AC COMPRESSOR 01-3502 6 MONTHS JP-C-RC-S JP-C-RC-A

RC-024 PM RECIP AC COMPRESSOR 01-2548 6 MONTHS JP-C-RC-S JP-C-RC-A

RC-025 PM RECIP AC COMPRESSOR 01-2548 6 MONTHS JP-C-RC-S JP-C-RC-A

RC-026 PM RECIP AC COMPRESSOR 01-2548 6 MONTHS JP-C-RC-S JP-C-RC-A

Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

NIST Site Equipment (Boulder)

05-PAC-002 PM PACKAGED A/C 05-Roof 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

05-PAC-003 PM PACKAGED A/C 05-Roof 6 MONTHS JP-C-PAC-C

JP-C-PAC-H

22-BLR-1122-1 Boiler (location 22-1122) 22-1122 1 MONTHS JP-C-BLR-M JP-C-BLR-Q JP-C-BLR-A 01-AHU-1200-1 Air Handler above 1200 Office suite (location 01-Roof-L) 01-1200 6 MONTHS JP-C-AHU-S JP-C-AHU-A RC-007 Chiller 01-R-W2-MECH JP-CCH-C-Q JP-CCH-C-A JP-CCH-C-2Y

Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

4 Year Job Plan

CU-H-013 PM CONDENSER UNIT 013 WWV-H-EX-N 3 MONTHS JP-C-CU-Q JP-C-CU-S

CU-H-014 PM CONDENSER UNIT 014 WWV-H-EX-N 3 MONTHS JP-C-CU-Q JP-C-CU-S

CU-H-015 PM CONDENSER UNIT 015 WWV-H-EX-N 3 MONTHS JP-C-CU-Q JP-C-CU-S

CU-H-016 PM CONDENSER UNIT 016 WWV-H-EX-N 3 MONTHS JP-C-CU-Q JP-C-CU-S

CU-H-017 PM CONDENSER UNIT 017 WWV-H-EX-N 3 MONTHS JP-C-CU-Q JP-C-CU-S

EF-H-125 PM Exhaust Fan Hawaii 125 WWV-H-ROOF-NC 6 MONTHS JP-C-EF-S JP-C-EF-A EF-H-126 PM Exhaust Fan Hawaii 126 WWV-H-ROOF-NC 6 MONTHS JP-C-EF-S JP-C-EF-A

EVU-H-013 PM EVAPORATOR UNIT 013 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-014 PM EVAPORATOR UNIT 014 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-015 PM EVAPORATOR UNIT 015 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-016 PM EVAPORATOR UNIT 016 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-017 PM EVAPORATOR UNIT 017 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-018 PM EVAPORATOR UNIT 018 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-019 PM EVAPORATOR UNIT 019 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-020 PM EVAPORATOR UNIT 020 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-021 PM EVAPORATOR UNIT 021 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-022 PM EVAPORATOR UNIT 022 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-023 PM EVAPORATOR UNIT 023 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-024 PM EVAPORATOR UNIT 024 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-025 PM EVAPORATOR UNIT 025 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-026 PM EVAPORATOR UNIT 026 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-027 PM EVAPORATOR UNIT 027 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-028 PM EVAPORATOR UNIT 028 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-029 PM EVAPORATOR UNIT 029 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-030 PM EVAPORATOR UNIT 030 WWV-H-1011 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-031 PM EVAPORATOR UNIT 031 WWV-H-1012 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-032 PM EVAPORATOR UNIT 032 WWV-H-1012 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-033 PM EVAPORATOR UNIT 033 WWV-H-1012 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-034 PM EVAPORATOR UNIT 034 WWV-H-1012 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-035 PM EVAPORATOR UNIT 035 WWV-H-1012 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-036 PM EVAPORATOR UNIT 036 WWV-H-1012 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-037 PM EVAPORATOR UNIT 037 WWV-H-1010A 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-038 PM EVAPORATOR UNIT 038 WWV-H-1010A 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-039 PM EVAPORATOR UNIT 039 WWV-H-1010B 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-040 PM EVAPORATOR UNIT 040 WWV-H-1010B 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-041 PM EVAPORATOR UNIT 041 WWV-H-1010 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-042 PM EVAPORATOR UNIT 042 WWV-H-1010 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-043 PM EVAPORATOR UNIT 043 WWV-H-1010 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-044 PM EVAPORATOR UNIT 044 WWV-H-1008 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

NIST Site Equipment Hawaii

Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

4 Year Job Plan

NIST Site Equipment Hawaii

EVU-H-045 PM EVAPORATOR UNIT 045 WWV-H-1007 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-046 PM EVAPORATOR UNIT 046 WWV-H-1006 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-047 PM EVAPORATOR UNIT 047 WWV-H-1004 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-048 PM EVAPORATOR UNIT 048 WWV-H-1003 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-049 PM EVAPORATOR UNIT 049 WWV-H-1002 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-050 PM EVAPORATOR UNIT 050 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

SOLAR-H-001 PM SOLAR ARRAY HAWAII 001 WWV-H-EX-N 6 MONTHS JP-SOLAR-H-S JP-SOLAR-H-A

EVU-H-051 PM EVAPORATOR UNIT 051 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-052 PM EVAPORATOR UNIT 052 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-053 PM EVAPORATOR UNIT 053 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-054 PM EVAPORATOR UNIT 054 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-055 PM EVAPORATOR UNIT 055 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-056 PM EVAPORATOR UNIT 056 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-057 PM EVAPORATOR UNIT 057 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-H-058 PM EVAPORATOR UNIT 058 WWV-H-1009 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

BL-H-WWVH PM HAWAII EXTERIOR BUILDING LIGHTS WWV-H-PMRF 6 MONTHS JP-H-BL-S JP-H-BL-A INT-H-WWVH INTERIOR BUILDING LIGHTING WWV HAWAII WWV-H 6 MONTHS JP-H-INT-S JP-H-INT-A

Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

4 Year Job Plan

EVU-W-051 PM EVAPORATIVE UNIT 051 WWV-1007 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-W-052 PM EVAPORATIVE UNIT 052 WWV-1007 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-W-053 PM EVAPORATIVE UNIT 053 WWV-1007 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-W-054 PM EVAPORATIVE UNIT 054 WWV-1007 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-W-055 PM EVAPORATIVE UNIT 055 WWVB-010 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-W-056 PM EVAPORATIVE UNIT 056 WWVB-010 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-W-057 PM EVAPORATIVE UNIT 057 WWVB-013 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

EVU-W-058 PM EVAPORATIVE UNIT 058 WWVB-013 3 MONTHS JP-C-EVU-Q JP-C-EVU-S

AHU-W-030 PM WWV/B AHU (SWAMP COOLER)-W-030 WWVB-EX-S 6 MONTHS

JP-C-W-AHU-SWAP-F

JP-C-W-AHU-SWAP-S

AHU-W-040 PM WWV/B AHU (SWAMP COOLER)-W-040 WWVB-EX-W 6 MONTHS

AHU-W-050 PM WWV/B AHU (SWAMP COOLER)-W-050 WWVB-EX-N 6 MONTHS

AHU-W-060 PM WWV/B AHU (SWAMP COOLER)-W-060 WWVB-EX-E 6 MONTHS

AHU-W-131 PM WWV/B AHU (SWAMP COOLER)-W-131 (Big Unit) WWV-ROOF-U 6 MONTHS

EF-W-101 PM WWV/B EXHAUST FAN-W-101 WWV-ROOF-L 3 MONTHS JP-C-EF-A

EF-W-102 PM WWV/B EXHAUST FAN-W-102 WWV-ROOF-U 3 MONTHS JP-C-EF-A

EF-W-103 PM WWV/B EXHAUST FAN-W-103 WWV-ROOF-U 3 MONTHS JP-C-EF-A

EF-W-106 PM WWV/B EXHAUST FAN-W-106 WWV-ROOF-U 3 MONTHS JP-C-EF-A

EF-W-107 PM WWV/B EXHAUST FAN-W-107 WWV-ROOF-U 3 MONTHS JP-C-EF-A

EF-W-108 PM WWV/B EXHAUST FAN-W-108 WWV-ROOF-L 3 MONTHS JP-C-EF-A

EF-W-109 PM WWV/B EXHAUST FAN-W-109 WWV-ROOF-L 3 MONTHS JP-C-EF-A

EF-W-110 PM WWV/B EXHAUST FAN-W-110 WWVB-ROOF 3 MONTHS JP-C-EF-A

EF-W-112 PM WWV/B EXHAUST FAN-W-112 WWVB-019 3 MONTHS JP-C-EF-A

EF-W-113 PM WWV/B EXHAUST FAN-W-113 WWVB-020 3 MONTHS JP-C-EF-A

EF-W-114 PM WWV/B EXHAUST FAN-W-114 WWVB-013 3 MONTHS JP-C-EF-A

EF-W-115 PM WWV/B EXHAUST FAN-W-115 WWVB-ROOF 3 MONTHS JP-C-EF-A

EF-W-116 PM WWV/B EXHAUST FAN-W-116 WWVB-ROOF 3 MONTHS JP-C-EF-A

EF-W-117 PM WWV/B EXHAUST FAN-W-117 WWVB-ROOF 3 MONTHS JP-C-EF-A

EF-W-118 PM WWV/B EXHAUST FAN-W-118 WWVB-015 3 MONTHS JP-C-EF-A

EF-W-127 PM WWV/B EXHAUST FAN-W-127 WWV-ROOF-U 3 MONTHS JP-C-EF-A

EF-W-128 PM WWV/B EXHAUST FAN-W-128 WWV-ROOF-U 3 MONTHS JP-C-EF-A

EF-W-129 PM WWV/B EXHAUST FAN-W-129 WWVB-ROOF 3 MONTHS JP-C-EF-A

EF-W-130 PM WWV/B EXHAUST FAN-W-130 WWVB-ROOF 3 MONTHS JP-C-EF-A

EF-W-131 PM WWV/B EXHAUST FAN-W-131 WWVB-ROOF 3 MONTHS JP-C-EF-A

PAC-W-091 PM WWV/B PACKAGE AIR CONDITIONER- W-091 WWVB-ROOF 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-092 PM WWV/B PACKAGE AIR CONDITIONER- W-092 WWV-ROOF-L 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-093 PM WWV/B PACKAGE AIR CONDITIONER- W-093 WWV-ROOF-U 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-132 PM WWV/B PACKAGE AIR CONDITIONER- W-132 WWVB-ROOF 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

NIST Site Equipment (Ft. Collins)

Job Plan

Quarterly Job Plan

Tri-Annual Job Plan

Semi-Annual Job Plan

Annual Job Plan

2 Year Job Plan

4 Year Job Plan

NIST Site Equipment (Ft. Collins)

PAC-W-133 PM WWV/B PACKAGE AIR CONDITIONER- W-133 WWV-ROOF-L 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-134 PM WWV/B PACKAGE AIR CONDITIONER- W-134 WWVB-COOP 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-124 PM WWV/B SPLIT A/C PACKAGE PAC-W-124 WWV-ROOF-U 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-125 PM WWV/B SPLIT A/C PACKAGE PAC-W-125 WWV-ROOF-U 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-126 PM WWV/B SPLIT A/C PACKAGE PAC-W-126 WWV-ROOF-U 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-127 PM WWV/B SPLIT A/C PACKAGE PAC-W-127 WWV-ROOF-U 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-128 PM WWV/B SPLIT A/C PACKAGE PAC-W-128 WWVB-018 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-129 PM WWV/B SPLIT A/C PACKAGE PAC-W-129 WWVB-018 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-130 PM WWV/B SPLIT A/C PACKAGE PAC-W-130 WWVB-018 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

PAC-W-131 PM WWV/B SPLIT A/C PACKAGE PAC-W-131 WWVB-018 3 MONTHS JP-C-PAC-M*

JP-C-PAC-C

JP-C-PAC-H

WAC-W-008 PM Wall Air Aconditioner 008 WWVB-015 3 MONTHS JP-C-WAC-Q *Monthly PM on all condensing units to clean cotton from coils. PM will be during the summer months. (May, June, July, and August)

CUP
NIST Site
Hawaii
Ft. Collins

File details come from the government source that posted it. Updated .