PWS Attach 3 - CUP Monthly Report Amend 0006.pdf

PDF 1 MB Posted

Attached to
Operations, Maintenance, and Repair Services of the Central Utility Plant NIST, Boulder
Solicitation number
1333ND20RNB190010
Issued by

About this file

This document contains a monthly report template for a federal contract to provide operations, maintenance, and repair services for the central utility plant at the National Institute of Standards and Technology in Boulder, Colorado. The report requires the contractor to provide detailed logs and summaries of major and minor repairs, preventative maintenance completed, chemical testing results, spare parts inventory, man-hour reporting, and after-hours responses. The contract has a base period of one year with four optional one-year extensions, and the contractor must also perform maintenance at field sites in Fort Collins, Colorado and Kekaha, Hawaii. The North American Industry Classification System code for this requirement is 811310.

View the file

Other files

File Type Posted
PWS Attach 8 NIST GENERAL INSTRUCTIONS 9.28.20.pdf PDF
PWS Attach 12 - Lighting Summary WWVh Field Site Kekaha HI Amend 0006.pdf PDF
PWS Attach 10 - Primer on Safety Plan RequirementsAddendums for COVID19 Amend 0006.pdf PDF
PWS Attach 1 - Mechanical Room and Preventative Maintenance (MR_PM) List Amend 0006.pdf PDF
PWS Attach 5 - Job Plans Amend 0006.pdf PDF
PWS Attach 11 - Emergency Generators Amend 0006.pdf PDF
1333ND20RNB190010 Conformed thru Amend 0006.pdf PDF
1333ND20RNB190010 0006.pdf PDF
CUP PWS 2020-10-01 Amend 0006.pdf PDF
PWS Attach 13 - Transition Requirements Amend 0006.pdf PDF
1333ND20RNB190010 0005.pdf PDF
1333ND20RNB190010 0004.pdf PDF
1333ND20CNB190010 0003.pdf PDF
1333ND20RNB190010 0002.pdf PDF
PWS Attachment 1 Mech Rm_PM List Amend 0001.pdf PDF
PWS Attachment 6 Daily Report.pdf PDF
PWS Attachment 2 Spare Parts Inventory.pdf PDF
PWS Attachment 9 Safety Plan Checklist for CUP 2020.pdf PDF
PWS Attachment 3 Monthly Report.pdf PDF
PWS Attachment 5 Job Plans.pdf PDF
RFP Attch A_NIST AMD Boulder PPQ Form.doc DOC document
PWS Attachment 8 NIST GENERAL INSTRUCTIONS_3-15-19.pdf PDF
RFP Attch C_KeyPersonnelStatement.docx DOCX document
RFP Attch F_PricingSheet.xlsx XLSX spreadsheet
RFP Attch B_ResumeFormKeyPersonnel.docx DOCX document
20RNB190010 Amend 001.pdf PDF
RFP Attch D SBPCD.docx DOCX document
PWS Attachment 6 Safety Plan Checklist for CUP 2020.pdf PDF
PWS Attachment 1 Mech Rm_PM List.pdf PDF
PWS Attachment 3 Daily Report.pdf PDF
PWS Attachment 5 NIST GENERAL INSTRUCTIONS_3-15-19.pdf PDF
1333ND20RNB190010.pdf PDF
PWS Attachment 2 Monthly Report.pdf PDF
PWS Attachment 4 Job Plans.pdf PDF
CUP PWS 2020-03-09.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Major Repairs:

Minor Repairs:

Boiler Monthly Repair Log

Month:

Year:

Company:

PWS Attach 3 - CUP Monthly Report Page 1 of 16 1333ND20RNB190010 Amendment 0006

Major Repair Summary:

Minor Repair Summary:

Air Compressor Repair Summary

Month:

Year:

Company:

PWS Attach 3 - CUP Monthly Report Page 2 of 16 1333ND20RNB190010

Month: Year:

Day Start End Daily Total

Building Water Usage Report

PWS Attach 3 - CUP Monthly Report Page 3 of 16 1333ND20RNB190010

Date Daily DA Tank Temp

Daily DA Tank Press

Daily System Condensate Return

Daily Total Make-Up Water Flow

DA Tank - Pressure - Temps

PWS Attach 3 - CUP Monthly Report Page 4 of 16 1333ND20RNB190010

Date

BLR 17

Meter reading

BLR 18

Meter reading

BLR 19

Meter reading

BLDG. 42

Meter reading

NIST Boulder Gas Usage

PWS Attach 3 - CUP Monthly Report Page 5 of 16 1333ND20RNB190010

BLR Date Daily M/CF Total Gas Flow

Daily GALS Total FDW Flow

Daily LBS/H Total BLR Steam Flow

Daily Lbs/H Total SYS Steam Flow

Daily PSI Total System Steam Press

Daily PSI Total BLR Steam Press

Daily LBS / H Total BLR Steam LG Flow

Boiler - Pressures - Flow

PWS Attach 3 - CUP Monthly Report Page 6 of 16 1333ND20RNB190010

BLR Date Daily Total Temp Stack ENT

Daily Total Temp Stack

LVG

Daily Total Temp Econo IN

Daily Total Temp Econo

OUT

Daily Total Temp OAT

Boiler Temps

PWS Attach 3 - CUP Monthly Report Page 7 of 16 1333ND20RNB190010

Monthly Man Hour Report Month of:

Contracted Work;

a) Contract Number:

b) Contract Type (Select Type): ( ) Construction ( ) Service

c) Project Name: Central Utility Plant Operation and Maintenance

d) Company Name:

e) NAICS Code for the Company performing the work:

f) Total number of man-hours worked this month (must include subcontractor hours):

g) Lost Time Injury experienced during the month:

h) Near Miss Incidents for the month:

i) Fire/Property Damage Incidents:

j) No Work Completed this Month:

2. COR’s are responsible for collecting the forms from your contractor and submit to FMD Safety offic

1. All contractors, service and construction, are required to submit a monthly man-hour/ injury report. This report needs to be submitted to the EMSS Safety office no later than the 5th of each month. The report needs to contain the following information;

PWS Attach 3 - CUP Monthly Report Page 8 of 16 1333ND20RNB190010

Monthly Maintenance Summary:

Ft. Collins Maintenance Summary

Month:

Year:

Company:

Contractor to provide Maintenance reports/checklists on the PMs completed at the Ft.

Collins site, and record preventative maintenance information from the job plan inputted into Maximo Logs. Any temperature, voltage or pressure readings listed in the job plan shall be provided in the Maximo logs.

PWS Attach 3 - CUP Monthly Report Page 9 of 16 1333ND20RNB190010

Monthly Maintenance Summary:

Hawaii Maintenance Summary

Month:

Year:

Company:

Contractor to provide Maintenance reports/checklists on the PMs completed at the Hawaii site, and record preventative maintenance information from the job plan inputted into Maximo Logs. Any temperature, voltage or pressure readings listed in the job plan shall be provided in the Maximo logs.

PWS Attach 3 - CUP Monthly Report Page 10 of 16 1333ND20RNB190010

Date Time Time

Alarm Cleared

Dispatch Personnel Name of Alarm Description Description of Actions Taken

Stationary Engineer

Initials

After Hours Log

PWS Attach 3 - CUP Monthly Report Page 11 of 16 1333ND20RNB190010

Monthly Repair / Replacement Summary:

Discrepancies:

Steam Trap Repair / Replacement Summary

Month:

Year:

Company:

PWS Attach 3 - CUP Monthly Report Page 12 of 16 1333ND20RNB190010

Chemical Testing Summary:

Month:

Year:

Company:

Testing to be completed every 8 hours based on selected manufacturer's recommendations checklist and submitted as part of the monthly report.

- Chemical testing of B-17, 18 and 19 every 8 hours

- B-42 closed loop chilled water system tested monthly

- B-42 condenser water system tested every 8 hours

Contractor shall provide monthly reporting on any anomalies found in the testing for the month, and the manufacturer's recommendations on chemical adjustments or treatments to be made.

Chemical Testing Summary (Revised Amend 0006)

PWS Attach 3 - CUP Monthly Report Page 13 of 16 1333ND20RNB190010

Chilled Water Repair Summary

Month:

Year:

Company:

PWS Attach 3 - CUP Monthly Report Page 14 of 16 1333ND20RNB190010

Type of equipment

Spare Parts Quantity needed

Spare parts Quantity on hand Chemical LMI pumps 2

Liquid end assemblies 2

LMI pump Repair kits 2

B-1 Steam traps 2

B-2 Steam Traps 2

B-3 Steam Traps 2

Thermo Dynamic traps 2

CUP Building 42 Government Provided Parts

PWS Attach 3 - CUP Monthly Report Page 15 of 16 1333ND20RNB190010

Generator Preventative Maintenance

Month:

Year:

Company:

PWS Attach 3 - CUP Monthly Report Page 16 of 16 1333ND20RNB190010

Boiler Repairs
Air Comp Repair
Building Water Usage
DA Tank Daily
Gas Usage Report
Boiler Daily Read Pressure Flow
Boiler Daily Temp Readings
Man Hour
Ft. Collins Maint. Summary
Hawaii Maint Summary
After Hours Log
Steam Trap
Chemical Treatment
Chilled Water
Spare Parts Inventory
Generator PMs