RFP-PII_9_HVAC_Design_Data_and_Sizing_Summary_for_Wing_5_from_PPR_Appendix_A.pdf

PDF 187 KB Posted

Attached to
NIST Boulder Campus Renovation of Building 1 Wing 5, Wing 4 and Partial Spine / Main Corridor
Solicitation number
1333ND19RNB190004
Issued by

About this file

This document provides details for a design-build construction project solicitation for the renovation of Building 1 Wings 4 and 5 and partial spine at the National Institute of Standards and Technology campus in Boulder, Colorado. The solicitation will include a base contract line item for Wing 5 renovation and seven option contract line items, including furnishings, Wing 4 renovation, furnishings, partial spine renovation, furnishings, and remobilization. The period of performance for Wing 5 is 616 days, while Wings 4 and partial spine will be 420 and 308 days respectively if those options are exercised. A LEED Gold certification is required. The project magnitude is over $10 million. The solicitation will utilize full and open competition and result in a single award. The pre-proposal conference will be in June 2019 and proposals are due as specified in the solicitation.

Attachment 9 - HVAC Design Data and Sizing Summary for Wing 5 from PPR Appendix A

View the file

Other files

File Type Posted
RFP-PII_22_Historic_Structure_Report_Attachments_-_Preservation_Brief_24.pdf PDF
RFP-PII_10_Conceptual_Planning_Report_by_Smith_Group_2012_from_PPR_Appendix_C.pdf PDF
RFP-PII_5_Geotech_Report_by_Empire_Labs_for_Wing_3_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_8_HVAC_Design_Data_and_Sizing_Summary_for_Wing_4_from_PPR_Appendix_A.pdf PDF
RFP-PII_0_Attach_E_Subcontracting_Plan_Requirements.pdf PDF
RFP-PII_16_Historic_Structure_Report_Attachments_-_Preservation_Brief_4.pdf PDF
RFP-PII_4_Geotech_Report_by_Empire_Labs_for_Wing_1_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_25_Wage_Determination_CO20180027.pdf PDF
1333ND19RNB190004A002.pdf PDF
RFP-PII_18_Historic_Structure_Report_Attachments_-_Preservation_Brief_14.pdf PDF
RFP-PII_14_Historic_Structure_Report_Attachments_-_Preservation_Brief_1.pdf PDF
RFP-PII_1_Energy_Modeling_Data_from_PPR_Appendix_A.pdf PDF
RFP-PII_24_NIST_Bldr_Lab_&_Admin_Space_Planning_Study_2016.pdf PDF
RFP-PII_6_Geotech_Report_by_JA_Cesare_from_PPR_Appendix_A.pdf PDF
RFP-PII_11_Construction_Drawings_1960_from_PPR_Appendix_C.pdf PDF
RFP-PII_12_Construction_Drawings_by_HDR_for_Connector_to_B81_from_PPR_Appendix_C.pdf PDF
RFP-PII_20_Historic_Structure_Report_Attachments_-_Preservation_Brief_16.pdf PDF
RFP-PII_19_Historic_Structure_Report_Attachments_-_Preservation_Brief_15.pdf PDF
RFP-PII_2_Geotech_Report_by_Empire_Labs_for_Rear_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_13_Floor_Plans_for_Spine_from_PPR_Appendix_C.pdf PDF
RFP-PII_3_Geotech_Report_by_Empire_Labs_for_South_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_21_Historic_Structure_Report_Attachments_-_Preservation_Brief_18.pdf PDF
RFP-PII_17_Historic_Structure_Report_Attachments_-_Preservation_Brief_13.pdf PDF
RFP-PII_7_HVAC_Design_Data_and_Sizing_Summary_for_Spine_from_PPR_Appendix_A.pdf PDF
RFP-PII_15_Historic_Structure_Report_Attachments_-_Preservation_Brief_3.pdf PDF
RFP-PII_23_Historic_Structure_Report_Attachments_-_Preservation_Brief_41.pdf PDF
1333ND19RNB190004A001.pdf PDF
Attachment_A001_1333ND19RNB190004-B1RW5-4-S-RFI-GovResponse-2019-08-15.pdf PDF
Attendance_Roster_B1R.pdf PDF
1_NIST-B1R-W5-4-Spine-P1-Preproposal_Conf-8-8-19.pdf PDF
RFI_Sheet_Template.xlsx XLSX spreadsheet
RFP_Attach_8_Historic_Assessment_by_Goodwin_&_Assoc_from_PPR_Appendix_C.pdf PDF
RFP_Attach_B_NIST_AMD_Boulder_PPQ_Form.pdf PDF
RFP_Attach_12_Sustainable_Design_Review_for_LEED-NC_2018.pdf PDF
RFP_Attach_11_Historic_Structure_Report_Attachments_-_Zone_Maps.pdf PDF
RFP_Attach_A_Cons_&_Design_Exp_Proj-Data-Sheet.pdf PDF
RFP_Attach_7_Construction_Drawings_1952_from_PPR_Appendix_C.pdf PDF
RFP_Attach_2_General_Instructions_for_Conducting_Work_at_NIST_Boulder_-_22_August_2018.pdf PDF
RFP_Attach_C_ResumeFormKeyPersonnel.pdf PDF
RFP_Attach_4_Geotech_Report_by_CTL_Thompson_from_PPR_Appendix_A.pdf PDF
RFP_Attach_D_KeyPersonnelStatement.pdf PDF
RFP_Attach_5_Site_Plans_from_PPR_Appendix_A.pdf PDF
RFP_Attach_1_Statement_of_Work_B1_Renovation_W5_W4_Spine.pdf PDF
RFP_Attach_9_Historic_Structure_Report_-_PPR_Appendix_C.pdf PDF
RFP_Attach_E_Subcontracting_Plan_Requirements.pdf PDF
RFP_Attach_3_NIST_PPR-B1R-W5-W4-Spine-31Jul2019.pdf PDF
RFP_Attach_6_NIST_Boulder_Campus_Master_Plan_2017_from_PPR_Appendix_C.pdf PDF
RFP_Attach_10_Historic_Structure_Report_Attachments_-_Photos.pdf PDF
Request_for_Proposal_1333ND19RNB190004.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

60560981 - B1R Design Development Design Summary Description Baseline Remarks

Wing 5

Square Footage (AHU-5-1) 47,007 SQFT

Square Footage (AHU-5-2) 26,141 SQFT

Total 73,148 SQFT

HVAC Cooling Load 258 TONS sum of peaks - connected loads

Process Cooling Load 73 Tons (Included in above figure) 12 W/SF of Lab Area (21 336 SF) = 256.0kW = 874

MBH = 72.9 tons

Future Cooling load (0%) - Applied to accommodate future building tenant demand

Design Margin (0%) TONS Applied to make the current value upper bounding for space allocation at conceptual design

Total Chilled Water Flow Demand 519 GPM Qty. (2) pumps @ 100% each

Total Cooling Tower Capacity 260 TONS Qty. (2) towers @ 50% each

Condenser Water Flow Demand 780 GPM Qty. (2) pumps @ 100% each

Process Cooling Flow Demand 175 GPM Qty. (2) pumps @ 100% each

Engineering Checks 391 SQFT/TON Process Load, Conceptual Design Factor removed from calc

HVAC Heating Load 3,063 MBH sum of peaks - connected load

Future Heating load (0%) - Applied to accommodate future building tenant demand

Conceptual Design Factor (10%) 307 MBH Applied to make the current value upper bounding for space allocation at conceptual design

Total Heating Plant Capacity 3,063 MBH Capacity is Site Output.

Total Heating Water Flow Demand 247 GPM 25 deg F delta T

Engineering Checks 65 BTUH/SQFT Domestic Load and Conceptual Design Factor removed from calc.

1,382 MBH OA heating Load

19 BTUH/SQFT

Domestic Heating Load 41 MBH Estimate is based on engineering judgement and previous building designs.

Future Heating load (0%) - Applied to accommodate future building tenant demand

Conceptual Design Factor (0%) MBH Applied to make the current value upper bounding for space allocation at conceptual design

Total Dom. Heating Capacity 41 MBH Capacity is Site Output.

Sea Level Input 100 MBH Required Sea Level Input. Assume 84% (0.84) efficiency and 4%/1000 ft. elev. (0.784) derate

Hot Water Generator installation

Hot Water Generator redundancy

FCU and DOAS System (AHU-5-1)

DOAS Airflow 20,825 CFM

Future Airflow Expansion (0%) -

Conceptual Design Factor (10%) 2,100 CFM

23,000 CFM Demand

AHU Installation

Engineering Checks 0.44 CFM/sqft (OA) Conceptual Design Factor removed from calc.

Recirc VAV System (AHU-5-2)

Total Airflow (DOAS)

Cooling Demand

Heating Plant

Air Handling Units

Domestic Water Heating

Chilled Water System Sizing

Project: NIST B1R

System: Chilled Water Glycol: 0%

MBH kW GPM L/s F C

1337 391.6 222.9 14.06 12.06 6.70

AHU-5-2 675 197.7 112.5 7.10 12.06 6.70

PFHX-5-1 874 256.0 145.7 9.19 12.06 6.70

FCU-5-201 5.2 1.5 0.9 0.06 11.62 6.45

FCU-5-202 1.1 0.3 0.2 0.01 11.06 6.14

FCU-5-203 6.4 1.9 1.1 0.07 11.70 6.50

FCU-5-204 2.8 0.8 0.5 0.03 11.26 6.26

FCU-5-205 2.3 0.7 0.4 0.03 11.56 6.42

FCU-5-206 2.3 0.7 0.4 0.03 11.56 6.42

FCU-5-207 2.3 0.7 0.4 0.03 11.56 6.42

FCU-5-208 1.1 0.3 0.2 0.01 11.06 6.14

FCU-5-209 3.6 1.1 0.6 0.04 12.06 6.70

FCU-5-301 4.7 1.4 0.8 0.05 11.81 6.56

FCU-5-302 2.2 0.6 0.4 0.03 11.06 6.14

FCU-5-303 4.4 1.3 0.8 0.05 11.06 6.14

FCU-5-304 6.4 1.9 1.1 0.07 11.70 6.50

FCU-5-305 1.1 0.3 0.2 0.01 11.06 6.14

FCU-5-306 1.5 0.4 0.3 0.02 10.05 5.58

FCU-5-307 2.3 0.7 0.4 0.03 11.56 6.42

FCU-5-308 6.4 1.9 1.1 0.07 11.70 6.50

FCU-5-309 1.5 0.4 0.3 0.02 10.05 5.58

FCU-5-310 1.5 0.4 0.3 0.02

FCU-5-311 1.5 0.4 0.3 0.02 10.05 5.58

FCU-5-312 1.5 0.4 0.3 0.02 10.05 5.58

FCU-5-313 1.7 0.5 0.3 0.02 11.39 6.33

FCU-5-314 1.7 0.5 0.3 0.02 11.39 6.33

FCU-5-315 1.7 0.5 0.3 0.02 11.39 6.33

FCU-5-316 1.7 0.5 0.3 0.02 11.39 6.33

FCU-5-317 4.7 1.4 0.8 0.05 11.81 6.56

FCU-5-318 6.4 1.9 1.1 0.07 11.70 6.50

FCU-5-319 4.4 1.3 0.8 0.05 11.06 6.14

FCU-5-320A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-320B 5.6 1.6 1 0.06 11.26 6.26

FCU-5-320A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-320B 5.6 1.6 1 0.06 11.26 6.26

FCU-5-321A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-321B 5.6 1.6 1 0.06 11.26 6.26

FCU-5-322A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-322B 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-323A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-323B 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-324A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-324B 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-325A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-325B 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-326A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-326B 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-327 7 2.1 1.2 0.08 11.73 6.52

Temp. Differential

AHU-5-1

System Tot. Cooling Cap. Water Flow

30CD Equipment Sizing-WING 5 - Chilled Water 7/24/2018 - 11:04 AM

FCU-5-328A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-328B 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-329A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-329B 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-330A 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-330B 3.1 0.9 0.6 0.04 10.39 5.77

FCU-5-331 7 2.1 1.2 0.08 11.73 6.52

FCU-5-401 2.7 0.8 0.5 0.03 10.86 6.03

FCU-5-402 4.4 1.3 0.8 0.05 11.06 6.14

FCU-5-403 2 0.6 0.4 0.03 10.05 5.58

FCU-5-404 1.8 0.5 0.3 0.02 12.06 6.70

FCU-5-405 4.4 1.3 0.8 0.05 11.06 6.14

FCU-5-406 4.4 1.3 0.8 0.05 11.06 6.14

FCU-5-407 1.6 0.5 0.3 0.02 10.72 5.96

FCU-5-408 2.9 0.8 0.5 0.03 11.66 6.48

FCU-5-409 4.4 1.3 0.8 0.05 11.06 6.14

FCU-5-410 0.6 0.2 0.1 0.01 12.06 6.70

FCU-5-411 2.5 0.7 0.5 0.03 10.05 5.58

0.0 0.00 0.00 0.00

0.0 0.00 0.00 0.00

Sub-Total 3092 906 519 32.7

0.0 0 0 0.0

Total 3091.8 906 519 32.7 12.0 6.7 or 257.7 Tons

Growth Factor (0%)

30CD Equipment Sizing-WING 5 - Chilled Water 7/24/2018 - 11:04 AM

Heating Water System Sizing

Project: NIST B1R

System: Heating Water Glycol: 0%

MBH kW GPM L/s F C

663 194.2 53.1 3.35 25.10 13.95

AHU-5-2 (HC-5-2) 442 129.5 35.4 2.23 25.10 13.95

15.6 4.6 1.3 0.08 24.13 13.40

CUH-5-301 15.6 4.6 1.3 0.08 24.13 13.40

CUH-5-302 15.6 4.6 1.3 0.08 24.13 13.40

CUH-5-303 15.6 4.6 1.3 0.08 24.13 13.40

CUH-5-401 16.6 4.9 1.4 0.09 23.84 13.24

CUH-5-402 17.6 5.2 1.5 0.09 23.59 13.11

CUH-5-403 18.6 5.4 1.5 0.09 24.93 13.85

CUH-5-404 18.6 5.4 1.5 0.09 24.93 13.85

UH-5-201 20.1 5.9 1.7 0.11 23.77 13.21

UH-5-301 20.1 5.9 1.7 0.11 23.77 13.21

UH-5-302 20.1 5.9 1.7 0.11 23.77 13.21

R-5-5 (184LF@815 BTUh/LF)) 150 43.9 12 0.76 25.13 13.96

R-5-1:4 (340LF@815 BTUh/LF) 375 109.8 30 1.89 25.13 13.96

FCU-5-201 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-202 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-203 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-204 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-205 31.3 9.2 2.6 0.16 24.20 13.45

FCU-5-206 31.3 9.2 2.6 0.16 24.20 13.45

FCU-5-207 31.3 9.2 2.6 0.16 24.20 13.45

FCU-5-208 15.1 4.4 1.3 0.08 23.35 12.97

FCU-5-209 16.3 4.8 1.4 0.09 23.41 13.00

FCU-5-301 21.2 6.2 1.7 0.11 25.07 13.93

FCU-5-302 10.6 3.1 0.9 0.06 23.68 13.16

FCU-5-303 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-304 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-305 4.8 1.4 0.4 0.03 24.13 13.40

FCU-5-306 6.9 2.0 0.6 0.04 23.12 12.85

FCU-5-307 10.3 3.0 0.9 0.06 23.01 12.78

FCU-5-308 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-309 6.9 2.0 0.6 0.04 23.12 12.85

FCU-5-310 6.9 2.0 0.6 0.04 23.12 12.85

FCU-5-311 6.9 2.0 0.6 0.04 23.12 12.85

FCU-5-312 6.9 2.0 0.6 0.04 23.12 12.85

FCU-5-313 7.4 2.2 0.6 0.04 24.80 13.78

FCU-5-314 7.4 2.2 0.6 0.04 24.80 13.78

FCU-5-315 7.4 2.2 0.6 0.04 24.80 13.78

FCU-5-316 7.4 2.2 0.6 0.04 24.80 13.78

FCU-5-317 21.2 6.2 1.7 0.11 25.07 13.93

FCU-5-318 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-319 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-320A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-320B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-320A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-320B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-321A 41 12.0 3.3 0.21 24.98 13.88

System Tot. Heating Cap. Water Flow Temp. Differential

AHU-5-1 (HC-4-1)

CUH-5-201

30CD Equipment Sizing-WING 5 - Heating Water 7/24/2018 - 11:04 AM

FCU-5-321B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-322A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-322B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-323A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-323B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-324A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-324B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-325A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-325B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-326A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-326B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-327 33.6 9.8 2.7 0.17 25.02 13.90

FCU-5-328A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-328B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-329A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-329B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-330A 41 12.0 3.3 0.21 24.98 13.88

FCU-5-330B 41 12.0 3.3 0.21 24.98 13.88

FCU-5-331 33.6 9.8 2.7 0.17 25.02 13.90

FCU-5-401 12.2 3.6 1 0.06 24.53 13.63

FCU-5-402 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-403 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-404 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-405 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-406 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-407 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-408 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-409 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-410 0 0.0 0 0.00 #DIV/0! #DIV/0!

FCU-5-411 0 0.0 0 0.00 #DIV/0! #DIV/0!

0.0 0.00 0.00 0.00

0.0 0.00 0.00 0.00

Sub-Total 3063 897 247 15.6

0.0 0 0 0.0

Total 3063.0 897 247 15.6 24.9 13.8

Growth Factor (0%)

30CD Equipment Sizing-WING 5 - Heating Water 7/24/2018 - 11:04 AM

DOAS AHU Sizing

System: AHU-5-1 Project: NIST

CFM L/s Min Max Min Max in.w.g. Pa

- 0 0 164 410 77.408 193.52 0.5 124.535

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

580 273.76 0 0 0

580 273.76 0 0 0

580 273.76 0 0 0

275 129.8 0 0 0

500 236 0 0 0

350 165.2 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

110 51.92 0 0 0

55 25.96 0 0 0

85 40.12 0 0 0

0 0 0 0 0

55 25.96 0 0 0

55 25.96 0 0 0

55 25.96 0 0 0

55 25.96 0 0 0

125 59 0 0 0

55 25.96 0 0 0

55 25.96 0 0 0

55 25.96 0 0 0

350 165.2 0 0 0

0 0 0 0 0

0 0 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

0 0 0 0 0

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0FCU-5-329A

FCU-5-326A

FCU-5-326B

FCU-5-327

FCU-5-328A

FCU-5-328B

FCU-5-323B

FCU-5-324A

FCU-5-324B

FCU-5-325A

FCU-5-325B

Primary Flow (L/s) Req'd Inlet Press.

FCU-5-203

FCU-5-204

FCU-5-205

FCU-5-201

FCU-5-202

FCU Box

Mark Type

Zone OA Req'd Primary Flow (CFM)

FCU-5-303

FCU-5-304

FCU-5-305

FCU-5-306

FCU-5-311

FCU-5-308

FCU-5-309

FCU-5-310

FCU-5-207

FCU-5-208

FCU-5-209

FCU-5-301

FCU-5-302

FCU-5-206

FCU-5-312

FCU-5-313

FCU-5-320B

FCU-5-314

FCU-5-315

FCU-5-316

FCU-5-317

FCU-5-318

FCU-5-319

FCU-5-320A

FCU-5-320A

FCU-5-307

FCU-5-320B

FCU-5-321A

FCU-5-321B

FCU-5-322A

FCU-5-322B

FCU-5-323A

30CD Equipment Sizing-WING 5 - AHU-5-1 7/24/2018 - 11:04 AM

750 354 0 0 0

750 354 0 0 0

750 354 0 0 0

0 0 0 0 0

350 165.2 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0

0 0 0 0

Sub-Total 20825 9829.4 164 410 77.408 193.52 0.5 124.535

0 0 0 0

Total 20825 9829.4 410 193.52

FCU-5-401

FCU-5-402

placeholder

FCU-5-329B

FCU-5-330A

FCU-5-330B

FCU-5-331

placeholder placeholder

Growth Factor (0%) placeholder placeholder placeholder placeholder placeholder placeholder

30CD Equipment Sizing-WING 5 - AHU-5-1 7/24/2018 - 11:04 AM

Heat Exchanger Sizing

Printed On: 7/24/2018

Project Name: NIST B1R

Project #: 60560981

Heat Exchanger: STHX-SP-1

Service Steam (15 PSI) to Heating Water

System Properties

Hot Side Steam Cold Side Heating Water

Flow 3930 PPH Flow 247 GPM

EWT 0 deg F EWT 135 deg F

LWT 0 deg F LWT 165 deg F

Delta T 0 deg F Delta T 30 deg F

Fluid Steam Fluid Water

Percent Glycol 0 % Percent Glycol 0 %

Derate Factor 500 Derate Factor 500

Heat Transfer 3708 MBH

Code Requirements:

TBD

Notes:

M:\DCS\Projects\BDL\60560981_NIST_Bould\400-Technical\437-Mechanical\Calculations\30CD_Equipment Sizing\30CD Equipment

Sizing-WING 5

Project Name: NIST B1R

Project #: 60560981

Heat Exchanger: STHX-SP-1

Service Steam (15 PSI) to Heating Water

System Properties

Hot Side Process Water Cold Side Chilled Water

Flow 146 GPM Flow 121 GPM

EWT 65 deg F EWT 44 deg F

LWT 55 deg F LWT 56 deg F

Delta T 10 deg F Delta T 12 deg F

Fluid Water Fluid Water

Percent Glycol 0 % Percent Glycol 0 %

Derate Factor 500 Derate Factor 500

Heat Transfer 729 MBH Heat Transfer 729 MBH

Code Requirements:

TBD

Notes:

M:\DCS\Projects\BDL\60560981_NIST_Bould\400-Technical\437-Mechanical\Calculations\30CD_Equipment Sizing\30CD Equipment

Project Name: NIST B1R

Project #: 60560981

Heat Exchanger: STHX-SP-1

Service Steam (15 PSI) to Heating Water

System Properties

Hot Side Heating Water Cold Side Snowmelt

Flow 65 GPM Flow 65 GPM

EWT 160 deg F EWT 132 deg F

LWT 135 deg F LWT 157 deg F

Delta T 25 deg F Delta T 25 deg F

Fluid Water Fluid Water

Percent Glycol 0 % Percent Glycol 0 %

Derate Factor 500 Derate Factor 500

Heat Transfer 813 MBH Heat Transfer 813 MBH

Code Requirements:

TBD

Notes:

M:\DCS\Projects\BDL\60560981_NIST_Bould\400-Technical\437-Mechanical\Calculations\30CD_Equipment Sizing\30CD Equipment

File details come from the government source that posted it. Updated .