This document summarizes a federal solicitation for design-build construction services. The National Institute of Standards and Technology seeks to renovate Building 1 at its Boulder, Colorado campus, including Wings 4, 5 and portions of the main corridor. The agency will award a firm-fixed-price contract using a two-phase design-build selection process outlined in FAR Part 36. Phase 1 involves evaluating offeror qualifications, while Phase 2 assesses technical and price proposals. The solicitation includes a base CLIN for Wing 5 renovation and seven option CLINs for additional work. The period of performance is 616 days for the base and one option CLIN, 420 days for two other option CLINs, and 308 days for the remaining two option CLINs. At a minimum, the completed project must achieve LEED Gold certification. The estimated value exceeds $10 million. The NAICS code is 236220 and small business size standard is $36.5 million. Proposals are due on a date specified in the forthcoming solicitation.

Pre-Proposal Conference Slides

View the file

Other files

File Type Posted
RFP-PII_22_Historic_Structure_Report_Attachments_-_Preservation_Brief_24.pdf PDF
RFP-PII_10_Conceptual_Planning_Report_by_Smith_Group_2012_from_PPR_Appendix_C.pdf PDF
RFP-PII_5_Geotech_Report_by_Empire_Labs_for_Wing_3_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_8_HVAC_Design_Data_and_Sizing_Summary_for_Wing_4_from_PPR_Appendix_A.pdf PDF
RFP-PII_0_Attach_E_Subcontracting_Plan_Requirements.pdf PDF
RFP-PII_16_Historic_Structure_Report_Attachments_-_Preservation_Brief_4.pdf PDF
RFP-PII_4_Geotech_Report_by_Empire_Labs_for_Wing_1_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_25_Wage_Determination_CO20180027.pdf PDF
RFP-PII_9_HVAC_Design_Data_and_Sizing_Summary_for_Wing_5_from_PPR_Appendix_A.pdf PDF
1333ND19RNB190004A002.pdf PDF
RFP-PII_18_Historic_Structure_Report_Attachments_-_Preservation_Brief_14.pdf PDF
RFP-PII_14_Historic_Structure_Report_Attachments_-_Preservation_Brief_1.pdf PDF
RFP-PII_1_Energy_Modeling_Data_from_PPR_Appendix_A.pdf PDF
RFP-PII_24_NIST_Bldr_Lab_&_Admin_Space_Planning_Study_2016.pdf PDF
RFP-PII_6_Geotech_Report_by_JA_Cesare_from_PPR_Appendix_A.pdf PDF
RFP-PII_11_Construction_Drawings_1960_from_PPR_Appendix_C.pdf PDF
RFP-PII_12_Construction_Drawings_by_HDR_for_Connector_to_B81_from_PPR_Appendix_C.pdf PDF
RFP-PII_20_Historic_Structure_Report_Attachments_-_Preservation_Brief_16.pdf PDF
RFP-PII_19_Historic_Structure_Report_Attachments_-_Preservation_Brief_15.pdf PDF
RFP-PII_2_Geotech_Report_by_Empire_Labs_for_Rear_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_13_Floor_Plans_for_Spine_from_PPR_Appendix_C.pdf PDF
RFP-PII_3_Geotech_Report_by_Empire_Labs_for_South_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_21_Historic_Structure_Report_Attachments_-_Preservation_Brief_18.pdf PDF
RFP-PII_17_Historic_Structure_Report_Attachments_-_Preservation_Brief_13.pdf PDF
RFP-PII_7_HVAC_Design_Data_and_Sizing_Summary_for_Spine_from_PPR_Appendix_A.pdf PDF
RFP-PII_15_Historic_Structure_Report_Attachments_-_Preservation_Brief_3.pdf PDF
RFP-PII_23_Historic_Structure_Report_Attachments_-_Preservation_Brief_41.pdf PDF
1333ND19RNB190004A001.pdf PDF
Attachment_A001_1333ND19RNB190004-B1RW5-4-S-RFI-GovResponse-2019-08-15.pdf PDF
Attendance_Roster_B1R.pdf PDF
RFI_Sheet_Template.xlsx XLSX spreadsheet
RFP_Attach_8_Historic_Assessment_by_Goodwin_&_Assoc_from_PPR_Appendix_C.pdf PDF
RFP_Attach_B_NIST_AMD_Boulder_PPQ_Form.pdf PDF
RFP_Attach_12_Sustainable_Design_Review_for_LEED-NC_2018.pdf PDF
RFP_Attach_11_Historic_Structure_Report_Attachments_-_Zone_Maps.pdf PDF
RFP_Attach_A_Cons_&_Design_Exp_Proj-Data-Sheet.pdf PDF
RFP_Attach_7_Construction_Drawings_1952_from_PPR_Appendix_C.pdf PDF
RFP_Attach_2_General_Instructions_for_Conducting_Work_at_NIST_Boulder_-_22_August_2018.pdf PDF
RFP_Attach_C_ResumeFormKeyPersonnel.pdf PDF
RFP_Attach_4_Geotech_Report_by_CTL_Thompson_from_PPR_Appendix_A.pdf PDF
RFP_Attach_D_KeyPersonnelStatement.pdf PDF
RFP_Attach_5_Site_Plans_from_PPR_Appendix_A.pdf PDF
RFP_Attach_1_Statement_of_Work_B1_Renovation_W5_W4_Spine.pdf PDF
RFP_Attach_9_Historic_Structure_Report_-_PPR_Appendix_C.pdf PDF
RFP_Attach_E_Subcontracting_Plan_Requirements.pdf PDF
RFP_Attach_3_NIST_PPR-B1R-W5-W4-Spine-31Jul2019.pdf PDF
RFP_Attach_6_NIST_Boulder_Campus_Master_Plan_2017_from_PPR_Appendix_C.pdf PDF
RFP_Attach_10_Historic_Structure_Report_Attachments_-_Photos.pdf PDF
Request_for_Proposal_1333ND19RNB190004.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Institute of Standards and Technology (NIST), Boulder, CO

Prepared by: Office of Acquisition and Agreements Management/Acquisition Management Division and Office of Facilities and Property Management/Boulder Design and Construction Division

RFP 1333ND19RNB190004

Renovation of Building 1, Wings 4, 5 and Spine Phase I Pre-proposal

Conference August 8, 2019

Agenda

• Welcome and General Information

• Introduction of Acquisition Team Members

• General Information on Project & Site

• Acquisition Information

• Site Visit Procedures

• Closing Comments

Welcome and General Information

• Welcome.

• General Information:

Please complete

Attendance Roster.

Escort requirements / security.

Building exits and restrooms.

• Questions:

All questions or comments related to the acquisition must be submitted in writing to the POCs identified in the RFP by the closing date identified in the RFP.

Written questions can be submitted to the Contracting Officer or Contract Specialist during the pre-proposal conference.

Question / Request for Information (RFI) Forms are provided.

• Information presented for this pre-proposal conference is not to be interpreted as a comprehensive description of the RFP.

• The information presented is not contractually binding.

• Changes to the RFP will be made through amendments.

• Slides and associated information resulting from the pre-proposal conference will be posted with the Request For Proposal (RFP) on FedBizOpps.gov (FBO).

About NIST

• Measure – Innovate – Lead.

• Enhance the competitiveness of

American Industry.

• Work with industry and science community to advance innovation and improve quality of life.

• Develop national standards for highly accurate measurements of a wide array of physical properties and provides calibration services.

Introduction of Acquisition Team Members

• Project Manager.

• Contracting Officer and Contract Specialist.

• Contracting Officer’s Representative.

• Others.

Source Selection Information - FAR Subparts 2.101 and 3.104.4

General Information on Project and Site

• Site/Campus houses NIST, NOAA and NTIA facilities on 200 acres.

• Controlled protected area in collaboration with the City of Boulder and the

Native American community.

• Sensitive to environmental issues including noise, dust, vibration and light pollution.

• One controlled point of vehicular entry. There are two points of egress for emergency use only.

• Business hours are 6 am to 6 pm.

• Vehicle parking is limited; typically specified in the contract.

• Building access is strictly monitored and limited to properly-badged individuals.

• Major renovation is necessary for NIST's continued long-term support of US industrial competitiveness in the world market.

• The goal is to provide a significant area of high performance laboratory space to perform research and measurement science.

• Renovation will support key technology areas such as: nanotechnology, biotechnology, new energy sources, computing, and telecommunications.

• Must maintain original historic architecture and its defining characteristics.

• Interiors and exteriors must be in keeping with mid-century modern design and be aesthetically pleasing, including furniture.

Building 1 – Phased Renovation A multi-year Phased Project (Planned):

FY12-17: Design and renovation Wings 3 and Wing 6 completed; Bridging documents developed for future phases.

FY19-20: Award demolition and D-B construction contracts for Wing 5.

FY21: Award demolition and D-B construction contracts for Wing 4.

FY23: Award demolition and D-B renovation contract for partial Spine connecting Wings 5 & 4.

• Existing facilities are the result of years of modifications to accommodate changing research needs.

• The result is a decaying facility that is not suited for current research requirements.

• This effort includes complete removal and replacement of all systems with fully code compliant and energy efficient systems.

Acquisition Information

• Design-Build (DB) construction, Firm-Fixed-Price (FFP) contract.

• FAR Part 36 Construction and Architect-Engineer (A-E) Contracts and FAR Part 15 Contracting by Negotiation.

• Utilizes a base CLIN and Optional CLINS.

• Two-Phased DB Selection Procedures.

Section L: Instructions, Conditions and Notices to Offerors Section M: Evaluation Factors for Award

• Phase I – Request for Qualifications - submittal and evaluation of technical qualifications:

• All Non-price: Bonding Capacity (Ability) (Pass/Fail);

Technical Approach, Experience, and Past Performance.

• Narrow selection up to the 3 most highly qualified offerors.

Section L: Includes Proposal Submission Address, Factors and Factor Submittal Requirements

Section M: Includes Basis of Evaluation

• Phase II – RFP - submittal and evaluation of technical and price proposals.

• Uses a maximum award amount (NTE) amount for renovation and furniture Contract Line Item Numbers (CLINS).

• Significant flexibility in design / technical approach.

• Allows for best value determination with price and non-price tradeoffs.

Section L: Includes Factors and Submittal Requirements Section M: Includes Basis of Evaluation

Site Visit Procedures

• Three groups.

• Walk through of each of Wing 5, Wing 4 and the Spine.

• Departure after site visit.

• All questions submitted in writing.

Closing Comments

• Very critical program / project for NIST and Department of Commerce.

• Thank you for your time and interest in this project and acquisition!

National Institute of Standards and Technology (NIST), Boulder, CO��
Agenda
Welcome and General Information
Welcome and General Information
Welcome and General Information
About NIST
Introduction of Acquisition Team Members
General Information on Project and Site
General Information on Project and Site
General Information on Project and Site
General Information on Project and Site�
Acquisition Information
Acquisition Information
Acquisition Information
Site Visit Procedures
Closing Comments

File details come from the government source that posted it. Updated .