RFP_Attach_D_KeyPersonnelStatement.pdf
PDF 10 KB Posted
- Attached to
- NIST Boulder Campus Renovation of Building 1 Wing 5, Wing 4 and Partial Spine / Main Corridor
- Solicitation number
- 1333ND19RNB190004
About this file
This document summarizes a solicitation for design-build construction services. The National Institute of Standards and Technology is seeking proposals for the renovation of Building 1 at its Boulder, Colorado campus, including work on Wing 5, Wing 4, and portions of the main corridor. The solicitation will utilize a two-phase design-build selection process and provide approximately 30% complete construction drawings and specifications, as well as program and performance requirements. The base contract line item is for work on Wing 5, with seven option contract line items that include furnishings, renovation of additional wings, remobilization costs, and a period of performance ranging from 308 to 616 days depending on the line item. Proposers must meet a LEED Gold certification minimum, and the project value is over $10 million. The response due date will be included in the solicitation documents to be posted on or around June 3, 2019.
Attachment D - Key Personnel Qualifications And Statement Of Understanding
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP ATTACHMENT (D)
KEY PERSONNEL QUALIFICATIONS AND STATEMENT OF UNDERSTANDING
I, __________________________________ [Name of certifier], am the Official responsible for the preparation of this qualifications and experience information package and hereby certify:
(1) That, to the best of my knowledge and belief, the key personnel on this project;
(2) That the Contracting Officer’s approval shall be obtained prior to any substitution or replacement of any proposed key design or construction team members and/or personnel; and
(3) That any proposed substitute shall possess equal or greater qualifications and experience than that which is being substituted. (Contracting Officer is final determination for qualification.)
The Contracting Officer must approve the submittals of any key personnel of the contract.
SIGNATURE DATE
KEY PERSONNEL QUALIFICATIONS AND STATEMENT OF UNDERSTANDING
File details come from the government source that posted it. Updated .