RFP-PII_1_Energy_Modeling_Data_from_PPR_Appendix_A.pdf

PDF 117 KB Posted

Attached to
NIST Boulder Campus Renovation of Building 1 Wing 5, Wing 4 and Partial Spine / Main Corridor
Solicitation number
1333ND19RNB190004
Issued by

About this file

This document contains an energy modeling report and related federal contract opportunity notice. The energy modeling report provides baseline and proposed energy consumption data by end use for the renovation of NIST Building 1 Wings 4, 5 and partial spine in Boulder, Colorado. It includes modeling assumptions for the building envelope, mechanical and electrical systems.

The related federal contract opportunity is a solicitation for design-build construction services for the renovation of NIST Building 1 Wings 4, 5 and partial spine. The solicitation includes a base CLIN for Wing 5 and seven option CLINs for furnishings, Wing 4 renovation, furnishings, spine renovation, furnishings, and remobilization. The period of performance is 616 days for the base and one option CLIN, 420 days for two option CLINs, and 308 days for two option CLINs. A LEED Gold certification is required. The project magnitude exceeds $10 million. The NAICS code is 236220 and small business size standard is $36.5 million. The pre-proposal conference will be held on a date included in the solicitation to post on or about June 3, 2019.

Attachment 1 - Energy Modeling Data from PPR Appendix A

View the file

Other files

File Type Posted
RFP-PII_22_Historic_Structure_Report_Attachments_-_Preservation_Brief_24.pdf PDF
RFP-PII_10_Conceptual_Planning_Report_by_Smith_Group_2012_from_PPR_Appendix_C.pdf PDF
RFP-PII_5_Geotech_Report_by_Empire_Labs_for_Wing_3_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_8_HVAC_Design_Data_and_Sizing_Summary_for_Wing_4_from_PPR_Appendix_A.pdf PDF
RFP-PII_0_Attach_E_Subcontracting_Plan_Requirements.pdf PDF
RFP-PII_16_Historic_Structure_Report_Attachments_-_Preservation_Brief_4.pdf PDF
RFP-PII_4_Geotech_Report_by_Empire_Labs_for_Wing_1_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_25_Wage_Determination_CO20180027.pdf PDF
RFP-PII_9_HVAC_Design_Data_and_Sizing_Summary_for_Wing_5_from_PPR_Appendix_A.pdf PDF
1333ND19RNB190004A002.pdf PDF
RFP-PII_18_Historic_Structure_Report_Attachments_-_Preservation_Brief_14.pdf PDF
RFP-PII_14_Historic_Structure_Report_Attachments_-_Preservation_Brief_1.pdf PDF
RFP-PII_24_NIST_Bldr_Lab_&_Admin_Space_Planning_Study_2016.pdf PDF
RFP-PII_6_Geotech_Report_by_JA_Cesare_from_PPR_Appendix_A.pdf PDF
RFP-PII_11_Construction_Drawings_1960_from_PPR_Appendix_C.pdf PDF
RFP-PII_12_Construction_Drawings_by_HDR_for_Connector_to_B81_from_PPR_Appendix_C.pdf PDF
RFP-PII_20_Historic_Structure_Report_Attachments_-_Preservation_Brief_16.pdf PDF
RFP-PII_19_Historic_Structure_Report_Attachments_-_Preservation_Brief_15.pdf PDF
RFP-PII_2_Geotech_Report_by_Empire_Labs_for_Rear_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_13_Floor_Plans_for_Spine_from_PPR_Appendix_C.pdf PDF
RFP-PII_3_Geotech_Report_by_Empire_Labs_for_South_Addition_to_Building_1_from_PPR_Appendix_A.pdf PDF
RFP-PII_21_Historic_Structure_Report_Attachments_-_Preservation_Brief_18.pdf PDF
RFP-PII_17_Historic_Structure_Report_Attachments_-_Preservation_Brief_13.pdf PDF
RFP-PII_7_HVAC_Design_Data_and_Sizing_Summary_for_Spine_from_PPR_Appendix_A.pdf PDF
RFP-PII_15_Historic_Structure_Report_Attachments_-_Preservation_Brief_3.pdf PDF
RFP-PII_23_Historic_Structure_Report_Attachments_-_Preservation_Brief_41.pdf PDF
1333ND19RNB190004A001.pdf PDF
Attachment_A001_1333ND19RNB190004-B1RW5-4-S-RFI-GovResponse-2019-08-15.pdf PDF
Attendance_Roster_B1R.pdf PDF
1_NIST-B1R-W5-4-Spine-P1-Preproposal_Conf-8-8-19.pdf PDF
RFI_Sheet_Template.xlsx XLSX spreadsheet
RFP_Attach_8_Historic_Assessment_by_Goodwin_&_Assoc_from_PPR_Appendix_C.pdf PDF
RFP_Attach_B_NIST_AMD_Boulder_PPQ_Form.pdf PDF
RFP_Attach_12_Sustainable_Design_Review_for_LEED-NC_2018.pdf PDF
RFP_Attach_11_Historic_Structure_Report_Attachments_-_Zone_Maps.pdf PDF
RFP_Attach_A_Cons_&_Design_Exp_Proj-Data-Sheet.pdf PDF
RFP_Attach_7_Construction_Drawings_1952_from_PPR_Appendix_C.pdf PDF
RFP_Attach_2_General_Instructions_for_Conducting_Work_at_NIST_Boulder_-_22_August_2018.pdf PDF
RFP_Attach_C_ResumeFormKeyPersonnel.pdf PDF
RFP_Attach_4_Geotech_Report_by_CTL_Thompson_from_PPR_Appendix_A.pdf PDF
RFP_Attach_D_KeyPersonnelStatement.pdf PDF
RFP_Attach_5_Site_Plans_from_PPR_Appendix_A.pdf PDF
RFP_Attach_1_Statement_of_Work_B1_Renovation_W5_W4_Spine.pdf PDF
RFP_Attach_9_Historic_Structure_Report_-_PPR_Appendix_C.pdf PDF
RFP_Attach_E_Subcontracting_Plan_Requirements.pdf PDF
RFP_Attach_3_NIST_PPR-B1R-W5-W4-Spine-31Jul2019.pdf PDF
RFP_Attach_6_NIST_Boulder_Campus_Master_Plan_2017_from_PPR_Appendix_C.pdf PDF
RFP_Attach_10_Historic_Structure_Report_Attachments_-_Photos.pdf PDF
Request_for_Proposal_1333ND19RNB190004.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Baseline Proposed

Location

Rating Method

Weather File

Conditioned Area

External Wall Steel Framed; U=0.064 Mass Wall; U=0.103

Roof Ins Above Deck; U=0.048 Ins Above Deck; U=0.033

Floor Slab-on-Grade Slab-on-Grade

Glazing U=0.5208

SHGC=0.40

U=0.34

SHGC=0.40

Window to Wall

Ratio 29% 29%

Shading None Shaded as per design

Airside Systems

Packaged VAV with Reheat

PSZ-AC for Electrical, Mechanical, IDF and

Telecom

2-Speed FCUs with CAV Outside Air AHUs

CAV AHUs for Wing 5 Level 4 Labs only

Energy Recovery on AHUs

Waterside

Systems Two Natural Draft Boilers

Two Natural Draft Boilers

Two Water-Cooled Screw Chillers

Lighting Power

Density

BREAK ROOM - 0.73 W/SF

CONFERENCE ROOM - 1.23 W/SF

CORRIDORS - 0.66 W/SF

JANITORS CLOSETS - 0.63 W/SF

LABS - 1.81 W/SF

OPEN OFFICE - 0.98 W/SF

PRIVATE OFFICE - 1.11 W/SF

SERVER ROOMS - 0.95 W/SF

STORAGE - 0.63 W/SF

RESTROOMS AND SHOWERS - 0.98 W/SF

BREAK ROOM - W/SF

CONFERENCE ROOM - 0.8 W/SF (35% LPD Reduction)

CORRIDORS - 0.5 W/SF (24% LPD Reduction)

JANITORS CLOSETS - 0.5 W/SF (20% LPD Reduction)

LABS - 1.4 W/SF (22% LPD Reduction)

OPEN OFFICE - 0.8 W/SF (18% LPD Reduction)

PRIVATE OFFICE - 0.8 W/SF (28% LPD Reduction)

SERVER ROOMS - 0.8 W/SF (15% LPD Reduction)

STORAGE - 0.5 W/SF (20% LPD Reduction)

RESTROOMS AND SHOWERS - 0.8 W/SF (18% LPD Reduction)

Lighting Controls Side-Lighted Area Photcell None

Equipment Power

Density

ELECTRICAL ROOMS - 50 W/SF

LAB L1 - 2 W/SF

LAB L2 - 4 W/SF

LAB L2+ - 4 W/SF

LAB L3 - 12 W/SF

LAB L3* - 12 W/SF

MACHINE ROOM - 25 W/SF

MECHANICAL ROOM - 25 W/SF

OPEN OFFICE - 1 W/SF

PRIVATE OFFICE - 1 W/SF

SERVER ROOMS - 50 W/SF

Boulder, CO

LEED v4 ; ASHRAE 90.1-2010

USA_CO_Boulder-Broomfield-Jefferson.County.AP.724699_TMY3.epw

128,000 SF

AECOM Technical Services, Inc NIST Building 1 Renovation Wing 4, 5 and Partial Spine

Energy Modeling Data July 2018

118621 SF

# End Use

ASHRAE 90.1

Baseline (kBtu)

Proposed

(kBtu)

Baseline with

Changes

(kBtu)

Proposed with

Changes (kBtu)

No Waterside

Economizer

(kBtu)

With Shading

Devices (kBtu)

2 Internal Lighting 854,800 672,230 853,121 671,071 671,071 671,071

5 Space Heating 17,452,758 6,594,315 17,878,067 7,238,750 7,238,750 7,228,667

6 Space Cooling 2,398,229 1,378,858 1,832,106 748,617 1,795,126 1,749,649

7 Pumps 269,816 344,410 236,111 230,274 230,274 230,287

9 Fans Interior 5,263,529 2,621,927 4,376,080 2,251,482 2,251,482 2,250,131

11 Service Water Heating (Fossil Fuel) 1,606,054 1,606,191 1,606,912 1,607,050 1,607,050 1,607,050

13 Receptacle Equipment 20,476,640 20,476,640 9,172,481 9,349,338 9,349,338 9,349,338

19 Elevators Escalators 104,212 104,212 104,212 104,212 104,212 104,212

20 Heat Rejection 796,235 880,687 625,579 592,616 553,387 553,896

49,222,271.35 34,679,470.20 36,684,669.18 22,793,409.04 23,800,688.66 23,744,298.84

# End Use

ASHRAE 90.1

Baseline

(kBtu/SF)

Proposed

(kBtu/SF)

Proposed 2

(kBtu/SF)

Proposed 3

(kBtu/SF)

Proposed 4

(kBtu/SF)

Proposed 5

(kBtu/SF)

2 Internal Lighting 7.21 5.67 7 6 6 6

5 Space Heating 147.13 55.59 151 61 61 61

6 Space Cooling 20.22 11.62 15 6 15 15

7 Pumps 2.27 2.90 2 2 2 2

9 Fans Interior 44.37 22.10 37 19 19 19

11 Service Water Heating (Fossil Fuel) 13.54 13.54 14 14 14 14

13 Receptacle Equipment 172.62 172.62 77 79 79 79

19 Elevators Escalators 0.88 0.88 1 1 1 1

20 Heat Rejection 6.71 7.42 5 5 5 5

414.95 292.36 309.26 192.15 200.64 200.17

Total

Total

AECOM Technical Services, Inc NIST Building 1 Renovation Wing 4, 5 and Partial Spine

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

Internal

Lighting

Space

Heating

Space Cooling Pumps Fans Interior Service

Water

Heating

(Fossil Fuel)

Receptacle

Equipment

Elevators

Escalators

Heat

Rejection

Energy Consumption by End Use

ASHRAE 90.1 Baseline (kBtu)

Proposed (kBtu)

Baseline with Changes (kBtu)

Proposed with Changes (kBtu)

No Waterside Economizer (kBtu)

With Shading Devices (kBtu)

AECOM Technical Services, Inc NIST Building 1 Renovation Wing 4, 5 and Partial Spine

Internal Lighting

Space Heating

Space Cooling

Pumps

Fans Interior

Service Water Heating (Fossil Fuel)

Receptacle Equipment

Elevators Escalators

Heat Rejection

ASHRAE 90.1

Baseline

New Loads

310kBtu/ft2

Internal Lighting

Space Heating

Space Cooling

Pumps

Fans Interior

Service Water Heating (Fossil Fuel)

Receptacle Equipment

Elevators Escalators

Heat Rejection

Proposed

New Loads

193kBtu/ft2

AECOM Technical Services, Inc NIST Building 1 Renovation Wing 4, 5 and Partial Spine

File details come from the government source that posted it. Updated .