This is a pricing schedule for a firm-fixed-price contract to provide a business applications solution to the Department of Commerce Office of the Secretary. The contract includes implementation of an enterprise data warehouse and business intelligence capability along with hosting and operations and maintenance for the Department of Commerce bureaus NOAA, NIST and Census. Pricing is provided for base and option periods from 2020 to 2040. The schedule includes details of deliverables and pricing for project management, implementation, operations and maintenance and hosting activities. Labor categories and hourly rates are also provided to cover any optional time and materials work over the life of the contract.
J.12 Attachment 12 - Price Schedule
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
Summary Level Pricing
| CLIN | Description | Anticipated PoP | Firm Fixed Price |
| Base Period | |||
| 0001 | Project Management Services | 4/1/20 - 3/31/21 | 0 |
| 0002 | EDW and Reporting Capability | 4/1/20 - 3/31/21 | 0 |
| 0003 | Phase 1 Implementation (NOAA), Part 1 | 4/1/20 - 3/31/21 | 0 |
| 0004 | Hosting | 4/1/20 - 3/31/21 | 0 |
| Total | 0 | ||
| Option Period 1 | |||
| 0101 | Project Management Services | 4/1/21 - 3/31/22 | 0 |
| 0102 | EDW and Reporting Capability | 4/1/21 - 3/31/22 | 0 |
| 0103 | Phase 1 Implementation (NOAA), Part 2 | 4/1/21 - 3/31/22 | 0 |
| 0104 | Hosting | 4/1/21 - 3/31/22 | 0 |
| Total | 0 | ||
| Option Period 2 | |||
| 0201 | Project Management Services | 4/1/22 - 3/31/23 | 0 |
| 0202 | EDW and Reporting Capability | 4/1/22 - 3/31/23 | 0 |
| 0203 | Phase 1 Implementation (NOAA), Part 3 and Deploy | 4/1/22 - 10/31/22 | 0 |
| 0204 | Phase 2 Implementation (NIST), Part 1 | 10/1/22 - 3/31/23 | 0 |
| 0205 | O&M Services - NOAA | 10/1/22 - 3/31/23 | 0 |
| 0206 | Hosting | 4/1/22 - 3/31/23 | 0 |
| Total | 0 | ||
| Option Period 3 | |||
| 0301 | Project Management Services | 4/1/23 - 3/31/24 | 0 |
| 0302 | EDW and Reporting Capability | 4/1/23 - 3/31/24 | 0 |
| 0303 | Phase 2 Implementation (NIST), Part 2 and Deploy | 4/1/23 - 10/31/23 | 0 |
| 0304 | O&M Services - NIST | 10/1/23 - 3/31/24 | 0 |
| 0305 | Phase 3 Implementation (Census), Part 1 | 10/1/23 - 3/31/24 | 0 |
| 0306 | O&M Services - NOAA | 4/1/23 - 3/31/24 | 0 |
| 0307 | Hosting | 4/1/23 - 3/31/24 | 0 |
| Total | 0 | ||
| Option Period 4 | |||
| 0401 | Project Management Services | 4/1/24 - 3/31/25 | 0 |
| 0402 | EDW and Reporting Capability | 4/1/24 - 3/31/25 | 0 |
| 0403 | Phase 3 Implementation (Census), Part 2 and Deploy | 4/1/24 - 10/31/24 | 0 |
| 0404 | O&M Services - Census | 10/1/24 - 3/31/25 | 0 |
| 0405 | O&M Services - NOAA and NIST | 4/1/24 - 3/31/25 | 0 |
| 0406 | Hosting | 4/1/24 - 3/31/25 | 0 |
| Total | 0 | ||
| Option Period 5 | |||
| 0501 | Hosting and O&M Services | 4/1/25 - 3/31/26 | 0 |
| Option Period 6 | |||
| 0601 | Hosting and O&M Services | 4/1/26 - 3/31/27 | 0 |
| Option Period 7 | |||
| 0701 | Hosting and O&M Services | 4/1/27 - 3/31/28 | 0 |
| Option Period 8 | |||
| 0801 | Hosting and O&M Services | 4/1/28 - 3/31/29 | 0 |
| Option Period 9 | |||
| 0901 | Hosting and O&M Services | 4/1/29 - 3/31/30 | 0 |
| Option Period 10 | |||
| 1001 | Hosting and O&M Services | 4/1/30 - 3/31/31 | 0 |
| Option Period 11 | |||
| 1101 | Hosting and O&M Services | 4/1/31 - 3/31/32 | 0 |
| Option Period 12 | |||
| 1201 | Hosting and O&M Services | 4/1/32 - 3/31/33 | 0 |
| Option Period 13 | |||
| 1301 | Hosting and O&M Services | 4/1/33 - 3/31/34 | 0 |
| Option Period 14 | |||
| 1401 | Hosting and O&M Services | 4/1/34 - 3/31/35 | 0 |
| Option Period 15 | |||
| 1501 | Hosting and O&M Services | 4/1/35 - 3/31/36 | 0 |
| Option Period 16 | |||
| 1601 | Hosting and O&M Services | 4/1/36 - 3/31/37 | 0 |
| Option Period 17 | |||
| 1701 | Hosting and O&M Services | 4/1/37 - 3/31/38 | 0 |
| Option Period 18 | |||
| 1801 | Hosting and O&M Services | 4/1/38 - 3/31/39 | 0 |
| Option Period 19 | |||
| 1901 | Hosting and O&M Services | 4/1/39 - 3/31/40 | 0 |
| Total Firm Fixed Pricing | |||
| Base Plus All Option Periods FFP Combined | 0 | ||
| Optional T&M Support for EAS Migration, Hosting and O&M Services; Enhancements; and Transition Support Services | |||
| CLIN | Description | Anticipated PoP | Ceiling Price* |
| 2000 | Base Period - Optional T&M Support | 4/1/20 - 3/31/21 | * |
| 2001 | Option Period 1 - Optional T&M Support | 4/1/21 - 3/31/22 | * |
| 2002 | Option Period 2 - Optional T&M Support | 4/1/22 - 3/31/23 | * |
| 2003 | Option Period 3 - Optional T&M Support | 4/1/23 - 3/31/24 | * |
| 2004 | Option Period 4 - Optional T&M Support | 4/1/24 - 3/31/25 | * |
| 2005 | Option Period 5 - Optional T&M Support | 4/1/25 - 3/31/26 | * |
| 2006 | Option Period 6 - Optional T&M Support | 4/1/26 - 3/31/27 | * |
| 2007 | Option Period 7 - Optional T&M Support | 4/1/27 - 3/31/28 | * |
| 2008 | Option Period 8 - Optional T&M Support | 4/1/28 - 3/31/29 | * |
| 2009 | Option Period 9 - Optional T&M Support | 4/1/29 - 3/31/30 | * |
| 2010 | Option Period 10 - Optional T&M Support | 4/1/30 - 3/31/31 | * |
| 2011 | Option Period 11 - Optional T&M Support | 4/1/31 - 3/31/32 | * |
| 2012 | Option Period 12 - Optional T&M Support | 4/1/32 - 3/31/33 | * |
| 2013 | Option Period 13 - Optional T&M Support | 4/1/33 - 3/31/34 | * |
| 2014 | Option Period 14 - Optional T&M Support | 4/1/34 - 3/31/35 | * |
| 2015 | Option Period 15 - Optional T&M Support | 4/1/35 - 3/31/36 | * |
| 2016 | Option Period 16 - Optional T&M Support | 4/1/36 - 3/31/37 | * |
| 2017 | Option Period 17 - Optional T&M Support | 4/1/37 - 3/31/38 | * |
| 2018 | Option Period 18 - Optional T&M Support | 4/1/38 - 3/31/39 | * |
| 2019 | Option Period 19 - Optional T&M Support | 4/1/39 - 3/31/40 | * |
| Total (*NOTE: A ceiling price for the optional T&M CLINs will be established at the time of award) | * |
1331L519R13OS0005 Summary Level Pricing Attachment J.12
&P of &N
Base Period CLIN Detail
| CLIN | Description | PWS Deliverable # | PWS Deliverable Name | Billable Milestone Amount | |||
| 0001 | Project Management Services | 1 | Draft Integrated Master Schedule | ||||
| 2 | Final Integrated Master Schedule Baseline | ||||||
| 4 | Draft Schedule Management Plan | ||||||
| 5 | Final Schedule Management Plan | ||||||
| 6 | Draft Cost Management Plan | ||||||
| 7 | Final Cost Management Plan | ||||||
| 8 | Project Status Reports | ||||||
| 9 | Analyses and Presentations | ||||||
| 10 | EVM Analyses, Forecasts, and Performance Reports | ||||||
| 11 | Draft Scope Definition and Management Plan | ||||||
| 12 | Final Scope Definitation and Management Plan | ||||||
| 13 | Draft Requirements Management Plan | ||||||
| 14 | Final Requirements Management Plan | ||||||
| 15 | Requirements Traceability Matrix | ||||||
| 16 | Draft Quality Management Plan | ||||||
| 17 | Final Quality Management Plan | ||||||
| 18 | Draft Human Resources Management Plan | ||||||
| 19 | Final Human Resources Management Plan | ||||||
| 20 | Draft Staffing Management Plan | ||||||
| 21 | Final Staffing Management Plan | ||||||
| 22 | Draft Issue Management Plan | ||||||
| 23 | Final Issue Management Plan | ||||||
| 24 | Draft Project Information Management Plan | ||||||
| 25 | Final Project Information Management Plan | ||||||
| 26 | Draft Project Management Plan | ||||||
| 27 | Final Project Management Plan | ||||||
| 28 | Draft Integrated Project Change Contorl Plan | ||||||
| 29 | Final Integrated Project Change Control Plan | ||||||
| 30 | Draft Configuration Management Plan | ||||||
| 31 | Final Configuation Management Plan | ||||||
| 32 | Draft Security Management Plan | ||||||
| 33 | Final Security Management Plan | ||||||
| 34 | Draft Scope Management Plan | ||||||
| 35 | Final Scope Management Plan | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Project Management Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0002 | EDW and Reporting Capability | 51 | Draft High Level Operational Reporting Strategy and Recommendation | ||||
| 54 | Draft Operational Reports Requirements Documents | ||||||
| 78 | Draft Data Model Governance Strategy | ||||||
| 82 | Draft EDW Requirements Document | ||||||
| 83 | Final EDW Requirements Document | ||||||
| 85 | Draft EDW Architecture Detailed Design Document | ||||||
| 88 | Draft Data Transfer Documentation | ||||||
| 91 | Draft EDW/BI Implementation Approach | ||||||
| 103 | Draft Reporting/BI Requirements | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required EDW and Reporting Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0003 | Phase 1 Implementation (NOAA), Part 1 | 36 | System Configuration Options Catalog/Matrix | ||||
| 37 | Draft Detailed Implementation Approach Assessment | ||||||
| 38 | Final Detailed Implementation Approach Assessment | ||||||
| 45 | Draft Solution Design Document | ||||||
| 133 | Draft Detailed Interface Strategy | ||||||
| 136 | Draft Interface Requirements Documents | ||||||
| 193 | Application Suite Draft Requirements Documents (Per Application) | ||||||
| 205 | Draft Implementation Plan | ||||||
| 206 | Final Implementation Plan | ||||||
| 214 | Draft Overall Test Strategy | ||||||
| 226 | Draft Organizational Change Management Plan | ||||||
| 227 | Final Organizational Change Management Plan | ||||||
| 229 | Draft Impact Assessment | ||||||
| 233 | Draft Stakeholder Management Plan | ||||||
| 234 | Final Stakeholder Management Plan | ||||||
| 236 | Draft Implementation Communications Plan | ||||||
| 237 | Final Implementation Communications Plan | ||||||
| 239 | Draft Training Plan and Approach | ||||||
| 240 | Updated Training Plan and Approach | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Phase 1 Implementation Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0004 | Hosting | 246 | Draft IT Concept of Operations | ||||
| 248 | Draft Software Acquisitions Strategy | ||||||
| 249 | Final Software Acquisitions Strategy | ||||||
| 257 | Draft Archiving Strategy | ||||||
| 260 | Draft Archiving Requirements | ||||||
| 261 | Final Archiving Requirements | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab) | 12 | MO | 0 | 0 | |||
| Subtotal | 0 |
Total 0
1331L519R13OS0005 Base Period CLIN Detail Attachment J.12
&P of &N
Option Period 1 CLIN Detail
| CLIN | Description | PWS Deliverable # | PWS Deliverable Name | Billable Milestone Amount | |||
| 0101 | Project Management Services | 3 | Updated Integrated Master Schedule | ||||
| 8 | Project Status Reports | ||||||
| 9 | Analyses and Presentations | ||||||
| 10 | EVM Analyses, Forecasts and Performance Reports | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Project Management Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0102 | EDW and Reporting Capability | 52 | Final High Level Operational Reporting Strategy and Recommendation | ||||
| 55 | Final Operational Reports Requirements Documents | ||||||
| 57 | Draft Operational Reports High Level Designs | ||||||
| 58 | Final Operationsl Reports High Level Designs | ||||||
| 60 | Draft Operational Reports Detailed Designs | ||||||
| 61 | Final Operational Reports Detailed Designs | ||||||
| 63 | Initial Operational Reports Code | ||||||
| 66 | Draft Operational Reports Test Plan | ||||||
| 72 | Draft Operational Reports Training Plan | ||||||
| 73 | Final Operational Reports Training Plan | ||||||
| 75 | Draft Operational Reports Deployment Plan | ||||||
| 76 | Final Operational Reports Deployment Plan | ||||||
| 79 | Final Data Model Governance Strategy | ||||||
| 80 | Updated Canonical Data Model | ||||||
| 81 | Updated Conceptual EDW Data Model | ||||||
| 84 | Updated EDW Requirements Document | ||||||
| 86 | Final EDW Architecture Detailed Design Document | ||||||
| 87 | Updated EDW Architecture Detailed Design Document | ||||||
| 89 | Final Required Data Transfer Documentation | ||||||
| 90 | Updated Required Data Transfer Documentation | ||||||
| 92 | Final EDW/BI Implenetation Approach | ||||||
| 93 | Updated EDW/BI Implementation Approach | ||||||
| 94 | Initial EDW Solution and Underlying Code Delivery | ||||||
| 97 | Draft EDW Training Plan | ||||||
| 98 | Final EDW Training Plan | ||||||
| 99 | Updated EDW Training Plan | ||||||
| 100 | Draft EDW Deployment Plan | ||||||
| 101 | Final EDW Deployment Plan | ||||||
| 102 | Updated EDW Deployment Plan | ||||||
| 104 | Final Reporting/BI Requirements | ||||||
| 105 | Updated/Additional Reporting/BI Requirements | ||||||
| 106 | Draft Reporting/BI High Level Designs | ||||||
| 107 | Final Reporting/BI High Level Designs | ||||||
| 108 | Updated/Additional Reporting/BI High Level Designs | ||||||
| 109 | Draft Reporting/BI Detailed Level Designs | ||||||
| 110 | Final Reporting/BI Detailed Level Designs | ||||||
| 111 | Updated/Additional Reporting/BI Detailed Level Designs | ||||||
| 115 | Draft Reporting/BI Training Plan | ||||||
| 116 | Final Reporting/BI Training Plan | ||||||
| 117 | Updated Operationsl Reports Training Plan | ||||||
| 118 | Draft Reporting/BI Deployment Plan | ||||||
| 121 | Draft EDW Test Plan | ||||||
| 122 | Final EDW Test Plan | ||||||
| 124 | Draft Reporting/BI Test Plan | ||||||
| 125 | Final Reporting/BI Test Plan | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required EDW and Reporting Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0103 | Phase 1 Implementation (NOAA), Part 2 | 39 | Draft BAS SOPs | ||||
| 40 | Final BAS SOPs | ||||||
| 41 | Updated BAS SOPs | ||||||
| 42 | Draft Fit Gap Analysis | ||||||
| 43 | Final Fit Gap Analysis | ||||||
| 46 | Final Solution Design Document | ||||||
| 48 | Draft Functional Concept of Operations | ||||||
| 134 | Final Detailed Interface Strategy | ||||||
| 135 | Updated Detailed Interface Strategy | ||||||
| 137 | Final Interface Requirements Documents | ||||||
| 138 | Updated Interface Requirements Documents | ||||||
| 139 | Draft Interface High Level Designs | ||||||
| 140 | Final Interface High Level Designs | ||||||
| 141 | Updated/Additional Interface High Level Designs | ||||||
| 142 | Draft Interface Detailed Level Designs | ||||||
| 143 | Final Interface Detailed Level Designs | ||||||
| 144 | Updated/Additional Interface Detailed Level Designs | ||||||
| 145 | Initial Interface Code for Each Interface | ||||||
| 148 | Draft Interface Test Plan | ||||||
| 149 | Final Interface Test Plan | ||||||
| 150 | Updated Interface Test Plan | ||||||
| 154 | Draft Interface SOPs | ||||||
| 157 | Draft Interface Training Plan | ||||||
| 158 | Final Interface Training Plan | ||||||
| 160 | Draft Interface Deployment Plan | ||||||
| 163 | Draft Detailed Conversion Strategy | ||||||
| 164 | Final Detailed Conversion Strategy | ||||||
| 166 | Detailed Legacy System Decommissioning Strategy | ||||||
| 171 | Updated Interface Requirements Documents | ||||||
| 173 | Final Conversion High Level Design | ||||||
| 174 | Updated/Additional Conversion High Level Designs | ||||||
| 175 | Draft Conversion Detailed Level Designs | ||||||
| 178 | Initial Conversion Code | ||||||
| 181 | Draft Conversion Test Plan | ||||||
| 182 | Final Conversion Test Plan | ||||||
| 183 | Updated Conversion Test Plan | ||||||
| 190 | Draft Conversion Deployment Plan | ||||||
| 191 | Final Conversion Deployment Plan | ||||||
| 194 | Application Suite Final Requirements (Per Application) | ||||||
| 195 | Application Suite Updated Requirements (Per Application) | ||||||
| 196 | Draft Detailed Application Suite Requirements (Per Application) | ||||||
| 197 | Final Detailed Application Suite System Configuration Documentation | ||||||
| 198 | Updated Detailed Application Suite System Configuration Documentation | ||||||
| 199 | Application Suite Draft Test Plan | ||||||
| 200 | Application Suite Final Test Plan | ||||||
| 201 | Appliccation Suite Updated Test Plan | ||||||
| 207 | Updated Implementation Plan | ||||||
| 208 | Updated RTM | ||||||
| 209 | Financial Audit Strategy | ||||||
| 210 | Draft Go Live Plan | ||||||
| 215 | Final Overall Test Strategy | ||||||
| 217 | Draft Overall Test Plan | ||||||
| 218 | Final Overall Test Plan | ||||||
| 219 | Updated Overall Test Plan | ||||||
| 220 | Draft Test Scripts | ||||||
| 228 | Updated Organizational Change Management Plan | ||||||
| 230 | Final Impact Assessment | ||||||
| 231 | Updated Impact Assessment | ||||||
| 232 | Impact Analysis Tracking Log | ||||||
| 235 | Updated Stakeholder Management Plan | ||||||
| 238 | Updated Implementation Communications Plan | ||||||
| 241 | Final Training Plan and Approach | ||||||
| 242 | Draft Training Curriculum and Materials | ||||||
| 243 | Final Training Curriculum and Materials | ||||||
| 244 | Updated Training Curriculum and Materials | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Phase 1 Implementation Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0104 | Hosting | 247 | Final IT Concept of Operations | ||||
| 250 | Updated Software Acquisitions Strategy | ||||||
| 251 | Software Licenses or Softwre License Certification Letter | ||||||
| 255 | Draft SLA, Including all related documents | ||||||
| 258 | Final Archiving Strategy | ||||||
| 262 | Updated Archiving Requirements | ||||||
| 263 | Draft Archiving Design | ||||||
| 264 | Final Archiving Design | ||||||
| 265 | Updated Archiving Design | ||||||
| 269 | Draft Archiving Test Plan | ||||||
| 270 | Final Archiving Test Plan | ||||||
| 271 | Updated Archiving Test Plan | ||||||
| 275 | Draft Archiving SOPs | ||||||
| 278 | Draft Archiving Training Plan | ||||||
| 279 | Final Archiving Training Plan | ||||||
| 280 | Updated Archiving Training Plan | ||||||
| 281 | Draft Archiving Deployment Plan | ||||||
| 282 | Final Archiving Deployment Plan | ||||||
| 283 | Updated Archiving Deployment Plan | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab) | 12 | MO | 0 | 0 | |||
| Subtotal | 0 |
Total 0
1331L519R13OS0005 Option Period 1 CLIN Detail Attachment J.12
&P of &N
Option Period 2 CLIN Detail
| CLIN | Description | PWS Deliverable # | PWS Deliverable Name | Billable Milestone Amount | |||
| 0201 | Project Management Services | 8 | Project Status Reports | ||||
| 9 | Analyses and Presentations | ||||||
| 10 | EVM Analyses, Forecasts and Performance Reports | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Project Management Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0202 | EDW and Reporting Capability | 53 | Updated High Level Operational Reporting Strategy and Recommendations | ||||
| 56 | Updated Operationsl Reports Requirements Documents | ||||||
| 59 | Updated/Additional Operational Reports High Level Designs | ||||||
| 62 | Updated/Additional Operational Reports Detailed Designs | ||||||
| 64 | Final Operational Reports Code | ||||||
| 65 | Updated/Additional Operational Reports Code | ||||||
| 67 | Final Operational Reports Test Plan | ||||||
| 68 | Updated Operational Reports Test Plan | ||||||
| 69 | Draft Operational Reports Test Results | ||||||
| 70 | Final Operaional Reports Test Results | ||||||
| 71 | Updated Operational Reports Test Results | ||||||
| 74 | Updated Operational Reports Training Plan | ||||||
| 77 | Updated Operational Reports Deployment Plan | ||||||
| 84 | Updated EDW Requirements Document | ||||||
| 87 | Updated EDW Architecture Detailed Design Document | ||||||
| 90 | Updated Required Data Transfer Documentation | ||||||
| 93 | Updated EDW/BI Implementation Approach | ||||||
| 95 | Final EDW Solution and Underlying Code Delivery | ||||||
| 96 | Updted/Additional EDW Solution and Underlying Code Delivery | ||||||
| 99 | Updated EDW Training Plan | ||||||
| 102 | Updated EDW Deployment Plan | ||||||
| 105 | Updated/Additional Reporting/BI Detailed Level Designs | ||||||
| 108 | Updated/Additional Reporting/BI High Level Designs | ||||||
| 111 | Updated/Additional Reporting/BI Detailed Level Designs | ||||||
| 112 | Initial Reporting/BI Solution and Underlying Code Delivery | ||||||
| 113 | Final Reporting/BI Solution and Underlying Code Delivery | ||||||
| 114 | Updated/Additional Reporting/BI Solution and Underlying Code Delivery | ||||||
| 117 | Updated Operational Reports Training Plan | ||||||
| 119 | Final Reporting/BI Deployment Plan | ||||||
| 120 | Updated Reporting/BI Deployment Plan | ||||||
| 123 | Updated EDW Test Plan | ||||||
| 126 | Updated Reporting/BI Test Plan | ||||||
| 127 | Draft EDW Test Results | ||||||
| 128 | Final EDW Test Results | ||||||
| 129 | Updated EDW Test Results | ||||||
| 130 | Draft Reporting/BI Test Results | ||||||
| 131 | Final Reporting/BI Test Results | ||||||
| 132 | Updated Reporting/BI Test Results | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required EDW and Reporting Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0203 | Phase 1 Implementation (NOAA), Part 3 and Deploy | 41 | Updated BAS SOPs | ||||
| 44 | Updated Fit/Gap Analysis | ||||||
| 47 | Updated Solution Design Document | ||||||
| 49 | Final Functional Concept of Operations | ||||||
| 50 | Updated Functional Concept of Operations | ||||||
| 135 | Updated Detailed Interface Strategy | ||||||
| 138 | Updated Interface Requirements Documents | ||||||
| 141 | Updated/Additional Interface High Level Designs | ||||||
| 144 | Updated/Additional Interface Detailed Level Designs | ||||||
| 146 | Final Interface Code for each Interface | ||||||
| 147 | Updated/Additional Interface Code for each Interface | ||||||
| 150 | Updated Interface Test Plan | ||||||
| 151 | Draft interface Test Results | ||||||
| 152 | Final Interface Test Results | ||||||
| 153 | Updated Interface Test Results | ||||||
| 155 | Final Interface SOPs | ||||||
| 156 | Updated Interface SOPs | ||||||
| 159 | Updated Interface Testing Plan | ||||||
| 161 | Final Interface Deployment Plan | ||||||
| 162 | Updated Interface Deployment Plan | ||||||
| 165 | Updated Detailed Conversion Strategy (Transaction Cutover) | ||||||
| 167 | Final Detailed Legacy System Decommissioning Strategy | ||||||
| 168 | Updated Detailed Legacy System Decommissioning Strategy | ||||||
| 171 | Updated Interface Requirements Documents | ||||||
| 174 | Updated/Additional Conversion High Level Designs | ||||||
| 176 | Final Conversion Detailed Level Designs | ||||||
| 177 | Updated/Additional Conversion Detailed Level Designs | ||||||
| 179 | Final Conversion Code | ||||||
| 180 | Updated/Additional Conversion Code | ||||||
| 183 | Updated Conversion Test Plan | ||||||
| 184 | Draft Mock 1 Conversion Test Results | ||||||
| 185 | Final Mock 1 Conversion Test Results | ||||||
| 186 | Draft Mock 2 Conversion Test Results | ||||||
| 187 | Final Mock 2 Conversion Test Results | ||||||
| 188 | Draft Mock 3 Conversion Test Results | ||||||
| 189 | Final Mock 3 Conversion Test Results | ||||||
| 192 | Updated Conversion Deployment Plan | ||||||
| 195 | Application Suite Updated Requirements (per application) | ||||||
| 198 | Updated Detailed Application Suite System Configuration Documentation | ||||||
| 201 | Application Suite Updated Test Plan | ||||||
| 202 | Application Suite Draft Test Results | ||||||
| 203 | Application Suite Final Test Results | ||||||
| 204 | Application Suite Updated Test Results | ||||||
| 207 | Updated Implementation Plan | ||||||
| 208 | Updated RTM | ||||||
| 211 | Final Go Live Plan | ||||||
| 212 | Updated Go Live Plan | ||||||
| 213 | Go Live Support | ||||||
| 216 | Updated Overall Test Strategy | ||||||
| 219 | Updated Overall Test Plan | ||||||
| 221 | Final Test Scripts | ||||||
| 222 | Updated Test Scripts | ||||||
| 223 | Draft Test Analysis Report | ||||||
| 224 | Final Test Analysis Report | ||||||
| 225 | Updated Test Analysis Reports | ||||||
| 228 | Updated Organizational Change Management Plan | ||||||
| 231 | Updated Impact Assessment | ||||||
| 235 | Updated Stakeholder Management Plan | ||||||
| 238 | Updated Implementation Communications Plan | ||||||
| 244 | Updated Training Curriculum and Materials | ||||||
| 245 | Training Evaluation Report and Surveys | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Phase 1 Implementation Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0204 | Phase 2 Implementation (NIST), Part 1 | 50 | Updated Functional Concept of Operations | ||||
| 135 | Updated Detailed Interface Strategy | ||||||
| 138 | Updated Interface Requirements Documents | ||||||
| 141 | Updated/Additional Interface High Level Designs | ||||||
| 144 | Updated/Additional Interface Detailed Level Designs | ||||||
| 147 | Updated/Additional Interface Code for each Interface | ||||||
| 150 | Updated Interface Test Plan | ||||||
| 156 | Updated Interface SOPs | ||||||
| 159 | Updated Interface Training Plan | ||||||
| 162 | Updated Interface Deployment Plan | ||||||
| 165 | Updated Detailed Conversion Strategy (Transaction Cutover) | ||||||
| 168 | Updated Detailed Legacy Systesm Decommissioning Strategy | ||||||
| 171 | Updated Interface Requirements Documents | ||||||
| 174 | Updated/Additional Conversion High Level Designs | ||||||
| 201 | Application Suite Updated Test Plan | ||||||
| 207 | Updated Implementation Plan | ||||||
| 208 | Updated RTM | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Phase 1 Implementation Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0205 | O&M Services - NOAA | 213 | Go Live Support | ||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required O&M Service Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0206 | Hosting | 259 | Updated Data Archiving Strategy | ||||
| 262 | Updated Archiving Requirements | ||||||
| 265 | Updated Archiving Design | ||||||
| 266 | Initial Archiving Code | ||||||
| 267 | Final Archiving Code | ||||||
| 268 | Updated/Additional Archiving Code | ||||||
| 271 | Updated Archiving Test Plan | ||||||
| 272 | Draft Archiving Test Results | ||||||
| 273 | Final Archiving Test Results | ||||||
| 274 | Updated Archiving Test Results | ||||||
| 276 | Final Archiving SOPs | ||||||
| 277 | Updated Archiving SOPs | ||||||
| 280 | Updated Archiving Training Plan | ||||||
| 283 | Updated Archiving Deployment Plan | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab) | 12 | MO | 0 | 0 | |||
| Subtotal | 0 |
Total 0
1331L519R13OS0005 Option Period 2 CLIN Detail Attachment J.12
&P of &N
Option Period 3 CLIN Detail
| CLIN | Description | PWS Deliverable # | PWS Deliverable Name | Billable Milestone Amount | |||
| 0301 | Project Management Services | 8 | Project Status Reports | ||||
| 9 | Analyses and Presentations | ||||||
| 10 | EVM Analyses, Forecasts and Performance Reports | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Project Management Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0302 | EDW and Reporting Capability | 56 | Updated Operationsl Reports Requirements Documents | ||||
| 59 | Updated/Additional Operational Reports High Level Designs | ||||||
| 62 | Updated/Additional Operational Reports Detailed Designs | ||||||
| 65 | Updated/Additional Operational Reports Code | ||||||
| 68 | Updated Operational Reports Test Plan | ||||||
| 71 | Updated Operational Reports Test Results | ||||||
| 74 | Updated Operational Reports Training Plan | ||||||
| 96 | Updated/Additional EDW Solution and Underlying Code Delivery | ||||||
| 114 | Updated/Additional Reporting/BI Solution and Underlying Code Delivery | ||||||
| 120 | Updated Reporting/BI Deployment Plan | ||||||
| 129 | Updated EDW Test Results | ||||||
| 132 | Updated Reporting/BI Test Results | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required EDW and Reporting Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0303 | Phase 2 Implementation (NIST), Part 2 and Deploy | 153 | Updated Interface Test Results | ||||
| 177 | Updated/Additional Conversion Detailed Level Designs | ||||||
| 180 | Updated/Additional Conversion Code | ||||||
| 183 | Updated Conversion Test Plan | ||||||
| 186 | Draft Mock 2 Conversion Test Results | ||||||
| 189 | Final Mock 3 Conversion Test Results | ||||||
| 192 | Updated Conversion Deployment Plan | ||||||
| 204 | Application Suite Updated Test Results | ||||||
| 212 | Updated Go Live Plan | ||||||
| 213 | Go Live Support | ||||||
| 216 | Updated Overall Test Strategy | ||||||
| 219 | Updated Overall Test Plan | ||||||
| 222 | Updated Test Scripts | ||||||
| 225 | Updated Test Analysis Reports | ||||||
| 244 | Updated Training Curriculum and Materials | ||||||
| 245 | Training Evaluation Report and Surveys | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Phase 2 Implementation Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0304 | O&M Services - NIST | 213 | Go Live Support | ||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required O&M Service Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0305 | Phase 3 Implementation (Census), Part 1 | 50 | Updated Functional Concept of Operations | ||||
| 135 | Updated Detailed Interface Strategy | ||||||
| 138 | Updated Interface Requirements Documents | ||||||
| 141 | Updated/Additional Interface High Level Designs | ||||||
| 144 | Updated/Additional Interface Detailed Level Designs | ||||||
| 147 | Updated/Additional Interface Code for each Interface | ||||||
| 150 | Updated Interface Test Plan | ||||||
| 156 | Updated Interface SOPs | ||||||
| 159 | Updated Interface Training Plan | ||||||
| 162 | Updated Interface Deployment Plan | ||||||
| 165 | Updated Detailed Conversion Strategy (Transaction Cutover) | ||||||
| 168 | Updated Detailed Legacy Systesm Decommissioning Strategy | ||||||
| 171 | Updated Interface Requirements Documents | ||||||
| 174 | Updated/Additional Conversion High Level Designs | ||||||
| 201 | Application Suite Updated Test Plan | ||||||
| 207 | Updated Implementation Plan | ||||||
| 208 | Updated RTM | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Phase 3 Implementation Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0306 | O&M Services - NOAA | 213 | Go Live Support | ||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required O&M Service Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0307 | Hosting | 259 | Updated Data Archiving Strategy | ||||
| 268 | Updated/Additional Archiving Code | ||||||
| 274 | Updated Archiving Test Results | ||||||
| 277 | Updated Archiving SOPs | ||||||
| 280 | Updated Archiving Training Plan | ||||||
| 283 | Updated Archiving Deployment Plan | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab) | 12 | MO | 0 | 0 | |||
| Subtotal | 0 |
Total 0
1331L519R13OS0005 Option Period 3 CLIN Detail Attachment J.12
&P of &N
Option Period 4 CLIN Detail
| CLIN | Description | PWS Deliverable # | PWS Deliverable Name | Billable Milestone Amount | |||
| 0401 | Project Management Services | 8 | Project Status Reports | ||||
| 9 | Analyses and Presentations | ||||||
| 10 | EVM Analyses, Forecasts and Performance Reports | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Project Management Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0402 | EDW and Reporting Capability | 56 | Updated Operationsl Reports Requirements Documents | ||||
| 59 | Updated/Additional Operational Reports High Level Designs | ||||||
| 62 | Updated/Additional Operational Reports Detailed Designs | ||||||
| 65 | Updated/Additional Operational Reports Code | ||||||
| 68 | Updated Operational Reports Test Plan | ||||||
| 71 | Updated Operational Reports Test Results | ||||||
| 74 | Updated Operational Reports Training Plan | ||||||
| 96 | Updated/Additional EDW Solution and Underlying Code Delivery | ||||||
| 114 | Updated/Additional Reporting/BI Solution and Underlying Code Delivery | ||||||
| 120 | Updated Reporting/BI Deployment Plan | ||||||
| 129 | Updated EDW Test Results | ||||||
| 132 | Updated Reporting/BI Test Results | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required EDW and Reporting Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0403 | Phase 2 Implementation (Census), Part 2 and Deploy | 153 | Updated Interface Test Results | ||||
| 177 | Updated/Additional Conversion Detailed Level Designs | ||||||
| 180 | Updated/Additional Conversion Code | ||||||
| 183 | Updated Conversion Test Plan | ||||||
| 186 | Draft Mock 2 Conversion Test Results | ||||||
| 189 | Final Mock 3 Conversion Test Results | ||||||
| 192 | Updated Conversion Deployment Plan | ||||||
| 204 | Application Suite Updated Test Results | ||||||
| 212 | Updated Go Live Plan | ||||||
| 213 | Go Live Support | ||||||
| 216 | Updated Overall Test Strategy | ||||||
| 219 | Updated Overall Test Plan | ||||||
| 222 | Updated Test Scripts | ||||||
| 225 | Updated Test Analysis Reports | ||||||
| 244 | Updated Training Curriculum and Materials | ||||||
| 245 | Training Evaluation Report and Surveys | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Phase 2 Implementation Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
| 0404 | O&M Services - Census | 213 | Go Live Support | ||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required O&M Service Activities | 12 | MO | 0 | ||||
| Subtotal | 0 |
0405 O&M Services - NOAA and NIST All Required O&M Service Activities (Steady State O&M - Go Live Deliverables/Support Not Applicable) 12 MO 0
| 0406 | Hosting | 259 | Updated Data Archiving Strategy | ||||
| 268 | Updated/Additional Archiving Code | ||||||
| 274 | Updated Archiving Test Results | ||||||
| 277 | Updated Archiving SOPs | ||||||
| 280 | Updated Archiving Training Plan | ||||||
| 283 | Updated Archiving Deployment Plan | ||||||
| Supplies/Services | Quantity | Unit | Unit Price | Amount | |||
| All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab) | 12 | MO | 0 | 0 | |||
| Subtotal | 0 |
Total 0
1331L519R13OS0005 Option Period 4 CLIN Detail Attachment J.12
&P of &N
Hosting Worksheet Base & OPs1-4
| CLIN | Description | Period of Performance | Cost Category | Amount |
| 0004 | Hosting (All other required hosting activities) | 4/1/20 - 3/31/21 | Licenses (Implementation Phase) | |
| Hardware/Infrastructure Design/Test/Deploy | ||||
| Networking Design/Test/Deploy | ||||
| Access Management Design/Test/Deploy | ||||
| Environment Test/Deploy (Test, Train Production) | ||||
| Subtotal | 0 | |||
| 0104 | Hosting (All other required hosting activities) | 4/1/21 - 3/31/22 | Licenses (Implementation Phase) | |
| Hardware/Infrastructure Design/Test/Deploy | ||||
| Networking Design/Test/Deploy | ||||
| Access Management Design/Test/Deploy | ||||
| Environment Test/Deploy (Test, Train Production) | ||||
| Subtotal | 0 | |||
| 0206 | Hosting (All other required hosting activities) | 4/1/22 - 3/31/23 | Licenses (Implementation Phase) | |
| Hardware/Infrastructure Design/Test/Deploy | ||||
| Networking Design/Test/Deploy | ||||
| Access Management Design/Test/Deploy | ||||
| Environment Test/Deploy (Test, Train Production) | ||||
| Subtotal | 0 | |||
| 0307 | Hosting (All other required hosting activities) | 4/1/23 - 3/31/24 | Licenses (Implementation Phase) | |
| Hardware/Infrastructure Design/Test/Deploy | ||||
| Networking Design/Test/Deploy | ||||
| Access Management Design/Test/Deploy | ||||
| Environment Test/Deploy (Test, Train Production) | ||||
| Subtotal | 0 | |||
| 0406 | Hosting (All other required hosting activities) | 4/1/24 - 3/31/25 | Licenses (Implementation Phase) | |
| Hardware/Infrastructure Design/Test/Deploy | ||||
| Networking Design/Test/Deploy | ||||
| Access Management Design/Test/Deploy | ||||
| Environment Test/Deploy (Test, Train Production) | ||||
| Subtotal | 0 |
Total 0
1331L519R13OS0005 Hosting Worksheet Base & Option Periods 1-4 Attachment J.12
&P of &N
Hosting Worksheet OPs5-19 Component/Module(s) Subscription/Traditional Metric Unit Price Quantity Price
Hosting/Infrastructure
| Public Cloud Services: |
| Number of environments (test, dev, pre-prod, prod) |
| Number of Virtual Machines by size (small, med, large) |
| Storage (production & Backup) |
| Primary and secondary zones |
| On-premise or private cloud: | |
| Number of environments (test, dev, pre-prod, prod) | |
| Number of virtual CPUs | |
| Memory | |
| Storage (production, backup) | |
| Primary and Secondary sites (DR, HA) | |
| Subtotal | 0 |
| Note: Please include assumptions around following areas that impacts estimate/price above, including but not limited to: |
| Disaster Recovery - Recovery Time |
| Disaster Recovery - Recovery Point |
| Security - FISMA Rating/Compliance |
| Security - Host & Network Based Intrusion Detection |
| Backup & Recovery |
| Support for installation of application patches and service packs |
| Establishment and maintenance of application security and access controls for all environments. |
| Rigorous change control process that enforces consistent configuration management across all increments, instances, and upgrades of software |
Software Licenses
S/W Licensing - Financial System
S/W Licensing - Procurement System
S/W Licensing - Property System
S/W Licensing - EDW
Subtotal 0
Full Scale, Steady State Annual Estimate for First Year of Hosting O&M Services under CLIN 0501 0
| CLIN / Description | Period of Performance | Quantity | Unit | Unit Price | Amount |
| 0501 / Hosting O&M Services | 4/1/25 - 3/31/26 | 12 | MO | 0 | 0 |
| 0601 / Hosting O&M Services | 4/1/26 - 3/31/27 | 12 | MO | 0 |
Author: Firm Fixed Pricing proposed for CLINs 0601 - 1901 may increase or decrease from the price proposed for CLIN 0501 consistent with the offeror's approach to delivering hosting and O&M services over the life of the contract.
Increases and/or decreases in pricing across CLINs 0601 - 1901 shall be addressed in the offeror's Basis of Estimate.
| 0701 / Hosting O&M Services | 4/1/27 - 3/31/28 | 12 | MO | 0 | |
| 0801 / Hosting O&M Services | 4/1/28 - 3/31/29 | 12 | MO | 0 | |
| 0901 / Hosting O&M Services | 4/1/29 - 3/31/30 | 12 | MO | 0 | |
| 1001 / Hosting O&M Services | 4/1/30 - 3/31/31 | 12 | MO | 0 | |
| 1101 / Hosting O&M Services | 4/1/31 - 3/31/32 | 12 | MO | 0 | |
| 1201 / Hosting O&M Services | 4/1/32 - 3/31/33 | 12 | MO | 0 | |
| 1301 / Hosting O&M Services | 4/1/33 - 3/31/34 | 12 | MO | 0 | |
| 1401 / Hosting O&M Services | 4/1/34 - 3/31/35 | 12 | MO | 0 | |
| 1501 / Hosting O&M Services | 4/1/35 - 3/31/36 | 12 | MO | 0 | |
| 1601 / Hosting O&M Services | 4/1/36 - 3/31/37 | 12 | MO | 0 | |
| 1701 / Hosting O&M Services | 4/1/37 - 3/31/38 | 12 | MO | 0 | |
| 1801 / Hosting O&M Services | 4/1/38 - 3/31/39 | 12 | MO | 0 | |
| 1901 / Hosting O&M Services | 4/1/39 - 3/31/40 | 12 | MO | 0 | |
| Total Hosting O&M Services Price (CLINs 0501 - 1901) | 0 |
1331L519R13OS005 Hosting Worksheet Option Periods 5-19 Attachment J.12
&P of &N
Labor Hour Worksheet
| Labor Category | Base Period | OY1 | OY2 | OY3 | OY4 | OY5 | OY6 | OY7 | OY8 | OY9 | OY10 | OY11 | OY12 | OY13 | OY14 | OY15 | OY16 | OY17 | OY18 | OY19 |
| Project Manager | ||||||||||||||||||||
| Project Analyst I | ||||||||||||||||||||
| Technical Manager I | ||||||||||||||||||||
| Technical Consultant I | ||||||||||||||||||||
| Technical Developers I | ||||||||||||||||||||
| Technical Manager II | ||||||||||||||||||||
| Technical Analyst I | ||||||||||||||||||||
| Technical Manager III | ||||||||||||||||||||
| Technical Analyst II | ||||||||||||||||||||
| Technical Consultants II | ||||||||||||||||||||
| Technical Analyst III | ||||||||||||||||||||
| Project Analyst II |
1331L519R13OS0005 Labor Hour Worksheet Attachment J.12
&P of &N
Microsoft_Word_Document.docx Attachment J.12 Instructions
1) Attachment J.12, Price Schedule, is a spreadsheet that consists of the following tabs:
· Summary Level Pricing
· Base Period CLIN Detail
· Option Period 1 CLIN Detail
· Option Period 2 CLIN Detail
· Option Period 3 CLIN Detail
· Option Period 4 CLIN Detail
· Hosting Worksheet Base & Option Periods 1 – 4
· Hosting Worksheet Option Periods 5 – 19
· Labor Hour Worksheet
2) To facilitate completion of the Price Schedule the spreadsheet contains formulas to calculate subtotals and totals and to link related information between tabs. The offeror bears exclusive responsibility, however, for ensuring that the spreadsheet is properly populated with their pricing information, and for verifying and validating the completeness and accuracy of all information including all formulas. Any omissions or errors in the Price Schedule as submitted with the offeror’s proposal are the offeror’s exclusive responsibility.
3) The CLINs for NOAA and NIST implementation and deployment also encompass implementation and deployment requirements for the bureaus that NOAA and NIST cross service. The bureaus that NOAA and NIST cross service are identified in Section 2.2 of the BAS Performance Work Statement. Census does not have any cross-servicing clients.
4) Instructions by Tab
a. Summary Level Pricing Tab
i. This tab consists of the Firm Fixed Price (FFP) CLINs applicable to the Base and Option Periods and placeholder CLINs for the optional T&M support over the life of the contract.
ii. In this tab offerors shall identify the FFP proposed by CLIN.
iii. No pricing information shall be identified for the T&M CLINs on this tab. A ceiling price for the optional T&M CLINs will be established by the Government at the time of award.
b. CLIN Detail Tabs
i. The Base Period, Option Period 1, Option Period 2, Option Period 3, and Option Period 4 CLIN Detail tabs consist of the list of deliverables and supplies/services required by CLIN.
ii. In this tab offerors shall identify the proposed billable milestone amounts for each deliverable and the proposed monthly price for all other required activities by CLIN.
iii. The billable milestone amounts represent the payment the contractor would receive after Government inspection and acceptance of the corresponding deliverable. The monthly price represents the payment the contractor would receive on a monthly basis after Government inspection and acceptance of all other required activities by CLIN.
c. Hosting Worksheet Base & Option Periods 1 – 4
i. This tab consists of pricing for all other required Hosting Activities over the Base and Option Periods 1 – 4, other than for the Hosting deliverables specified in the CLIN Detail tabs.
ii. Offerors shall identify their proposed price breakdown for all other required Hosting Activities across the 5 price elements as identified below:
1. Licenses
2. Hardware/Infrastructure Design/Test/Deploy
3. Networking Design/Test/Deploy
4. Access Management Design/Test/Deploy
5. Environment Test/Deploy (Test, Train Production)
iii. Offerors may include additional tabs or provide separate spreadsheets containing further details regarding the calculation of these price elements.
d. Hosting Worksheet Option Periods 5 – 19
i. This tab consists of pricing for all hosting activities required for full scale, steady state operations over Option Periods 5 – 19.
ii. Offerors shall provide a detailed Basis of Estimate (BOE) for hosting service by hosting environment including solution assumptions related to pricing.
iii. If proposing a SaaS component, the BOE must detail the measure of SaaS units required to deliver the solution.
iv. In this tab offerors shall identify the total proposed FFP for hosting on an annual basis, payable on a monthly basis in 12 equal payments.
e. Labor Hour Worksheet
i. This tab consists of the fully burdened, hourly labor rates applicable to Labor Categories who may perform work on a Labor Hour basis under the contract.
ii. Offerors shall insert their proposed fully burdened, hourly labor rate for the Base Period and Option Periods 1 – 19 for each Labor Category.
iii. The hourly rates proposed will be incorporated into the resulting contract and will be binding on work performed on a Labor Hour basis over the life of the contract.