J.12_Attachment_12_A001.xlsx

XLSX spreadsheet 97 KB Posted

Attached to
Business Applications Solution - Request for Proposal
Solicitation number
1331L519R13OS0005
Issued by

About this file

This price schedule attachment to a solicitation for a Business Applications Solution requires proposed pricing for a range of CLINs delivering project management, EDW and reporting capabilities, implementation, hosting and O&M services to three federal agencies over multiple periods of performance. Offerors must provide firm fixed prices for base and option periods encompassing activities such as solution design, development, testing and deployment, as well as ongoing hosting and support. Pricing is also requested for optional time and materials support and fully burdened labor rates. Submission of the completed price schedule with pricing information for all CLINs and labor categories is required as part of proposals due under this solicitation.

J.12_Attachment_12_A001

View the file

Other files

File Type Posted
1331L519R13OS0005_A003.pdf PDF
1331L519R13OS0005_A002.pdf PDF
1331L519R13OS0005_Response_to_Inquiries_Follow-up.pdf PDF
J.10_Attachment_10_A001.pdf PDF
1331L519R13OS0005_A001_conformed.pdf PDF
J.11_Attachment_11_A001.pdf PDF
1331L519R13OS0005_A001_SF30.pdf PDF
J.1_Attachment_01_A001.xlsx XLSX spreadsheet
J.15_Attachment_15.pdf PDF
1331L519R13OS0005_A001_tracked_changes.pdf PDF
J.7_Attachment_07_A001.pdf PDF
J.14_Attachment_14.docx DOCX document
1331L519R13OS0005_Responses_to_Inquiries.pdf PDF
J.11_Attachment_11.pdf PDF
J.3_Attachment_03.pdf PDF
J.10_Attachment_10.pdf PDF
J.5_Attachment_05.pdf PDF
J.4A_Attachment_04A.pdf PDF
J.7_Attachment_07.pdf PDF
J.1_Attachment_01.pdf PDF
1331L519R13OS0005_BAS_Final_RFP.pdf PDF
J.13_Attachment_13.xlsx XLSX spreadsheet
J.6_Attachment_06.pdf PDF
J.12_Attachment_12.xlsx XLSX spreadsheet
J.8_Attachment_08.pdf PDF
J.4B_Attachment_04B.pdf PDF
J.2_Attachment_02.pdf PDF
J.9_Attachment_09.pdf PDF
1331L519R13OS0005_BAS_Draft_RFP.pdf PDF
BAS_Draft_Performance_Work_Statement.pdf PDF
BAS_Notional_CLIN_Structure_FFP.pdf PDF
Draft_RFP_&_PWS_Question_and_Comment_Template.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Summary Level Pricing

CLINDescriptionAnticipated PoPFirm Fixed Price
Base Period
0001Project Management Services4/1/20 - 3/31/210
0002EDW and Reporting Capability4/1/20 - 3/31/210
0003Phase 1 Implementation (NOAA), Part 14/1/20 - 3/31/210
0004Hosting4/1/20 - 3/31/210
Total0
Option Period 1
0101Project Management Services4/1/21 - 3/31/220
0102EDW and Reporting Capability4/1/21 - 3/31/220
0103Phase 1 Implementation (NOAA), Part 24/1/21 - 3/31/220
0104Hosting4/1/21 - 3/31/220
Total0
Option Period 2
0201Project Management Services4/1/22 - 3/31/230
0202EDW and Reporting Capability4/1/22 - 3/31/230
0203Phase 1 Implementation (NOAA), Part 3 and Deploy4/1/22 - 10/31/220
0204Phase 2 Implementation (NIST), Part 110/1/22 - 3/31/230
0205O&M Services - NOAA10/1/22 - 3/31/230
0206Hosting4/1/22 - 3/31/230
Total0
Option Period 3
0301Project Management Services4/1/23 - 3/31/240
0302EDW and Reporting Capability4/1/23 - 3/31/240
0303Phase 2 Implementation (NIST), Part 2 and Deploy4/1/23 - 10/31/230
0304O&M Services - NIST10/1/23 - 3/31/240
0305Phase 3 Implementation (Census), Part 110/1/23 - 3/31/240
0306O&M Services - NOAA4/1/23 - 3/31/240
0307Hosting4/1/23 - 3/31/240
Total0
Option Period 4
0401Project Management Services4/1/24 - 3/31/250
0402EDW and Reporting Capability4/1/24 - 3/31/250
0403Phase 3 Implementation (Census), Part 2 and Deploy4/1/24 - 10/31/240
0404O&M Services - Census10/1/24 - 3/31/250
0405O&M Services - NOAA and NIST4/1/24 - 3/31/250
0406Hosting4/1/24 - 3/31/250
Total0
Option Period 5
0501Hosting and O&M Services4/1/25 - 3/31/260
Option Period 6
0601Hosting and O&M Services4/1/26 - 3/31/270
Option Period 7
0701Hosting and O&M Services4/1/27 - 3/31/280
Option Period 8
0801Hosting and O&M Services4/1/28 - 3/31/290
Option Period 9
0901Hosting and O&M Services4/1/29 - 3/31/300
Option Period 10
1001Hosting and O&M Services4/1/30 - 3/31/310
Option Period 11
1101Hosting and O&M Services4/1/31 - 3/31/320
Option Period 12
1201Hosting and O&M Services4/1/32 - 3/31/330
Option Period 13
1301Hosting and O&M Services4/1/33 - 3/31/340
Option Period 14
1401Hosting and O&M Services4/1/34 - 3/31/350
Option Period 15
1501Hosting and O&M Services4/1/35 - 3/31/360
Option Period 16
1601Hosting and O&M Services4/1/36 - 3/31/370
Option Period 17
1701Hosting and O&M Services4/1/37 - 3/31/380
Option Period 18
1801Hosting and O&M Services4/1/38 - 3/31/390
Option Period 19
1901Hosting and O&M Services4/1/39 - 3/31/400
Total Firm Fixed Pricing
Base Plus All Option Periods FFP Combined0
Optional T&M Support for EAS Migration, Hosting and O&M Services; Enhancements; and Transition Support Services
CLINDescriptionAnticipated PoPCeiling Price*
2000Base Period - Optional T&M Support4/1/20 - 3/31/21*
2001Option Period 1 - Optional T&M Support4/1/21 - 3/31/22*
2002Option Period 2 - Optional T&M Support4/1/22 - 3/31/23*
2003Option Period 3 - Optional T&M Support4/1/23 - 3/31/24*
2004Option Period 4 - Optional T&M Support4/1/24 - 3/31/25*
2005Option Period 5 - Optional T&M Support4/1/25 - 3/31/26*
2006Option Period 6 - Optional T&M Support4/1/26 - 3/31/27*
2007Option Period 7 - Optional T&M Support4/1/27 - 3/31/28*
2008Option Period 8 - Optional T&M Support4/1/28 - 3/31/29*
2009Option Period 9 - Optional T&M Support4/1/29 - 3/31/30*
2010Option Period 10 - Optional T&M Support4/1/30 - 3/31/31*
2011Option Period 11 - Optional T&M Support4/1/31 - 3/31/32*
2012Option Period 12 - Optional T&M Support4/1/32 - 3/31/33*
2013Option Period 13 - Optional T&M Support4/1/33 - 3/31/34*
2014Option Period 14 - Optional T&M Support4/1/34 - 3/31/35*
2015Option Period 15 - Optional T&M Support4/1/35 - 3/31/36*
2016Option Period 16 - Optional T&M Support4/1/36 - 3/31/37*
2017Option Period 17 - Optional T&M Support4/1/37 - 3/31/38*
2018Option Period 18 - Optional T&M Support4/1/38 - 3/31/39*
2019Option Period 19 - Optional T&M Support4/1/39 - 3/31/40*
Total (*NOTE: A ceiling price for the optional T&M CLINs will be established at the time of award)*

1331L519R13OS0005 Summary Level Pricing Attachment J.12

&P of &N

Base Period CLIN Detail

CLINDescriptionPWS Deliverable #PWS Deliverable NameBillable Milestone Amount
0001Project Management Services1Draft Integrated Master Schedule
2Final Integrated Master Schedule Baseline
4Draft Schedule Management Plan
5Final Schedule Management Plan
6Draft Cost Management Plan
7Final Cost Management Plan
8Project Status Reports
9Analyses and Presentations **NOT SEPARATELY PRICED**
10EVM Analyses, Forecasts, and Performance Reports
11Draft Scope Definition and Management Plan
12Final Scope Definitation and Management Plan
13Draft Requirements Management Plan
14Final Requirements Management Plan
15Requirements Traceability Matrix
16Draft Quality Management Plan
17Final Quality Management Plan
18Draft Human Resources Management Plan
19Final Human Resources Management Plan
20Draft Staffing Management Plan
21Final Staffing Management Plan
22Draft Issue Management Plan
23Final Issue Management Plan
24Draft Project Information Management Plan
25Final Project Information Management Plan
26Draft Project Management Plan
27Final Project Management Plan
28Draft Integrated Project Change Contorl Plan
29Final Integrated Project Change Control Plan
30Draft Configuration Management Plan
31Final Configuation Management Plan
32Draft Security Management Plan
33Final Security Management Plan
34Draft Scope Management Plan
35Final Scope Management Plan
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Project Management Activities12MO0
Subtotal0
0002EDW and Reporting Capability51Draft High Level Operational Reporting Strategy and Recommendation
54Draft Operational Reports Requirements Documents
78Draft Data Model Governance Strategy
82Draft EDW Requirements Document
83Final EDW Requirements Document
85Draft EDW Architecture Detailed Design Document
88Draft Data Transfer Documentation
91Draft EDW/BI Implementation Approach
103Draft Reporting/BI Requirements
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required EDW and Reporting Activities12MO0
Subtotal0
0003Phase 1 Implementation (NOAA), Part 136System Configuration Options Catalog/Matrix
37Draft Detailed Implementation Approach Assessment
38Final Detailed Implementation Approach Assessment
45Draft Solution Design Document
133Draft Detailed Interface Strategy
136Draft Interface Requirements Documents
193Application Suite Draft Requirements Documents (Per Application)
205Draft Implementation Plan
206Final Implementation Plan
214Draft Overall Test Strategy
226Draft Organizational Change Management Plan
227Final Organizational Change Management Plan
229Draft Impact Assessment
233Draft Stakeholder Management Plan
234Final Stakeholder Management Plan
236Draft Implementation Communications Plan
237Final Implementation Communications Plan
239Draft Training Plan and Approach
240Updated Training Plan and Approach
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Phase 1 Implementation Activities12MO0
Subtotal0
0004Hosting246Draft IT Concept of Operations
248Draft Software Acquisitions Strategy
249Final Software Acquisitions Strategy
257Draft Archiving Strategy
260Draft Archiving Requirements
261Final Archiving Requirements
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab)12MO00
Subtotal0

Total 0

1331L519R13OS0005 Base Period CLIN Detail Attachment J.12

&P of &N

Option Period 1 CLIN Detail

CLINDescriptionPWS Deliverable #PWS Deliverable NameBillable Milestone Amount
0101Project Management Services3Updated Integrated Master Schedule
8Project Status Reports
9Analyses and Presentations **NOT SEPARATELY PRICED**
10EVM Analyses, Forecasts and Performance Reports
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Project Management Activities12MO0
Subtotal0
0102EDW and Reporting Capability52Final High Level Operational Reporting Strategy and Recommendation
55Final Operational Reports Requirements Documents
57Draft Operational Reports High Level Designs
58Final Operationsl Reports High Level Designs
60Draft Operational Reports Detailed Designs
61Final Operational Reports Detailed Designs
63Initial Operational Reports Code
66Draft Operational Reports Test Plan
72Draft Operational Reports Training Plan
73Final Operational Reports Training Plan
75Draft Operational Reports Deployment Plan
76Final Operational Reports Deployment Plan
79Final Data Model Governance Strategy
80Updated Canonical Data Model
81Updated Conceptual EDW Data Model
84Updated EDW Requirements Document
86Final EDW Architecture Detailed Design Document
87Updated EDW Architecture Detailed Design Document
89Final Required Data Transfer Documentation
90Updated Required Data Transfer Documentation
92Final EDW/BI Implenetation Approach
93Updated EDW/BI Implementation Approach
94Initial EDW Solution and Underlying Code Delivery
97Draft EDW Training Plan
98Final EDW Training Plan
99Updated EDW Training Plan
100Draft EDW Deployment Plan
101Final EDW Deployment Plan
102Updated EDW Deployment Plan
104Final Reporting/BI Requirements
105Updated/Additional Reporting/BI Requirements
106Draft Reporting/BI High Level Designs
107Final Reporting/BI High Level Designs
108Updated/Additional Reporting/BI High Level Designs
109Draft Reporting/BI Detailed Level Designs
110Final Reporting/BI Detailed Level Designs
111Updated/Additional Reporting/BI Detailed Level Designs
115Draft Reporting/BI Training Plan
116Final Reporting/BI Training Plan
117Updated Operationsl Reports Training Plan
118Draft Reporting/BI Deployment Plan
121Draft EDW Test Plan
122Final EDW Test Plan
124Draft Reporting/BI Test Plan
125Final Reporting/BI Test Plan
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required EDW and Reporting Activities12MO0
Subtotal0
0103Phase 1 Implementation (NOAA), Part 239Draft BAS SOPs
40Final BAS SOPs
41Updated BAS SOPs
42Draft Fit Gap Analysis
43Final Fit Gap Analysis
46Final Solution Design Document
48Draft Functional Concept of Operations
134Final Detailed Interface Strategy
135Updated Detailed Interface Strategy
137Final Interface Requirements Documents
138Updated Interface Requirements Documents
139Draft Interface High Level Designs
140Final Interface High Level Designs
141Updated/Additional Interface High Level Designs
142Draft Interface Detailed Level Designs
143Final Interface Detailed Level Designs
144Updated/Additional Interface Detailed Level Designs
145Initial Interface Code for Each Interface
148Draft Interface Test Plan
149Final Interface Test Plan
150Updated Interface Test Plan
154Draft Interface SOPs
157Draft Interface Training Plan
158Final Interface Training Plan
160Draft Interface Deployment Plan
163Draft Detailed Conversion Strategy
164Final Detailed Conversion Strategy
166Detailed Legacy System Decommissioning Strategy
171Updated Interface Requirements Documents
173Final Conversion High Level Design
174Updated/Additional Conversion High Level Designs
175Draft Conversion Detailed Level Designs
178Initial Conversion Code
181Draft Conversion Test Plan
182Final Conversion Test Plan
183Updated Conversion Test Plan
190Draft Conversion Deployment Plan
191Final Conversion Deployment Plan
194Application Suite Final Requirements (Per Application)
195Application Suite Updated Requirements (Per Application)
196Draft Detailed Application Suite Requirements (Per Application)
197Final Detailed Application Suite System Configuration Documentation
198Updated Detailed Application Suite System Configuration Documentation
199Application Suite Draft Test Plan
200Application Suite Final Test Plan
201Appliccation Suite Updated Test Plan
207Updated Implementation Plan
208Updated RTM
209Financial Audit Strategy
210Draft Go Live Plan
215Final Overall Test Strategy
217Draft Overall Test Plan
218Final Overall Test Plan
219Updated Overall Test Plan
220Draft Test Scripts
228Updated Organizational Change Management Plan
230Final Impact Assessment
231Updated Impact Assessment
232Impact Analysis Tracking Log
235Updated Stakeholder Management Plan
238Updated Implementation Communications Plan
241Final Training Plan and Approach
242Draft Training Curriculum and Materials
243Final Training Curriculum and Materials
244Updated Training Curriculum and Materials
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Phase 1 Implementation Activities12MO0
Subtotal0
0104Hosting247Final IT Concept of Operations
250Updated Software Acquisitions Strategy
251Software Licenses or Softwre License Certification Letter
255Draft SLA, Including all related documents
258Final Archiving Strategy
262Updated Archiving Requirements
263Draft Archiving Design
264Final Archiving Design
265Updated Archiving Design
269Draft Archiving Test Plan
270Final Archiving Test Plan
271Updated Archiving Test Plan
275Draft Archiving SOPs
278Draft Archiving Training Plan
279Final Archiving Training Plan
280Updated Archiving Training Plan
281Draft Archiving Deployment Plan
282Final Archiving Deployment Plan
283Updated Archiving Deployment Plan
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab)12MO00
Subtotal0

Total 0

1331L519R13OS0005 Option Period 1 CLIN Detail Attachment J.12

&P of &N

Option Period 2 CLIN Detail

CLINDescriptionPWS Deliverable #PWS Deliverable NameBillable Milestone Amount
0201Project Management Services8Project Status Reports
9Analyses and Presentations **NOT SEPARATELY PRICED**
10EVM Analyses, Forecasts and Performance Reports
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Project Management Activities12MO0
Subtotal0
0202EDW and Reporting Capability53Updated High Level Operational Reporting Strategy and Recommendations
56Updated Operationsl Reports Requirements Documents
59Updated/Additional Operational Reports High Level Designs
62Updated/Additional Operational Reports Detailed Designs
64Final Operational Reports Code
65Updated/Additional Operational Reports Code
67Final Operational Reports Test Plan
68Updated Operational Reports Test Plan
69Draft Operational Reports Test Results
70Final Operaional Reports Test Results
71Updated Operational Reports Test Results
74Updated Operational Reports Training Plan
77Updated Operational Reports Deployment Plan
84Updated EDW Requirements Document
87Updated EDW Architecture Detailed Design Document
90Updated Required Data Transfer Documentation
93Updated EDW/BI Implementation Approach
95Final EDW Solution and Underlying Code Delivery
96Updted/Additional EDW Solution and Underlying Code Delivery
99Updated EDW Training Plan
102Updated EDW Deployment Plan
105Updated/Additional Reporting/BI Detailed Level Designs
108Updated/Additional Reporting/BI High Level Designs
111Updated/Additional Reporting/BI Detailed Level Designs
112Initial Reporting/BI Solution and Underlying Code Delivery
113Final Reporting/BI Solution and Underlying Code Delivery
114Updated/Additional Reporting/BI Solution and Underlying Code Delivery
117Updated Operational Reports Training Plan
119Final Reporting/BI Deployment Plan
120Updated Reporting/BI Deployment Plan
123Updated EDW Test Plan
126Updated Reporting/BI Test Plan
127Draft EDW Test Results
128Final EDW Test Results
129Updated EDW Test Results
130Draft Reporting/BI Test Results
131Final Reporting/BI Test Results
132Updated Reporting/BI Test Results
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required EDW and Reporting Activities12MO0
Subtotal0
0203Phase 1 Implementation (NOAA), Part 3 and Deploy41Updated BAS SOPs
44Updated Fit/Gap Analysis
47Updated Solution Design Document
49Final Functional Concept of Operations
50Updated Functional Concept of Operations
135Updated Detailed Interface Strategy
138Updated Interface Requirements Documents
141Updated/Additional Interface High Level Designs
144Updated/Additional Interface Detailed Level Designs
146Final Interface Code for each Interface
147Updated/Additional Interface Code for each Interface
150Updated Interface Test Plan
151Draft interface Test Results
152Final Interface Test Results
153Updated Interface Test Results
155Final Interface SOPs
156Updated Interface SOPs
159Updated Interface Testing Plan
161Final Interface Deployment Plan
162Updated Interface Deployment Plan
165Updated Detailed Conversion Strategy (Transaction Cutover)
167Final Detailed Legacy System Decommissioning Strategy
168Updated Detailed Legacy System Decommissioning Strategy
171Updated Interface Requirements Documents
174Updated/Additional Conversion High Level Designs
176Final Conversion Detailed Level Designs
177Updated/Additional Conversion Detailed Level Designs
179Final Conversion Code
180Updated/Additional Conversion Code
183Updated Conversion Test Plan
184Draft Mock 1 Conversion Test Results
185Final Mock 1 Conversion Test Results
186Draft Mock 2 Conversion Test Results
187Final Mock 2 Conversion Test Results
188Draft Mock 3 Conversion Test Results
189Final Mock 3 Conversion Test Results
192Updated Conversion Deployment Plan
195Application Suite Updated Requirements (per application)
198Updated Detailed Application Suite System Configuration Documentation
201Application Suite Updated Test Plan
202Application Suite Draft Test Results
203Application Suite Final Test Results
204Application Suite Updated Test Results
207Updated Implementation Plan
208Updated RTM
211Final Go Live Plan
212Updated Go Live Plan
213Go Live Support
216Updated Overall Test Strategy
219Updated Overall Test Plan
221Final Test Scripts
222Updated Test Scripts
223Draft Test Analysis Report
224Final Test Analysis Report
225Updated Test Analysis Reports
228Updated Organizational Change Management Plan
231Updated Impact Assessment
235Updated Stakeholder Management Plan
238Updated Implementation Communications Plan
244Updated Training Curriculum and Materials
245Training Evaluation Report and Surveys
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Phase 1 Implementation Activities7MO0
Subtotal0
0204Phase 2 Implementation (NIST), Part 150Updated Functional Concept of Operations
135Updated Detailed Interface Strategy
138Updated Interface Requirements Documents
141Updated/Additional Interface High Level Designs
144Updated/Additional Interface Detailed Level Designs
147Updated/Additional Interface Code for each Interface
150Updated Interface Test Plan
156Updated Interface SOPs
159Updated Interface Training Plan
162Updated Interface Deployment Plan
165Updated Detailed Conversion Strategy (Transaction Cutover)
168Updated Detailed Legacy Systesm Decommissioning Strategy
171Updated Interface Requirements Documents
174Updated/Additional Conversion High Level Designs
201Application Suite Updated Test Plan
207Updated Implementation Plan
208Updated RTM
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Phase 1 Implementation Activities6MO0
Subtotal0
0205O&M Services - NOAA213Go Live Support
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required O&M Service Activities6MO0
Subtotal0
0206Hosting259Updated Data Archiving Strategy
262Updated Archiving Requirements
265Updated Archiving Design
266Initial Archiving Code
267Final Archiving Code
268Updated/Additional Archiving Code
271Updated Archiving Test Plan
272Draft Archiving Test Results
273Final Archiving Test Results
274Updated Archiving Test Results
276Final Archiving SOPs
277Updated Archiving SOPs
280Updated Archiving Training Plan
283Updated Archiving Deployment Plan
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab)12MO00
Subtotal0

Total 0

1331L519R13OS0005 Option Period 2 CLIN Detail Attachment J.12

&P of &N

Option Period 3 CLIN Detail

CLINDescriptionPWS Deliverable #PWS Deliverable NameBillable Milestone Amount
0301Project Management Services8Project Status Reports
9Analyses and Presentations **NOT SEPARATELY PRICED**
10EVM Analyses, Forecasts and Performance Reports
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Project Management Activities12MO0
Subtotal0
0302EDW and Reporting Capability56Updated Operationsl Reports Requirements Documents
59Updated/Additional Operational Reports High Level Designs
62Updated/Additional Operational Reports Detailed Designs
65Updated/Additional Operational Reports Code
68Updated Operational Reports Test Plan
71Updated Operational Reports Test Results
74Updated Operational Reports Training Plan
96Updated/Additional EDW Solution and Underlying Code Delivery
114Updated/Additional Reporting/BI Solution and Underlying Code Delivery
120Updated Reporting/BI Deployment Plan
129Updated EDW Test Results
132Updated Reporting/BI Test Results
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required EDW and Reporting Activities12MO0
Subtotal0
0303Phase 2 Implementation (NIST), Part 2 and Deploy153Updated Interface Test Results
177Updated/Additional Conversion Detailed Level Designs
180Updated/Additional Conversion Code
183Updated Conversion Test Plan
186Draft Mock 2 Conversion Test Results
189Final Mock 3 Conversion Test Results
192Updated Conversion Deployment Plan
204Application Suite Updated Test Results
212Updated Go Live Plan
213Go Live Support
216Updated Overall Test Strategy
219Updated Overall Test Plan
222Updated Test Scripts
225Updated Test Analysis Reports
244Updated Training Curriculum and Materials
245Training Evaluation Report and Surveys
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Phase 2 Implementation Activities7MO0
Subtotal0
0304O&M Services - NIST213Go Live Support
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required O&M Service Activities6MO0
Subtotal0
0305Phase 3 Implementation (Census), Part 150Updated Functional Concept of Operations
135Updated Detailed Interface Strategy
138Updated Interface Requirements Documents
141Updated/Additional Interface High Level Designs
144Updated/Additional Interface Detailed Level Designs
147Updated/Additional Interface Code for each Interface
150Updated Interface Test Plan
156Updated Interface SOPs
159Updated Interface Training Plan
162Updated Interface Deployment Plan
165Updated Detailed Conversion Strategy (Transaction Cutover)
168Updated Detailed Legacy Systesm Decommissioning Strategy
171Updated Interface Requirements Documents
174Updated/Additional Conversion High Level Designs
201Application Suite Updated Test Plan
207Updated Implementation Plan
208Updated RTM
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Phase 3 Implementation Activities6MO0
Subtotal0
0306O&M Services - NOAA213Go Live Support
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required O&M Service Activities12MO0
Subtotal0
0307Hosting259Updated Data Archiving Strategy
268Updated/Additional Archiving Code
274Updated Archiving Test Results
277Updated Archiving SOPs
280Updated Archiving Training Plan
283Updated Archiving Deployment Plan
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab)12MO00
Subtotal0

Total 0

1331L519R13OS0005 Option Period 3 CLIN Detail Attachment J.12

&P of &N

Option Period 4 CLIN Detail

CLINDescriptionPWS Deliverable #PWS Deliverable NameBillable Milestone Amount
0401Project Management Services8Project Status Reports
9Analyses and Presentations **NOT SEPARATELY PRICED**
10EVM Analyses, Forecasts and Performance Reports
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Project Management Activities12MO0
Subtotal0
0402EDW and Reporting Capability56Updated Operationsl Reports Requirements Documents
59Updated/Additional Operational Reports High Level Designs
62Updated/Additional Operational Reports Detailed Designs
65Updated/Additional Operational Reports Code
68Updated Operational Reports Test Plan
71Updated Operational Reports Test Results
74Updated Operational Reports Training Plan
96Updated/Additional EDW Solution and Underlying Code Delivery
114Updated/Additional Reporting/BI Solution and Underlying Code Delivery
120Updated Reporting/BI Deployment Plan
129Updated EDW Test Results
132Updated Reporting/BI Test Results
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required EDW and Reporting Activities12MO0
Subtotal0
0403Phase 2 Implementation (Census), Part 2 and Deploy153Updated Interface Test Results
177Updated/Additional Conversion Detailed Level Designs
180Updated/Additional Conversion Code
183Updated Conversion Test Plan
186Draft Mock 2 Conversion Test Results
189Final Mock 3 Conversion Test Results
192Updated Conversion Deployment Plan
204Application Suite Updated Test Results
212Updated Go Live Plan
213Go Live Support
216Updated Overall Test Strategy
219Updated Overall Test Plan
222Updated Test Scripts
225Updated Test Analysis Reports
244Updated Training Curriculum and Materials
245Training Evaluation Report and Surveys
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Phase 2 Implementation Activities7MO0
Subtotal0
0404O&M Services - Census213Go Live Support
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required O&M Service Activities6MO0
Subtotal0

0405 O&M Services - NOAA and NIST All Required O&M Service Activities (Steady State O&M - Go Live Deliverables/Support Not Applicable) 12 MO 0

0406Hosting259Updated Data Archiving Strategy
268Updated/Additional Archiving Code
274Updated Archiving Test Results
277Updated Archiving SOPs
280Updated Archiving Training Plan
283Updated Archiving Deployment Plan
Supplies/ServicesQuantityUnitUnit PriceAmount
All Other Required Hosting Activities (reference data from "Hosting Worksheet Base & OY 1-4" Tab)12MO00
Subtotal0

Total 0

1331L519R13OS0005 Option Period 4 CLIN Detail Attachment J.12

&P of &N

Hosting Worksheet Base & OPs1-4

CLINDescriptionPeriod of PerformanceCost CategoryAmount
0004Hosting (All other required hosting activities)4/1/20 - 3/31/21Licenses (Implementation Phase)
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
Subtotal0
0104Hosting (All other required hosting activities)4/1/21 - 3/31/22Licenses (Implementation Phase)
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
Subtotal0
0206Hosting (All other required hosting activities)4/1/22 - 3/31/23Licenses (Implementation Phase)
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
Subtotal0
0307Hosting (All other required hosting activities)4/1/23 - 3/31/24Licenses (Implementation Phase)
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
Subtotal0
0406Hosting (All other required hosting activities)4/1/24 - 3/31/25Licenses (Implementation Phase)
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
Subtotal0

Total 0

1331L519R13OS0005 Hosting Worksheet Base & Option Periods 1-4 Attachment J.12

&P of &N

Hosting Worksheet OPs5-19 Component/Module(s) Subscription/Traditional Metric Unit Price Quantity Price

Hosting/Infrastructure

Public Cloud Services:
Number of environments (test, dev, pre-prod, prod)
Number of Virtual Machines by size (small, med, large)
Storage (production & Backup)
Primary and secondary zones
On-premise or private cloud:
Number of environments (test, dev, pre-prod, prod)
Number of virtual CPUs
Memory
Storage (production, backup)
Primary and Secondary sites (DR, HA)
Subtotal0
Note: Please include assumptions around following areas that impacts estimate/price above, including but not limited to:
Disaster Recovery - Recovery Time
Disaster Recovery - Recovery Point
Security - FISMA Rating/Compliance
Security - Host & Network Based Intrusion Detection
Backup & Recovery
Support for installation of application patches and service packs
Establishment and maintenance of application security and access controls for all environments.
Rigorous change control process that enforces consistent configuration management across all increments, instances, and upgrades of software

Software Licenses

S/W Licensing - Financial System

S/W Licensing - Procurement System

S/W Licensing - Property System

S/W Licensing - EDW

Subtotal 0

Full Scale, Steady State Annual Estimate for First Year of Hosting O&M Services under CLIN 0501 0

CLIN / DescriptionPeriod of PerformanceQuantityUnitUnit PriceAmount
0501 / Hosting O&M Services4/1/25 - 3/31/2612MO00
0601 / Hosting O&M Services4/1/26 - 3/31/2712MO0

Author: Firm Fixed Pricing proposed for CLINs 0601 - 1901 may increase or decrease from the price proposed for CLIN 0501 consistent with the offeror's approach to delivering hosting and O&M services over the life of the contract.

Increases and/or decreases in pricing across CLINs 0601 - 1901 shall be addressed in the offeror's Basis of Estimate.

0701 / Hosting O&M Services4/1/27 - 3/31/2812MO0
0801 / Hosting O&M Services4/1/28 - 3/31/2912MO0
0901 / Hosting O&M Services4/1/29 - 3/31/3012MO0
1001 / Hosting O&M Services4/1/30 - 3/31/3112MO0
1101 / Hosting O&M Services4/1/31 - 3/31/3212MO0
1201 / Hosting O&M Services4/1/32 - 3/31/3312MO0
1301 / Hosting O&M Services4/1/33 - 3/31/3412MO0
1401 / Hosting O&M Services4/1/34 - 3/31/3512MO0
1501 / Hosting O&M Services4/1/35 - 3/31/3612MO0
1601 / Hosting O&M Services4/1/36 - 3/31/3712MO0
1701 / Hosting O&M Services4/1/37 - 3/31/3812MO0
1801 / Hosting O&M Services4/1/38 - 3/31/3912MO0
1901 / Hosting O&M Services4/1/39 - 3/31/4012MO0
Total Hosting O&M Services Price (CLINs 0501 - 1901)0

1331L519R13OS005 Hosting Worksheet Option Periods 5-19 Attachment J.12

&P of &N

Labor Hour Worksheet

Labor CategoryBase PeriodOY1OY2OY3OY4OY5OY6OY7OY8OY9OY10OY11OY12OY13OY14OY15OY16OY17OY18OY19
Project Manager
Project Analyst I
Technical Manager I
Technical Consultant I
Technical Developers I
Technical Manager II
Technical Analyst I
Technical Manager III
Technical Analyst II
Technical Consultants II
Technical Analyst III
Project Analyst II

1331L519R13OS0005 Labor Hour Worksheet Attachment J.12

&P of &N

Microsoft_Word_Document.docx Attachment J.12 Instructions

1) Attachment J.12, Price Schedule, is a spreadsheet that consists of the following tabs:

· Summary Level Pricing

· Base Period CLIN Detail

· Option Period 1 CLIN Detail

· Option Period 2 CLIN Detail

· Option Period 3 CLIN Detail

· Option Period 4 CLIN Detail

· Hosting Worksheet Base & Option Periods 1 – 4

· Hosting Worksheet Option Periods 5 – 19

· Labor Hour Worksheet

2) To facilitate completion of the Price Schedule the spreadsheet contains formulas to calculate subtotals and totals and to link related information between tabs. The offeror bears exclusive responsibility, however, for ensuring that the spreadsheet is properly populated with their pricing information, and for verifying and validating the completeness and accuracy of all information including all formulas. Any omissions or errors in the Price Schedule as submitted with the offeror’s proposal are the offeror’s exclusive responsibility.

3) The CLINs for NOAA and NIST implementation and deployment also encompass implementation and deployment requirements for the bureaus that NOAA and NIST cross service. The bureaus that NOAA and NIST cross service are identified in Section 2.2 of the BAS Performance Work Statement. Census does not have any cross-servicing clients.

4) Instructions by Tab

a. Summary Level Pricing Tab

i. This tab consists of the Firm Fixed Price (FFP) CLINs applicable to the Base and Option Periods and placeholder CLINs for the optional T&M support over the life of the contract.

ii. In this tab offerors shall identify the FFP proposed by CLIN.

iii. No pricing information shall be identified for the T&M CLINs on this tab. A ceiling price for the optional T&M CLINs will be established by the Government at the time of award.

b. CLIN Detail Tabs

i. The Base Period, Option Period 1, Option Period 2, Option Period 3, and Option Period 4 CLIN Detail tabs consist of the list of deliverables and supplies/services required by CLIN.

ii. In this tab offerors shall identify the proposed billable milestone amounts for each deliverable and the proposed monthly price for all other required activities by CLIN.

iii. The billable milestone amounts represent the payment the contractor would receive after Government inspection and acceptance of the corresponding deliverable. The monthly price represents the payment the contractor would receive on a monthly basis after Government inspection and acceptance of all other required activities by CLIN.

c. Hosting Worksheet Base & Option Periods 1 – 4

i. This tab consists of pricing for all other required Hosting Activities over the Base and Option Periods 1 – 4, other than for the Hosting deliverables specified in the CLIN Detail tabs.

ii. Offerors shall identify their proposed price breakdown for all other required Hosting Activities across the 5 price elements as identified below:

1. Licenses

2. Hardware/Infrastructure Design/Test/Deploy

3. Networking Design/Test/Deploy

4. Access Management Design/Test/Deploy

5. Environment Test/Deploy (Test, Train Production)

iii. Offerors may include additional tabs or provide separate spreadsheets containing further details regarding the calculation of these price elements.

d. Hosting Worksheet Option Periods 5 – 19

i. This tab consists of pricing for all hosting activities required for full scale, steady state operations over Option Periods 5 – 19.

ii. Offerors shall provide a detailed Basis of Estimate (BOE) for hosting service by hosting environment including solution assumptions related to pricing.

iii. If proposing a SaaS component, the BOE must detail the measure of SaaS units required to deliver the solution.

iv. In this tab offerors shall identify the total proposed FFP for hosting on an annual basis, payable on a monthly basis in 12 equal payments.

e. Labor Hour Worksheet

i. This tab consists of the fully burdened, hourly labor rates applicable to Labor Categories who may perform work on a Labor Hour basis under the contract.

ii. Offerors shall insert their proposed fully burdened, hourly labor rate for the Base Period and Option Periods 1 – 19 for each Labor Category.

iii. The hourly rates proposed will be incorporated into the resulting contract and will be binding on work performed on a Labor Hour basis over the life of the contract.

image1.emf

File details come from the government source that posted it. Updated .