NOAA Standard Specification AMC-583-1B General Requirements for Life Raft Inspections.pdf

PDF 26 KB Posted

Attached to
NOAA SHIP OKEANOS EXPLORER FY26 DRYDOCK REPAIR
Solicitation number
1305M225Q0151
Issued by

About this file

This document is a Standard Specification (AMC-583-1B) from the National Oceanic and Atmospheric Administration (NOAA) Atlantic Marine Center, detailing general requirements for liferaft inspections. The specification outlines comprehensive inspection procedures for ocean liferafts and hydraulic releases, mandating annual and five-year U.S. Coast Guard inspections performed by an authorized service facility of the liferaft manufacturer.

Key requirements include removing liferafts from ships for inspection, renewing specific components such as bands, clips, instruction labels, flashlight batteries, and repair kit cement, and providing a detailed report for each liferaft with a cost breakdown. The five-year inspection additionally requires a CO2 recharge of the inflation cylinder with weight certification. The specification references Code of Federal Regulations Title 46, Parts 160.151 and 160.062, and specifies that the contractor must provide all necessary labor, materials, services, tools, supervision, and technical expertise to complete the required inspections and servicing.

View the file

Other files

File Type Posted
Sol_1305M225Q0151_Amd_0006.pdf PDF
FY21DD RV OKEANOS EXPLORER - SIGNED (2).pdf PDF
Sol_1305M225Q0151_Amd_0008.pdf PDF
Sol_1305M225Q0151_Amd_0003.pdf PDF
Attachment 1 (Updated) - NOAA Ship Okeanos Explorer FY 2026 Drydock Repair Specifications Revision 2.pdf PDF
Drawing 320-6233696_HVAC Elementary and Isometric Wiring Diagram.pdf PDF
FY21DD Propulsion Motor Room Tank Top Plating.pdf PDF
FY21DD Lower Engine Room Deck.pdf PDF
528-6233903.pdf PDF
Lifting Appliance Certifications NOAA Ship Okeanos Explorer DS FY25.pdf PDF
Drawing 512-6233797_HVAC Lower Platform.pdf PDF
NOAA Standard Specification AMC-300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
NVIC 3-97 Stability Related Review Performed by the American Bureau of Shipping for U.S. Flag Vessels.pdf PDF
OE-085-001.pdf PDF
Sol_1305M225Q0151_Amd_0005.pdf PDF
Drawing 512-6233792_ Heating Ventilation and Air Conditioning Diagram.pdf PDF
Maintenance Item Details Port ROV and STBD Working Cranes (1).pdf PDF
USCG MSC Plan Review Guideline GEN-02 Submission of Stability Test (Deadweight Survey or Inclining Experiment).pdf PDF
620-6233557.pdf PDF
CFR-023 WI-573-01 NOAA Ship Okeanos Explorer DS FY25.pdf PDF
Attachment I - LIST OF REFERENCES-Okeanos Explorer.xlsx XLSX spreadsheet
620-6233548.pdf PDF
Sol_1305M225Q0151_Amd_0007.pdf PDF
Sol_1305M225Q0151_Amd_0009.pdf PDF
OE-165-101.pdf PDF
Anchor Windlass and Capstan Manual (1).pdf PDF
243-6233870 (1).pdf PDF
Sol_1305M225Q0151_Amd_0004.pdf PDF
110-6233551.pdf PDF
512-6233792 (1).pdf PDF
OE-165-101_.pdf PDF
Attachment 2 - Price Schedule Okeanos Explorer.xlsx XLSX spreadsheet
Attachment 7 Subcontracting Plan Template.pdf PDF
Sol_1305M225Q0151_Amd_0002.pdf PDF
Sol_1305M225Q0151_Amd_0001.pdf PDF
Attachment 1 - NOAA Ship Okeanos Explorer FY 2026 Drydock Repair Specifications Revision 1.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-583-1B

DECEMBER 1998

SUPERSEDING

AMC-583-1A

JULY 1995

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-583-1B

GENERAL REQUIREMENTS FOR LIFERAFT INSPECTIONS

1. SCOPE. This specification contains the general requirements and procedures to be used for performing U.S. Coast Guard inspections on NOAA liferafts and hydraulic releases.

2. REFERENCE.

(a) Code of Federal Regulations Title 46, Part 160, section 151, "Inflatable Liferafts (SOLAS)"

(b) Code of Federal Regulations Title 46, Part 160, Section 062, "Releases. Lifesaving Equipment, Hydraulic, and Manual."

3. REQUIREMENTS.

3.1. General. The following requirements apply to all work.

3.1.1. Except as otherwise specified, the contractor shall

provide all labor, material, services, tools, supervision, and technical expertise needed to accomplish the work required by this specification.

3.1.2. All work shall be performed by an authorized service

facility of the liferaft manufacturer.

3.1.3. Provide and install parts and components during

servicing of the liferafts as required by this specification, the Detail Specification, and other procurement documents. Renewal of other parts and components determined to be needed, as a result of servicing the liferafts will be negotiated by the Contracting Officer as an additional cost to the purchase order or contract. Provide a list of renewal parts and components which have not reached their expiration date to the COTR for disposition.

3.1.4. The Contractor shall remove all the ocean liferafts and associated hydraulic releases from the ship to the contractors facility for inspection.

3.1.5. Service the liferaft in accordance with reference (a)

and this specification.

3.1.6. Stamp the metal inspection plate in accordance with

reference (a).

3.1.7. Reinstall all liferafts and hydraulic releases in their original locations.

3.2. Annual Inspection. Perform an annual U.S. Coast Guard

inspection on the required ocean liferafts in accordance with reference (a). Renew or provide the following items as part of the inspection:

3.2.1. All bands.

3.2.2. All clips.

3.2.3. All required instruction labels.

3.2.4. All certifications (including U.S. Coast Guard) for

inspected items.

3.2.5. Deleted.

3.2.6. All flashlight batteries.

3.2.7. All repair kit cement.

3.2.8. A report for each liferaft with a cost breakdown for

all renewed items and an inventory of all dated items with their expiration date.

3.3. Special Five-Year Inspection. In addition to the above

annual inspection, perform a five-year U.S. Coast Guard inspection on the required ocean liferafts in accordance with reference (a). In addition to all renewals identified in reference (a), provide a CO2 recharge of the inflation cylinder with certification of the cylinder’s weight prior to and after the two week stand period as part of the inspection.

3.4. Hydraulic Release Inspection. Perform an annual U.S. Coast Guard inspection on all hydraulic releases in accordance with reference (b).

4. NOTES.

4.1. The following information will be provided by the Detail Specification or other procurement document:

4.1.1. The quantity, capacity, and manufacturer of each

liferaft being serviced.

4.1.2. The location of each liferaft being services.

4.1.3. The type of servicing (annual inspection or special

five-year inspection) required for each of the liferafts being serviced.

4.1.4. The quantity and manufacturer of the hydraulic

releases being serviced.

END OF SPECIFICATION