Attachment J.2 Pricing Schedule_Amendment 0005.xlsx

XLSX spreadsheet 64 KB Posted

Attached to
Request for Proposal_NOAA C-130J Aircraft Production
Solicitation number
1305M224RNMAN0230
Issued by

About this file

This document is the Attachment J.2 Pricing Schedule for a Request for Proposal (RFP) issued by the National Oceanic and Atmospheric Administration (NOAA) for the procurement of up to four (4) fully modified C-130J aircraft. The RFP includes the production of two (2) "green" C-130J aircraft, an analysis of alternatives for a vertically scanning Doppler radar, and design of aircraft modifications. Optional Contract Line Item Numbers (CLINs) are included for two (2) additional "green" C-130J aircraft, modifications for each of the four (4) aircraft, additional design of provisions for a vertically scanning Doppler radar, spare parts and supplies, and training and engineering support services. The requirement has a five-year ordering period from approximately May 1, 2024 through April 30, 2029, during which optional CLINs may be exercised. The pricing schedule details the firm-fixed-price and cost-plus-fixed-fee CLINs, with instructions for completing the pricing information.

View the file

Other files

File Type Posted
RFP 1305M224RNMAN0230_C-130J Aircraft Production_Amendment 0007.pdf PDF
SF30_ Amendment 0007.pdf PDF
Attachment J.2 Pricing Schedule_Amendment 0006 (2).xlsx XLSX spreadsheet
Attachment J.1.1 Appendix A - Specification - Amendment 0006.pdf PDF
SF30_ Amendment 0006.pdf PDF
Amendment 0005_SF30.pdf PDF
Attachment J.6 - Accounting System Questionaire.pdf PDF
Attachment J.1 Statement of Work - Amendment 0005.pdf PDF
RFP 1305M224RNMAN0230_C-130J Aircraft Production_Amendment 0005.pdf PDF
Attachment J.1.1 Appendix A - Specification - Amendment 0005.pdf PDF
Attachment J.4 Past Performance Questionnaire_Amendment 0005.pdf PDF
SF30 Amendment 0004.pdf PDF
J.1.1 Appendix A - Specification - Amendment 0003.pdf PDF
J.1 Statement of Work - Amendment 0003.pdf PDF
RFP 1305M224RNMAN0230_C-130J Aircraft Production_Amendment 0003.pdf PDF
Amendment 0003.pdf PDF
RFP 1305M224RNMAN0230_C-130J Aircraft Production_Amendment 0002.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
RFP 1305M224RNMAN0230_C-130J Aircraft Production.pdf PDF
J.1 SOW_ Final.docx DOCX document
J.2 Pricing Schedule_Final.xlsx XLSX spreadsheet
J.3 Past Performance Information Form.docx DOCX document
J.4 Past Performance Questionnaire.docx DOCX document
SOW Appendix A Specification_FINAL.docx DOCX document
J.5 Justification for Other Than Full and Open Competition_Redacted.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing CLIN structure NOAA C-130 Aircraft Production - Attachment J.2 Pricing Schedule Five Year Period of Performance: Date of Award - 5 Years thereafter (Exact dates will be solidified at Contract Award) CLIN Item Pricing Type Description Quantity Unit Year 1 Date of Award - 5 Years thereafter Extended Price Year 2 Date of Award - 5 Years thereafter Extended Price Year 3 Date of Award - 5 Years thereafter Extended Price Year 4 Date of Award - 5 Years thereafter Extended Price Year 5 Date of Award - 5 Years thereafter Extended Price

0001Firm Fixed Price (FFP)Aircraft #1- Completion of new unmodified "green' C-130J aircraft in accordance with the Statement of Work (SOW)1EA
0002FFPFeasibility study to determine options for a Vertically Scanning Doppler Radar in accordance with the SOW.1EA
0003Cost-Plus Fixed Fee (CPFF)Design of modifications to the Baseline aircraft #1 to meet the requirements and configurations in accordance with the SOW and Specifications within Appendix A.

Estimated Cost $__________ Fixed Fee $____________

Total CPFF Amount (Estimated Cost & Fixed Fee = NTE Amount) $_______________1EASee Notes Tab for instructions - NTE amount will be determined at contract award based on the summation of Estimated Cost & Fixed Fee Amount
0004 (Opt)FFPAdditional design for ‘provisions for’ a Vertically Scanning Doppler Radar, in accordance with the SOW, Specifications (Appendix A).1EASee Notes Tab for completion of Labor Category Rates;

To be negotiated upon acceptance of feasibilty study (CLIN 0002) 0005 (Opt) CPFF Modification of Baseline C-130J aircraft #1, in accordance with the SOW, Appendix A (Specifications).

Estimated Cost $__________ Fixed Fee $____________

Total CPFF Amount (Estimated Cost & Fixed Fee = NTE Amount) $_______________1EASee Notes Tab for instructions - NTE amount will be determined at contract award based on the summation of Estimated Cost & Fixed Fee Amount
0006 (Opt)FFPSpare parts, supplies, and additional infrastructure, in accordance with the SOW, Specifications (Appendix A), and Attachment, J.2 Schedule B. Pricing Schedule.

New Parts Discount: _________% from cost Overhauled Parts Discount: _________% from cost Materials Discount: _________% from cost

Spare parts to be ordered, as needed, in accordance with Offeror’s Price Schedule and Offeror discounts for delivery of two fully modified C-130Js, and optional CLINs 2001,2002, 3001 and 3002 are exercised.1LT$15M (NTE)
0007 (Opt)FFPTraining Services and additional Engineering Support Services, in accordance with the SOW, Specifications (Appendix A).

*Labor Rates will be incorporated into resulting contract **If more than one labor category is applicable, Offeror is to provide Labor Rates for all applicable labor categories. 1 LT See Notes Tab for completion of Labor Category Rates;

$15M (NTE)

1001FFPAircraft #2- Completion of new unmodified "green' C-130J aircraft in accordance with the Statement of Work (SOW)1EA
1002 (Opt)CPFFModification of Baseline C-130J aircraft #2, in accordance with Appendix A (Specifications). Provide separate listed pricing spreadsheet of all Modification pricing.

Estimated Cost $__________ Fixed Fee $____________

Total CPFF Amount (Estimated Cost & Fixed Fee = NTE Amount) $_______________1EASee Notes Tab for instructions - NTE amount will be determined at contract award based on the summation of Estimated Cost & Fixed Fee Amount
2001 (Opt)FFPAircraft #3- Completion of new unmodified "green' C-130J aircraft in accordance with the Statement of Work (SOW)1EA
2002 (Opt)CPFFModification of Baseline C-130J aircraft #3, in accordance with Appendix A (Specifications). Provide separate listed pricing spreadsheet of all Modification pricing.

Estimated Cost $__________ Fixed Fee $____________

Total CPFF Amount (Estimated Cost & Fixed Fee = NTE Amount) $_______________1EASee Notes Tab for instructions - NTE amount will be determined at contract award based on the summation of Estimated Cost & Fixed Fee Amount
3001 (Opt)FFPAircraft #4- Completion of new unmodified "green' C-130J aircraft in accordance with the Statement of Work (SOW)1EA
3002 (Opt)CPFFModification of Baseline C-130J aircraft #4, in accordance with Appendix A (Specifications). Provide separate listed pricing spreadsheet of all Modification pricing.

Estimated Cost $__________ Fixed Fee $____________ Total CPFF Amount (Estimated Cost & Fixed Fee = NTE Amount) $_______________ 1 EA See Notes Tab for instructions - NTE amount will be determined at contract award based on the summation of Estimated Cost & Fixed Fee Amount

Notes needed for pricing

Notes:
Pricing for CLINs (0001, 0002, 0003, and 1001) does not need to be provided by Offerors for Years 2 through 5, as the Government anticipates fully funding these CLINs upon award in Year 1. As such, cells that do not need Offerors to input pricing information are indetified in gray.
Optional CLINs may be exercised at any point throughout the life of the contract. Years 1 through 5 are identified for Offerors to propose outlying years of these supplies and labor category fixed rates; the period of performance dates associated with Years 1 through 5 indicate the time period at which the CLIN is exercised. In regards to the 'green' Aircraft, and completion of fully modified aircraft, the completion of this work will follow its own schedule, as indicated within the deliverable schedule and communicated with the awarded Contractor.
Include loaded benefits, Program Management and other ancillary costs in all person-hour quotes
Include admininistrative and pass-through costs in all training quotes
CLINs 0003, 0005, 1002, 2002, and 3002 are identfied as Cost-Plus Fixed Fee (CPFF) items and must specify the estimated cost and fixed fee broken out within each of the CPFF CLINs; whereby the NTE amount will be determined at award consisting of the summation of the estimated cost and fixed fee amoumt for each CPFF CLIN.
CLINs 0003, 0005, 1002, 2002, and 3002 are identfied as Cost-Plus Fixed Fee (CPFF) items. Based on the totality of items quoted within each of these CPFF CLINs a NTE amount for each of the following CLINs shall be identified within the Offeror's proposal: 0003, 0005, 1002, 2002, and 3002. These NTE amounts will be included in the overall Total Evaluated Price (TEP).
Upon the completion, delivery, and final acceptance of CLIN 0003, Design of modifications to the Baseline aircraft #1 to meet the requirements and configurations in accordance with the SOW and Specifications within Appendix A, the following CLINs will then be modified to Firm Fixed Price (FFP) items via a modification to the contract: CLINs 0005, 1002, 2002, and 3002.
CLIN 0004, Additional design for ‘provisions for’ a Vertically Scanning Doppler Radar, are NOT to be priced. Pricing will be negotiated upon acceptance of CLIN 0002, Feasibility study to determine options for a Vertically Scanning Doppler Radar.
CLIN 0006, Spare parts, supplies, and additional infrastructure, is a Not-To-Exceed (NTE) line item in the amount of $15,000,000. The Offeror shall submit percentage of discount, if any, in the Supply Schedule for CLIN 0006 and shall submit a separate Price Schedule for spare parts list.
CLIN 0007, Training Services and additional Engineering Support Services, is a NTE line item. The NTE amount will be determined at contract award. The Offeror shall submit labor rates for services for CLIN 0007 and shall submit a separate Price Schedule for suggested services and training. If more than one training is suggested, provide price for each training discipline (e.g. price for pilot training, separate price for navigator training, and separate price for mechanic training).

Additional Pricing Information - Labor Categories (This will be used for informational purposes only)

CodeDescriptionYear 1Year 2Year 3Year 4Year 5
CLIN 0004 (Optn)A-EngrAdditional Aeronautical Engineering (per person/hour)
S-TechAdditional Structural or mechanical modification (per person/hour)
A-TechAdditional Wiring or Avionics modification (per person/hour)
CLIN 0004 and CLIN 0007(Optn)S-EngrAdditional Structural Engineering (per person/hour)
E-EngrAdditional Electrical or Avionics Engineering (per person/hour)
C-EngrAdditional Airworthiness Certification (DER or equiv) (per person/hour)
CLIN 0007 (Optn)P-TrngPilot Training (per person)
L-TrngLoadmaster Training (per person)
M-TrngGround Maintainer/Mechanic Training (per person)
A-TrngAvionics Technician Training (per person)

File details come from the government source that posted it. Updated .