This document is an amendment to a solicitation for drydock repairs to the NOAA Ship Okeanos Explorer for fiscal year 2024. The solicitation is issued by the Department of Commerce National Oceanic and Atmospheric Administration. The amendment provides responses to contractor questions regarding work items requiring the emptying, cleaning, and certification of shipboard fuel oil tanks; the intended handling of fuel oil removed from tanks; references in work items to non-destructive testing locations; and clarification on areas highlighted in an attached sketch. Specifically, the responses indicate that not all fuel tanks will require entry, any residual fluid removed from tanks does not need to be saved, non-destructive testing is to be performed in bilges per referenced documents, and the sketch shows the extent of bilge areas to be preserved under generator sets.

View the file

Other files

File Type Posted
Amendment 0008 Continuation Page.pdf PDF
HJ241 Product Manual.pdf PDF
Amendment 0008.pdf PDF
A314OSTG OKEANOS EXPLORER UPGRADE.PDF PDF
B119454-A.pdf PDF
B119261 DIAGRAM.pdf PDF
Airborne Survey Results.pdf PDF
KNC_Project_230202RH_Schedule.pdf PDF
Amendment 0007 Continuation Page.pdf PDF
Amendment 0007.pdf PDF
22-55552 NOAA Vessel.pdf PDF
IAC Silencers Submittal Sheets 9017-DR.pdf PDF
KNC_Project_230202RH_Quote.pdf PDF
OE-123-101.pdf PDF
Amendment 0006 Continuation Page.pdf PDF
OE-422-103 LED Navigation Lights Installation.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0005 Continuation Page.pdf PDF
Model HH 219_Separator_Manual.pdf PDF
Boss 107 Separator System.pdf PDF
OE-570-001.pdf PDF
Amendment 0004 Continuation Page.pdf PDF
Amendment 0004.pdf PDF
RFQ_1305M223QNMAN0142 REV 2.pdf PDF
Continuation Page.pdf PDF
RFQ_1305M223QNMAN0142 REV 1.pdf PDF
Amendment 0003.pdf PDF
508 Standards Checklist.pdf PDF
Amendment 0002.pdf PDF
243-6233870.pdf PDF
524-6233814.pdf PDF
OE-555-001_Fire Control Plan_Rev D (3).pdf PDF
T9568-AC-MMO-010_0_0.PDF PDF
OE_583_06_REV0_MAN.pdf PDF
SSPC-SP-1-Solvent-Wipe.pdf PDF
0606- Standards for Lifting Appliances on NOAA Ships.doc DOC document
Explorer GSSP Hydrostatics.pdf PDF
OE_575_04_MAN - Traction Winch.pdf PDF
NOAA Pre-Drydock Worksheet.pdf PDF
528-6233824.pdf PDF
562-6233911.pdf PDF
436-6233675.pdf PDF
OE_583_03_MAN.pdf PDF
Manual-HP46-18KE-6600-06262.pdf PDF
OE-601-101.pdf PDF
OE-165-101.pdf PDF
320-6233663.pdf PDF
OE-436-001.pdf PDF
528-6233903.pdf PDF
Show 40 more

Latest 50 of 140 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 3

Question 3: WI 070-01 Para 1.4.18 states “Contractor shall empty, open, clean and certify (safe for entry) al shipboard … fuel oil… tanks to support work items.”, and Para 1.4.19 states “All remaining fluid in the tanks that must be removed by the contractor…. will be the responsibility of the contractor at no additional cost to the Government.”

WI 070-04 Para 1.6.4 states “ship carries approximately 150,000 gallons of diesel oil and can be assumed to have up to approximately 65% of its fuel on board upon arrival at Contractor’s facility.”

Contractor notes that per WI 070-04 there could be as much as 97,500 gallons of fuel oil for

Contractor to “remove” in accordance with WI 070-01.

Request Government clarify whether they intend Contractor to dispose of the removed fuel or store it for return to ship at the end of the availability in light of the information outlined above.

If the intent is for Contractor to dispose of the fuel the ship arrives with, request Government clarify whether they intend for Contractor to provide new fuel at completion of the availability.

Response 3: WI 070-04 provides fuel information for docking purposes. The current intent is

NOT to remove all the fuel on the ship. Not all fuel tanks will require entry such as during the 5-year ABS inspections. For tanks that will require entry the intent is to move the fuel to a different tank onboard the ship. The tanks will be pumped to low suction and the contractor will be required for removal of remaining fluid in the tank. The residual fluid does not need to be saved.

Should the situation and conditions change prior to arrival; a change order will be issued to address handling of the fuel.

Question 4

Question 4: WI 631-05 Para 1.4.4 states “Perform Non-Destructive Tests on areas shown in

Reference 1.2.4”, however there is no Reference 1.2.4 listed in WI 631-05. WI 631-05 Para 1.2.3 states only “Deck Gauging Locations” which seems might be what Para 1.4.4 was intended to refer to, however Contractor can find no document amongst those provided with the solicitation that seem to be a match for that wording nor context. Furthermore, since the title of the WI refers to preservation of bilges it is unclear based on 1.2.3 whether the intent is for NDT to be performed on the decks or bilges of the space.

Contractor further notes that there is a sketch included in WI 631-05, located between Para 1.4.5 and 1.5, which appears to be neither labeled nor specifically referenced by any WI paragraph. In addition to highlighting the forward and aft bilge areas of Main Generator Room 3-34-0-E, the sketch also has highlighting applied in the port and starboard areas of the bilge as well.

Contractor assumes this sketch is intended to show the extents of the areas to be power tooled and coated per Paragraphs 1.4.3 and 1.4.5.

Continuation Page – Amendment 0002

OKEANOS EXPLORER FY24 DRYDOCK

RFQ# 1305M223QNMAN0142

The purpose of this Amendment is as follows:

Question 4a: Request Government clarify and/or provide the document intended to be

“Reference 1.2.4” and/or “Reference 1.2.3”; locations of areas requiring NDT?

Response 4a: WI 631-05 Para 1.4.4 should be Reference 1.2.3. It is the same deck gauging reference as 070-02 Ref. 1.2.2. The specific pages for WI 631-05 are 41, 41-1; UTs are to be performed in the bilges.

Question 4b: Request Government confirm Contractor’s interpretation (described above) of the highlighted sketch included in WI 631-05.

Response 4b: The sketch is intended to show the extent of the areas to be preserved. The outer bilge is separated from the bilge under the Gensets.