These engineering design drawings detail the 19th Avenue NE Road Reconstruction project for the City of Rio Rancho, New Mexico, prepared by Huitt-Zollars, Inc. in May 2025. The project involves comprehensive roadway improvements including paving, storm drainage infrastructure, utility relocation, and associated civil engineering work along 19th Avenue. Key construction elements include building new storm drain laterals, installing storm drain inlets, constructing curb and gutter, creating sidewalks, implementing ADA ramps, and performing roadway grading and pavement work. The design documents show detailed plan and profile views of proposed improvements, with specific focus on road geometry, drainage infrastructure, and utility coordination.

The project appears to be part of a phased infrastructure improvement plan, with references to future phase developments including planned channel and pond construction. The engineering drawings indicate multiple utility relocations and protections, including gas lines, fiber optic cables, electrical lines, and water lines. Construction notes emphasize the contractor's responsibility to verify existing utility locations, maintain existing utilities during construction, and follow specific technical standards for installation and integration of new infrastructure elements. The project seems to be funded through municipal infrastructure budgeting, with precise engineering specifications designed to ensure comprehensive and compliant road reconstruction in the Rio Rancho area.

View the file

Other files for this state and local contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

s

X X

X X

X

X

X

X X X X

12+00

13+00

13+26

+0

+0

+0

+0

+0

+0

+0

+8

G

AS

G

AS

G

ASG

AS

G

AS

G

AS

GASGASGASGASGASGASGASGASGASGASGAS

GAS

s s

X X

X X

X

X

X

X X X X

STA. 14+33.11

-23.25' L

MATCH EXIST CURB

STA. 14+33.11

23.62' R

MATCH EXIST CURB

13+00 14+00 15+00 16+00

3.31%

-4.36%

-2.39%

-4.06%

4.80%

-4.67%

-2.39%

-4.06%

90.00' VC

FL RT

PVI STA = 13+65.00

PVI ELEV = 5580.06

K = 9.51

PV

C

S

TA

3+

.0

EL

EV

7.

PV

T

ST

A

+1 0.

EL

EV

7.

H.P. STA = 13+65.61

H.P. ELV 5579.00

C L

.5

C L

.1

C L

.0

C L

.1

C L

.6

C L

.2

C L

.2

.4

C L

.0

.6

C L

.4

.7

C L

.3

.3

C L

.8

.0

C L

.9

.6

C L

.2

.2

C L

.7

.6

C L

.2

.1

C L

.7

.7

C L

.9

.9

C L

.1

.1

C L

.6

.6

C L

.1

.1

C L

.6

.6

R T

.5

R T

.1

R T

.0

R T

.1

R T

.6

R T

.2

R T

.4

R T

.6

R T

.7

R T

.3

R T

.0

R T

.6

R T

.2

R T

.6

R T

.1

R T

.7

R T

.9

R T

.1

R T

.6

R T

.1

R T

.6

LT

9.

LT

9.

LT

9.

LT

9.

LT

8.

LT

8.

LT

8.

LT

8.

LT

8.

LT

8.

LT

8.

LT

7.

LT

7.

LT

6.

LT

6.

LT

5.

LT

4.

LT

4.

LT

3.

LT

3.

LT

2.

90.00' VC

FL LT

PVI STA = 13+65.00

PVI ELEV = 5579.85

K = 11.74

PV

C

S

TA

3+

.0

EL

EV

8.

PV

T

ST

A

+1 0.

EL

EV

7.

H.P. STA = 13+58.81

H.P. ELV 5579.00

G R

AD

E

BR

EA

K

ST

A

+0

9.

EL

EV

7.

G R

AD

E

BR

EA

K

ST

A

+3

3.

EL

EV

7.

G R

AD

E

BR

EA

K

ST

A

+4

4.

EL

EV

3.

PVI STA:13+65.00

PVI ELEV:5580.54

K:9.24

LVC:90.00

BV

C

S:

3+

.0

BV

C

E:

8.

EV

C

S:

4+

.0

EV

C

E:

8.

CONSTRUCT 8" STD CURB & GUTTER PER CORR STD

DWG CG-01 & DETAIL B ON SHEET 2 - 5.

CONSTRUCT CROWN TRANSITION PER DETAIL C,

SHEET 2 - 5.

CONSTRUCT CONCRETE CUT-OFF WALL PER CORR

STD DWG CG-01 & DETAIL B SHEET 2 - 5.

NEATCUT EXISTING PAVEMENT PLUS 2 FOOT WIDE

MILL STRIP 1-1/2" DEPTH ON EXISTING PAVEMENT TO

STAGER PAVEMENT JOINT. DETAIL D, SHEET 2 - 5.

CONSTRUCT COLLECTOR STREET OPTION PER CORR

STD DWG PS-01; DETAIL A ON SHEET 2 - 5.

CONSTRUCT CURB RETURNS & VALLEY GUTTER PER

PER CORR STD DWG VG-01; DETAIL A ON SHEET 2 - 6 &

DETAIL C ON SHEET 2 - 5.

CONSTRUCT CONCRETE RUNDOWN DETAIL SEE

SHEET 2 - 7.

INSTALL 2 MAINTENANCE ACCESS GATES SEE DETAIL B

SHEET 2 - 6.

9 INSTALL MUTCD "SIDEWALK ENDS" SIGN R9-9.

10 REMOVE AND RESET STOP SIGN.

11 REMOVE AND REPLACE EXISTING CONCRETE VALLEY

GUTTER

12 CONSTRUCT 5' WIDE 4" PCC SIDEWALK PER CORR STD

DWGS TS-01 & DW-01.

13 CONSTRUCT ADA RAMP PER CORR STD DWG ADA-005.

SEE SHEET 4-3

14 CONSTRUCT RESIDENTIAL STREET OPTION 1 PER

CORR STD DWG PS-01; DETAIL A ON SHEET 2 - 5.

15 INSTALL 6" THICK 2"-4" ROCK, WITH FILTER FABRIC

FOR SLOPES 3% OR GREATER

16 CONTRACTOR TO COORDINATE WITH PROPERTY

OWNER TO RELOCATE FENCE/WALL AND LANDSCAPE

17 CONSTRUCT 4" MEDIAN PAVEMENT (COLORED AND

PATTERNED)

18 INSTALL CLASS A SEEDING ON ALL DISTURBED AREAS

19TH AVENUE

19TH AVENUE

SCALE: 1:20

EXISTING GRADE @ CL

00 20' 40'

SCALES: HORZ. 1" = 20'

VERT. 1" = 5'

SHEET:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

DPW CHK:

D es ig ne d By

D es ig ne d Fo r:

N O

R

EV

IS

IO

N S

(O R

C H

AN

G

E N

O

TI

C

ES

PROJECT NO.

D

ES

C R

IP

TI

O N

D

AT

E

BY

12346 57

Pl ot te d:

7/ 7/

2:

:1

PM,

B y:L aw so n, J am es

H :\p ro j\R

.0

- C

O R

R

- 1

9t h

D ra in ag e St ud y

R

FP

3-

PW

-0

\1

C

AD

D

B

IM

\1

0.

Au to

C

AD

\S he et s\

PH

AS

E 1\

3_ Sh ee ts

\R

_P

AV

IN

G

-P N

P.

dw g La st S av ed

:7/ 7/

2:

:5

PM,

jla w so n

TWO WORKING DAYS

BEFORE YOU DIG CALL

811 OR 260-1990

C

IT

Y O

F R

IO

R

AN

C

H O

TH

A

VE

N U

E N

E R

O A

D R

EC

O

N

ST

R U

C

TI

O N

DMD

STAFF

RJD

R316418.01

MAY 2025

R io

R an ch o

D riv e N

E, S ui te

R io

R an ch o, N ew

M ex ic o

Ph on e

(5

) 8

-5

F ax (5

) 8

-3

HUITT-ZOLLARS, INC.

Consulting Engineers

DESIGN P.G.L @ CL

3 - 2

TH

A

VE

R

OA

DW

AY

P

LA

N

PR

OF

ILE

M

ATC

H

LIN

E STA: 16+00

PAVING CONSTRUCTION NOTES

77.05

BEGIN CURB RETURN

77.39

END CURB RETURN

RET.

STA. = 13+34.36, 23.04' RT

STA. = 13+10.53, 40.39' RT

FL ELEV.

L = 31.53' T = 31.53' R = 25.00'

RETURN FL

CURVE DATA

Δ = 072°15'37"77.32

77.59 78.04

78.48RET.

B

78.75

BEGIN CURB RETURN

78.01

END CURB RETURN

RET.

STA. = 13+09.34, 47.55' LT

STA. = 13+34.37, 22.60' LT

FL ELEV.

L = 39.25' T = 39.25' R = 25.00'

RETURN FL

CURVE DATA

Δ = 89°57'26"78.48

78.21 78.28

78.34RET.

A

NOTE:

CONTRACTOR SHALL FIELD VERIFY SURVEY INFORMATION AND

DATUM PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.

NOTIFY ENGINEER IN WRITING OF ANY DISCREPANCY

TH

S T

R

EB

EC

C

A

LP

A

℄ OF CONSTRUCTION

2 - 2

FU

TU

R E

PH

AS

E

II

PO

N

D

A

FU

TU

R

E

PH

AS

E

PO

N

D

B

FUTURE PHASE

CHANNEL

STORM DRAIN ALIGNMENT

SEE SHEET 11-8

10TH STREET ALIGNMENT

SEE SHEET 3 - 8

.5'

.5'

' B

K

- B

K

' R W

R25.

00'

A

B

EXISTING EDGE

OF CHANNEL

DESIGN P.G.L @ FL LT/RT

15 15

NOTE:

DESIGN PROFILE GRADE SHOWN FROM STA:14+33.11 TO CHERRY

ROAD IS FOR VERIFYING SITE DISTANCES ONLY

NO CHANGE IN PROFILE GRADE

STA:14+33.11 TO CHERRY ROAD

AutoCAD SHX Text 07/07/25

AutoCAD SHX Text 17616

X X

X X

X

X

X

X

X

X

X

X

X

GASGASGASGAS

GAS

W W W W W

GAS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

W W

SD1

+0

+0

+0

11+00

12+00

+0

+0

+0

131.14' of 12" C900 WL @ 2.74%

GASGASGASGAS

GAS

SD CAP 1

STA. 11+12.44, 0.00

INSTALL 36" SD CAP

SD END CAP 2

STA. 12+08.12, 0.00

INSTALL 36" SD CAP

SD CAP 1

STA. 11+12.44, 0.00

INSTALL 36" SD CAP

SD CAP 1

STA. 11+12.44, 0.00

INSTALL 36" SD CAP

STA. 11+86.58

SD INV=66.67

SD TP=70.00

FG=73.90

BOC=73.40

44.74' of 12" C900 WL @ -0.03%

STA. 12+68.15

12.67' L

STA. 14+44.04

STA. 14+66.47STA. 12+76.99

12.64' L

AIR RELEASE VALVE

STA. 13+64.96

-12.51' L

11+00 12+00 12+50

E G

4.

E G

3.

E G

2.

E G

1.

E G

1.

E G

9.

E G

8.

E G

7.

E G

6.

E G

3.

E G

5.

E G

6.

E G

6.

E G

7.

INSTALL 36" SD CAP

STA 11+12.44

INV 5568.49

INSTALL 36" SD CAP

STA 12+08.12

INV 5566.09

STA 11+49.32

ELEV 5577.00 @ FL

STA 11+86.58

TP INV 5570.00

STA 11+86.58

BOC ELEV 5573.40

STA 11+94.27

ELEV 5573.00

BUILD 95.68 LF OF

36" SD @ 2.51%

Q= 86.74 cfs V= 12.27 ft/sec

11-8

UT

ILI

TY

P

LA

N

PR

OF

ILE

00 20' 40'

SCALES: HORZ. 1" = 20'

VERT. 1" = 5'

TH

S T

SD LATERAL 1

SCALE: 1:20

EXISTING GRADE @ ℄

SHEET:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

DPW CHK:

D es ig ne d By

D es ig ne d Fo r:

N O

R

EV

IS

IO

N S

(O R

C H

AN

G

E N

O

TI

C

ES

PROJECT NO.

D

ES

C R

IP

TI

O N

D

AT

E

BY

12346 57

Pl ot te d:

7/ 7/

2:

:5

PM,

B y:L aw so n, J am es

H :\p ro j\R

.0

- C

O R

R

- 1

9t h

D ra in ag e St ud y

R

FP

3-

PW

-0

\1

C

AD

D

B

IM

\1

0.

Au to

C

AD

\S he et s\

PH

AS

E 1\

_S he et s\ R

_U

TI

LI

TY

-P

N P.

dw g

La st

S av ed :7/

7/

2:

:1

PM,

jla w so n

TWO WORKING DAYS

BEFORE YOU DIG CALL

811 OR 260-1990

C

IT

Y O

F R

IO

R

AN

C

H O

TH

A

VE

N U

E N

E R

O A

D R

EC

O

N

ST

R U

C

TI

O N

DMD

STAFF

RJD

R316418.01

MAY 2025

R io

R an ch o

D riv e N

E, S ui te

R io

R an ch o, N ew

M ex ic o

Ph on e

(5

) 8

-5

(5

) 8

-3

HUITT-ZOLLARS, INC.

Consulting Engineers

19TH AVENUE

FUTURE PHASE II

CHANNEL

FUTURE PHASE II

POND 1A

FUTURE PHASE II

POND 1B

FUTURE PHASE II

STORM DRAIN

199.7 LF

S=2.51%

FUTURE PHASE II

STORM DRAIN

EX. 4" GAS LINE

EX 4" GAS

CONCRETE

RUNDOWN

FUTURE OUTLET

STRUCTURE

INV=5570.00

FUTURE MANHOLE

INV=5565.00

2%

50' ROW

HGL

CONSTRUCTION NOTES

1. THE LOCATION OF EXISTING UTILITIES IS BASED ON RECORD

DRAWINGS, POTHOLE INFORMATION, ABOVE GROUND

FEATURES, AND DESCRIPTIONS PROVIDED BY THE CITY OF

RIO RANCHO.

2. CONTRACTOR SHALL VERIFY THE LOCATION (HORIZONTAL

AND VERTICAL) AND SIZE/DIAMETER OF ALL UTILITIES PRIOR

TO COMMENCING WORK. DAMAGE TO EXISTING UTILITIES

CAUSED BY CONTRACTOR'S ACTIONS SHALL BE REPAIRED AT

THE CONTRACTOR'S EXPENSE.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING

AND SUPPORTING ALL EXISTING UTILITIES, INCLUDING

SERVICES, DURING CONSTRUCTION.

4. RIM ELEVATION PROVIDED FOR CURB DROP INLETS (CDI) IS

AT FLOWLINE OF CURB.

5. AT UTILITY CROSSINGS, WHERE LESS THAN 18" OF VERTICAL

SEPARATION FROM STORM DRAIN PIPING OR STRUCTURES IS

PROPOSED, LEAN FILL CONSTRUCTION (PER SECTION 207 OF

THE STANDARD SPECIFICATIONS) SHALL BE USED TO

PROTECT THE WATER OR SEWER LINE. LEAN FILL SHALL

EXTEND A PERPENDICULAR DISTANCE OF 5 FEET ON EACH

SDE OF THE STORM PIPE OR STRUCTURE.

6. INLETS PER DETAILS SHEET 11-10.

7. JOINT RESTRAINTS PER TABLE ON SHEET 11-10.

AutoCAD SHX Text 07/07/25

V

V FH

s

G

AS

G

AS

G

AS

G

AS

FO

FO

FO

FO

W W W W W W

W W

W W

W

E E E

E

E E

E

SD

SD

SD

SD

SD

SD

SD2

SD3

9.

' o f 1 2"

C

W

L

.1

6%

G

AS

G

AS

G

AS

G

AS

FO

FO

FO

FO

TO

P EL=5565.11'

36" C M

C

TO

P EL=5565.22'

36" C M

C

TO

P EL=5565.16'

36" C M

C

SD INLET 1

STA. 10+79.57, 0.00 R

INSTALL 1-TYPE A SD INLET

STA. 10+51.62, 3.97 R

INSTALL 30" FLARED END SECTION

INV=5560.50

SD INLET 2

STA. 11+25.47, 0.00 L

INSTALL 1-TYPE A SD INLET

40.76' of 10" C900 WL @ 0.00%

12.45' of 10" C900 WL @ 0.22%

11+00 11+50

E G

9.

E G

8.

E G

2.

E G

7.

E G

7.

E G

7.

E G

7.

E G

2.

E G

2.

IN

V

.5 0(

IN

N

W

" F

LA

R

ED

E

N D

S

EC

TI

O

N

ST

A.

0+

.6

IN

V

.0 0(

O U

T

SE

IN

V

.5

0(

IN

N

FL

7.

SD

IN

LE

T

ST

A.

0+

.5

IN

V

.0 0(

O U

T S)

FL

7.

SD

IN

LE

T

ST

A.

1+

.4

STA 11+17.39

TP 5560.50

STA 11+14.36

ELEV 5562.39

BUILD 29.55 LF OF

30" SD @ 1.69%

Q=10.80 cfs V= 2.20 ft/sec

BUILD 45.90 LF OF

24" SD @ 3.27%

Q= 4.9 cfs V= 1.56 ft/sec

11+00 12+00

E G

3.

E G

1.

E G

9.

E G

3.

E G

3.

E G

4.

E G

4.

E G

7.

E G

E G

E G

IN

V

.7 8(

IN

N

" F

LA

R

ED

E N

D S

EC

TI

O N

ST

A.

0+

.6

IN

V

.5 0(

O U

T S)

IN

V

.5 0(

IN

N

FL

3.

SD

IN

LE

T

ST

A.

0+

.8

IN

V

.3 2(

O U

T S)

FL

3.

SD

IN

LE

T

ST

A.

1+

.1

BOTTOM OF CHANNEL

STA 10+28.24

ELEV 5558.78

STA 11+04.90

ELEV 5560.90

EX 8" SAS

STA 10+90.49

INV= 5554.87

STA 11+07.95

TP 5558.20

BUILD 24.21 LF OF

24" SD @ 7.10%

Q= 21.1 cfs V= 6.72 ft/sec

BUILD 43.27 LF OF

18" SD @ 1.89%

Q= 12.7 cfs V= 7.19 ft/sec

X X

X

XX

XXX

X

X

FO

FO

FO FO

GAS GAS GAS

G

AS

G

AS

G

AS

G

AS

FO FOE

E

E E

E

FO

FO

FO

FO

TVT

W W

W W

W

WWWW

SSSSSS

S S

S S

E E

E E

E

FOFOFO

FO

FO

FO

SD4 SD5

FO

FO

FO FO

GAS GAS GAS

G

AS

G

AS

G

AS

G

AS

FO FOE

E

E E

E

FO

FO

FO

FO

SS

STA. 10+48.64, 0.02 L

INSTALL 24" FLARED END SECTION

INV=5560.50

SD INLET 3

STA. 10+72.85, 0.00 L

INSTALL 1-TYPE "A" SD INLET

SD INLET 4

STA. 11+16.12, 0.00 R

INSTALL 1-TYPE A SD INLET

4.

' o f 1 2"

C

W

L

-0 .4

8%

11-9

UT

ILI

TY

P

LA

N

PR

OF

ILE

00 20' 40'

SCALES: HORZ. 1" = 20'

VERT. 1" = 5'

SD LATERAL 2

SCALE: 1:20

EXISTING GRADE @ ℄

SHEET:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

DPW CHK:

D es ig ne d By

D es ig ne d Fo r:

N O

R

EV

IS

IO

N S

(O R

C H

AN

G

E N

O

TI

C

ES

PROJECT NO.

D

ES

C R

IP

TI

O N

D

AT

E

BY

12346 57

Pl ot te d:

7/ 7/

:3

4:

P M, B y:L aw so n, J am es H

:\p ro j\R

.0

- C O

R R

- 1 9t h D ra in ag e

St ud y R

FP

3-

PW

-0

\1

C

AD

D

B

IM

\1 0.

Au to C

AD

\S he et s\

PH

AS

E

1\

_S he et s\

R

_U

TI

LI

TY

-P N

P.

dw g La st S av ed

:7/ 7/

2:

:4

PM,

jla w so n

TWO WORKING DAYS

BEFORE YOU DIG CALL

811 OR 260-1990

C

IT

Y O

F R

IO

R

AN

C

H O

TH

A

VE

N U

E N

E R

O A

D R

EC

O

N

ST

R U

C

TI

O N

DMD

STAFF

RJD

R316418.01

MAY 2025

R io

R an ch o

D riv e N

E, S ui te

R io

R an ch o, N ew

M ex ic o

Ph on e

(5

) 8

-5

(5

) 8

-3

HUITT-ZOLLARS, INC.

Consulting Engineers

TH

A

VE

N U

E

SD LATERAL 3

SCALE: 1:20

EXISTING GRADE @ ℄

19TH

AVEN

U E

17TH AVENUE

REBECCA

LOOP

SEE SHEET 2 - 9 FOR

GRADING DETAIL

SEE SHEET 2 - 9 FOR

GRADING DETAIL

FUTURE PHASE II

CHANNEL

EX GAS

SPARKLIGHT

FIBER OPTIC

ELECTRICAL LINE

EX 10" WL

EX 3-36" CMP

FUTURE PHASE II

CHANNEL

ELECTRICAL LINE

SPARKLIGHT

FIBER OPTIC

LUMEN

FIBER OPTIC

SPARKLIGHT

FIBER OPTIC

ELECTRICAL LINE

EX GAS

PROTECT EX GAS LINE

FUTURE 60" SD

FUTURE

BEEHIVE GRATE INLET

FUTURE

48" SD

FUTURE 36" SD

FUTURE 8' DIA MH

FUTURE 36" SD

FUTURE

BEEHIVE GRATE INLET

ROW

ROW

ROW

ROW

ROW

EXISTING EDGE

OF CHANNEL

EXISTING EDGE

OF CHANNEL

13' ROADWAY WINDING EASEMENT

13' ROADWAY WINDING EASEMENT

FUTURE 36" SD

FUTURE 8' DIA MH

FUTURE 24" SD

12" WL

HGL

1.5 ' C

LE

AR

AN

CE

1.5 ' C

LE

AR

AN

CE

CONSTRUCTION NOTES

1. THE LOCATION OF EXISTING UTILITIES IS BASED ON RECORD

DRAWINGS, POTHOLE INFORMATION, ABOVE GROUND

FEATURES, AND DESCRIPTIONS PROVIDED BY THE CITY OF

RIO RANCHO.

2. CONTRACTOR SHALL VERIFY THE LOCATION (HORIZONTAL

AND VERTICAL) AND SIZE/DIAMETER OF ALL UTILITIES PRIOR

TO COMMENCING WORK. DAMAGE TO EXISTING UTILITIES

CAUSED BY CONTRACTOR'S ACTIONS SHALL BE REPAIRED AT

THE CONTRACTOR'S EXPENSE.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING

AND SUPPORTING ALL EXISTING UTILITIES, INCLUDING

SERVICES, DURING CONSTRUCTION.

4. RIM ELEVATION PROVIDED FOR CURB DROP INLETS (CDI) IS

AT FLOWLINE OF CURB.

5. AT UTILITY CROSSINGS, WHERE LESS THAN 18" OF VERTICAL

SEPARATION FROM STORM DRAIN PIPING OR STRUCTURES IS

PROPOSED, LEAN FILL CONSTRUCTION (PER SECTION 207 OF

THE STANDARD SPECIFICATIONS) SHALL BE USED TO

PROTECT THE WATER OR SEWER LINE. LEAN FILL SHALL

EXTEND A PERPENDICULAR DISTANCE OF 5 FEET ON EACH

SDE OF THE STORM PIPE OR STRUCTURE.

6. INLETS PER DETAILS SHEET 11-10.

7. JOINT RESTRAINTS PER TABLE ON SHEET 11-10.

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text 07/07/25

File details come from the government source that posted it. Updated .