GBWC new office site visit questions and answers II.pdf
PDF 160 KB Posted
- Solicitation number
- 127EAX24R0018
About this file
This document appears to be a set of questions and answers related to a federal contract opportunity for the construction of a new office building less than 5,000 square feet, associated new septic system, and utility connections for the Green Base Work Center (Pittman Valley Helibase) in Williams, Arizona.
The key details are: 1) The contractor is responsible for preparing a storm water Pollution Prevention Plan (SWPPP) per the plans and specifications; 2) The fiber extension from the existing building will be handled separately and is not part of this contract; 3) There are no landscape drawings or landscaping plans included in the contract, but the optional landscaping items cover topsoil and seeding of the drainage features. The overall federal contract opportunity has a Solicitation Number of 127EAX24R0018, with an anticipated award of a Firm Fixed-Price Contract using a Best Value-Tradeoffs source selection process. The project is a 100% Small Business Set-Aside with a magnitude between $1,000,000 and $5,000,000. A site visit is scheduled for July 9, 2024, and the deadline for submitting offers is August 1, 2024 at 1:00 pm PT.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. There are no silt fence and temporary fence reflected in the plans, please confirm if these are not required.?
The contractor is responsible for preparing a storm water Pollution prevention plan (SWPPP) according to the plans sheet C100 and specifications SECTION 312000 EARTH MOVING and SECTION 01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS
2. Is the fiber extension from existing building to the new building, is that being handled by Contractor/LV Contractor or by the service provider?
The fiber extension from the existing building will be handled separately and not part of this contract.
3. On the Green Base work center they have a note on A101 saying to refer to Landscape drawing for all planting, irrigation, etc. However, there are no landscape drawing in the set of plans I have.
There are no Landscape drawings for planting, irrigation, etc., and this note will not be part of the contract. The landscaping optional item will cover the topsoil and seeding of the drainage features, including the retention pond, V-ditches and relief swale are the optional landscaping items.
File details come from the government source that posted it. Updated .