Amend 5 Att C - Bid Guarantee 1243ZPR0011.docx

DOCX document 14 KB Posted

Attached to
Renovation of Catalina Headquarters at El Yunque National Forest - Amendment 8
Solicitation number
1243ZP20R0011
Issued by

About this file

This document provides details for a federal construction contract opportunity with the USDA Forest Service. The solicitation seeks proposals to reconstruct the Catalina Headquarters Building and site at the El Yunque National Forest in Puerto Rico, which was damaged during Hurricanes Irma and Maria in 2017. The two-story 11,016 square foot administrative facility will be rebuilt according to provided construction documents. The contractor will furnish all labor, materials, equipment, transportation, and other services for the project estimated between $4-10 million. The NAICS code is 236220 for commercial and institutional building construction. The solicitation is expected to be issued on or around July 15, 2020 and will include photographs, video, and documents provided here for reference.

View the file

Other files

File Type Posted
Amendment 8 - 1243ZP20R0011 SF-30.pdf PDF
Amendment 7 - 1243ZP20R0011 SF-30.pdf PDF
AMENDMENT 7 ATTACH A - SOI.xlsx XLSX spreadsheet
AMENDMENT 6 ATTACH B - Relevant Experience Questionaire.doc DOC document
AMENDMENT 6 - 1243ZP20R0011 SF-1442.pdf PDF
AMENDMENT 6 - 1243ZP20R0011 SF-30.pdf PDF
AMENDMENT 6 ATTACH A - SOI.xlsx XLSX spreadsheet
Amend 5 Att A - DOL Wage Det 1243ZP20R0011.pdf PDF
Amend 5 Att B - Section 889 1243ZPR0011.docx DOCX document
Amend 5 - 1243ZP20R0011 SF-30.pdf PDF
1243ZP20R0011 Amd 004.pdf PDF
1243ZP20R0011 Amd 002.pdf PDF
1243ZP20R0011 Amd 003.pdf PDF
1243ZP20R0011 Amd 02.pdf PDF
1243ZP20R0011 rev 07242020.pdf PDF
Sol_1243ZP20R0011_Amd_0001.pdf PDF
6440 Real Property.pdf PDF
Catalina Photos 2020-07-13-selected.zip ZIP file
Solicitation Attachments-selected.zip ZIP file
2020.06.22_IFC.pdf PDF
BOD - Issued for Construction.pdf PDF
Catalina - SPECS IFC_6.22.20.pdf PDF
10.6_TOPOGRAPHY_AS.BUILT_SURVEYS.pdf PDF
Catalina Revitalization SOW_17Jul20.pdf PDF
Electrical_100 Combined Calc Package.pdf PDF
18.08.10_PROJECT_PROGRAM.pdf PDF
10.1_BLOCK_DIAGRANS_TEST_FITS.pdf PDF
Structural_IFC_Combined Calc Package.pdf PDF
PLUMBING_Cals.pdf PDF
10.2_LEED_CHECKLIST_COMMENTED.pdf PDF
Catalina Addition_1996-97.zip ZIP file
Catalina Original_1981.zip ZIP file
10.3_RELI_STANDARDS_LIST.pdf PDF
10.5_STAFF_INTERVIEWS.pdf PDF
Mechanical_100 Combined Calc Package.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1243ZP20R0011

AMENDMENT 5

ATTACHMENT C

52.228-1 Bid Guarantee.

As prescribed in 28.101-2 , insert a provision or clause substantially as follows:

BID GUARANTEE (SEPT 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be __20__ percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

File details come from the government source that posted it. Updated .