10.1_BLOCK_DIAGRANS_TEST_FITS.pdf

PDF 3 MB Posted

Attached to
Renovation of Catalina Headquarters at El Yunque National Forest - Amendment 8
Solicitation number
1243ZP20R0011
Issued by

About this file

This document contains information regarding a federal contract opportunity for the renovation of the Catalina Headquarters at El Yunque National Forest in Puerto Rico. The USDA Forest Service Southern Region intends to solicit fixed price proposals to reconstruct the Catalina Headquarters Building and site based on construction documents dated June 22, 2020. The project includes a two-story, 11,016 square foot administrative facility damaged by hurricanes in 2017. Contractors must furnish all labor, materials, equipment and supplies to complete the reconstruction. The estimated solicitation release date is July 15, 2020. The magnitude of the contract is between $4 million to $10 million under NAICS code 236220. All vendors must register in SAM.gov to be considered for award.

View the file

Other files

File Type Posted
Amendment 8 - 1243ZP20R0011 SF-30.pdf PDF
Amendment 7 - 1243ZP20R0011 SF-30.pdf PDF
AMENDMENT 7 ATTACH A - SOI.xlsx XLSX spreadsheet
AMENDMENT 6 ATTACH B - Relevant Experience Questionaire.doc DOC document
AMENDMENT 6 - 1243ZP20R0011 SF-1442.pdf PDF
AMENDMENT 6 - 1243ZP20R0011 SF-30.pdf PDF
AMENDMENT 6 ATTACH A - SOI.xlsx XLSX spreadsheet
Amend 5 Att A - DOL Wage Det 1243ZP20R0011.pdf PDF
Amend 5 Att B - Section 889 1243ZPR0011.docx DOCX document
Amend 5 Att C - Bid Guarantee 1243ZPR0011.docx DOCX document
Amend 5 - 1243ZP20R0011 SF-30.pdf PDF
1243ZP20R0011 Amd 004.pdf PDF
1243ZP20R0011 Amd 002.pdf PDF
1243ZP20R0011 Amd 003.pdf PDF
1243ZP20R0011 Amd 02.pdf PDF
1243ZP20R0011 rev 07242020.pdf PDF
Sol_1243ZP20R0011_Amd_0001.pdf PDF
6440 Real Property.pdf PDF
Catalina Photos 2020-07-13-selected.zip ZIP file
Solicitation Attachments-selected.zip ZIP file
2020.06.22_IFC.pdf PDF
BOD - Issued for Construction.pdf PDF
Catalina - SPECS IFC_6.22.20.pdf PDF
10.6_TOPOGRAPHY_AS.BUILT_SURVEYS.pdf PDF
Catalina Revitalization SOW_17Jul20.pdf PDF
Electrical_100 Combined Calc Package.pdf PDF
18.08.10_PROJECT_PROGRAM.pdf PDF
Structural_IFC_Combined Calc Package.pdf PDF
PLUMBING_Cals.pdf PDF
10.2_LEED_CHECKLIST_COMMENTED.pdf PDF
Catalina Addition_1996-97.zip ZIP file
Catalina Original_1981.zip ZIP file
10.3_RELI_STANDARDS_LIST.pdf PDF
10.5_STAFF_INTERVIEWS.pdf PDF
Mechanical_100 Combined Calc Package.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHEOLOGY LAB

SWING SPACE

COMMUNITY ENGAGEMENT

SUPPORT

CIRCULATION PATH PANTRY

BLOCK DIAGRAM FOR TEST FIT

CATALINA

LOWER LEVEL

WORKSTATIONS

OFFICES

RECEPTION

SUPPORT

CIRCULATION PATH

MEETING ROOMSSOCIAL

PANTRY

BLOCK DIAGRAM FOR TEST FIT

CATALINA

UPPER LEVEL

UP

MEETING

ROOM

SUPPORT

CIRCULATION

PATH

COMMUNITY AND

CULTURE ZONE

ADMINISTRATIVE

BLOCK DIAGRAM FOR TEST FIT

EL PORTAL

TERRACE LEVEL

DN

THEATER

INTERPRETATIVE

EXHIBITS

STORE

SUPPORT

CIRCULATION

PATH

COMMUNITY AND CULTURE

ZONE/COMFORT AREA

ORIENTATION

BLOCK DIAGRAM FOR TEST FIT

PORTAL

ATRIUM LEVEL

INTERPRETATIVE

EXHIBITS

SUPPORT

CIRCULATION

PATH

COMMUNITY AND

CULTURE ZONE

CAFESPECIAL

EVENTS

BLOCK DIAGRAM FOR TEST FIT

EL PORTAL

PAVILION LEVEL

NOTES:

Remove concrete seating from ALL low walls.

In courtyard, remove the low walls except right at the water feature to remain. Fill and pave old water feature.

File details come from the government source that posted it. Updated .