This document is Amendment 0002 to Solicitation 12363N26R4016, issued by the USDA Forest Service Stewardship Contracting Branch on September 23, 2026. The amendment provides responses to 48 questions submitted by offerors, corrections to solicitation documents, and updated contact information for proposal submission. The response due date and time remain unchanged, and the contract period extends from April 1, 2027, to October 30, 2037.

The solicitation encompasses comprehensive forest stewardship work including timber harvest and removal, road reconstruction, fuels reduction, and reforestation across a mandatory Jungle Bird contract area (764 acres) and five optional contract areas (B through F). Mandatory work includes items such as unit layout and cruise, timber harvest with ground-based and skyline/tether logging systems, landing cleanup, hand and machine piling, hand and machine fireline/fuelbreak construction, slashing, leave tree protection, and reforestation. Optional items include machine piling, tether pile operations on slopes exceeding 35 percent, mastication treatments in varying stem density classes, and chipping/biomass removal. Road reconstruction work (Item 7) includes activities such as linear grading, surface treatment, and drainage improvements under Davis Bacon wage requirements, while temporary road construction and obliteration (Item 9) fall under Service Contract Act wages. The amendment clarifies that quantities for optional contract areas B-F remain unknown until optional items 1 and 2 (unit layout and cruise) are completed; offerors may price these areas using the posted Jungle Bird appendices. Key clarifications address specifications for fuels treatments (maximum slashing diameter of 7 inches; hand fuelbreaks minimum 8 feet wide; excavator fuelbreaks minimum 15 feet wide), leave tree protection criteria, landing cleanup ratios (1 acre per 20 harvest acres for paid quantities), GPS acceptance standards, wage determinations, road closure authorizations, material provision (government-furnished aggregate for safe haul status repairs at no charge), and eligibility of certain items for price adjustments. Proposals must be submitted via email to Bonnie Yoakum (bonnie.yoakum@usda.gov) and Kasandra Meyer (kasandra.meyer@usda.gov), with all certifications and past performance documentation required at proposal submission.

View the file

Other files

File Type Posted
C05e_1b EOTW G-Z LTIRSC SOI_12363N26R4016_A002.xlsx XLSX spreadsheet
C05h_EOTW G-Z LTIRSC Appendix C_A002.pdf PDF
C05g_3 EOTW G-Z LTIRSC Appendix B_A002.pdf PDF
C05d_1a EOTW G-Z LTIRSC_12363N26R4016_A002.pdf PDF
C05f_2 EOTW G-Z LTIRSC Appendix A_A002.pdf PDF
C05a_SF-30_12363N26R4016.pdf PDF
C05b_A001_Subcontracting Plan Template.docx DOCX document
C04m_10 End of the World Marking Guide.pdf PDF
C04n_11 Least Cost Road Standards.pdf PDF
C04k_8 Layout Note Template.pdf PDF
C04x_21 DBA WD ID20260080 Mod 1 Dated 05182026.pdf PDF
C04v_19 EOTW G-Z LTIRSC GIS Data.zip ZIP file
C04r_15 PCT Description of Work.pdf PDF
C04t_17 EOTW G-Z LTIRSC Lidar Volume Estimates.xlsx XLSX spreadsheet
C04c_2 EOTW GZ IRSC Appendix A.pdf PDF
C04s_16 Jungle Bird Mandatory Timber Cruise.pdf PDF
C04e_4 EOTW G-Z LTIRSC Appendix C - Jungle Bird T-Specs.pdf PDF
C04g_5b FSSS Jungle Bird.pdf PDF
C04d_3 EOTW GZ LTIRSC Appendix B.pdf PDF
C04l_9 Road Survey Description of Work.pdf PDF
C04q_14 Planting and Reforestation Description of Work.pdf PDF
C04u_18 EOTW G-Z LTIRSC LiDAR Process.pdf PDF
C04o_12 FP-24 Specifications.pdf PDF
C04j_7 Project Design Elements.pdf PDF
C04f_5a_EOTW G-Z LTIRSC Appendix D-Jungle Bird Road Plans.pdf PDF
C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf PDF
C04h_6a Jungle Bird Mandatory CAM.pdf PDF
C04b_1b EOTW G-Z LTIRSC SOI_12363N26R4016.xlsx XLSX spreadsheet
C04w_20 SCA WD 1955-0228v68 Dated 08142026.pdf PDF
C04i_6b_EOTW GZ LTIRSC Overview Map.pdf PDF
C04p_13 PCT Survey Template.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12363N26R4016 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

363N

WASHINGTON DC 20250-1138

MS-1138

1400 INDEPENDENCE AVE SW

USDA-FS STEWARDSHIP CONTRACTING BR

09/23/20260002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/23/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment provides responses to questions received, corrections to several solicitation documents, and provides new contacts for the receipt of proposals. The response sue date and time are not extended.

The following documents are amended and previous versions deleted:

1. C05a_1a EOTW G-Z LTIRSC_12363N26R4016_A002

2. C05b_1b EOTW G-Z LTIRSC SOI_12363N26R4016_A002

3. C05c_2 EOTW G-Z LTIRSC Appendix A_A002

4. C05d_3 EOTW G-Z LTIRSC Appendix B_A002

5. C05e_4 EOTW G-Z LTIRSC Appendix C_A002

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

BONNIE L. YOAKUM

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 8

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0002

Proposals are to be submitted via email to Bonnie

Yoakum at bonnie.yoakum@usda.gov and Kasandra

Meyer at kasandra.meyer@usda.gov.

Period of Performance: 04/01/2027 to 10/30/2037

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Q1. Can the Forest Service provide the following? Appendices B and C for Optional Contract Areas B through F. Appendix A, Item 4/5 §12: "As optional contract areas are exercised, new appendices B and C will be shared." Offerors are required to price Items 4–10 for Areas B–F with their offers (p.49).

A.1. Quantities are unknown for Optional Contract Areas B-F. Unit specific information will be updated in Appendices B and C once Optional Items 1 and 2 are completed and accepted.

Q2. Can the Forest Service provide the following? The Hazard Reduction and Site Preparation Plan and Map referenced in Appendix B, C6.7#, showing by cutting unit the hand fireline and hand fuelbreak that support Schedule item 8.5a (42,890 feet), the excavator piling locations, and the units where the excavator fuelbreak applies (C6.7#: "Cutting Units TBD").

A.2. Appendix B C6.7 ‘Hand Fuelbreaks’ and ‘Hand Fireline’ represent Item 8.5. Fuels activities found under Appendix B C6.7 with TBD represent a placeholder for Contract Area B-F which will be updated by contract area.

Q3. The following provisions cited in Appendices B and C that do not appear in the posted appendices: C5.32# and C6.816# (cited in B3.1, Required Deposits); C2.211# (C2.2#); B2.133 (C2.38#);

the C5.419# System Road Stabilization road list (C6.601#); B5.253 (C5.221#, C5.222#); and Specification T-508 (T-108 §3.4). Can you clarify?

A.3.

· C5.32# and C6.816# are not applicable, no deposits required

· C2.2- References C2.211 which is not included.

· B2.133- Corrected reference to Division A.2

· C5.419 is not applicable

· B5.253- B5.253 is not applicable, references struck from Appendix C.

· T-508 has been added to Appendix C

Q4. Can you clarify the following specifications for Items 8.3 Hand Pile and Covering, 8.7 Slashing and 8.9 Leave Tree Protection, including pile size, covering material and who furnishes it, the slashing diameter limit, and the leave-tree protection method?

A.4. As item harvest is completed in optional contract areas, the Forest Service will provide a fuels plan that will specify what optional fuels reduction items will be required.

For item 8.3, the contractor will provide coated kraft paper to cover piles.

Item 8.7 slashing requirements will have <300 stems per acre (Appendix B) of unmerchantable material.

The maximum diameter for slashing is 7”.

Leave tree protection will use the following criteria: Contractor shall remove logging slash larger than XXX inches in diameter on the large end and XXX feet or longer in length created by Contractor's Operations from around the base of XXX designated leave trees for a distance of XXX feet on the sides, XXX feet above and XXX feet below the bole of the leave trees. Large fuels, such as chunks of logs, will be placed up and down with the slope so they will not roll down slope during burning operations. The slash will not be piled or windrowed but scattered within the unit and not concentrated near the perimeter fuel break or fireline. Material shall be removed and placed as specified by HAND unless otherwise approved by the Forest Service.

Q5. The Contract Area Map references Specified Roads A7 and A7 is missing from Appendix B.

A.5. A7 is not applicable to this IRSC, and the legend reference is incorrect. Specified Roads referred to Road Reconstruction requirements found in Appendix D. An updated map will be provided at award.

Q6. Exhibits 1- Certifications (pg. 62-63): Our interpretation of this form is that it is completed by the Offeror, and will provide appropriate documentation for all MSPA sub-contractors as identified, and no documentation would be required for sub-contractors that do not utilize MSPA workers. Is this correct?

A.6. The Employment of Eligible workers certification must be completed regardless of the employment or nonemployment of H2B or MSPA workers. As stated in the certification, If a Prime Contractor identifies a Subcontractor as part of their workforce to accomplish the work under this solicitation, the Prime Contractor shall submit the Subcontractor's signed certification with their response to the solicitation.

Q7. Exhibit 2- Past Performance Questionnaire (pg 64-65): Is this to be completed by the Offeror with regard to their Offeror's Past Performance? Or, is this to be completed by all sub-contractors identified in the Proposal?

A.7. Past Performance by key subcontractors and predecessor firms will be considered in the offeror’s past performance. As stated in the solicitation, The technical proposal must address past performance for both the Offeror and any proposed major subcontractors completing unit and road surveying, timber harvest and removal, road reconstruction, fuels reduction and reforestation work.

Performance information will be requested from references provided and other known clients.

Q8. Are the certifications in Exhibit 1 due with proposals?

A.8. All certifications in exhibit 1 are required when proposals are submitted.

Q9. There isn't a line item on the Bid Schedule for Slash Throwback per C6.7. Was this intentional, or should these costs be considered in a different Item?

A.9. This is incidental to the Cut/Skid/Deck of included timber.

Q10. For Jungle Bird Mandatory, there appears to be discrepancies between the Summary of Quantities and Itemized Bid Schedule quantities.

A.10. The schedule of items has been corrected and replaced.

Q11. Without Appendices B and C for Areas B–F, would offerors price those areas from the Jungle Bird appendices and prescription? Can the Forest Service confirm if this approach is acceptable?

A.11. Yes

Q12. Appendix A Item 3 §1 makes the Marking Guide (C04m_10) the guideline for optional-area Marking Plans. Its retention targets (60–80 and 80–120 sq ft basal area, legacy trees, yew, gaps up to 30% of the stand) which differ from C2.355# leave-tree criteria written for Jungle Bird. Can you clarify?

A.12. There may be some changes between Mandatory Jungle Bird contract area and optional contract area marking guides.

Q13. If the Appendices B and C for Areas B–F are not issued before offers are due, may offerors price Items 4 through 10 for Areas B–F on the basis of the Jungle Bird Appendix B and Appendix C as posted, including C2.355#? And would any difference in the appendices or prescriptions issued at exercise be addressed under the Changes clause?

A.13. Appendices B and C contain project area and unit specific information that require the completion of Optional Items 1 and 2 to determine final quantities for items 4 through 10. The contractor has the option of utilizing a designation by description, prescription, or paint marking to be approved by the Forest Service. Cost increases or decreases may be addressed in accordance with the Economic Price Adjustment clause, 52.222-43 or 52.243-4.

Q14. A few Schedule of Items entries have no total, a unit that differs from similar lines, or a quantity that differs from related lines. Will a corrected schedule price spreadsheet be shared?

A.14. A corrected schedule price workbook is provided with this amendment. Refer to document C05_3

Q15. Landing Cleanup. Appendix A Item 8 4 states "20 acres of harvest will generate 1 acre of landings"; Items 8.4b–8.4f equal roughly 1 acre per 50 harvest acres (for example, Area B: 34.5 acres for 1,913 acres). Which governs the paid quantities?

A.15. Paid quantities will be based on 1 acre of landings per 20 acres of harvest. Optional Areas B-F have estimated quantities.

Q16. Item 8.2 "Tether Pile >35% Slope" (1,736 acres) is not divided by contract area; the optional skyline/tether acres (Items 5b–5f) total 1,528 acres. To which areas does Item 8.2 apply, and are eligible acres defined by the >35% slope criterion or by the skyline/tether acres?

A.16. Optional Item 8.2 quantities are estimates. Use of Item 8.2 will specified in updated Appendix B C6.7 for Optional Contract Areas.

Q17. The Salvage Area X schedule lists 6x.1 and 6x.*2 and no pulp-facility haul line, and 3x is titled "Cruise Design Plan, Cruise, and Processing" without "Marking Plan."

A.17. Most salvage operations don’t include the utilization of pulp depending on the environmental cause. Updated Marking plans will be implemented specific to the salvage operation.

Q18. The Item 7 Optional Road Reconstruction Work Items table runs from 7a.13 to 7a.15 and contains no 21201 Linear Grading line (mandatory 7a.14, 6.36 miles). How is linear grading in Areas B–F intended to be paid?

A.18. Linear Grading 21201 will not be utilized in B-F. All work that is bundled into Linear Grading will be itemized separately in the road reconstruction menu.

Q19. Optional 7a.44 and 7a.45 (crack sealing) and Item 8.5d carry the price-adjustment asterisk; the clause lists Road Reconstruction Items "7.1 … 7.18, 7.25, and 7.26" and does not list Item 8.5. Are these items eligible for price adjustment?

A.19. Manual Fireline 8.5 would not be eligible for a fuel-related price adjustment. The Proportional Economic Fuel Price Adjustment of Contract Price(S) Based on a Price Index clause has been updated.

Q20. Several haul roads are coded closed to motor vehicles all year, and three close to highway vehicles on September 15, a month before the Normal Operating Season ends. Can these roads be utilized during the closure period?

A.20. Use of a road during a closure period is acceptable for management activities by agreement.

Q21. Appendix A defines tractor logging as slopes "<45%" and skyline/tether as ">45%" (Items 4/5 §3–4, §10); the LiDAR process (C04u_18) assigns ground-based to slopes "< 36" and skyline to ">=36."

Which slope break was used to compute the Item 4 and Item 5 acreages, for Area A and for Areas B–F?

A.21. Contract area A logging systems were determined during unit layout. Optional Contract Area’s B-F acreage estimates for logging systems were estimated with <35% tractor >35% skyline/tether.

Attachment CO4j_7 SR-2 describes slopes allowed for ground-based skidding.

Q22. A design element asks for green tops to be retained or returned, and Appendix B requires whole-tree yarding. Which governs?

A.22. Design elements list NEPA units where tops need to be retained/returned. FS may determine returning limbs and tops is not required on a unit basis. Returning limbs/tops does not have a cost adjustment.

Q23. Appendix B C6.7# requires in all units: “Whole trees shall be skidded or yarded to landings.”

Design Element SR-10 (C04j_7) requires: “Retain and/or return green tops within units and allow green foliage to over-winter 1 year prior to burning in units 1A, 3, 4, 5, 6, 7, 9, 10, 11, 41, 59, 62, 63.” Does SR- 10 apply to Jungle Bird units 62A–C and 63A–B? If so, are green tops to be left at the stump, or yarded and then returned?

A.23. SR-10 will not apply to those units. The Forest Service determined there is enough woody material in those units after they were layed out.

Q24. C2.11# makes biomass “Included Timber upon written agreement.” The Timber Products sheet lists no biomass rate.

A.24. The minimum rate for agreed to biomass would be $0.01/ton. The timber price schedule has been amended to reflect.

Q25. To which area does the 50% limit apply: all Jungle Bird units (Appendix A Item 8, "Units: All (764 Acres)"), the units harvested with ground-based equipment (SR-4), or the units listed for Excavator

Piling in C6.7#? Does it apply to Items 8.1b–8.1f?

A.25. C04j_7 SR-4 applies to all units harvested with ground-based equipment across all contract areas. Machine piling will target slash concentrations.

Q26. Is Item 8.1a payment measured on the acres of each unit designated for piling or on the area actually piled?

A.26. This is measured in acres per unit less the landing area acreage.

Q27. Are the 8.1b–8.1f quantities estimates of the acres to be ordered, or the maximum eligible acres, subject to the Forest Service determination under Appendix A Item 8 §3?

A.27. These are estimates based on NEPA units and logging systems. Machine piling estimates were made on acres of tractor logging estimates.

Q28. Fuelbreaks. C6.7# requires hand fuelbreaks "to minimum width of 8 feet" on the same units as hand fireline, and an excavator fuelbreak "constructed to minimum width of 15 feet." The Schedule of Items pays Manual Fireline (8.5a) and Machine Fireline (8.6) per foot and has no fuelbreak item. Are the fuelbreaks included in the Item 8.5a and 8.6 units of measure, or are they intended to be paid as separate items?

A.28. Fuel breaks are included in items 8.5 and 8.6.

Q29. Mastication. Types 1–3 are "0-1499," "1500-2500" and "2500-4000," each "max 7” diameter" (Appendix A Item 8); the Marking Guide describes PCT/mastication "in stands up to 12” DBH." Which class applies at exactly 2,500 trees per acre, how are stands over 4,000 paid, and what is the maximum diameter to be masticated?

A.29. Stands with >4000 stems/acre will not be considered for mastication. Appendix A has been updated so 2,500 is not in both.

Q30. Chipping and biomass. Items 8.10 and 8.11 are priced per ton (14,519 tons each). How are tons measured for payment (scale weight, green or dry), and what is the maximum depth of chips spread on site where chips are not hauled?

A.30. Chipping is removed from the price schedule and the requirements for biomass removal have been amended in Appendix A.

Q31. What is the timing for Item 8.15a in Area A, which unit or units will be planted, and what seedling delivery schedule does the Forest Service anticipate?

A.31. Timing will depend on completion of harvest and fuels activities.

Q32. Which acceptance standard applies to planting quality?

A.32. The Acceptable Quality Level for planting is 90%, refer to planting standards in document C04q_14.

Q33. May a subcontractor's forester fill the position? Must the cruise be "completed by a professional forester" (Appendix A Item 3 subsection 4), or performed by cruisers "supervised by" one (Performance Requirements Summary)?

A.33. Yes, if the subcontractor’s forester meets requirements. Personnel completing ‘Cruise’ must be supervised by professional forester.

Q34. Which GPS acceptance standard applies to layout: the "10% area error on a unit basis" (Appendix A Item 1 subsection 7), FSH 2409.12 Ch. 50 (Performance Requirements Summary), or the remeasurement tolerances in Appendix A Section V?

A.34. Corrected in Appendix A.

Q35. Is contractor use of the yearlong-closure roads for log haul, road maintenance and reconstruction authorized under this contract, or will the roads be listed with code W? What conditions apply? Does the FS provide keys?

A.35. Yes. Roads will be listed as ‘A’ Public Use Restriction under C5.12#. Keyed locks will be replaced by the Forest Service with combination locks. The Contractor may be required to close gates after every pass though or at the end of each day depending on work performed, time of year, and work activity level.

Q36. Is log haul on Roads 9424, 9424B and 9465 authorized from 9/15 to 10/15, under a regulation waiver (code W) or by agreement, and are the closure dates inclusive?

A.36. Yes, if conditions for hauling permit, haul may occur during those dates. Closure dates are specific to public motorized access.

Q37. Which wage determination applies to) Item 7 Road Reconstruction (7a.1–7a.39 and optional 7b– 7f, the Item 7 rate table, and 7x) and ditch, catch basin, inlet and outlet cleaning described in the Appendix D worklists under pay items 30301-5000 and 30301-6000?

A.37. Davis Bacon wages

Q38. Which wage determination applies to Item 9 Temporary Road Construction and Obliteration (9a.1, 9a.2, optional 9b–9f and 9x), including any culverts installed on temporary roads under the Streamcourse Protection provision (p.46, paragraph (b)) and road maintenance under Appendix C performed under Item 6, including T-108 Slide Removal and Slump Repair, T-113 Surfacing Repair and T- 310 Minor Drainage Structures?

A.38. Service Contract Act wages

Q39. Is the contractor’s commensurate share 100% for the full C5.31# termini on each road? Does the Forest Service anticipate any other commercial user on these roads during the contract?

A.39. Contractor’s share will be commensurate with usage. No commercial activities are expected on roads within the project except FSR 221. FSR 221 is planned to be the haul route for other timber sales during the contract period.

Q40. How many subsequent magnesium chloride applications per season does the Forest Service anticipate on NFSR 642? Will water sources be designated for dust abatement and road maintenance? Is drafting from streams within the contract area or along the haul routes authorized, and at which locations?

A.40. The amount of treatment is largely dependent on the haul timing and intensity. With variable volume (Optional units) – Water sources and usage will be evaluated based on the contractors proposed drafting site(s). FSR 642 has a dependable water source at the Twin Cabins Bridge for drafting. There are no drafting restrictions on other streams within the project area if proper equipment is utilized by the contractor.

Q41. Is contractor asphalt repair under T-113 subsection 3.2 limited to the subsection 1.1 quantities, and how will paved repair beyond those limits be handled?

A.41. Yes. Repair needs beyond what is specified under T-113 will be handled on a case-by-case basis.

Q42. FSSS subsection 109.02(c) defines a contract quantity as "the quantity listed in the bid schedule," with adjustment provided "when that … exceeds 15% or more." Appendix D marks certain quantities with an asterisk (CUBIC YARD*, ACRE*). AGAR 452.211-73 provides for adjustment of road reconstruction items above 115% or below 85% of the estimated quantity. Which quantities govern the evaluated price, the bid guarantee under p.5 B, and payment?

A.42. The estimated and priced quantities.

Q43. How do AGAR 452.211-73 and FSSS 109.02(c) apply together to those items?

A.43. FSSS 109.02(c) is complimentary to 452.211-73 which governs.

Q44. Is Government pit material is free and ready to use?

A.44. Government provided material for road work identified as necessary to bring roads to safe haul status will be available free of charge. Materials that are needed for contractor-related damage (i.e.

aggregate for repairing a section of road due to contractors’ negligence or operations in conditions that aren’t suitable for haul) are the Contractors responsibility to obtain.

Q45. Who provides construction staking?

A.45. Construction staking is the responsibility of the contractor – Jungle Bird has been staked for the currently identified worklist

Q46. How rock is paid?

A.46. Aggregate is measured in place by the CY

Q47. Can temporary roads cross streams?

A.47. No temporary road crossings are permitted in RHCAs. The Streamcourse Protection language in the solicitation has been amended to align with requirements in Appendix A.

Q48. C5.222# lists Twin Cabins Pit, Aggregate Surface Course Gradation F, 885 CY, Unit Price "N/A"; C5.221# lists no Source I, II or III. Is the material furnished without charge? Is it stockpiled crushed material meeting Table 703-1 Grading F, or pit-run material to be processed by the contractor? What quantity is available?

A.48. Materials are furnished without charge for work necessary to repair maintain roads to bring them to safe haul standards. Quantity available will vary.