C05a_SF-30_12363N26R4016.pdf

PDF 161 KB Posted

Attached to
End of the World Long Term Stewardship
Solicitation number
12363N26R4016
Issued by

About this file

This document is Amendment 0001 to USDA Forest Service Solicitation 12363N26R4016, a Stewardship Contracting opportunity issued by the USDA-FS Stewardship Contracting Branch in Washington, DC. The amendment extends the proposal submission deadline to 9:00 AM MST on December 11, 2026, and updates the points of contact to Bonnie Yoakum (bonnie.yoakum@usda.gov) and Matt Daigle (matthew.daigle@usda.gov). The amendment provides responses to questions received, shares a Small Business Subcontracting Plan template, and establishes a deadline of November 13, 2026, for submission of additional questions. Proposals must be submitted via email to the identified contacts.

The solicitation encompasses six primary contract areas—Jungle Bird, Wooly Bully, Ski Bird, Cold Fir, and Free Bird—plus optional line items for road reconstruction, fuels and reforestation work, and an economic price adjustment reserve. All work involves natural resources conservation and tree thinning services (Product/Service Code F014) spanning performance periods from April 2027 through October 2037. Tasks include unit reconnaissance, road surveys, marking plans, timber cutting and skidding using tractors or skyline/tether systems across varying terrain and volume units, load/haul operations to local and pulp facilities, road reconstruction, machine piling, landing cleanup, manual fireline work, temporary road construction, erosion control, and planting. The scope covers thousands of acres across multiple geographic areas with quantities specified in acres, miles, feet, and tons across numerous line items. Questions and answers clarify precommercial thinning specifications, mastication thresholds, survey protocols, and data submission requirements (GIS shapefiles or ESRI geodatabases with final deliverables in Microsoft Excel and PDF formats). Certifications required in Exhibit 1 must be submitted at time of proposal.

View the file

Other files

File Type Posted
C05b_A001_Subcontracting Plan Template.docx DOCX document
C04m_10 End of the World Marking Guide.pdf PDF
C04n_11 Least Cost Road Standards.pdf PDF
C04k_8 Layout Note Template.pdf PDF
C04x_21 DBA WD ID20260080 Mod 1 Dated 05182026.pdf PDF
C04v_19 EOTW G-Z LTIRSC GIS Data.zip ZIP file
C04r_15 PCT Description of Work.pdf PDF
C04t_17 EOTW G-Z LTIRSC Lidar Volume Estimates.xlsx XLSX spreadsheet
C04c_2 EOTW GZ IRSC Appendix A.pdf PDF
C04s_16 Jungle Bird Mandatory Timber Cruise.pdf PDF
C04e_4 EOTW G-Z LTIRSC Appendix C - Jungle Bird T-Specs.pdf PDF
C04g_5b FSSS Jungle Bird.pdf PDF
C04d_3 EOTW GZ LTIRSC Appendix B.pdf PDF
C04l_9 Road Survey Description of Work.pdf PDF
C04q_14 Planting and Reforestation Description of Work.pdf PDF
C04u_18 EOTW G-Z LTIRSC LiDAR Process.pdf PDF
C04o_12 FP-24 Specifications.pdf PDF
C04j_7 Project Design Elements.pdf PDF
C04f_5a_EOTW G-Z LTIRSC Appendix D-Jungle Bird Road Plans.pdf PDF
C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf PDF
C04h_6a Jungle Bird Mandatory CAM.pdf PDF
C04b_1b EOTW G-Z LTIRSC SOI_12363N26R4016.xlsx XLSX spreadsheet
C04w_20 SCA WD 1955-0228v68 Dated 08142026.pdf PDF
C04i_6b_EOTW GZ LTIRSC Overview Map.pdf PDF
C04p_13 PCT Survey Template.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12363N26R4016 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

363N

WASHINGTON DC 20250-1138

MS-1138

1400 INDEPENDENCE AVE SW

USDA-FS STEWARDSHIP CONTRACTING BR

09/23/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/23/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment provides responses to questions received, updates the points of contact for proposal submission, extends the solicitation response due date and time to 9:00 AM MST on

12/11/2026, shares a subcontracting plan template and sets a deadline of 11/13/2026 for additional questions.

Proposals are to be submitted via email to Bonnie Yoakum at bonnie.yoakum@usda.gov and Matt

Daigle at matthew.daigle@usda.gov.

Period of Performance: 04/01/2027 to 10/30/2037

0002 Jungle Bird Optional Contract Area

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

BONNIE L. YOAKUM

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

1b Unit Recon, Layout, Boundary Identification, and Area Determination

1,913 Acres

2b.a Road Survey-Survey via motorized vehicle

5 Miles

2b.b Road Survey-Survey via foot

5 Miles

3b Marking Plan, Cruise Design/Plan, Cruise, and

Processing

1,913 Acres

4b.1 Cut, skid and deck included timber

(Tractor)-High Volume Units

649 Acres

4b.2 Cut, skid and deck included timber

(Tractor)-Medium Volume Units

670 Acres

4b.3 Cut, skid and deck included timber

(Tractor)-Low Volume Units

406 Acres

5b.1 Cut, skid and deck included timber

(Skyline/Tether)-High Volume Units

94 Acres

5b.2 Cut, skid and deck included timber

(Skyline/Tether)-Medium Volume Units

58 Acres

5b.3 Cut, skid and deck included timber

(Skyline/Tether)-Low Volume Units

36 Acres

6b.1 Load/Haul/Road Maintenance Included Sawlog

Timber

105,195 Tons

6b.2 Load/Haul/Road Maintenance Included Nonsaw

Timber: Local Facility

2,337 Tons

6b.3 Load/Haul/Road Maintenance Included Nonsaw

Timber: Pulp Facility

9,351 Tons

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

7b Road Reconstruction

8.1b Machine Pile

1,725 Acres

8.4b Landing Cleanup

34.5 Acres

8.5b Manual Fireline

10,000 Feet

9b.1 New Temporary Road

1 Mile

9b.2 Existing Prism Temporary Road

3 Miles

10b Erosion Control

191 Acres

(Option Line Item)

Product/Service Code: F014

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- TREE THINNING

Period of Performance: 04/01/2028 to 10/30/2037

0003 Wooly Bully Contract Area

1c Unit Recon, Layout, Boundary Identification, and Area Determination

1,323 Acres

2c.a Road Survey-Survey via motorized vehicle

27 Miles

2c.b Road Survey-Survey via foot

9 Miles

3c Marking Plan, Cruise Design/Plan, Cruise, and

Processing

1,323 Acres

4c.1 Cut, skid and deck included timber

(Tractor)-High Volume Units

560 Acres

4c.2 Cut, skid and deck included timber

(Tractor)-Medium Volume Units

545 Acres

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

4c.3 Cut, skid and deck included timber

(Tractor)-Low Volume Units

100 Acres

5c.1 Cut, skid and deck included timber

(Skyline/Tether)-High Volume Units

100 Acres

5c.2 Cut, skid and deck included timber

(Skyline/Tether)-Medium Volume Units

5 Acres

5c.3 Cut, skid and deck included timber

(Skyline/Tether)-Low Volume Units

13 Acres

6c.1 Load/Haul/Road Maintenance Included Sawlog

Timber

87,268 Tons

6c.2 Load/Haul/Road Maintenance Included Nonsaw

Timber: Local Facility

1,940 Tons

6c.3 Load/Haul/Road Maintenance Included Nonsaw

Timber: Pulp Facility

7,757 Tons

7c Road Reconstruction

8.1c Machine Pile

1,205 Acres

8.4c Landing Cleanup

26.5 Acres

8.5c Manual Fireline

12,335 Feet

9c.1 New Temporary Road

3 Mile

9c.2 Existing Prism Temporary Road

8 Miles

10c Erosion Control

132 Acres

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

Product/Service Code: F014

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- TREE THINNING

Period of Performance: 04/01/2029 to 10/30/2037

0004 Ski Bird Contract Area

1d Unit Recon, Layout, Boundary Identification, and Area Determination

3,313 Acres

2d.a Road Survey-Survey via motorized vehicle

46 Miles

2d.b Road Survey-Survey via foot

15 Miles

3d Marking Plan, Cruise Design/Plan, Cruise, and

Processing

3,313 Acres

4d.1 Cut, skid and deck included timber

(Tractor)-High Volume Units

1,105 Acres

4d.2 Cut, skid and deck included timber

(Tractor)-Medium Volume Units

979 Acres

4d.3 Cut, skid and deck included timber

(Tractor)-Low Volume Units

781 Acres

5d.1 Cut, skid and deck included timber

(Skyline/Tether)-High Volume Units

197 Acres

5d.2 Cut, skid and deck included timber

(Skyline/Tether)-Medium Volume Units

235 Acres

5d.3 Cut, skid and deck included timber

(Skyline/Tether)-Low Volume Units

22 Acres

6d.1 Load/Haul/Road Maintenance Included Sawlog

Timber

193,032 Tons

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

6d.2 Load/Haul/Road Maintenance Included Nonsaw

Timber: Local Facility

4,290 Tons

6d.3 Load/Haul/Road Maintenance Included Nonsaw

Timber: Pulp Facility

17,158 Tons

7d Road Reconstruction

8.1d Machine Pile

2,862 Acres

8.4d Landing Cleanup

66 Acres

8.5d Manual Fireline

56,232 Feet

8.15d Planting

31 Acres

9d.1 New Temporary Road

3 Mile

9d.2 Existing Prism Temporary Road

8 Miles

10d Erosion Control

331 Acres

(Option Line Item)

Product/Service Code: F014

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- TREE THINNING

Period of Performance: 04/01/2031 to 10/30/2037

0005 Cold Fir Contract Area

1e Unit Recon, Layout, Boundary Identification, and Area Determination

2,714 Acres

2e.a Road Survey-Survey via motorized vehicle

52 Miles

2e.b Road Survey-Survey via foot

19 Miles

3e Marking Plan, Cruise Design/Plan, Cruise, and

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

7 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

Processing

2,714 Acres

4e.1 Cut, skid and deck included timber

(Tractor)-High Volume Units

762 Acres

4e.2 Cut, skid and deck included timber

(Tractor)-Medium Volume Units

1,268 Acres

4e.3 Cut, skid and deck included timber

(Tractor)-Low Volume Units

152 Acres

5e.1 Cut, skid and deck included timber

(Skyline/Tether)-High Volume Units

217 Acres

5e.2 Cut, skid and deck included timber

(Skyline/Tether)-Medium Volume Units

152 Acres

5e.3 Cut, skid and deck included timber

(Skyline/Tether)-Low Volume Units

22 Acres

6e.1 Load/Haul/Road Maintenance Included Sawlog

Timber

163,073 Tons

6e.2 Load/Haul/Road Maintenance Included Nonsaw

Timber: Local Facility

3,624 Tons

6e.3 Load/Haul/Road Maintenance Included Nonsaw

Timber: Pulp Facility

14,495 Tons

7e Road Reconstruction

8.1e Machine Pile

2,862 Acres

8.4e Landing Cleanup

54 Acres

8.5e Manual Fireline

48,523 Feet

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

8 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

8.15e Planting

429 Acres

9e.1 New Temporary Road

3 Mile

9e.2 Existing Prism Temporary Road

8 Miles

10e Erosion Control

271 Acres

(Option Line Item)

Product/Service Code: F014

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- TREE THINNING

Period of Performance: 04/01/2033 to 10/30/2037

0006 Free Bird Contract Area

1f Unit Recon, Layout, Boundary Identification, and Area Determination

2,916 Acres

2f.a Road Survey-Survey via motorized vehicle

56 Miles

2f.b Road Survey-Survey via foot

18 Miles

3f Marking Plan, Cruise Design/Plan, Cruise, and

Processing

2,916 Acres

4f.1 Cut, skid and deck included timber

(Tractor)-High Volume Units

1,948 Acres

4f.2 Cut, skid and deck included timber

(Tractor)-Medium Volume Units

435 Acres

4f.3 Cut, skid and deck included timber

(Tractor)-Low Volume Units

297 Acres

5f.1 Cut, skid and deck included timber

(Skyline/Tether)-High Volume Units

174 Acres

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

9 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

5f.2 Cut, skid and deck included timber

(Skyline/Tether)-Medium Volume Units

17 Acres

5f.3 Cut, skid and deck included timber

(Skyline/Tether)-Low Volume Units

45 Acres

6f.1 Load/Haul/Road Maintenance Included Sawlog

Timber

200,977 Tons

6f.2 Load/Haul/Road Maintenance Included Nonsaw

Timber: Local Facility

4,466 Tons

6f.3 Load/Haul/Road Maintenance Included Nonsaw

Timber: Pulp Facility

17,864 Tons

7f Road Reconstruction

8.1f Machine Pile

2,680 Acres

8.4f Landing Cleanup

58.3 Acres

8.5f Manual Fireline

27,350 Feet

8.15f Planting

547 Acres

9f.1 New Temporary Road

3 Mile

9f.2 Existing Prism Temporary Road

5 Miles

10f Erosion Control

292 Acres

(Option Line Item)

Product/Service Code: F014

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- TREE THINNING

Period of Performance: 04/01/2034 to 10/30/2037

0007 Optional Road Reconstruction

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

10 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12363N26R4016/0001

(Option Line Item)

Product/Service Code: F014

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- TREE THINNING

Period of Performance: 04/01/2028 to 10/30/2037

0008 Optional Fuels/Reforestation

(Option Line Item)

Product/Service Code: F014

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- TREE THINNING

Period of Performance: 04/01/2028 to 10/30/2037

0009 Economic Price Adjustment Reserve

(Option Line Item)

Product/Service Code: F014

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- TREE THINNING

Period of Performance: 04/01/2028 to 10/30/2037

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Q1. Reviewing the requirements for the Small Business Subcontracting Plan, this appears to be quite complex as presented. Are you able to provide any context or templates for this requirement?

A.1. A Small Business Subcontracting Plan template is being provided to all offerors. This template is a resource to assist in the preparation of subcontracting plans required under this solicitation. Offerors are responsible for ensuring that any submitted subcontracting plan complies with the solicitation requirements, FAR Part 19, and FAR 52.219-9. Submission of the attached template, by itself, does not guarantee acceptance. The Government will review each plan for completeness and compliance with applicable requirements.

Q2. Can you explain the reporting requirements and how a contractor can apply 52.222-43?

A.2. A contractor may apply FAR 52.222-43 by submitting a request to the Contracting Officer within 30 days of receiving a new wage determination, including supporting documentation that demonstrates the actual increase or decrease in wages, fringe benefits, and associated payroll costs required by the updated wage determination or applicable minimum wage change. The allowable adjustment is limited to the actual labor cost impacts and related Social Security, unemployment tax, and workers' compensation changes, and cannot include overhead, G&A, profit, or voluntary wage increases above the amount required to comply with the new wage determination.

Q3. Is there a maximum size above which it would not be required to be cut in PCT units?

A.3. Document C04m_10, details generally what the PCT size would be and in what circumstances it should be used. In general, PCT activities will be limited to trees below merchantable size (3"- 8" DBH) but in some situation¿s diameters may be increased up to 12" DBH depending on site characteristics and intent. Specific size classes to be cut will be decided on a site-specific basis and will be detailed in the silviculture Rx's provided to the contractor.

Q4. Is hand piling in PCT units only?

A.4. Yes, hand piling is expected to be utilized in high aesthetic, sensitive areas, or areas adjacent to private property after PCT work is completed.

Q5. Are there any specs on spacing based on size class and species preference?

A.5. Attachment C04m_10 Page generally describes what Precommercial Thinning/Mastication specifications are. This will vary based on site specific conditions.

Q6. Our assumption is mastication will be considered in stands with larger/older trees and where is the approximate threshold?

A.6. The priority will be commercial timber removal in larger diameter stands. Mastication will be utilized on slopes <35% and will function as a single pass so that piling or slash loads aren¿t an issue for further management.

Q7. Should lop and scatter costs be assumed in the pricing?

A.7. Yes

Q8. Is there potential to add walk-in pricing?

A.8. No, this is not expected to be an issue with the road density within the project area.

Q9. What are the assumed buffers for PCT?

A.9. PCT will follow the same riparian buffers described for Item 1.

Q10. Is there a guide available to help provide guidance on Road Survey work? Or solely working with FS Engineers to establish protocols?

A.10. Surveys are to follow FP-24 specifications, the description of work located in attachment C04l_Road Survey Description of Work provides a synopsis of requirements .

Q11. Are the Jungle Bird plans considered the R1 Plan Sheets?

A.11. Jungle Bird plans are located in attachment C04f_5a_EOTW G-Z LTIRSC Appendix D-Jungle Bird Road Plans

Q12. For the raw data submitted to the USFS- is the format in ArcView/GIS acceptable?

A.12. Spatial data may be submitted as a shapefile or ESRI geodatabase. Per FSH 7709.56, Road Preconstruction Handbook Chapter 30 - Engineering Survey and attachment C04l_Road Survey Description of Work, the contractor may determine the method for gathering, storing and organizing the raw survey data, however the deliverable WSQE with worklists must be in Microsoft excel format for the preliminary submittals and in a pdf format for final worklist and plans with the final Microsoft Excel WSQE and worklist submitted as backup.

Q13. Is it acceptable to have photos embedded in GIS points, or is there a different deliverable required?

A.13. That is acceptable for raw survey data only.

Q14. Is Twin Cabins Pit the assumed pit location for Gradation F and C?

A.14. Twin Cabins pit is a likely location for obtaining aggregate, other locations may be utilized as agreed.

Q15. Are the certifications in Exhibit 1 required with proposals or can these be completed post award?

A.15. Certifications are due at time of proposal submission. Refer to solicitation instructions in 52.212-1 and it's addenda.