C04d_3 EOTW GZ LTIRSC Appendix B.pdf

PDF 1 MB Posted

Attached to
End of the World Long Term Stewardship
Solicitation number
12363N26R4016
Issued by

About this file

This document is Appendix B (Scaled Stewardship Contract – Timber Removal Specifications) for the "End of the World G-Z Long-Term Integrated Resource Stewardship Contract" on the Nez Perce-Clearwater National Forest, Salmon River Ranger District in Idaho County, Idaho. The contract specifies timber removal and stewardship operations across designated cutting units totaling approximately 762 acres. The Jungle Bird Contract Area includes estimated volumes of 76,017 tons of Grand fir sawtimber (7.0" DBH minimum), 10,359 tons of Ponderosa pine sawtimber, and 9,284 tons of combined softwood non-sawtimber products, plus an unestimated quantity of biomass timber subject to separate written agreement. Products must be removed and scaled using weight measurement at certified state scales; scaling services are provided at Forest Service-approved locations at no cost ($0.00 per ton estimated). Timber designations employ species designation (C2.38#) and designation-by-prescription (C2.355#) methods, with specified leave tree spacing of 25-30 feet and maximum stump diameters of 32 inches. The normal operating season runs June 15 to October 15, with fire suppression obligations within 10-50 road miles and maximum contractor fire suppression liability of $52,300. All scaling must comply with FSH 2409.11a standards with maximum scaling length of 20 feet and 6-inch trim allowance. The contract requires comprehensive erosion control, streamcourse protection within riparian habitat conservation areas (RHCA) with category-specific setbacks (100-300 feet), hazard reduction including hand and excavator firelines, site condition maintenance, temporary road obliteration, equipment cleaning to prevent noxious weed spread, and product identification via hammer branding and highway-yellow paint marking. Contractor must maintain roads commensurate with use, protect residual trees and survey monuments, and comply with Forest Resources Conservation and Shortage Relief Act requirements prohibiting unprocessed timber export.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

End of the World G-Z Long-Term IRSC Nez Perce-Clearwater National Forest Page 1 of 48 Salmon River Ranger District

APPENDIX B - SCALED

STEWARDSHIP CONTRACT - TIMBER REMOVAL SPECIFICATIONS

B1.0 CONTRACT AREA

B1.1 Contract Area Map B1.2 Claims

B2.0 TIMBER SPECIFICATIONS

B2.1 Included Timber B2.11 Standard Timber B2.12 Substandard Timber B2.13 Damaged Timber B2.131 Damaged by Contractor B2.132 Negligent or Willful Damage B2.134 Minor Damage by Natural Causes B2.14 Unintentionally Cut Timber B2.15 Construction Timber B2.16 Other Material B2.2 Utilization and Removal of Included Timber B2.3 Timber Designations B2.31 Clearcutting Units B2.32 Construction Clearing B2.33 Overstory Removal Units B2.34 Understory Removal Units B2.35 Individual Trees B2.37 Minor Changes B2.4 Volume Estimate

B3.0 RATES OF PAYMENT

B3.1 Current Contract Rates B3.4 Other Payment Rates B.341 Material Not in Division A2 B3.42 Timber Cut Through Mistake B3.43 Designated Timber Cut But Not Removed B3.44 Undesignated Timber Damaged Without Negligence B3.45 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut B3.46 Liquidated Damages B3.47 Defect Caused by Abnormal Delay

B4.0 PAYMENTS

B4.1 Amount Payable for Timber B4.2 Integrated Resource Account B4.21 Cash Deposits B4.215 Deposits When Payment Guarantee B4.218 Cooperative Deposits B4.24 Refund after Scaling Completed B4.4 Payments Not Received

B5.0 TRANSPORTATION FACILITIES

B5.1 Authorization B5.11 Requirements of Rights-of-Way B5.12 Use of Roads by Contractor B5.3 Road Maintenance B5.4 Use by Others

B6.0 OPERATIONS

B6.22 Protection of Improvements B6.221 Protection of Improvements Not Owned by Forest Service B6.222 Protection of Property B6.23 Protection of Land Survey Monuments B6.24 Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources B6.32 Protection of Residual Trees

B6.3 Control of Operations B6.33 Safety B6.34 Sanitation and Servicing B6.341 Prevention of Oil Spills B6.342 Hazardous Substances B6.35 Equipment Cleaning B6.36 Acceptance of Work B6.4 Conduct of Logging B6.41 Felling and Bucking B6.411 Felling in Clearings B6.412 Stump Heights B6.413 Bucking Lengths B6.414 Limbing B6.42 Skidding and Yarding B6.421 Rigging B6.422 Landings and Skid Trails B6.423 Skidding on Roads B6.424 Arches and Dozer Blades B6.5 Streamcourse Protection B6.6 Erosion Prevention and Control B6.61 Meadow Protection B6.63 Temporary Roads B6.64 Landings B6.65 Skid Trails and Fire Lines B6.66 Current Operating Areas B6.67 Erosion Control Structure Maintenance B6.7 Slash Disposal B6.8 Scaling B6.81 Scaling Services B6.811 Scaling Location B6.812 Scaling Adjustments B6.813 Delayed or Interrupted Scaling Services B6.814 Weighing Services B6.82 Presentation for Scaling B6.83 Scaling Other Products B6.84 Accountability B6.841 Route of Haul ** B6.842 Product Identification B6.85 Scaling Lost Products B6.851 Scaling Lost Sample Loads B6.86 Scale Reports

B8.0 OTHER CONDITIONS

B8.1 Title and Liability B8.11 Title Passage B8.12 Liability for Loss B8.32 Modification for Catastrophe B8.5 Sale of Other Materials

B9.0 PERFORMANCE AND SETTLEMENT

B9.5 Settlement B9.6 Contract Closure

DIVISION C

C1.21 Unpatented Mining Claims C2.11# Timber Subject To Agreement. (9/04) C2.2# Utilization and Removal of Included Products (3/21) C2.355# Designation By Prescription. (7/22) C2.38 Species Designation (7/20).

Page 2 of 48 Salmon River Ranger District

C5.12# Use Of Roads By Contractor. (9/04) C6.332 Safety (Timber Hauling) (1/18).

Attachment B6.33 08/2024 C6.36 Acceptance Of Work (9/22) C6.4 Conduct Of Logging (1/18).

C6.406# Site Condition (7/20) C6.6 Erosion Prevention And Control (10/04).

C6.601 Erosion Control Seeding (7/20).

C6.632 Temporary Road And Tractor Road Obliteration (2/02).

C6.633 Temporary Road, Skid Trail/Skid Road And Landing Scarification (2/02).

C6.661 Current Operating Areas (10/04).

C6.7# Hazard Reduction And Site Preparation (4/21) C6.71 Change In Slash Treatments (3/90).

C6.753 Temporary Road Construction Slash Disposal (10/82).

C6.801 Scaling (Non-Sawtimber) (7/20) C6.822 Presentation For Weight Scaling. (4/13) C6.823 Volume Determination. (4/13) C6.841 Route Of Haul (Option 1). (7/22) C6.848 Weight Accountability For Split Pricing (3/12).

C8.66# Use Of Timber. (9/04)

Page 3 of 48 Salmon River Ranger District

DIVISION A: Specific Conditions. The following conditions apply to the indicated portions.

A.1 Location and Area:

This Contract Area is located on the Salmon River Ranger District of the Nez Perce-Clearwater National Forest located in Idaho County, State of Idaho.

A.2 Volume Estimate and Utilization Standards

Species Group Product Estimated Quantity

Unit of Measure

Minimum Specifications Merchantable Tree Piece Required to be Removed

Diameter Breast

High

(DBH)

(inches)

Number of

Minimum Pieces per Tree

Length (feet)

Diameter Inside Bark at

Small End (inches)

Net Scale in % Gross

Scale

Jungle Bird Contract Area

Grand fir & Others Sawtimber 76,017 Ton 7.0 1 8 5.6 10.7

Ponderosa pine Sawtimber 10,359 Ton 7.0 1 8 5.6 10.7

Combined Softwood

Nonsaw 9,284 Ton 5.0 1 16 4.0 50%

Timber Subject to Agreement

Combined Softwood

Biomass Unestimated Ton 5.0 1 16 4.0 N/A

Total Quantity

1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.

A.3 Timber Designations, acres are approximate:

Number Acres

Species Designation C2.38#

50A, 50B, 49, 145B, 54E, 47C, 47D, 47A, 69B, 87D, 47E, 87B, 47B, 62A, 87C, 69A, 57, 87E, Designation by Prescription C2.355#

58D, 54A, 146A, 146B, 145A, 145B, 54E, 54D, 54B, 147,47C, 47D, 47A, 48, 58A, 58C, 58B, 63A, 63B, 87A, Page 4 of 48 Salmon River Ranger District

87D, 54C, 47E, 47B, 57, 87E

A.6 High Stumps

Species Product Maximum Stump Height (inches)

All All 12

A.8 Reserved

A.9 Scaling Instructions and Specifications

Name and Date of Governing Instructions:

FSH 2409.11a, National Forest Cubic Log Scaling Handbook, as amended and supplemented. Governing instructions for products contained in C Provisions follow: C6.801, C6.822, C6.823, C6.841, C6.848.

Scaling Specifications

Species Product Maximum Scaling

Length (feet)

Trim Allowance

Diameter Range (inches) Length Range

(feet) Trim Allowance

(inches)

ALL ALL 20 ALL ALL 6

A.10 Scaling Services

Unit of Measure Site and Geographic Location Method Standard Estimated Cost per Unit $

Ton Forest Service Approved, State Certified Scale

Total (100%) Weight Scale $0.00

A. 12 - Fire Precautionary Period, applicable to AGAR 452.236-70

May 10 to October 20

A.13 – Contractor Responsibility to Furnish Crews and Equipment for:

Initial Fire Suppression, applicable to AGAR 452.236-70

Within 10 road miles

Fire Suppression Reinforcement, applicable to AGAR 452.236-70

Within 50 road miles

A14 – Contractor’s Obligation per Operations Fire, applicable to AGAR 452.236-70

Maximum Amount: $ 52,300

A16 – Normal Operating Season, applicable to B6.66

First Period: June 15 to October 15

Page 5 of 48 Salmon River Ranger District

Second Period: N/A

Page 6 of 48 Salmon River Ranger District

DIVISION B- Timber Removal Specifications

UNITED STATES DEPARTMENT OF AGRICULTURE

Forest Service

TIMBER REMOVAL SPECIFICATIONS

CLAUSES FOR SCALED TIMBER REMOVAL CONTRACTS

(Applicable to Contracts to be Measured After Felling)

This Division is organized into Parts, Sections, Subsections, and Items. These are numbered in accordance with the following scheme: Part B1.0, Section B1.1, Subsection B1.11, and Item B1.111. References to a Part include all Sections, Subsections, and Items within that Part; references to a Section include all Subsections and Items within that Section; and references to a Subsection include all Items within that Subsection. Cross-references within this contract cite the reference number of the applicable Division, Part, Section, Subsection, and Item. Descriptive headings used are not to be considered in determining the rights and obligations of the parties hereunder.

The Standard Clauses in this Division are subject to Specific Conditions of the contract stated in Division A.

Wherever appropriate, Specific Conditions established in Division A are herein cited by reference number.

References to Standard Clauses also apply to Special C Clauses with the same numbers. These clauses are applicable only to the timber removal portion of the End of the World Stewardship Contract except where otherwise specifically referenced. “Timber” when used in this appendix includes timber and other products.

B1.0—CONTRACT AREA

B1.1 Contract Area Map.

The boundaries of “Contract Area” and any subdivision thereof, are as shown on the attached “Contract Area Map” that is made a part hereof, and were, before contract solicitation, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of Contract Area and its approximate acreage are stated in Division A. Subdivisions may be revised and additional ones may be established only by written agreement.

Where applicable, the following are also identified on Contract Area Map:

(a) Identified claims limiting Contractor’s rights under B1.2

(b) Subdivisions defined in B2.3 where timber is to be Marked after date of contract solicitation

(c) Boundaries of Clearcutting Units, Overstory Removal Units, and Understory Removal Units under B2.3

(d) Diameter limits for Overstory Removal Units and Understory Removal Units under B2.33 and B2.34

(e) Areas where leave trees are Marked to be left uncut under B2.35

(f) Roads

(g) Sources of base course, surface rock, and rock riprap listed in the Schedule of Items

(h) Roads where log hauling or use is prohibited or restricted

(i) Roads and trails to be kept open

(j) Improvements to be protected

(k) Locations of known wildlife or plant habitat and cave resources to be protected

(l) Locations of areas known to be infested with specific invasive species of concern

(m) Maximum stump heights when more than one height is listed by areas in Division A6 under B6.412

(n) Skidding or yarding methods specified under B6.42

Page 7 of 48 Salmon River Ranger District

(o) Streamcourses to be protected

(p) Locations of meadows requiring protection

(q) Locations of wetlands requiring protection

(r) Locations of temporary roads to be kept open; and

(s) Other features required by Division B or C.

B1.2 Claims. Valid claims are excluded from Contract Area, except those on which timber cutting is authorized in writing by the claimant and except mining claims on which cutting is authorized by the Act of July 23, 1955 (30 USC 614). Claims that limit Contractor’s rights to operate under this contract and that Forest Service has been able to identify are shown on Contract Area Map. Contractor is not obligated to operate contrary to existing claim limitations. Forest Service shall designate boundaries of claims on the ground to the extent necessary to identify Included Timber.

B2.0—TIMBER SPECIFICATIONS

B2.1 Included Timber. “Included Timber” consists of:

B2.11 Standard Timber Live and dead trees and portions thereof that meet Utilization Standards under B2.2 and are designated for cutting under B2.3.

B2.12 Substandard Timber. Live and dead trees that:

(a) Do not meet Utilization Standards and

(b) Are located in Clearcutting Units or construction clearings or are otherwise designated for cutting.

B2.13 Damaged Timber.

B2.131 Damaged by Contractor. Undesignated live trees meeting Utilization Standards:

(a) Within 200 feet slope distance from centerline of roads constructed hereunder that are damaged by Contractor’s construction to the extent that considerable deterioration or mortality is imminent and are designated by Forest Service for felling before the nearest road segment is Substantially Completed or

(b) That are damaged by Contractor in logging or stewardship project operations and are subsequently Marked before Contractor has completed work in the immediate area.

By agreement, such trees may be left without charge if their removal would cause undue damage or be grossly uneconomic.

B2.132 Negligent or Willful Damage. Undesignated timber meeting Utilization Standards and unnecessarily damaged or negligently or willfully cut by Contractor, if included by Contracting Officer.

B2.134 Minor Damage by Natural Causes. Undesignated trees within Contract Area and meeting Utilization Standards, that become insect infested, wind-thrown, suffer serious damage, or die, as designated by agreement.

B2.14 Unintentionally Cut Timber. Trees, within or immediately adjacent to Contract Area or other authorized clearing outside Contract Area, not designated for cutting under B2.3 but that are cut through mistake by Contractor, when included by Contracting Officer.

B2.15 Construction Timber. Trees to be used for construction under this contract.

B2.16 Other Material. Species or products not listed in the contract, upon written approval of Forest Service.

B2.2 Utilization and Removal of Included Timber. “Utilization Standards” for trees and minimum pieces are stated in Division A2. To meet minimum tree specifications, trees must equal or exceed tree diameters listed in

Page 8 of 48 Salmon River Ranger District

Division A2 and contain at least one minimum piece. Except for timber required or authorized to be left Contractor shall fell and buck such trees and shall remove from Contract Area and present for Scaling all pieces that:

(a) Meet minimum piece standards in Division A2 or

(b) Do not meet such standards but would have qualified as part of minimum pieces if bucking lengths were varied to include such material.

B2.3 Timber Designations. Timber designated for cutting shall be confined to Contract Area, except as otherwise provided. Contract Area Map indicates subdivisions, if any, where Marking is to be done after contract solicitation, except for construction clearing, minor changes, and damaged timber. The boundaries of Clearcutting Units, Overstory Removal Units and Understory Removal Units were plainly Marked on ground before contract advertisement and are shown on Contract Area Map. Boundary trees shall not be cut. The number of units and approximate acreage of timber designations are stated in Division A3.

B2.31 Clearcutting Units. All trees that meet Utilization Standards within “Clearcutting Units” are designated for cutting.

B2.32 Construction Clearing. All timber is designated for cutting that is within the clearing limits of roads constructed hereunder or is in other authorized clearings. All dead or unstable live trees are designated for cutting that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Temporary Roads when Marked in advance of work in the immediate area. Pieces meeting Utilization Standards from such dead or unstable live trees shall be removed unless there is agreement that to do so could damage the road. Such designation may be revised as part of agreed changes in road locations.

B2.33 Overstory Removal Units. All trees within “Overstory Removal Units” are designated for cutting when they meet Utilization Standards and equal or exceed the diameter limits shown on Contract Area Map.

B2.34 Understory Removal Units. All trees within “Understory Removal Units” are designated for cutting when they meet Utilization Standards and are smaller than the diameter limits shown on Contract Area Map.

B2.35 Individual Trees. All trees to be cut, other than in the units described in B2.31, B2.32, B2.33, and B2.34, are Marked or designated by description. Trees are “Marked” when individually designated by Forest Service with paint marks above and below stump height. Contract Area Map indicates areas plainly identified on the ground where leave trees are Marked to be left uncut.

B2.37 Minor Changes. Within Contract Area, minor adjustments may be made in boundaries of cutting units or in the timber individually Marked for cutting when acceptable to Contractor and Forest Service.

B2.4 Volume Estimate. The estimated volumes of timber by species designated for cutting under B2.3 and expected to be cut under Utilization Standards are listed in Division A2. If Contract Area Map indicates that there are incompletely Marked subdivisions, the objective of Forest Service shall be to designate for cutting in such subdivisions sufficient timber so that Contract Area shall yield the approximate estimated volume by species or species groups stated in Division A2. However, the estimated volumes stated in Division A2 are not to be construed as guarantees or limitations of the timber volumes to be designated for cutting under the terms of this contract.

B3.0—RATES OF PAYMENT

B3.1 Current Contract Rates. Included Timber that is removed by Contractor and presented for Scaling in the product form stated in Division A2 shall be paid for at Current Contract Rates determined under this Section.

“Current Contract Rates” shall be Flat Rates. Flat Rates shall be those listed in the Schedule of Items – Timber/Product Removal Price Schedule. In the event contract time is adjusted, Current Contract Rates shall be continued in the same manner as immediately prior to the adjustment period. In addition, Required Deposits, if applicable, shall be made as listed in C5.32# and C6.816#.

B3.4 Other Payment Rates.

Page 9 of 48 Salmon River Ranger District

B3.41 Material Not in Division A2. Incidental amounts of products or portions of trees of species that do not meet Utilization Standards may be removed without charge. Such material may be purposely removed in more than incidental amounts without charge upon written approval of Contracting Officer, and subject to agreement on deposits if needed for road maintenance and use. Other species or products not listed may be cut and removed upon written approval of Contracting Officer and subject to agreement on rates of payment. Timber for which the quantity is not included in the estimate, shall be paid for at Current Contract Rates and Required Deposits.

B3.42 Timber Cut Through Mistake. Undesignated timber meeting Utilization Standards, cut by Contractor through mistake and included by Contracting Officer under B2.14, shall be removed and paid for at Current Contract Rates and Required Deposits, unless such material is not listed in Division A2. In such event, Contracting Officer, in accord with standard Forest Service methods, shall establish rates to be paid.

B3.43 Designated Timber Cut But Not Removed. Standard timber shall be removed, as provided in B2.2, prior to acceptance of a subdivision. There shall be no charge when:

(a) The leaving of incidental material is justified under existing conditions, or

(b) Cut timber is left by option or requirement.

B3.44 Undesignated Timber Damaged Without Negligence. Undesignated timber meeting Utilization Standards, damaged without negligence by Contractor and designated by Forest Service under B2.131, shall be cut, removed, and paid for at Current Contract Rates and Required Deposits.

B3.45 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut. Undesignated timber meeting Utilization Standards and unnecessarily damaged or negligently or willfully cut by Contractor, if included by Forest Service, shall be cut, removed, and paid for at Current Contract Rates and Required Deposits that are in addition to liquidated damages under B3.46.

If such timber is of a species or size not listed in Division A2 or is of a quality different from designated timber, Contracting Officer shall establish payment rates in accord with standard Forest Service methods.

B3.46 Liquidated Damages. Unnecessary damage to or negligent or willful cutting of undesignated timber, as described in B3.45, on portions of Contract Area cut over under this contract is likely to cause substantial silvicultural or other damage to the National Forest. It will be difficult, if not impossible, to determine the amount of such damage. Therefore, Contractor shall pay as fixed, agreed, and liquidated damages an amount equivalent to the amount payable at Current Contract Rates. If designated by Contracting Officer, Contractor shall remove such damaged or cut timber and pay for it at Current Contract Rates.

B3.47 Defect Caused by Abnormal Delay. Scaling deductions made for rot, check, or other defect resulting from abnormal delay in Scaling caused by Contractor shall be recorded separately and charged to Integrated Resource Account at Current Contract Rates and applicable deposits.

B4.0—PAYMENTS

B4.1 Amount Payable for Timber. Current Contract Rates and Required Deposits in effect when the timber is Scaled shall be applied to the Scaled volume to determine the amount Contractor shall pay.

B4.2 Integrated Resource Account. “Integrated Resource Account” is an account maintained by Forest Service of all Contractor’s deposits, credits, payment guarantees, and the charges for:

(a) Timber at Current Contract Rates

(b) Slash disposal, road maintenance at Required Deposit rates

(c) Stewardship Credits established

(d) Contract Scaling Deposits, and

Page 10 of 48 Salmon River Ranger District

(e) Other charges provided in this contract.

Cash deposits and Stewardship Credits earned shall be recorded currently in such account.

Charges for timber cut shall be made when Forest Service prepares and furnishes to Contractor periodic statements of volume and value of such timber cut and Scaled. Charges against Stewardship Credits shall be limited to timber value in excess of Required Deposits. Required Deposits, and Other Charges shall be paid in cash.

B4.21 Cash Deposits. Within the limitations of this Subsection, Contractor shall make cash deposits to meet Contractor’s obligations within 15 days of billing by Forest Service. Deposits shall be made to Forest Service, U.S.D.A., by mail or delivery to the address to be furnished by Forest Service. Forest Service shall explain the bill at the time it requests each deposit.

B4.215 Deposits When Payment Guaranteed. To the extent payment guarantee is provided under Clause entitled, “PRODUCT PAYMENT GUARANTEE” requirements for advance cash deposits shall be waived for the value of Product on contract area that is cut, but not removed, and for the value of Products removed from contract area, up to limit of remaining stewardship credits to be earned and exchanged for value of included product except for Required Deposits and Associated Charges. Associated charges shall be waived for not more than one monthly billing period.

B4.218 Cooperative Deposits. On a basis of cooperation or assistance (16 USC 572) and by a written agreement, Forest Service shall perform all or portions of the work that Contractor is obligated to perform under this contract, as well as furnish other Services in connection with activities under this contract. When Forest Service is to perform such work, Contractor shall make one or more deposits to cover the estimated cost of the work. On request of Contractor, Forest Service shall render monthly accounts, as may be specified in such agreement.

B4.24 Refund after Scaling Completed. Any cash deposit, in excess of that required to meet charges under B4.2, shall be refunded or transferred within 15 days of Contractor’s request after Scaling is completed, except for amounts estimated to be required under B9.5.

B4.4 Payments Not Received. (a) Payments are due and payable on the date of issue indicated on the bill for collection. When a payment for timber cut and other charges is not received at the location designated by Forest Service by the date specified in the bill for collection for receipt of payment, Contracting Officer will suspend all or any part of Contractor’s Operations until payment or acceptable payment guarantee is received. Other charges include, but are not limited to:

(i) Slash disposal, road maintenance, and contract Scaling deposits;

(ii) Cooperative work at rates established by specific agreement under B4.218; and

(iii) Other mandatory deposits.

(b) Failure to pay amounts due by the date specified in the bill for collection for receipt of payment shall be considered non-compliance. The non-compliance shall be remedied within 30-days which begins to run as of the end of business on the date specified for receipt of payments. If the performance or payment is guaranteed by surety bond, the surety will receive a copy of the written notification of non-compliance. Demand will be made on the surety or other institution providing the guarantee or bond instrument for immediate payment 10 days after issuance of written notification of the breach.

(c) Pursuant to the Debt Collection Improvement Act of 1996, as amended, if payment is not received by Forest Service within 15 days after the date of issue indicated on the bill for collection:

(i) Simple interest shall be assessed at the Current Value of Funds Rate as established by the Secretary of the Treasury. Interest will begin to accrue as of the date of issue indicated on the initial bill for collection.

Page 11 of 48 Salmon River Ranger District

(ii) Debtors will be assessed administrative charges, in addition to the delinquent amount due.

Administrative charges are those additional costs incurred by the Government in processing, handling, and collecting delinquent debts.

(iii) A penalty charge of six (6) percent per annum will be assessed on any portion of a debt delinquent more than 90 days. This penalty charge is in addition to interest and administrative charges under paragraphs (c)(i) and (c)(ii). The penalty charge shall accrue from the date of issue indicated on the bill for collection and shall be assessed on all outstanding amounts, including interest and administrative costs assessed under paragraphs (c)(i) and (c)(ii).

(iv) Payments will be credited on the date received by the Federal Depository or Collection Officer designated on the bill for collection.

(d) Forest Service remedies for Contractor’s failure to make payment for timber cut and other charges when due, except for accrual of interest, suspension of all or any part of Contractor’s Operations, and administrative offset, shall be stayed for so long as:

(i) A bona fide dispute exists as to Contractor’s obligation to make such payment and

(ii) Contractor files and prosecutes a timely Claim.

B5.0—TRANSPORTATION FACILITIES

B5.1 Authorization. Contractor is authorized to construct and maintain roads, bridges, and other transportation facilities, as needed for harvesting Included Timber and completing stewardship service items on National Forest and other lands where Forest Service has such authority. Maintenance shall be governed by Appendix C. Road reconstruction shall be governed by Appendix D. The location and clearing widths of all Temporary Roads or facilities shall be agreed to in writing before construction is started. “Temporary Roads” are roads other than roads listed in Appendix D that are constructed by Contractor for the purpose of harvesting Included Timber or completing stewardship service items. Contractor is authorized to cut and use for construction, without charge, construction timber designated by agreement.

B5.11 Requirements of Rights-of-Way. Contractor’s road construction and use on rights-of-way shall be confined to said rights-of-way and limited by the related easements and stipulations, if any, unless Contractor makes other arrangements that will not infringe upon or adversely affect the grantee’s rights. Said easements or right-of-way documents are available in the offices of the Forest Supervisor and District Ranger.

B5.12 Use of Roads by Contractor. Except as provided herein, Contractor is authorized to use existing National Forest system roads when Forest Service determines that such use will not cause damage to the roads or National Forest resources. C5.12# lists existing roads shown on Contract Area Map that for such reasons as limitations in structural capacity, safety, and protection of soil, water, and roads:

(a) Cannot be used for log hauling or

(b) May be used only under the restrictive limitations stated therein.

B5.3 Road Maintenance. Contractors shall maintain roads, commensurate with Contractor’s use, in accordance with Road Maintenance Requirements and the Road Maintenance Specifications in Appendix C. Performance of road maintenance work by Contractor may be required prior to, during, and/or after each period of use. The timing of work accomplishment shall be based on the Contractor’s Operating Schedule.

When two or more commercial users are simultaneously using the same road where Forest Service is not requiring maintenance deposits, the commercial users will develop maintenance responsibilities and arrangements for accomplishing the work. The Forest Service must agree to this plan. If the commercial users cannot agree on maintenance responsibilities, Forest Service shall resolve the differences. If Contractor elects to use different roads than those listed, Forest Service shall determine Contractor’s commensurate share of road

Page 12 of 48 Salmon River Ranger District maintenance and revise road maintenance deposits. If Forest Service cannot perform its full commensurate share of road maintenance, Forest Service shall make a cash payment to the Contractor for performance of such work.

Unless agreed in writing, prehaul maintenance shall be completed on any portion of road prior to hauling on that portion. Maintenance, as used in this contract, does not include road reconstruction or repairs of an extraordinary nature.

B5.4 Use by Others. Forest Service shall have the right to use any road constructed by Contractor under this contract for all purposes in connection with the protection and administration of the National Forest. Other parties, in connection with the logging of tributary National Forest timber, may use roads constructed by Contractor hereunder when such use will not materially interfere with Contractor’s Operations. Such third-party use shall be contingent upon the third party paying a fair share of maintenance cost commensurate with such commercial use. Unless otherwise provided, the Forest Service shall authorize other uses of roads constructed by Contractor hereunder only if:

(a) Forest Service makes appropriate arrangements to relieve Contractor of related maintenance costs commensurate with such other uses and

(b) Such other uses will not materially interfere with Contractor’s Operations.

Where Contractor reconstructs a road having established use, the use during reconstruction and thereafter by Contractor shall be such as to reasonably accommodate such established use. Contractor shall have the right to use such reconstructed roads without material additional interference from other users.

B6.0—OPERATIONS

B6.22 Protection of Improvements. So far as practicable, the Contractor shall protect all physical improvements including, but not limited to, roads, trails, ditches, fences, waterlines and other improvements, existing in the contract area, determined to have continuing need or use, and designated on the Contract Area Map.

The Contractor shall keep all roads and trails needed for fire protection or other purposes and designated on the Contract Area Map reasonably free of equipment and products, slash, and debris resulting from the Contractor’s operations. The Contractor shall make timely restoration of any such improvements damaged by the Contractor’s operations and, when directed (because of such operations) shall move such improvements if and as specified by the Forest Service.

All protected improvements will be protected from damage by the Contractor. If any protected improvements are disturbed, the Contractor shall immediately contact the COR and will be liable for the cost of repairs.

PROTECTED IMPROVEMENTS

IMPROVEMENT DESCRIPTION LOCATION

Roads All Roads (including associated features) Throughout contract area

Land Survey Monuments Protection of Land Survey Monuments As identified on Contract Area Map

Trails Protection of Improvements As identified on Contract Area Map

Range Improvements If present Throughout contract area

Page 13 of 48 Salmon River Ranger District

B6.221 Protection of Improvements Not Owned by Forest Service. Forest Service shall notify all utility companies, or other parties affected, and make arrangements for all necessary adjustments of the public utility fixtures, pipelines, and other appurtenances likely to be affected by Contractor’s Operations.

When Contractor’s Operations are adjacent to properties of railway, telephone, or power companies, or other property, work shall not begin until Contractor has identified actions necessary to prevent damage. Contractor shall cooperate with the owners of any underground or overhead utility lines in their removal and/or rearrangement operations in order that these operations may progress in a reasonable manner, utility duplication or rearrangement work may be reduced to a minimum, and services shall not be unnecessarily interrupted.

In the event of interruption to utility services because of accidental breakage or as a result of lines being exposed or unsupported, Contractor shall promptly notify the proper authority and shall cooperate with that authority in the restoration of service until the service is restored.

When materials are to be hauled across the tracks of any railway, Forest Service will make arrangements with the railroad for the use of any existing crossing or for any new crossing required. Contractor shall make arrangements for use of alternate crossings. All construction work to be performed by Contractor on the railroad right-of-way shall not damage railroad company’s property.

B6.222 Protection of Property. In construction and reconstruction of Roads, Contractor shall not unnecessarily remove, deface, injure, or destroy trees, shrubs, or other natural features, unless specifically authorized. To the extent practicable, Contractor shall confine operations to within the clearing limit or other areas designated in the contract and prevent the depositing of rocks, excavated materials, stumps, or other debris outside these limits.

Material that falls outside these limits shall be retrieved, disposed of, or incorporated in the work to the extent practicable and necessary to protect adjacent resource values, unless otherwise agreed.

B6.23 Protection of Land Survey Monuments. Forest Service shall appropriately designate on the ground all known survey monuments including but not limited to horizontal control stations (Triangulation Stations), vertical control stations (Benchmarks), property corner monuments, and all Public Land Survey System monuments.

This shall include reference monuments, corner accessories such as bearing trees, line trees and line posts.

Identifying signs shall be posted by Forest Service on two sides of each known bearing tree, and each line post shall be posted with a metal sign or decal. Line trees may be cut if designated by the Government.

In authorized clearings such as clearcutting units and road construction clearings, and in other instances where damage to survey monuments, corners, corner accessories and survey of property line markers is unavoidable, Forest Service shall arrange protective or perpetuative action that does not cause unnecessary delay to Contractor.

Contractor shall protect all known survey monuments, witness corners, reference monuments, bearing trees and line markers against avoidable destruction, obliteration or damage during Contractor's operations. Additional monuments or objects discovered on the area shall be promptly reported to the other party and shall also be protected. If any known monuments, corners, corner accessories, and survey or property line markers are destroyed, obliterated or damaged during Contractor's operations, Contractor shall employ a registered professional land surveyor to reestablish or restore at the same location the monuments, corners, corner accessories or line markers. Such surveyors shall use procedures and monumentation that accords with the Bureau of Land Management Manual of Instructions for the Survey of the Public Lands of the United States for General Land Office surveys and any applicable State statutes concerned with land surveys. The contractor’s agent shall record such surveys in accordance with state survey statutes.

B6.24 Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources.

Locations of known areas needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground. Special protection measures needed to protect such known areas are identified in Appendix B, if applicable.

Page 14 of 48 Salmon River Ranger District

In addition to any special protection measures noted, Contractor has a general duty to protect all known and identified resources referenced in this Subsection from damage or removal during Contractor’s operations.

Discovery of additional areas, resources, or members of species needing special protection shall be promptly reported to the other party, and operations shall be delayed or interrupted at that location, if Contracting Officer determines there is risk of damage to such areas, resources, or species from continued operations.

Wheeled or track-laying equipment shall not be operated in areas identified as needing special measures for the protection of cultural resources, except on roads, landings, tractor roads, or approved skid trails. Unless agreed otherwise, trees will not be felled into such areas. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s operations within such areas in lieu of required cross ditching.

Contractor shall immediately notify Forest Service if disturbance occurs to any area identified as needing special protection measures and shall immediately halt operations in the vicinity of the disturbance until Forest Service authorizes Contractor to proceed. Contractor shall bear costs of resource evaluation and restoration to identified sites. Such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.

Forest Service has exercised due diligence and followed established protocols in identifying known areas needing special protection measures. Nevertheless, nothing in this provision shall be interpreted as creating any warranty that all locations and special measures for the protection of plants, animals, cultural resources, and cave resources have been described herein, elsewhere in the contract, or designated on the ground.

Label on Contract Area Map Restrictions

See Legend Streamcourse Protection

B6.3 Control of Operations. Under this contract, “Contractor’s Operations” shall include activities of or use of equipment of Contractor, Contractor’s employees, agents, Subcontractors, or their employees or agents, acting in the course of their employment in operations hereunder on National Forest lands or within Forest Service protection boundary (unless acting under the immediate supervision of Forest Service).

Contractor’s Operations shall be conducted in a workmanlike and orderly manner. The timing of re- quired Forest Service designation of work on the ground and the performance of other Forest Service work shall not be such as to cause unnecessary delay to Contractor.

B6.32 Protection of Residual Trees. Contractor Operations shall not unnecessarily damage young growth or other trees to be reserved (see Appendix B.)

B6.33 Safety. Contractor’s Operations shall facilitate Forest Service’s safe and practical inspection of Contractor’s Operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees.

In the event that Contracting Officer identifies a conflict between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an adjustment in Current Contract Rates to compensate for the changed conditions.

Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations. Contractor and Forest Service shall agree to a specific Traffic Control Plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except as otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUTCD) and as shown on Plans, Contract Area Map, Traffic Control Plan, or in specifications attached hereto.

Page 15 of 48 Salmon River Ranger District

B6.34 Sanitation and Servicing. Contractor shall take all reasonable precautions to prevent pollution of air, soil, and water by Contractor's operations. If facilities for employees are established on Contract Area, they shall be operated in a sanitary manner. Contractor shall not service tractors, trucks, or other equipment on National Forest lands where servicing is likely to result in pollution to soil or water. Contractor shall remove from National Forest lands all refuse resulting from use, servicing, repair, or abandonment of equipment. In the event that Contractor's operations or servicing of equipment result in pollution to soil or water, Contractor shall conduct cleanup to restore the polluted site to the satisfaction of the Forest Service.

B6.341 Prevention of Oil Spills. If Contractor maintains storage facilities for oil or oil products on Contract Area, Contractor shall take appropriate preventive measures to ensure that any harmful discharge of such oil or oil products does not enter into or upon any navigable waters, adjoining shorelines, or other waters of the United States, as prescribed in 40 CFR 110. As soon as Contractor has knowledge that measures, as described in Sanitation and Servicing fail to prevent a discharge into or upon navigable waters or adjoining shorelines of the United States, Contractor shall notify the Contract Officer or Contract Officer Representative, the National Response Center and any other appropriate State agencies. In accordance with 40 CFR 110.6, all harmful discharges that occur as a direct or indirect result of Contractor’s operations, regardless of whether such discharges are caused by Contractor’s employees, agents, Subcontractors, or their employees or agents, directly or indirectly, as a result of Contractor’s Operations must be reported.

Harmful discharges of oil are those that violate applicable State water quality standards, cause a film or sheen on the water’s surface, or leave sludge or emulsion beneath the surface of the water or adjoining shorelines regardless of the amount of material discharged (40 CFR 110.3). As such reporting is not triggered by the amount of the discharge but by the presence of the criteria prescribed in 40 CFR 110.3. Harmful discharges meeting the criteria in 40 CFR 110 must be reported by Contractor. Contractor shall take whatever initial action may be safely accomplished to control all reportable discharges. Appropriate actions include but are not limited to containment, sorbents or dispersants as needed or as prescribed by the Spill Prevention Control and Countermeasures Plan pursuant to 40 CFR 112. Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan pursuant to EPA requirements as stated in 40 CFR 112 when the following conditions are met:

(a) Contractor maintains above ground storage facilities, including mobile storage, for oil or oil products on the Contract Area and the total storage capacity for these products exceeds 1,320 gallons in either a single container of greater than 1,320 gallons, or in multiple containers of 55 gallons or greater, and

(b) there is a reasonable expectation that a harmful discharge could reach navigable waters of the United States, adjoining shorelines or other waters as prescribed in 40 CFR 112.

Reasonable expectation for a discharge reaching navigable waters is based on the location of the storage facility to streams, ditches, gullies, or permanent water bodies that could be impacted as well as drainage patterns, soil conditions, precipitation runoff and the volume of material potentially spilled. The SPCC Plan shall outline measures which will prevent discharges from reaching navigable waters, adjoining shorelines, or other waters of the United States. According to §112.1(d)(1)(i), the determination of reasonable expectation for a harmful discharge must be based solely upon consideration of the geographical and locational aspects of the facility. If a Contractor makes a determination that, due to the location, the facility cannot reasonably be expected to discharge oil as described in §112.1(b), Contractor should be prepared to provide the rationale and any supporting documentation, if requested by the Contracting Officer, that explains why the facility does not have an SPCC Plan.

Contractor shall notify the National Response Center and Contracting Officer of all releases of reportable quantities of hazardous substances on or in the vicinity of Contract Area that are caused by Contractor’s employees, agents, Subcontractors or their employees or agents, directly or indirectly, as a result of Contractor’s Operations, in accordance with 40 CFR 302.The Contractor will take whatever initial action may be

Page 16 of 48 Salmon River Ranger District safely accomplished to contain all spills.

B6.342 Hazardous Substances. Contractor shall notify the National Response Center and Contracting Officer of all releases of reportable quantities of hazardous substances on or in the vicinity of Contract Area that are caused by Contractor’s employees, agents, Subcontractors or their employees or agents, directly or indirectly, as a result of Contractor’s Operations, in accordance with 40 CFR 302.

B6.35 Equipment Cleaning.

(1) In order to prevent the potential spread of noxious weeds onto National Forest lands, the Contractor shall be required to furnish the Forest Service with proof of weed-free equipment. Cleaning shall remove all soil, plant parts, seeds, vegetative matter, or other debris that could contain or hold seeds. Only logging and construction equipment so cleaned and inspected by the Forest Service will be allowed to operate within the Contract Area. All subsequent move-ins of equipment to the Contract Area shall be treated in the same manner as the initial move in. "Off-road equipment" includes all logging and construction machinery, except for log trucks, chip vans, service vehicles, water trucks, pickup trucks, cars, and similar vehicles.

(2) Noxious weeds are defined as any exotic plant species established or that may be introduced in the State, which may render the land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by applicable state agecy or the local counties vendor is operating in, or by other appropriate agencies having jurisdiction.

(3) All equipment and vehicles to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use, as well as on road use, whether they are owned, leased, or borrowed by the Contractor or subcontractor.

(4) Unless otherwise agreed, Contractor shall give the Forest Service at least 24 hours’ notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the forest service.

(5) Equipment, materials and vehicles shall be visually inspected by a designated Forest Service Officer, and certified in writing to be reasonably clean and weed free. Inspections will take place at a location designated by the Forest Officer in advance of equipment and material arrival. Equipment and vehicles are expected to proceed directly to the job site following the inspection.

(6) New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, on the Contract Area or on the haul route, shall be promptly reported to the other party.

Contractor and Forest Service shall agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

B6.36 Acceptance of Work. Upon Contractor’s written request and assurance that work has been completed, Forest Service shall perform an inspection within 5 days, excluding weekends and Federal holidays, so as not to delay unnecessarily the progress of Contractor’s Operations. Such a request may be for acceptance of:

(a) Specific requirements on a subdivision of Contract Area (such as logging, slash disposal, erosion control, or snag felling); or

(b) All contract requirements on a subdivision of Contract Area.

Forest Service may perform such inspections without request from Contractor.

Within 2 days of inspection, excluding weekends and Federal holidays, Forest Service shall furnish Contractor with written notice either of acceptance or of work remaining to be done.

Page 17 of 48 Salmon River Ranger District

In the event that Forest Service is unable to make such inspection within 5 days of Contractor’s request, Contractor shall be notified in writing of necessity for postponement and time when inspection can be made.

B6.4 Conduct of Logging. Unless otherwise specifically provided herein, Contractor shall fell trees designated for cutting and shall remove the portions which meet Utilization Standards, except for occasional trees inadvertently not cut or trees or pieces not removed for good reason, including possible damage to forest resources or gross economic impracticability at the time of removal of…