RFI1.docx
DOCX document 33 KB Posted
- Attached to
- UPS System Maintenance Federal contract opportunity
- Solicitation number
- 1232SA26Q0411
About this file
This is a Requests for Information (RFIs) and Responses document for RFQ Solicitation Number 1232SA26Q0411, issued by the Department of Agriculture Agricultural Research Service for UPS System Maintenance at the National Bio and Agro-Defense Facility (NBAF). The document clarifies contractor responsibilities and scope requirements through nine key questions and government responses.
The contract requires all-inclusive maintenance and repair services for NBAF's UPS systems, including rectifier/chargers, batteries, and capacitor banks. Clarifications establish that software and firmware updates from the original equipment manufacturer are in-scope and included in pricing. The contractor is responsible for checking and recording DC power cabinet room ambient temperature and verifying proper operation of ventilation equipment; however, this is limited to rectifier cabinet internal cooling fans, not building-wide HVAC systems. For preventative maintenance (CLIN 0001), contractor-installed government-provided parts should be estimated at less than one hour per replacement. For service/repair calls (CLIN 0002), the contractor should estimate eight hours per task with up to 32 hours billable per instance, and each "1 Each" price on the bid schedule represents a single service call, not all calls for a contracting period. Replacement parts installed during scheduled PM visits are covered under CLIN 0001, while parts replaced outside scheduled maintenance are covered under CLIN 0002. The contractor bears full responsibility for safely shutting down UPS systems, bypassing loads to maintenance, and disconnecting all power sources, with standard operating procedures available from NBAF. This is a total small business set-aside with a size standard of $19.0 million under NAICS code 238210.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Bid Schedule_rev2.xlsx | XLSX spreadsheet | |
| Sol_1232SA26Q0411_Amd_0007.pdf | ||
| Attachment 2 - PWS_v4.docx | DOCX document | |
| Sol_1232SA26Q0411_Amd_0006.pdf | ||
| Attachment 2 - PWS_v3.docx | DOCX document | |
| RFI.docx | DOCX document | |
| Sol_1232SA26Q0411_Amd_0005.pdf | ||
| Attachment 1 Bid Schedule_rev1.xlsx | XLSX spreadsheet | |
| Attachment 2 - PWS_v2.docx | DOCX document | |
| Sol_1232SA26Q0411_Amd_0004.pdf | ||
| Sol_1232SA26Q0411_Amd_0003.pdf | ||
| Attachment 6 Site Visit Informationv2.docx | DOCX document | |
| Sol_1232SA26Q0411_Amd_0002.pdf | ||
| Attachment 6 Site Visit Information.docx | DOCX document | |
| Sol_1232SA26Q0411.pdf | ||
| Attachment 1 - Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 2 - PWS.docx | DOCX document | |
| Attachment 6 - Site Visit Information.docx | DOCX document | |
| Attachment 3 - UPS Technical Exhibit.pdf | ||
| Attachment 5 - Site Visit Application.pdf | ||
| Attachment 4 - Wage Determination.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information (RFIs) and Responses
1. Under SOW Item 1.0 scope of work, the opening sentence states “to provide all-inclusive and repair services for the UPS Systems…”. Please clearly define “all-inclusive” or remove this verbiage. The contractor is concerned the all-inclusive statement will hold them liable for any maintenance/service omissions not clearly defined or stated in SOW Section 3.3. Please confirm the contractor is only required to perform maintenance/service explicitly defined/stated in SOW Section 3.3. RESPONSE: updated to state: This is a non-personal services contract to provide all-inclusive maintenance services and repair services for the National Bio and Agro-Defense Facility’s (NBAF) UPS Systems, including all necessary components, as detailed in this PWS.
2. Are software updates by OEM part of the maintenance requirements for this contract? RESPONSE: Yes all software or firmware updates are considered in scope and to be included in pricing.
3. Are firmware updates by OEM part of the maintenance requirements for this contract? RESPONSE: Yes all software or firmware updates are considered in scope and to be included in pricing.
4. Referencing SOW item 3.3.1 it states to check and record DC power room ambient temperature and verify proper operation of ventilation equipment. This statement sounds like a building maintenance HVAC operation given it references HVAC for the entire room. The contractor has no idea what ambient temperature the room was designed to achieve/maintain or the specs on HVAC ventilation fans either. The contractor requests this statement be modified to only record and document ambient temperatures. RESPONSE: Check and record DC power cabinet room ambient temperature and verify proper operation of ventilation equipment.
5. Referencing SOW item 3.3.1 it states to “check system ventilation fans and clean/replace fans and fan filters, if present”. Is this statement referencing the rectifier cabinets themselves (i.e. cooling fans on the cabinet doors? Or is it tied to question 3 above on the whole room HVAC. Please confirm. RESPONSE: This is referencing rectifier/chargers internal cooling fans only not room fans.
6. Referencing SOW item 3.3.3 it states “replace small, government-provided parts as a required component of the preventative maintenance service”. The contractor respectfully requests a list of parts they will be responsible for installing as the part will impact the amount of labor involved for installation. RESPONSE: updated - Check system cabinet ventilation fans and clean/replace fans and fan filters as needed, if present
7. Referencing the same question above about installing government provided parts, please state a quantity or range of parts that will be installed per year of the contract as this will help to price the level of effort for performing this service.
a. Are these parts to only be installed during quarterly or semi-annual visits? Or is the contractor required to send someone to site anytime there needs to be a part replaced? Please confirm. RESPONSE: Parts are to be installed at either PM CLIN 0001 or Service/Repair CLIN 0002
b. The contractor suggests this portion of the service be priced based on 4-hour intervals for any part replaced while they are onsite performing other maintenance activities or 8-hour blocks if they are required to install outside of a scheduled maintenance event. RESPONSE: Replacement parts installed under CLIN 0001 should be estimated to take less than 1 hour. CLIN 0002 Should be priced for up to 32 hours per instance.
8. Referencing CLIN 0002 Service Calls and Repairs, sub section 3.3.4 states “Requested service calls…”, however, the government provided bid schedule calls this CLIN “UPS Maintenance/Repair call” which is singular. Please confirm the contractor will be paid for up to 32 hours of repair for each call and that “1 Each” price on the bid schedule is not meant to pay for all service calls for any given contracting period. RESPONSE: Contractor to estimate 8 hours per task, note has been added and updated to bid schedule.
9. Referencing CLINs 0004 and 0005 with the same requirement to safely shut down the UPS system, bypass the load to maintenance and disconnect all power sources, will NBAF electrical staff be assisting in this effort or is this entirely the responsibility of the contractor? RESPONSE: This effort is entirely responsibility of the contractor. SOPs to disconnect UPS systems are available.
File details come from the government source that posted it. Updated .