10-AWARD ALLOCATION FORM IRA .xlsx
XLSX spreadsheet 176 KB Posted
- Solicitation number
- 47PH0824R0004
About this file
This document contains a federal contract opportunity notice and related project files. The General Services Administration is seeking proposals for the Ysleta Land Port of Entry Pavement Replacement Repairs Project in El Paso, Texas. The scope of work involves replacing or repairing approximately 725,000 square feet of concrete pavement, including removal and reconstruction of existing materials to depths of 8 to 10 inches. Additional work includes surface reconstruction, joint and crack sealing, and concrete patching. The project value is estimated between $10-20 million. The North American Industry Classification code is 237310 and it is set aside for small businesses. Proposals are due by May 16, 2024 and award is anticipated by August 1, 2024. The performance period is 362 calendar days from notice to proceed.
The related project files include templates for a post-award allocation form, cost breakdown, and bid tabulation. The forms request information on project name, owner and contractor details, scope of work, assumptions, excluded items, cost estimates by construction division, general conditions, insurances, bonds, overhead, and profit. Quantities and pricing are also requested to be provided by division for evaluation purposes.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Information
POST AWARD ALLOCATION FORM IRA
| PROJECT NAME | ||||
| BUILDING NAME | ||||
| BUILDING ADDRESS | BUILDING NUMBER | |||
| ESTIMATED | ||||
| START DATE | PERIOD OF PERFORMANCE DAYS | |||
| SOLICITATION # | DELIVERY METHOD | Design Bid Build |
| OWNER INFORMATION | CONTRACTOR INFORMATION | ||
| OWNER | |||
| COMPANY NAME | CONTRACTOR COMPANY NAME | ||
| OWNER | |||
| CONTACT NAME | CONTRACTOR CONTACT NAME | ||
| ADDRESS | ADDRESS | ||
| OWNER | |||
| PHONE | CONTRACTOR PHONE | ||
| OWNER | |||
| CONTRACTOR EMAIL |
| SCOPE OF WORK |
| TEXT |
| MATERIALS AND SERVICES NOT INCLUDED |
| TEXT |
| ASSUMPTIONS |
| TEXT |
| NET ZERO CONTRIBUTIONS |
| TEXT |
Masterformat CSI
PBS MASTERFORMAT CSI
| Masterformat | |||
| CSI | System Elements (Trade Work) | Self Performed/ | |
| Subcontracted? | Amount |
| Div. 00 | Design Services - for Design Build | |
| Div. 00A | High Performing Green Buildings | |
| Div. 00B | Emerging and Sustainable Technologies | |
| Div. 01 | General Requirements (Please Include Jobsite Overhead) | |
| Div. 02 | Existing Conditions | |
| Div. 03 | Concrete | 0 |
| Div. 03A | Low Embodied Carbon Concrete | |
| Div 03.B | Non LEC Concrete | |
| Div. 04 | Masonry | |
| Div. 05 | Metals | 0 |
| Div. 05A | Low Embodied Carbon Steel | |
| Div 05.B | Non LEC Metals | |
| Div. 06 | Wood, Plastics, Composites | |
| Div. 07 | Thermal and Moisture Protection | |
| Div. 08 | Openings | 0 |
| Div. 08A | Low Embodied Carbon Glass | |
| Div 05.B | Non LEC Openings | |
| Div. 09 | Finishes | |
| Div. 10 | Specialties | |
| Div. 11 | Equipment | |
| Div. 12 | Furnishings | |
| Div. 13 | Special Construction | |
| Div. 14 | Conveying Equipment | |
| Div. 21 | Fire Suppression | |
| Div. 22 | Plumbing | |
| Div. 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |
| Div. 26.1 | Electrical | |
| Div. 26.2 | Lighting | |
| Div. 27 | Communications | |
| Div. 28.1 | Electronic Safety | |
| Div. 28.2 | Electronic Security (TI - Non-BSAC) | |
| Div. 31 | Earthwork | |
| Div. 32 | Exterior Improvements | 0 |
| Div. 32.A | LEC Asphalt | |
| Div. 32.B | Rest of Exterior Improvements | |
| Div. 33 | Utilities | |
| Div. 34 | Transportation | |
| Div. 35 | Waterway and Marine Construction | |
| Div. 40 | Process Integration | |
| Div. 41 | Material Processing and Handling Equipment | |
| Div. 42 | Process Heating, Cooling and Drying Equipment | |
| Div. 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | |
| Div. 44 | Pollution and Waste Control Equipment | |
| Div. 45 | Industry Specific Manufacturing Equipment | |
| Div. 46 | Water and Wastewater Equipment | |
| Div. 48 | Electrical Power Generation | |
| Subtotal | Trade Cost | $0.00 |
| General Conditions | ||
| Insurances (General Liability, Subcontractor Performance, Builders Risk Program) | ||
| Payment and Performance Bond |
| Subtotal | Estimated Cost of Work | $0.00 |
| Overhead | ||
| Profit | ||
| ERROR:#NAME? | $0.00 |
Bid Tabulation
| PBS BID TABULATION FORM | ||||||
| Company Name: | Project No.: | |||||
| Project Name: | ||||||
| Location: | ||||||
| Architect: | Independent Government Estimate (IGE) | 0 | CONTRATOR B | CONTRACTOR C | CONTRACTOR D |
| Bid Date: | |||||||||||||
| BID QUANTITIES | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | |||
| Ref # | Item Description | Qty. | UNIT | ||||||||||
| Div. 00 | Design Services - for Design Build | 500 | $500.00 | 500 | $500.00 | $ - | $ - | $ - | |||||
| Div. 01 | General Requirements (Please Include Jobsite Overhead) | 900 | $900.00 | 1000 | $1,000.00 | $ - | $ - | $ - | |||||
| Div. 02 | Existing Conditions | 600 | $600.00 | 600 | $600.00 | $ - | $ - | $ - | |||||
| Div. 03 | Concrete | 210 | $210.00 | 200 | $200.00 | $ - | $ - | $ - | |||||
| Div. 03A | Low Embodied Carbon Concrete | 200 | $200.00 | 200 | $200.00 | $ - | $ - | $ - | |||||
| Div 03.B | Non LEC Concrete | 4.5 | $45.00 | 5 | $50.00 | $ - | $ - | $ - | |||||
| Div. 04 | Masonry | 5 | $50.00 | 6 | $60.00 | $ - | $ - | $ - | |||||
| Div. 05 | Metals | 6 | $60.00 | 5 | $50.00 | $ - | $ - | $ - | |||||
| Div. 05A | Low Embodied Carbon Steel | 1.4 | $280.00 | 1.5 | $300.00 | $ - | $ - | $ - | |||||
| Div 05.B | Non LEC Metals | 500 | $500.00 | 500 | $500.00 | $ - | $ - | $ - | |||||
| Div. 06 | Wood, Plastics, Composites | 1.25 | $250.00 | 1.25 | $250.00 | $ - | $ - | $ - | |||||
| Div. 07 | Thermal and Moisture Protection | 590 | $590.00 | 600 | $600.00 | $ - | $ - | $ - | |||||
| Div. 08 | Openings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 05A | Low Embodied Carbon Glass | $ - | $ - | $ - | $ - | $ - | |||||||
| Div 05.B | Non LEC Openings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 09 | Finishes | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 10 | Specialties | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 11 | Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 12 | Furnishings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 13 | Special Construction | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 14 | Conveying Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 21 | Fire Suppression | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 22 | Plumbing | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 23 | Heating, Ventilating, and Air Conditioning (HVAC) | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 26.1 | Electrical | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 26.2 | Lighting | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 27 | Communications | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 28.1 | Electronic Safety | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 28.2 | Electronic Security (TI - Non-BSAC) | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 31 | Earthwork | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32 | Exterior Improvements | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32.A | LEC Asphalt | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32.B | Rest of Exterior Improvements | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 33 | Utilities | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 34 | Transportation | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 35 | Waterway and Marine Construction | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 40 | Process Integration | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 41 | Material Processing and Handling Equipment | $ - | $ - | ||||||||||
| Div. 42 | Process Heating, Cooling and Drying Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | $ - | $ - | ||||||||||
| Div. 44 | Pollution and Waste Control Equipment | $ - | $ - | ||||||||||
| Div. 45 | Industry Specific Manufacturing Equipment | $ - | $ - | ||||||||||
| Div. 46 | Water and Wastewater Equipment | $ - | $ - | ||||||||||
| Div. 48 | Electrical Power Generation | $ - | $ - | ||||||||||
| $4,185.00 | $4,310.00 | ||||||||||||
| $426.69 | $426.69 | ||||||||||||
| $4,611.69 | $4,736.69 |