10-Attachment D.pdf

PDF 44 KB Posted

Attached to
CP2600617-Carlsbad State Veterans Cemetery
Solicitation number
70-350-26-08806
Issued by
Doña Ana County, New Mexico

About this file

Attachment D is a project management structure requirement document for the Carlsbad State Veterans Cemetery construction project in New Mexico. This document outlines mandatory wire diagram specifications that bidders must provide as part of their proposal submission. The wire diagram must illustrate the complete project organizational hierarchy, including the general contractor's project management and superintendent roles, all subcontractor positions and their reporting relationships, the safety manager structure for both the general contractor and subcontractors with their interconnected relationships, and the quality assurance/quality control manager's position within the overall job site personnel structure. The document requires comprehensive representation of the entire project team within the submitted wire diagram to establish clear lines of supervision and organizational accountability.

The document does not contain pricing information, set-asides, contract terms, funding sources, or award dates. Instead, it serves as a technical specification attachment that establishes organizational and management structure requirements that bidders must address in their proposals. This management structure documentation is essential for demonstrating the bidder's capability to coordinate complex construction activities involving multiple subcontractors, safety protocols, and quality control measures on the cemetery development project.

View the file

Other files

File Type Posted
23-Sign In Sheet 8-24-26.pdf PDF
34-Amendment 04.pdf PDF
15-Attachment I.pdf PDF
27-Appendix D-1.a.pdf PDF
6-Appendix G.pdf PDF
28-Amendment 02.pdf PDF
7-Attachment A.pdf PDF
12-Attachment F.pdf PDF
32-Amendment 04.pdf PDF
9-Attachment C.pdf PDF
29-70-350-26-08806 CP2600617-Carlsbad State Veterans Cemetery - QA 9-1-26.pdf PDF
17-Attachment J.pdf PDF
16-Attachment L.pdf PDF
18-Attachment M.pdf PDF
21-26.07.29 NM FMD - CARLSBAD VETERANS CEMETERY - CONSTRUCTION DOCUMENTS - BID SET.pdf PDF
30-Amendment 03.pdf PDF
11-Attachment E.pdf PDF
25-70-350-26-08806 CP2600617-Carlsbad State Veterans Cemetery - QA 8-28-26.pdf PDF
35-26.09.08 NM GSD Veterans Cemetery - Addendum 1.pdf PDF
24-Appendix F.pdf PDF
26-Amendment 01.pdf PDF
2-Appendix A.pdf PDF
1-Attachment K.pdf PDF
33-26.09.08 NM GSD Veterans Cemetery - Addendum 1.pdf PDF
13-Attachment G.pdf PDF
14-Attachment H 12.pdf PDF
3-Appendix B.pdf PDF
4-Appendix C.pdf PDF
19-Appendix H Draft Contract F.pdf PDF
8-Attachment B.pdf PDF
31-70-350-26-08806 CP2600617-Carlsbad State Veterans Cemetery - QA 9-2-26.pdf PDF
5-Appendix D-2.pdf PDF
22-Request for Proposal 70-350-26-08806 Carlsbad Veteran Cemetery.pdf PDF
20-26.07.29 NM FMD - CARLSBAD VETERANS CEMETERY - CONSTRUCTION PROJECT MANUAL - BID SET.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment D

REFERENCE: 4.b Wire Diagram of Project Management Structure for this Project

1. Indicate the relationship between the PM/Supt of the Subcontractors and the GC PM/SUPT.

2. Indicate the relationship of the Safety Manager of the Subcontractors and GC, and the relationship of the Safety Manager with others on the job site.

3. Indicate the relationship between the QA/QC Manager with other personnel on the job site.

WIRE DIAGRAM SHOULD INCLUDE

THE ENTIRE TEAM FOR THIS

PROJECT as well as subcontractors AND the lines of SUPERVISION

Personnel Position Name

Personnel Position Name

Personnel Position Name

Attachment D

File details come from the government source that posted it. Updated .