10-Appendix F Control Requirements.pdf

PDF 114 KB Posted

Attached to
Family Medical Leave Assistance
Solicitation number
BYZ25 - 00028078
Issued by
Dallas County, Texas

About this file

This document is Appendix F Control Requirements for a contract with the City of Dallas, detailing comprehensive control and compliance specifications for a technology or service provider. The document outlines a detailed set of requirements spanning regulatory/legal compliance, financial controls, business continuity, disaster recovery planning, and policy adherence. Key areas include mandatory compliance with federal, state, and municipal regulations, the ability to retrieve data in a usable format, and alignment with City of Dallas financial controls.

The requirements are extensively focused on disaster recovery and business continuity, mandating that the proposer establish and maintain a robust disaster recovery plan with specific elements such as Recovery Time Objective (RTO), Recovery Point Objective (RPO), identification of critical IT assets, maximum acceptable outage time, and annual disaster recovery testing. Additional requirements include providing key personnel contact information, a communication and escalation plan, insurance coverage, and compliance with the City of Dallas' software systems policies, Information Technology Services security guidelines, and records retention schedules as defined by TSLAC (Texas State Library and Archives Commission).

View the file

Other files

File Type Posted
6-Appendix K - Enterprise Standards for Business Applications and Internet of Things (IoT).pdf PDF
15-Appendix P - Audit-Compliance Requirement.pdf PDF
17-Appendix O – Business Continuity-Disaster Recovery Plan.pdf PDF
14-Appendix M - Web Accessibility and Development.pdf PDF
21-Exhibit A -Security Requirements Data Protection Clause.pdf PDF
18-Appendix N – ITIL® Process and Project Management Standard.pdf PDF
7-Appendix B – Roles.pdf PDF
1-Sample Contract.pdf PDF
26-Addendum 2 - Family Medical Leave Assitance.pdf PDF
11-Appendix C – Report Samples.pdf PDF
16-Appendix L - Enterprise Geographical Information Systems (GIS).pdf PDF
9-Appendix G - Technology Reference Architecture (TRA).pdf PDF
5-Appendix D – Data Requirements.pdf PDF
13-Appendix A – Functional Requirements.pdf PDF
20-01-Specifications for Family Medical Leaeve Assistance.pdf PDF
30-City of Dallas Personnel Rules.pdf PDF
24-Addendum 1.doc DOC document
2-02 - Standard Forms.pdf PDF
19-Appendix Q – Service Level Agreement SLA.pdf PDF
4-Appendix E – Non-Functional Requirements.pdf PDF
3-03 - OPS-FRM-640 -Team Make-Up and Local Workforce Form.xlsx XLSX spreadsheet
12-Appendix H - Enterprise Security Framework and Standards.pdf PDF
8-Appendix I – Data Management Strategy.pdf PDF
29-Addendum 4.doc DOC document
22-Exhibit B - Business Continuity.pdf PDF
28-Addendum 3.doc DOC document
27-Cost Scoring Sheet Example.xlsx XLSX spreadsheet
31-Addendum 5.doc DOC document
25-Attachment 1.pdf PDF
23-Exhibit X - Change Management Release and Deployment (1).pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix F Control Requirements

Req# Requirement Meets?

Y/N Comments

1.0 Regulatory/Legal

1.1 Contracts shall comply with Federal, State, and

Municipal regulations and requirements

1.2 The contract shall provide the capability to retrieve

data in a usable format.

2.0 Financial Control

2.1 Contractor will comply with City of Dallas financial

controls which shall be provided upon request.

3.0 Business Continuity

3.1 The solution shall have an established and maintained

disaster recovery plan for the duration on the engagement that shall include but not be limited to

3.1.1 Identification of the Recovery Time Objective

(RTO), Recovery Point Objective (RPO), and steps in a Disaster Recovery Declaration, implementation and return to production.

3.1.2 Identification of the most serious threats and

vulnerabilities.

3.1.3 Identification of the most critical IT assets and

determine their maximum outage time.

3.1.4 Identification of the Maximum Acceptable Outage

Time (MAOT). The MAOT is the longest period between the onset of a disaster and the resumption of the critical functions.

3.1.5 Identification of how the proposer’s annual disaster

recovery (DR) testing is accomplished.

3.1.6 Identification of how & when the DR Testing will be

reported from the proposer back to the City of Dallas.

3.1.7 Identification of how the inclusion of the DR testing

and validation as a milestone is in the project delivery phase.

3.1.8 Identification of proposer’s description of disaster

response actions immediately following an incident.

3.1.9 Identification of proposer’s assurance of support to

the City of Dallas for the DR transitions (to and from).

3.2 The proposer shall provide the key personnel and DR

team contact information that includes but is not limited to

3.2.1 Contact’s full name, email address and phone

number.

3.2.2 Communication plan and escalation process

3.2.3 Proposer Incident status frequency – every 30m, 45m, 60m.

3.2.4 Proposer support schedule e.g., (24x7

3.2.5 Escalation process controls.

3.3 When applicable a diagram of the City of Dallas

related network and recovery site(s), with instructions on how to reach the recovery site(s).

3.4 The City will establish as part of the contracting

process a set of SLAs to guide and ensure an acceptable and sustainable level of performance by the proposer.

3.5 When applicable the proposer shall provide a list of

software and systems that are used in the recovery process.

3.6 The proposer shall provide insurance coverage per City

of Dallas requirements.

3.7 In the event of an incident, the proposer shall provide

financial and legal processes where issues are encountered.

3.8 The system shall comply with City of Dallas backup

and recovery processes that include but are not limited to

3.8.1 When applicable, the proposer's disaster recovery

system shall ensure the integrity of the data and software.

3.8.2 The proposer must ensure that the computing

infrastructure that supports critical infrastructure business units and operating functions will be restored in accordance with the requirements of the City of Dallas.

3.8.3 When applicable the proposers must ensure against

catastrophic data loss and provide alternative means facility for continuing City essential services and critical business units and operating functions during a disaster.

3.8.4 The proposer shall have failover capability that will

allow for a quick recovery that meets documented RPO, RTO, and MAOT.

3.8.5 When applicable, the proposer shall demonstrate

their capability of a failover to their backup site or the city’s backup location, all shall fall under the accordance of City of Dallas requirements.

4.0 Policy

4.1 The system must comply with City of Dallas software

systems policies and Information Technology Services (ITS) security guidelines.

4.2 The system must manage and comply with records

retention requirements as defined by TSLAC records retention schedules.

File details come from the government source that posted it. Updated .