1.1.3 DRAFT PSNS_TASK F.WARE.docx
DOCX document 45 KB Posted
- Attached to
- N00406 JAPAN SUPPORT SERVICE(S)- REGION
- Solicitation number
- N0040626REGION
About this file
This is a Performance Work Statement (PWS) for Facility Support Services – Warehousing at Puget Sound Naval Shipyard Detachment Yokosuka (PSNS&IMF) in Japan, designated as SLIN 3005AB. The contractor shall provide comprehensive warehouse support including receiving, storing, and shipping operations; daily hazardous waste pickup and weekly transport to Commander Fleet Activity Yokosuka; operation of 1-ton and 3-ton trucks; cleanup of spills including biohazard materials; and management of waste dumpsters for recyclable metals, cardboard, wood, and industrial waste. The contractor must maintain HAZMAT lockers throughout the detachment, manage inventory with expiration date monitoring, and ensure proper labeling and custodian documentation. Additionally, the contractor shall operate a 3-ton forklift to process incoming and outgoing materials, move palletized items within warehouse spaces, transport materials to ships' piers and PSNS workshops, assist in unloading shipments, serve as a safety spotter for other forklift operators, and deliver items such as printers and toner to PSNS personnel.
The contractor must be onsite Monday through Friday, excluding federal holidays, during standard working hours, with capability to respond to emergency conditions at no additional cost. Key contractor responsibilities include supervising and controlling personnel; ensuring OSHA and safety regulation compliance; obtaining required certifications and licenses, including a COMFLEACT Yokosuka-supplied 4EJ forklift license; attending post-award conferences and progress meetings; providing hand and power tools valued at $300 or less; and promptly removing personnel whose conduct conflicts with Government interests. The PWS references applicable Navy instructions and federal safety standards (29 CFR Parts 1910 and 1915) and requires contractor compliance with environmental readiness programs and tropical cyclone/storm plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1.1.3 DRAFT PSNS_TASK Clerical.docx | DOCX document | |
| 1.1.3 DRAFT PSNS_TASK F.SUPP.docx | DOCX document | |
| 1.1.3 DRAFT PSNS_TASK Liason.docx | DOCX document | |
| 2. 0 DRAFT NIWC Warehouse Support PWS.docx | DOCX document | |
| 1.1.3 DRAFT PWS Janitorial Support COMSUBGRU.docx | DOCX document | |
| 1.1.3 DRAFT PWS Logistics-Financial Manager COMSUBGRU.docx | DOCX document | |
| 1.1.3 DRAFT PSNS_TASK F.JAN.docx | DOCX document | |
| 1.1.3 - DRAFT PWS CNRJ Dispatch.docx | DOCX document | |
| 1.1.3 DRAFT PSNS_TASK Log.docx | DOCX document | |
| 1.1.3 DRAFT PSNS_TASK Q. Refer.docx | DOCX document | |
| 2.0 DRAFT FLC YOKO PWS.docx | DOCX document | |
| 1.1.3 - DRAFT PWS CNRJ Watch.docx | DOCX document | |
| 1.1.3 NIWC DRAFT PWS Equipment Install and Coordinator.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7
PERFORMANCE WORK STATEMENT
PUGET SOUND NAVAL SHIPYARD DETACHMENT YOKOSUKA
FACILITY SUPPORT SERVICES: Warehousing (SLIN 3005AB)
1.0 SCOPE
This Performance Work Statement describes the efforts required by the Contractor to provide warehousing support for Puget Sound Naval Shipyard Detachment at Yokosuka, Japan (PSNS&IMF). Contractor personnel shall possess the necessary warehousing knowledge and skills required to carry out all assigned duties identified herein.
2.0 APPLICABLE DOCUMENTS
COMNAVFORJAPANINST 1020.3C dated 26 September 2016 (civilian clothing) COMFLEACTINST 5800.2G dated 03 December 2018 (vehicle code for CFAY) COMNAVFORJAPANINST 5800.9S dated 05 April 2016 (vehicle operations) COMFLEACTINST 3140.1AA dated 11 October 2018 (tropical cyclone & storm plan) 29 CFR Part 1910 - Occupational Safety and Health Administration (OSHA) General Industry Standards 29 CFR Part 1915 - Occupational Safety Standards for Shipyard Employment OPNAVINST M-5090.1 dated 3 September 2019 (environmental readiness program) COMNAVFORJAPANINST 1020.3 Latest Edition (civilian clothing) COMFLEACTINST 5800.2 Latest Edition (vehicle code for CFAY) COMNAVFORJAPANINST 5800.9 Latest Edition (vehicle operations) COMFLEACTINST 3140.1 Latest Edition (tropical cyclone & storm plan) 29 CFR Part 1910 - Occupational Safety and Health Administration (OSHA) General Industry Standards 29 CFR Part 1915 - Occupational Safety Standards for Shipyard Employment OPNAVINST M-5090.1 Latest Edition (environmental readiness program)
3.0 REQUIREMENTS
TASK 2: PROVIDE WAREHOUSING SUPPORT. Contractor shall accomplish a broad range of warehouse support (receiving, storing and shipping task). Perform daily pick-up of Hazardous Waste for the PSNS&IMF Detachment and transport all waste on a weekly basis to Commander Fleet Activity Yokosuka (CFAY) Hazardous Waste Area. Contractor shall be able to operate 1-ton and 3-ton truck. Clean up small ashore side spills; to include biohazard spills. Monitor and arrange waste dumping; recyclable metal binds, lock dumpsters (burn/non-burn), cardboard, wood and industrial waste dumpsters. Maintain HAZMAT lockers (End-use) throughout the detachments- maintain keys and ensure up to date custodian is noted, maintain inventories with period checks, expired products removed and disposed of, transfer containers are properly labeled. Provide HAZMAT support (bldg. 4808) - support inventory, expiration dates, cure dates, assist in ensuring items are in ERP/properly labeled. Contractor must be forklift license and know how to operate 3-ton forklift to process incoming and outgoing materials, to move palletized within warehouse spaces and to transport material to and from warehouse spaces, ships’ piers, barges, and PSNS workshops. The Contractor shall assist in unloading of shipments off trucks and be utilized to safety spot for other forklift drivers. The contractor shall deliver items to various requesting PSNS personnel to include printers/copiers, toner/ ink and materials. Contractor shall assist in organizing and tracking SLI/MTT material. Contractor will have access to material scanner and will be able to scan items into location after receiving into the warehouse. After the departure of the CVN, support inventory, Defense Reutilization Marketing Office (DRMO), re-whip, MTIS. PSNS inspectors and the Detachment Supply Management Officer are required to inspect and conduct surveillances on HazMat/HAZWASTE material to assess warehouse health and that NAVSEA, OSHA, local and PSNS instructions are being followed. The contractor must be on site M-F, excluding federal holidays listed in Master PWS, during working hours.
In case of an emergency condition, requiring immediate attention exists, or contractor support, the Contractor shall divert the workforce, or such part thereof, to meet the condition. When these employees are no longer needed for the special work, they shall be directed by the Contractor to return to their normal work. No additional cost shall be charged the Government for the diversion, and the Contractor shall not be penalized because the normal daily work which otherwise would have been performed during the interval has been neglected.
3.1 CONTRACTOR RESPONSIBILITIES
a. The Contractor shall be responsible for the control and supervision of Contractor personnel performing under this PWS. This includes Contractor employee leave and timekeeping issues. The Contractor is responsible for properly training its employees to recognize the scope of their duties before they commence work on a PWS. Contractor personnel must be qualified to perform the duties of their assigned labor classifications at the beginning of the PWS.
b. The Contractor shall be responsible for compliance of employees with all safety regulations while working on a Government site. All accidents which may arise out of, or in connection with, performance of required services that result in injury, death, or property damage shall be reported in writing to the Procuring Contracting Officer (PCO) and cognizant Contracting Officer Representative (COR) within 24 hours of such occurrence. Reports shall cite the applicable PWS number and give full details of the accident, including statements from witnesses. These procedures shall also apply to any claim made by a third party against the Contractor as a result of any accident that occurs in connection with performance under this contract.
c. The Contractor shall be responsible for obtaining any certifications and licenses that may be required for performance under this contract.
d. The Contractor shall attend all post award conferences and periodic progress meetings convened by the Contracting Officer or Contracting Officer's Representative. Meeting attendance and resolution of any outstanding issues shall be at no additional cost to the Government.
e. The Contractor shall promptly remove, or deny access to, any Contractor personnel whose conduct is determined by the Contractor or COR to be inconsistent with the best interests of the Government. The Contractor shall continue to perform contract services following the removal of, or denial of access to, said personnel.
f. The Contractor shall furnish hand and power tools valued at three hundred dollars or less that are required for performance of a PWS. Hand and power tools costing three hundred dollars or less are considered to be general purpose equipment and not specific to use only under this contract.
g. The Contractor shall have a COMFLEACT Yokosuka supplied 4EJ license and be authorized to operate <2,000lb Government owned trucks, if necessary, for transport of material. Contractor’s personnel carrying out TASK 2 will possess operator’s permits for government-provided light trucks or sedans shall possess a valid USFJ Form 4EJ, US Forces Japan Operator’s Permit for Civilian Vehicle.
3.2 CONTRACTOR LIABILITY
During periods when access to Government material is granted, the Contractor shall exercise precautions necessary to prevent loss or damage due to theft, carelessness, vandalism, or any misuse. The Contractor shall report in writing all cases of loss, damage, or destruction of Government Property Furnished to the COR as soon as such facts become known, or when requested by the ACOR.
3.3 WORKING HOURS
a. These are the anticipated shifts: 1st Shift 0700 to 1530. Sunday to Saturday. Working hours outside of the anticipated shift may be required. Workforce Support requirements will fluctuate resulting from the influx of PSNS personnel temporarily assigned to Yokosuka for shipboard availability periods.
3.4 CONTRACTOR PROVIDED MATERIAL, SUPPLIES AND EQUIPMENT
The Contractor shall provide the following as required by efforts under individual PWSs.
a. When required by local or federal regulations, site personnel shall wear American National Standards Institute (ANSI) rated safety glasses, safety shoes, hard hats, and earplugs furnished by the Contractor.
4.0 GOVERNMENT FURNISHED PROPERTY
The government will provide all office equipment, personal computer (PC), printers and copiers, telephone and fax machine equipment, forklifts and work spaces at PSNS Detachment Yokosuka, Japan. Personal or company use of phones, utilities, computers, printers, copiers, etc., not directly related to required services is strictly prohibited. Contractor shall not remove any government-furnished equipment or supplies from the worksite without the express written permission of the Contracting Officer.
4.1 ACCESS TO GOVERNMENT FACILITIES
The normal places of performance are building F-157 Main Floor Detachment spaces & 3rd Floor Detachment office area, Puget Barge Facilities YR-85, 95 and 96, Building 5218 1st Floor, Building-1841 2nd floor, Buildings 5230, 5233, 1235, portable office trailers, 5014/5014 annex, Building J-12 Modular, Trailer 20 on berth 10, J-12 Paint Shop, J-38 Warehouse, Building 5243, Building 5016 Woodshop, J-11 Warehouse, CVN Hanger Bay Offices. Customer Address: Puget Sound Naval Shipyard and IMF, 1400 Farragut Avenue, Bremerton, WA 98314-5001
The Contractor is responsible for providing information to the Government facility representative necessary to obtain clearances, permits, and security badges which will allow Contractor personnel access to work sites. This shall include any police checks or other requirements of the badge issuing activity. Further, the Contractor is responsible for ensuring security badges are promptly returned to the issuing activity upon termination of an employee or completion of a given project. The Contractor will be issued security badges and operation permits after clearance has been granted to access the base.
5.0 DELIVERABLES
5.1 MONTHLY STATUS REPORT
The Contractor shall submit a monthly status report to the ACOR no later than the 10th working day of the following month that includes all activity on the PWS.
6.0 SECURITY
Personnel shall be a U.S. citizen and possess a minimum of a CONFIDENTIAL clearance in order to access workspaces.
7.0 PERFORMANCE BASED REQUIREMENTS
The Contractor’s performance under this PWS will be evaluated in the following areas:
The following four (4) level assessment rating system will be used to evaluate a contractor’s performance.
| PERFORMANCE ELEMENT |
| PERFORMANCE REQUIREMENT |
| SURVEILLANCE METHOD |
| ACCEPTABLE QUALITY LEVEL |
| INCENTIVES/ DISINCENTIVES |
| Personnel |
| Qualified staff provided within the timeframes specified in the PWS. |
| Verification by the ACOR. |
| Greater than 95% of the PWS start dates are met by staff qualified to meet the specified task objectives. |
| Past performance will be considered in determining future PWS awards. |
| Contract Deliverables |
| Contract deliverables furnished as prescribed in the PWS, CDRLs and PWSs. |
| Verification by the ACOR. |
| Greater than 95% of the deliverables submitted timely and without rework required. |
| Past performance will be considered in determining future PWS awards. |
| Overall Contract Performance |
| Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the ACOR’s annual performance report. |
| Assessment by the ACOR. |
| All performance elements rated Satisfactory (or higher). |
| Past performance will be considered in determining future PWS awards. |
| Invoices |
| Invoices in accordance with contract procedures are timely and accurate. |
| Review and acceptance of the invoice. |
| 100% of the invoices are timely and accurate. |
| Past performance will be considered in determining future PWS awards. |
File details come from the government source that posted it. Updated .